1724823819000 | 0 | None | None | Buildings | Construction of one room at Nadafa Thota (Gomal Plot)Government Lower Primary School Shirol Village Mudhol Taluk of Bagalkote District | 1169357.65 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3869509 | 148261 | None | SHI01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD CSR 2023-24 Vol -1 P.No.8 I.No 1.14.1) | Cum | 107.1 | 107.1 | 28.305 | False | None | None | False | None | False | 3031.4655 | 0 | 3869510 | 148261 | None | SHI02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(PWD CSR 2023-24 Volume -1 Pg.No 15. I.No 2.1.2 ) | Cum | 5947.2 | 5947.2 | 2.295 | False | None | None | False | None | False | 13648.824 | 0 | 3869511 | 148261 | None | SHI03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. with all lead and lift complete. as per the directions of the Engineer-in-charge of the work. (PWD CSR 2023-24 Volume-2, P No:7, I No:1.9 ) | Cum | 279.3 | 279.3 | 18.634 | False | None | None | False | None | False | 5204.4762 | 0 | 3869512 | 148261 | None | SHI04 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.( PWD CSR 2023-24 Volume -1 Pg No 15/ I.No 2.2.1) | Cum | 6799.39 | 6799.39 | 7.371 | False | None | None | False | None | False | 50118.30369 | 0 | 3869513 | 148261 | None | SHI05 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 esign Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.( PWD CSR 2023-24 Volume -1 Pg No 15/ I.No 2.2.1) | Cum | 11286.56 | 11286.56 | 1.8579 | False | None | None | False | None | False | 20969.299824 | 0 | 3869514 | 148261 | None | SHI06 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(PWD CSR 2023-24 Volume -1 P.No 16/ I.No 2.4.2 ) | Cum | 9958.73 | 9958.73 | 12.7522 | False | None | None | False | None | False | 126995.716706 | 0 | 3869515 | 148261 | None | SHI07 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.( PWD CSR 2023-24 Volume -1 P.No 16/I.No 2.5.1 ) | Cum | 11834.55 | 11834.55 | 2.2884 | False | None | None | False | None | False | 27082.18422 | 0 | 3869516 | 148261 | None | SHI08 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.( PWD CSR 2023-24 Volume -1 P.No 16/I.No 2.5.1 ) | Cum | 11138.4 | 11138.4 | 4.7383 | False | None | None | False | None | False | 52777.08072 | 0 | 3869517 | 148261 | None | SHI09 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.( PWD CSR 2023-24 Volume -1 P.No 16/I.No 2.5.1 ) | Cum | 10442.25 | 10442.25 | 7.37 | False | None | None | False | None | False | 76959.3825 | 0 | 3869518 | 148261 | None | SHI10 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.( PWD CSR 2023-24 Volume -1 P.No 16/I.No 2.5.1 ) | Cum | 10094.18 | 10094.18 | 0.2025 | False | None | None | False | None | False | 2044.07145 | 0 | 3869519 | 148261 | None | SHI11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(PWD CSR 2023-24 VOLUME 1 / P. NO 18/ I NO 2.11.a) | Tonne | 93929.85 | 93929.85 | 3.0254 | False | None | None | False | None | False | 284175.36819 | 0 | 3869520 | 148261 | None | SHI12 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(PWD CSR 2023-24 Volume 2 P.No-14 I.No-6.8) | Cum | 8367.45 | 8367.45 | 16.8237 | False | None | None | False | None | False | 140771.468565 | 0 | 3869521 | 148261 | None | SHI13 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per direc tions of Engineer-in-charge(PWD CSR 2021-22 Volume -2 P.No-41 I.No-8.3.2 ) | Sqm | 349.65 | 349.65 | 110.7932 | False | None | None | False | None | False | 38738.84238 | 0 | 3869522 | 148261 | None | SHI14 | Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge(PWD CSR 2023-24 Volume -2 Page No-42 I.No-8.7) | Sqm | 384.3 | 384.3 | 78.95 | False | None | None | False | None | False | 30340.485 | 0 | 3869523 | 148261 | None | SHI15 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications. with all lead and lift complete. as per the directions of the Engineer-in-charge of the work. (PWD CSR 2021-22 Vol -2 P.No-64 / I.No-9.34 ) | Sqm | 1622.25 | 1622.25 | 54.044 | False | None | None | False | None | False | 87672.879 | 0 | 3869524 | 148261 | None | SHI16 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(PWD CSR 2023-24 Volume 2 P.No-100 I.No-12.13.2) | Cum | 104580.0 | 104580.0 | 0.243 | False | None | None | False | None | False | 25412.94 | 0 | 3869525 | 148261 | None | SHI17 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding with all lead and lift complete. as per the directions of the Engineer-in-charge of the work. PWD CSR 2023-24 Volume -2 P.No-86 I.No-11.34A | Kg | 176.4 | 176.4 | 39.96 | False | None | None | False | None | False | 7048.944 | 0 | 3869526 | 148261 | None | SHI18 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.PWD CSR 2023-24 Volume -2 P.No-100 I.No-12.21 | Sqm | 6029.1 | 6029.1 | 1.995 | False | None | None | False | None | False | 12028.0545 | 0 | 3869527 | 148261 | None | SHI19 | Providing and fixing in position fully panelled shutters for windows with Honne wood stiles and rails of 30mm. thick, 75mm wide in two halves with panels provided with MDF of 18mm thick including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures))with all lead and lift complete. as per the directions of the Engineer-in-charge of the work. PWD CSR 2023-24 Volume -2 P.No-101 I.No-12.29 | Sqm | 5922.0 | 5922.0 | 4.0163 | False | None | None | False | None | False | 23784.5286 | 0 | 3869528 | 148261 | None | SHI20 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge PWD CSR 2023-24 Volume -2 P.No-50 I.No-8.51 | Sqm | 105.0 | 105.0 | 130.614 | False | None | None | False | None | False | 13714.47 | 0 | 3869529 | 148261 | None | SHI21 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD CSR 2023-24 Volume 2 P.No-45 / I.No-8.25 | Sqm | 143.85 | 143.85 | 130.614 | False | None | None | False | None | False | 18788.8239 | 0 | 3869530 | 148261 | None | SHI22 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD CSR 2023-24 Vol -2 P.No-46 I.No-8.30 | Sqm | 182.7 | 182.7 | 110.7932 | False | None | None | False | None | False | 20241.91764 | 0 | 3869531 | 148261 | None | SHI23 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.PWD CSR 2023-24 Vol -2 P.No- 48 I.No-8.40 | Sqm | 120.75 | 120.75 | 17.424 | False | None | None | False | None | False | 2103.948 | 0 | 3869532 | 148261 | None | SHI24 | Providing and fixing 12 m thick flat pressed 3 layer medium density particle board or graded particle board (Grade I) IS:3087 marked, in ceiling with necessary nails etc. complete. with all lead and lift complete. as per the directions of the Engineer-in-charge of the work. PWD CSR 2023-24 Vol -2 P.No- 24 I.No-7.24 | Each | 785.4 | 785.4 | 1.0 | False | None | None | False | None | False | 785.4 | 0 | 3869533 | 148261 | None | SHI25 | Providing and fixing hand rail of approved size by welding etc. t steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(PWD CSR 2023-24 Vol-2 P No.84, I No. 11.26.1) | Kg | 144.9 | 144.9 | 366.0 | False | None | None | False | None | False | 53033.4 | 0 | 3869534 | 148261 | None | SHI26 | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.PWD CSR 2023-24 Volume -2 P.No- 44 I.No-8.16a | Sqm | 1299.9 | 1299.9 | 5.247 | False | None | None | False | None | False | 6820.5753 | 0 | 3869535 | 148261 | None | SHI27 | Supplying heavy guage PVC pipe 25 mm Dia 2 mm thick confirming to IS-2509 with suitable size bends, junction box, adhesive paste etc and fixing using inverted wood plug in case RCC ceiling & RCC Wall stone Structure are rawal plugs in case of brick walls and cement plastering damaged portion using heavy gaauge saddles at an intervel of 700mm using NF Screws with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.(2/1) PWD CSR 2023-24 Volume -6 P.No- 62 I.No-14.01 | m | 85.05 | 85.05 | 18.4585 | False | None | None | False | None | False | 1569.895425 | 0 | 3869536 | 148261 | None | SHI28 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead and lift complete. as per the directions of the Engineer-in-charge of the work.PWD CSR 2023-24 Volume -2 P.No- 9 I.No-5.1.1 | Cum | 5891.55 | 5891.55 | 3.9879 | False | None | None | False | None | False | 23494.912245 | 0 |
|