noticeInvitingTenderDTO
createdTs1724150023924
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee4110.00
emd247000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-09-2024 16:00:00
tenderQueryClose03-09-2024 16:00:00
technicalBidOpen05-09-2024 16:30:00
publishedDate28-08-2024 12:00:07
publishedByPostPWD_EE_DIV_HSPT
publishedByUserKPE10057 - DEVADASA T
bidValidityPeriod90
noOfCalls1
preBidMeetingDate30-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee147000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber09591173002
mobileNumber9591173002
tenderSupplierListNone
tenderSchedule
createdTs1724150023958
version8
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT12043
titleImprovements of Road from Ballari bypass road to 250Beds Hospital in Hosapete City in Vijayanagara Dist
descriptionImprovements of Road from Ballari bypass road to 250Beds Hospital in Hosapete City in Vijayanagara Dist
categoryWORKS
categoryTextWorks
ecv16439265.16
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1694
locationNamePWD Division Office Hosapete
provisionalAmount19570000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/PWD/SUB/HPT/KKRDB/195/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17241500240000NoneNoneRoadsConstruction of road3635099.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3819981145325None2.5.ii.aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle (UNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a.) Sqm412.65412.6547.16FalseNoneNoneFalseNoneFalse19460.5740
3819982145325None3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.(UNI SR 2023-24, V-3,Page No. 17 Item No.3.7) Cum110.25110.25943.2FalseNoneNoneFalseNoneFalse103987.80
3819983145325None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ( PWD SR 2023-24 Vol-1 Page-7 I.No. 1.8) Cum497.7497.73144.0FalseNoneNoneFalseNoneFalse1564768.80
3819984145325None4.2.B.vConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 - By Mix in Place Method For For Grading -V Material (PWD SR 2023-24 Vol-3 Page-23 I.No. 4.2 B v ) Cum2476.952476.95786.0FalseNoneNoneFalseNoneFalse1946882.70
17241500240001NoneNoneRoadsConstruction of road Continuation10982271.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3819985145326None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m(PWD SR 2023-24 Vol-2 Page-11 I.No. 1.14.1) Cum107.1107.1471.6FalseNoneNoneFalseNoneFalse50508.360
3819986145326None4.2.B.vConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 - By Mix in Place Method For For Grading -V Material (PWD SR 2023-24 Vol-3 Page-23 I.No. 4.2 B v ) Cum2476.952476.95786.0FalseNoneNoneFalseNoneFalse1946882.70
3819987145326None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. - Wet Mix Macadam (Plant mix method) (PWD SR 2023-24 Vol-3 P NO:26 I No:4.17) Cum2686.952686.951391.88FalseNoneNoneFalseNoneFalse3739911.9660
3819988145326None5.1.A.iPrime Coat over WMM/WBM-Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means. (PWD SR 2023-24 Vol-3 P No 31 I No :5.1 A i) Sqm43.0543.054912.5FalseNoneNoneFalseNoneFalse211483.1250
3819989145326None5.32Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (PWD SR 2023-24 Vol-3 P No:31 I No:5.32) Sqm12.612.64912.5FalseNoneNoneFalseNoneFalse61897.50
3819990145326None5.12.AA Providing and laying Dense Graded Bituminous Macadam with 120 TPH capacity HMP batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher tothe required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(PWD SR 2023-24,Vol-3 Page No. 32, Item No 5.12 A) Cum10002.310002.3245.62FalseNoneNoneFalseNoneFalse2456764.9260
3819991145326None5.16.ABituminous Concrete Grading II for traffic, Providing and laying Bituminous Concrete with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects 20 MSA (COMMON SR 2023-24, Vol-3 ,l.No 5.16 A ,P.No 37) Cum11584.6511584.65147.38FalseNoneNoneFalseNoneFalse1707345.7170
3819992145326None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (PWD SR 2023-24 Vol-3 Page-17 I.No. 3.6) Cum517.65517.65408.72FalseNoneNoneFalseNoneFalse211573.9080
3819993145326None8.6.1.iProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 ,Single lane with formation width of 5.75 m. (COMMON SR 2023-24, Vol-3 ,ltem.No.8.6.1 (i) ,P.No - 80) No36676.536676.53.0FalseNoneNoneFalseNoneFalse110029.50
3819994145326None8.6.A.iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 90 cm equilateral triangle. (PWD SR 2023-24 Vol-3 Pg No 64 I.No. 8.6 A ii) No4985.44985.48.0FalseNoneNoneFalseNoneFalse39883.20
3819995145326None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(PWD SR 2023-24 Vol-3 Pg No 67 I.No. 8.15) Sqm556.5556.5270.75FalseNoneNoneFalseNoneFalse150672.3750
3819996145326None8.16.iiReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (PWD SR 2023-24/Vol-3/Page-67, item No. 8.16ii) No3073.353073.351.0FalseNoneNoneFalseNoneFalse3073.350
3819997145326None8.16.iiiReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)(PWD SR 2023-24/Vol-3/Page-67, item No. 8.16iii) No884.1884.14.0FalseNoneNoneFalseNoneFalse3536.40
3819998145326None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (PWD SR 2023-24/Vol-3/Page-74, item No. 8.43) No383.25383.25704.0FalseNoneNoneFalseNoneFalse269808.00
3819999145326None8.54Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation,refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804(PWD SR 2023-24 Vol-3 Pg No 78 I.No. 8.54) Each9450.09450.02.0FalseNoneNoneFalseNoneFalse18900.00
17241500240001NoneNoneRoadsBOX CULVERT OF SINGLE CELLS 1.50 X 1.50 X 14.00m1821894.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3820000145327None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work . In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1 Sl.No. 1.14.1,P.No - 8) Cum107.1107.197.66FalseNoneNoneFalseNoneFalse10459.3860
3820001145327None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) Cum6288.56288.510.0FalseNoneNoneFalseNoneFalse62885.00
3820002145327None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (COMMON SR 2023-24,Vol-3 P.NO -121, SI.No -13.8)" Cum7151.67151.67.0FalseNoneNoneFalseNoneFalse50061.20
3820003145327None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2) Cum6639.26639.23.47FalseNoneNoneFalseNoneFalse23038.0240
3820004145327None14.8bCurtain wall complete as per drawing and Technical specification Cement concrete Grade M15 2507.2 (COMMON SR 2023-24 Vol-3, P.NO -112, SI.No -14.8.b) Cum6555.26555.27.47FalseNoneNoneFalseNoneFalse48967.3440
3820005145327None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24, Vol-1, Sl.No.2.5.2, P.No 17) Appendix I Additionalities for Formwork, Centering & Scaffolding -Bridges-SI.No.6-Box Culvert 20 (Pg No 116) Cum8622.28622.227.86FalseNoneNoneFalseNoneFalse240214.4920
3820006145327None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24, Vol-1, Sl.No.2.5.2, P.No 17) Appendix I Additionalities for Formwork, Centering & Scaffolding -Bridges-SI.No.6-Box Culvert 20% (Pg No:116) Cum7903.677903.6737.09FalseNoneNoneFalseNoneFalse293147.12030
3820007145327None13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification 2705 (COMMON SR 2023-24 Vol-3, P.NO -103, SI.No -13.7) Cum3434.63434.62.0FalseNoneNoneFalseNoneFalse6869.20
3820008145327None13.13.aProvision of an Reinforced cement concrete crash barrier at the bridge deck & approaches to bridge structure, constructed withReinforced cement concrete with TMT reinforcement conforming to MORT&H specificatios and as per details given in IRC-5 including dowel bars, 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the and approved drawing and at locations directed by the Engineer, all as specified Crash Barrier for Bridges (Height 950 mm) as per details given IRC-5 (fig-1) (Area 0.254 m2 for 1 m length) (COMMON SR 2023-24 Vol-3, P.NO -123, SI.No -13.13.a) Rmtr4376.44376.49.0FalseNoneNoneFalseNoneFalse39387.60
3820009145327None4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (COMMON SR 2023-24 Vol-3, P.NO -26, SI.No -4.17) Cum2686.952686.9510.5FalseNoneNoneFalseNoneFalse28212.9750
3820010145327None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(COMMON SR 2023-24 Vol-3, P.NO -122, SI.No -13.9)) Cum12426.7512426.7514.0FalseNoneNoneFalseNoneFalse173974.50
3820011145327None2.11.cSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Sub structure of Bridges (COMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11.c) Tonne90754.6590754.657.0FalseNoneNoneFalseNoneFalse635282.550
3820012145327None12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (COMMON SR 2023-24 Vol-3, P.NO -117, SI.No -12.2) Each250.95250.9518.0FalseNoneNoneFalseNoneFalse4517.10
3820013145327None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. 710.1.4 of IRC:78 & 2200 (COMMON SR 2023-24 Vol-3, P.NO -117, SI.No -12.4) Cum2810.852810.8520.7FalseNoneNoneFalseNoneFalse58184.5950
3820014145327None12.3aBack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material 710.1.4.of IRC:78 &2200 (COMMON SR 2023-24 Vol-3, P.NO -117, SI.No -12.3a) Cum1226.41226.429.66FalseNoneNoneFalseNoneFalse36375.0240
3820015145327None13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. 2600 (COMMON SR 2023-24 Vol-3 Sl.No. 13.16, P.No 124) Rmtr1884.751884.7528.0FalseNoneNoneFalseNoneFalse52773.00
3820016145327None14.1Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. (COMMON SR 2021-2, Vol-2, Sl.No. 14.1, P.No 129) Cum2007.62007.61.8FalseNoneNoneFalseNoneFalse3613.680
3820017145327None14.9Flexible Apron : Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. 2507.2 (COMMON SR 2018-19 Sl.No. 14.9 , P.No 129) Cum2151.452151.454.5FalseNoneNoneFalseNoneFalse9681.5250
3820018145327None13.14Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1litre for 2 m2. 800 (COMMON SR 2023-24 Vol-3 Page No.104 SI.No.13.14)" Sqm88.288.215.3FalseNoneNoneFalseNoneFalse1349.460
3820019145327None5.22Mastic Asphalt Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500- 29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005m3 per 10 m2 and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515. 515 & 2702 (COMMON SR 2023-24 Vol-3 Page No.39 SI.No.5.22)" Sqm789.6789.645.0FalseNoneNoneFalseNoneFalse35532.00
3820020145327None14.5Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (COMMON SR, Vol-3 2023-24, SL.No 14.5, P.No 129) Cum3187.83187.80.8FalseNoneNoneFalseNoneFalse2550.240
3820021145327None14.4.aProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder (COMMONSR 2023-24, Vol-3, SL.No 14.4.A, P.No 129) Cum2007.62007.62.4FalseNoneNoneFalseNoneFalse4818.240
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17241500260000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17241500260000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17241500260000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17241500260000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17241500260000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17241502260000NoneNoneELIGIBILITYIf the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.None
17241505990000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17241506100000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17241506180000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17241506260000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17241506430000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the Bid. The Original Certificate/Certificates shall be produced at the time of opening of technical Bids for physical verification.None
17241506550000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year(both days inclusive).None
17241506620000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17241506700000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17241506800000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reason.None
17241506890000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KPP-PortalNone
17241506980000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17241507140000NoneNoneELIGIBILITYThe rates of all the items appeared in Bill of Quantities are inclusive of all leads and liftsNone
17241507290000NoneNoneELIGIBILITYThe contractor shall bound to comply the prevailing rules and regulations with regard to the EPF rules and any modifications before and after execution of agreementNone
17241507360000NoneNoneELIGIBILITYAfter the award of the contract, the contractor has to furnish the details in respect of labour employed and the EPF details for this work in every RA bill.None
17241507450000NoneNoneELIGIBILITYThe Increse in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17241507540000NoneNoneELIGIBILITYThe bidder should mention the UDIN No on the turnover certificate, failing which bid is rejected.None
17241507670000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2024-25 in the Technical Qualification Criteria mentioned in the next section.None
17241507860000NoneNoneELIGIBILITYAny deviation / error / mistake found in units of items, they should be read as in the unified SR 2023-24 and the rates shall be quoted accordinglyNone
17241507970000NoneNoneELIGIBILITYGST Will be Paid Separately to the Executed QuantitiesNone
17241508110000NoneNoneELIGIBILITYThe work should be completed in 06 (Six) Months ( including monsoon)None
17241508420001NoneNoneELIGIBILITYThe deffect liability period is one year (1Year)from the date of actual completion of work.None
17241509210000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 2020-21 2021-22 2022-23 & 2023-24(a) achieved in at least TWO financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.328.80Lakhs. (Not below the rank of Charterd Accountant)None
17241509310000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2019-20 2020-21 2021-22 2022-23 & 2023-24 (b) satisfactorily completed (at least 50% of the contract value) as prime contractor, at least one similar nature of work (BT work) of Rs.82.20Lakhs. (Not Below the rank of Executive Engineer)None
17241510290000NoneNoneELIGIBILITYLiquid Assets and /or availability of credit facilities of no less than Rs. 82.20 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e.,2019-20, 2020-21 2021-22,2022-23 & 2023-24 b) Executed in any one year, the following minimum quantities of work: 1 Earth work /Embankment/Sub Grade/Shoulder 3244.00Cum 2.CC/RCC/Pavement 74.00cum 3.Steel 5.6 Tonnes.4.GSB-1336.00Cum 5. WMM/WBM-1122.00Cum 6. BC/SDBC/DBM-315.00CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2019-20 2020-21 2021-22 2022-23 & 2023-24 (b) satisfactorily completed (at least 50% of the contract value) as prime contractor, at least one similar nature of work (BT work) of Rs.82.20Lakhs. (Not Below the rank of Executive Engineer)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneRegistration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 2020-21 2021-22 2022-23 & 2023-24(a) achieved in at least TWO financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.328.80Lakhs. (Not below the rank of Charterd Accountant)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs. 82.20 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Registration CertificateTrueTechnical Bid
Annual Turnover Certificate Not below the rank of Charterd Accountant,The bidder should mention the UDIN NoTrueTechnical Bid
Single Work Done Certificate Not Below the rank of Executive Engineer/Work indent should be mentionedTrueTechnical Bid
GST CERTIFICATETrueTechnical Bid
Principal Place of Business with phone numberTrueTechnical Bid
Tender Bid CapacityTrueTechnical Bid
List of Existing commitments & Ongoing works- Format-5TrueTechnical Bid
List of works for which tenders acceptence letter received-Format-6TrueTechnical Bid
List of works for which tenders already submitted-Format-7TrueTechnical Bid
Profit and loss ac & Balance sheets for 5 yearsTrueTechnical Bid
Income Tax returns for 5 yearsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1724155607000
version0
createdDateNone
modifiedDateNone
blockNumberOffice Of the Executive Engineer, PWD Division, 100 bed Hospital road, Hosapete
streetNone
cityHOSAPETE
stateKARNATAKA
pin583201
tenderRecallDTONone