createdTs1724737597479
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd21000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose12-09-2024 16:00:00
tenderQueryClose10-09-2024 16:00:02
technicalBidOpenNone
publishedDate27-08-2024 17:09:59
publishedByPostRDPR_EE_DIV_GAD
publishedByUserKPE16679 - VIJAYKUMAR MADIVALAPPA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSHRI M P MANJUNATH
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08372238035
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724737597520
version5
createdDateNone
modifiedDateNone
tenderNumberRDPR/2024-25/BD/WORK_INDENT8113
titleConstruction of Panchkarma Room in Government Ayurvedic Clinic of Harogeri Village
descriptionConstruction of Panchkarma Room in Government Ayurvedic Clinic of Harogeri Village
categoryWORKS
categoryTextWorks
ecv839171.68
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location845
locationNameRDPR Division Office Gadag
provisionalAmount1000000.0
groupOverheadTotalNone
fileNumber8113
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17247375980000NoneNoneBuildingsConstruction of Panchkarma Room in Government Ayurvedic Clinic of Harogeri Village839171.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3861468147806Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum102.0102.011.72FalseNoneNoneFalseNoneFalse1195.440
3861469147806Nonecode02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum5664.05664.01.173FalseNoneNoneFalseNoneFalse6643.8720
3861470147806Nonecode03Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum5611.05611.05.2514FalseNoneNoneFalseNoneFalse29465.60540
3861471147806Nonecode04Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum6389.06389.09.524FalseNoneNoneFalseNoneFalse60848.8360
3861472147806Nonecode05Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum433.0433.036.24FalseNoneNoneFalseNoneFalse15691.920
3861473147806Nonecode06Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum5989.05989.03.883FalseNoneNoneFalseNoneFalse23255.2870
3861474147806Nonecode07Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum9613.59613.51.431FalseNoneNoneFalseNoneFalse13756.91850
3861475147806Nonecode08Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Tonne89457.089457.00.1FalseNoneNoneFalseNoneFalse8945.70
3861476147806Nonecode09Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Cum7969.07969.023.792FalseNoneNoneFalseNoneFalse189598.4480
3861477147806Nonecode10Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm4043.04043.05.04FalseNoneNoneFalseNoneFalse20376.720
3861478147806Nonecode11Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Kg168.0168.0454.56FalseNoneNoneFalseNoneFalse76366.080
3861479147806Nonecode12Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 5 mm thickness (weight not less than 12.50 kg/m²) including cost of materials, labour, usage charges of machinery complete as per specifications with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm1171.01171.014.4FalseNoneNoneFalseNoneFalse16862.40
3861480147806Nonecode13Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm1175.01175.0102.5FalseNoneNoneFalseNoneFalse120437.50
3861481147806Nonecode14Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm1392.01392.070.902FalseNoneNoneFalseNoneFalse98695.5840
3861482147806Nonecode15Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per direc- tions of Engineer-in-charge. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm354.0354.032.69FalseNoneNoneFalseNoneFalse11572.260
3861483147806Nonecode16Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm295.0295.0266.04FalseNoneNoneFalseNoneFalse78481.80
3861484147806Nonecode17Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm100.0100.053.83FalseNoneNoneFalseNoneFalse5383.00
3861485147806Nonecode18Distempering with dry distemper of approved brand and manufacture (two coats) of required shade on new work, over and including water thinnable priming coat to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm108.0108.053.83FalseNoneNoneFalseNoneFalse5813.640
3861486147806Nonecode19Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm89.089.0120.66FalseNoneNoneFalseNoneFalse10738.740
3861487147806Nonecode20Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm138.0138.011.34FalseNoneNoneFalseNoneFalse1564.920
3861488147806Nonecode21Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. Wedge expansion type Fastener with threaded dia 6 mm with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Sqm49.049.06.0FalseNoneNoneFalseNoneFalse294.00
3861489147806Nonecode22uPVC Pipes 32 mm nominal dia.. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr101.0101.035.0FalseNoneNoneFalseNoneFalse3535.00
3861490147806Nonecode23Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: . with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Each3082.03082.01.0FalseNoneNoneFalseNoneFalse3082.00
3861491147806Nonecode24Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary(2/1.2.1) 19/20mm dia 2mm thick with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr40.040.030.0FalseNoneNoneFalseNoneFalse1200.00
3861492147806Nonecode25Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary.( P-2,/1.3.1) 19/20mm dia 2mm thick with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr51.051.030.0FalseNoneNoneFalseNoneFalse1530.00
3861493147806Nonecode26Wiring for lighting/Power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper With Low conductor resistance single core wire in open or conceanled system of wiring with specified IS-694:1990 & confirming to the attached. (6/2.5.2) GTP of GROUP-a 1.5 sqmm with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. 25 Sqm ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr28.028.035.0FalseNoneNoneFalseNoneFalse980.00
3861494147806Nonecode27Wiring for lighting/Power circuit using one of FRLS PVC insulated 1100v grade, multistrand Copper With Low conductor resistance single core wire in open or conceanled system of wiring with specified IS-694:1990 & confirming to the attached. (6/2.5.2) GTP of GROUP-a 1.5 sqmm with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. 25 Sqm ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr41.041.030.0FalseNoneNoneFalseNoneFalse1230.00
3861495147806Nonecode28Fixing all types and all capacities of fluorescent / false ceiling/ spot light / CFL / LED fittings indoor on the wall / ceiling /rafters / girders using 23/0.0076” twin twisted PVC insulatedwires, required Nos of round blocks and clamps.On wall / ceiling / Rafter / Girders with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr110.0110.06.0FalseNoneNoneFalseNoneFalse660.00
3861496147806Nonecode29Supplying capacitor type celing fan complete with down road blades shakle regulator capacities., for operation on 230 volts 50 cycles single phase AC supply confirming to ISI 374-1979 and with double ball bearing system and as per technical approved (1200 mm swing) with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Mtr2949.02949.04.0FalseNoneNoneFalseNoneFalse11796.00
3861497147806Nonecode30Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.Ltr9.09.01000.0FalseNoneNoneFalseNoneFalse9000.00
3861498147806Nonecode31Providing, Single Phase Submersible Pump Sets of 100mm dia (4 inch)suitable for bore well confirming to IS 8034-2000 specifications, to worksite with testing of as per instructions of engineer incharge of work and latest amendments etc., complete with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work. ---- with all lead and lifts the work shall be carried out as per the instruction of Engineer in charge of the work.No10170.010170.01.0FalseNoneNoneFalseNoneFalse10170.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17247376000001NoneNoneELIGIBILITYLine of credit 30% to APT amount that is not less than Rupees- lakhs (Conditional LOC not considered)None
17247376000000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17247376000001NoneNoneELIGIBILITYThe tender is through e mode onlyNone
17247376000000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17247376000000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17247376000000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17247376000001NoneNoneELIGIBILITYThe rates enumerated in the tender schedule / BOQ are inclusive of all lead and lifts and all other charges to complete the work successfullyNone
17247376000001NoneNoneELIGIBILITYThe tender may be cancelled at any stage without assigning any reasonNone
17247376000001NoneNoneELIGIBILITYTenderer must submit his present accurate postal address and phone / cell phone numberNone
17247376000001NoneNoneELIGIBILITYMaterials to be utilized for the work must be tested in PRED labs and quality control test reports must be enclosed to the bills. Cost of quality control tests must be borne by the contractorNone
17247377440000NoneNoneELIGIBILITYTenderer who is successful in any tender previously, but not submitted security deposit, is not eligible to participate in this tenderNone
17247377550000NoneNoneELIGIBILITYIf any date in tender time table is government holiday, next working day will be consideredNone
17247377620000NoneNoneELIGIBILITYExecutive Engineer PRED Gadag has authority to reject or accept any tender without assigning any reasonNone
17247377720000NoneNoneELIGIBILITYIf the rates Quoted by the contractor is lesser than the amount put to tender, the difference cost should be paid by the contractor through DD/ FDR / NSC in the favour of Executive Engineer. within 20 days of the receipt of the letter of acceptance for unbalanced tenders in accordance with clause 25.5 of ITT and clause 44 of the condition of contract as per G.O.No FD 94 PCL 2008 Bangalore dated 14.10.2008None
17247377820000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separatelyNone
17247377900000NoneNoneELIGIBILITYThe contractor should provide daily there staff members on siteNone
17247378000000NoneNoneELIGIBILITYIf there is any objection regarding tender, eligibility of contractors, documents etc. The objection must be submitted before last date & time of submission of tender directly to Executive Engineer, PRE Dn, Gadag. (Not in inwardNone
17247378110000NoneNoneELIGIBILITYThe work subjected to third party inspection and inspection by other govt agencies third party inspection cost is borne by the contractor for the gross amount of the bill third party agency is appointed by the deptNone
17247378200000NoneNoneELIGIBILITYAspiring bidders/ contractors who have not obtained the user ID & Password for participating in E-Proc in PRED may now obtain the same from the website www.kppp.karnataka.gov.in through linkNone
17247378300000NoneNoneELIGIBILITYCorrigendum/modifications/corrections, if any, will be published only in the website individual letters, information to bidders will not be sent by post, courier. All information will be on the web site. However in case of any clarification required you are directed to contact the under signed during office hours on all working days.None
17247378380000NoneNoneELIGIBILITYIf any of the dates mentioned above is declared as holiday, the next working day will hold good without any change in the timings indicatedNone
17247378760000NoneNoneELIGIBILITYFurther details of work can be obtained in the office of the undersigned all working daysNone
17247378840000NoneNoneELIGIBILITYTenderer can inspect site before quoting rates. Quoted rates are inclusive statutory deduction as per Government orderNone
17247378950000NoneNoneELIGIBILITYAny over writing of civil engineering words and measurements should be clarified the considered department ( No claims should be considered)None
17247379030000NoneNoneELIGIBILITYAny over writing of civil engineering words and measurements should be clarified the considered department ( No claims should be considered)None
17247379120000NoneNoneELIGIBILITYContractor should upload PWD Valid Registration copyNone
17247379200000NoneNoneELIGIBILITYSimilar wok done 50% OTH & 25% SC ST attached separate sheet should not be less than Rs. lksNone
17247379280000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit(FDR) for an amount equivalent to 5% of the Contract price.None
17247379350000NoneNoneELIGIBILITYWork done certificate should be issued by competent authority not below the rank of Executive Engineer.None
17247379420000NoneNoneELIGIBILITYThe tender of any tenderer who does not accept the conditions contained in the tender document is liable to be rejected. Conditional tenders will not be acceptedNone
17247379500000NoneNoneELIGIBILITYThe cost of tender form fee shall not be refundable. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. No interest will be paid by the Government on the Earnest money deposit.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover certificate CA with UDIN No. & Profit and loss statements & Income Tax returnsTrueTechnical Bid
PWD Valid Registration CertificateTrueTechnical Bid
Line of credit amount that is not less than Rupees- lakhs, Conditional LOC not consideredTrueTechnical Bid
50percent Similar work done BUILDING ,CC DRAIN, ROAD WORK attached separate sheet should not be less than Rs. lks.TrueTechnical Bid