noticeInvitingTenderDTO
createdTs1724392687269
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd46230.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-09-2024 17:30:00
tenderQueryClose31-08-2024 17:30:00
technicalBidOpen05-09-2024 11:00:00
publishedDate27-08-2024 14:10:47
publishedByPostDMA_EE1_CC_BLR
publishedByUserKPE16049 - T A MANJUNATHA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonT A MANJUNATHA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9742138927
tenderSupplierListNone
tenderSchedule
createdTs1724392687314
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/RD/WORK_INDENT21522
titlepackage 04 1.Development of road at maruthi colony in ward number 20 ballari city. 2 Construction of CC Road at Yerriswamy house to Suresh house in ward no.08, Ballari City.(others)
descriptionpackage 04 1.Development of road at maruthi colony in ward number 20 ballari city. 2 Construction of CC Road at Yerriswamy house to Suresh house in ward no.08, Ballari City.(others)
categoryWORKS
categoryTextWorks
ecv1847628.40
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2154
locationNameDMA City Corporation Ballari
provisionalAmount1849000.0
groupOverheadTotal291292.14
fileNumberCCB/ENGG/SFC/01/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17243926870000NoneNoneRoadspackage 04 2 Construction of CC Road at Yerriswamy house to Suresh house in ward no.08, Ballari City.(others)718329.15
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3840795146570Nonecode01Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator PWD DSR 2023-24,Volume-3 Page No.17 Item No. 3.4Cum5.255.25885.0FalseNoneNoneFalseNoneFalse4646.250
3840796146570Nonecode02Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. PWD DSR 2023-24,Volume-3, item no 16.27 pg no 148Cum6692.76692.788.5FalseNoneNoneFalseNoneFalse592303.950
3840797146570Nonecode03Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete 3 PWD DSR 2023-24,Volume-3, sl no 6 pg no 163Sqm21.021.0885.0FalseNoneNoneFalseNoneFalse18585.00
3840798146570Nonecode04Earth work excavation for Foundation by mechanical means for all works & depth up to 3m,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labor , tools, usage of machinery other appurtenances required to complete the work in all kinds of soils Depth up to 3 m PWD DSR 20223-24 Volume-I Item No 1.14.1Cum107.1107.130.0FalseNoneNoneFalseNoneFalse3213.00
3840799146570Nonecode05Compacting Original Ground Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. PWD DSR 2023-24 Volume-III Page No. 15 Item No.3.7Sqm110.25110.2560.0FalseNoneNoneFalseNoneFalse6615.00
3840800146570Nonecode06Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 PWD DSR 2023-24 Volume-III Page No. 15 Item No.3.6Cum517.65517.659.0FalseNoneNoneFalseNoneFalse4658.850
3840801146570Nonecode07Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. PWD DSR 2023-24 Volume-III Page No. 49 Item No. 6.1,Cum5166.05166.06.0FalseNoneNoneFalseNoneFalse30996.00
3840802146570Nonecode08Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. PWD DSR 2023-24,Volume-3, item no 16.27 pg no 148Cum6692.76692.76.0FalseNoneNoneFalseNoneFalse40156.20
3840803146570Nonecode09Repairs to Machinehole for different depths including removal of debris, levelling the brick masonry, construction of brick masonry upto Ground level, providing CC coping alround the MH cover, plastering both inside and outside to the brick masonry and fixing of manhole frame and cover, curing, refilling with appurtenances complete. 16.28.1 Upto 0.30m dept PWD SR 2023-24, Vol-5, I.No16.28.1Each8577.458577.452.0FalseNoneNoneFalseNoneFalse17154.90
17243926870000NoneNoneRoadspackage 04 1.Development of road at maruthi colony in ward number 20 ballari city.(others)838007.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3840804146571Nonecode01Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at designated locations and disposal of dismantled materials and stacking serviceable and unserviceable materials separately. Vol-3 SR 2023-24, P.no. 11, I.No. 2.19.Cum591.15591.1556.25FalseNoneNoneFalseNoneFalse33252.18750
3840805146571Nonecode02Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. PWD DSR 2023-24 Volume-I Page No. 5, Item No. 1.1.Sqm95.5595.55375.0FalseNoneNoneFalseNoneFalse35831.250
3840806146571Nonecode03Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. Vol-3 SR 2023-24, Page No. 17, Item No.3.7.Cum110.25110.2537.5FalseNoneNoneFalseNoneFalse4134.3750
3840807146571Nonecode04Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Vol-3 SR 2023-24, Page No.17, Item No.3.6.Cum517.65517.6556.25FalseNoneNoneFalseNoneFalse29117.81250
3840808146571Nonecode05Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. Vol-3 SR 2023-24, Page No.49, Item No.6.1.Cum5166.05166.056.25FalseNoneNoneFalseNoneFalse290587.50
3840809146571Nonecode06Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and platevibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. Vol-3 SR 2023-24, Item No. 16.27, P.No.148Cum6692.76692.756.25FalseNoneNoneFalseNoneFalse376464.3750
3840810146571Nonecode07Repairs to Machinehole for different depths including removal of debris, levelling the brick masonry, construction of brick masonry upto Ground level, providing CC coping alround the MH cover, plastering both inside and outside to the brick masonry and fixing of manhole frame and cover, curing, refilling with appurtenances complete. VOL-5 SR 2023-24, It.No.16.28.1, P.No 198. Upto 0.30m depth.Each8577.458577.458.0FalseNoneNoneFalseNoneFalse68619.60
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17243926900000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17243926900000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17243926900000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17243926900000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17243926900000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17243929850000NoneNoneELIGIBILITYThe bidder should visit the proposed site and upload the site inspection report duly signed by the section officer and AEE before bidding the tender.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactory completion as a prime contractor for at least anyone similar Nature of work to an extent of 50Percent of the cost of the work, for all works costing upto and Rs.50 lakh Rs.9.245lakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonekpwd Registration certificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneAchieved in at least two financial years an average annual financial turnover of Rs.18.49 lakhs Certified turnover certificate issued by the Chartered accountant with UDIN NumberFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneEPF no due certificate (last one year)plicableOthersEPF no due certificate (last one year)plicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
NoneNoneNoneNoneNot ApplicableOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone