1724674389000 | 0 | None | None | Buildings | CONSTRUCTION OF SOAK PIT AT SWM SITE IN NAGANUR TP LIMITS | 122013.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3857936 | 147591 | None | 001 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | Cum | 446.25 | 446.25 | 29.97 | False | None | None | False | None | False | 13374.1125 | 0 | 3857937 | 147591 | None | 002 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement | Cum | 6288.45 | 6288.45 | 0.4 | False | None | None | False | None | False | 2515.38 | 0 | 3857938 | 147591 | None | 003 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) | Cum | 7185.15 | 7185.15 | 0.97 | False | None | None | False | None | False | 6969.5955 | 0 | 3857939 | 147591 | None | 004 | Providing Thermo-Mechanically Treated bars of grade Fe 500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be | Tonne | 93930.0 | 93930.0 | 0.1 | False | None | None | False | None | False | 9393.0 | 0 | 3857940 | 147591 | None | 005 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. | Cum | 8376.9 | 8376.9 | 7.74 | False | None | None | False | None | False | 64837.206 | 0 | 3857941 | 147591 | None | 006 | Providing and laying 100mm size graded coarse aggregates /pebble stones (For filter bed)as per drawing, specifications with all leads and lifts complete etc.,as directed by the Engineer.The rate includes cost of material, transportion, laying and compacting with all labour etc., (For drainage layers) : | Cum | 1405.95 | 1405.95 | 5.27 | False | None | None | False | None | False | 7409.3565 | 0 | 3857942 | 147591 | None | 007 | Supplying, filling, spreading &leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -in-charge. | Cum | 1251.6 | 1251.6 | 8.13 | False | None | None | False | None | False | 10175.508 | 0 | 3857943 | 147591 | None | 008 | Providing and laying 20mm size graded coarse aggregates /pebble stones (For filter bed)as per drawing, specifications with all leads and lifts complete etc.,as directed by the Engineer.The rate includes cost of material, transportion, laying and compacting with all labour etc., (For drainage layers) : | Cum | 1405.95 | 1405.95 | 2.3 | False | None | None | False | None | False | 3233.685 | 0 | 3857944 | 147591 | None | 009 | Providing and laying 40mm size graded coarse aggregates /pebble stones for side as per drawing, specifications with all leads and lifts complete etc.,as directed by the Engineer.The rate includes cost of material, transportion, laying and compacting with all labour etc., (For drainage layers) : | Cum | 1405.95 | 1405.95 | 2.92 | False | None | None | False | None | False | 4105.374 | 0 |
|