1724755215000 | 0 | None | None | Other Works | Construction of pipe drain from KIADB layout Nirmiti kendra via Ramnagar main road Gandhi bhavan upto NH-48 service road in ward no.41 | 19372663.49 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3865514 | 148051 | None | P.No10 .NO. 2.8, B) VOl-3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means Prestressed / RCC grade M-20 & above ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 1163.4 | 1163.4 | 16.67 | False | None | None | False | None | False | 19393.878 | 0 | 3865515 | 148051 | None | Page No.10, Item.No 1.17.2 Vol-1 2024-25) | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. Depth exceeding 1.5 m, but not exceeding 3 m. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 347.55 | 347.55 | 6775.18 | False | None | None | False | None | False | 2354713.809 | 0 | 3865516 | 148051 | None | P.No10 .NO. 2.8, B) VOl-3 2024-25 SR | 19.3 Demolishing R.C.C. work manually/ by mechanical means including stack ing of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 2547.3 | 2547.3 | 30.0 | False | None | None | False | None | False | 76419.0 | 0 | 3865517 | 148051 | None | Page No.11, Item.No1.23 Vol-1 2024-25) | Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 2816.1 | 2816.1 | 308.07 | False | None | None | False | None | False | 867555.927 | 0 | 3865518 | 148051 | None | P.No.07. item no 1.9) Common SR | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 497.7 | 497.7 | 545.4 | False | None | None | False | None | False | 271445.58 | 0 | 3865519 | 148051 | None | Page No.15, Item.No 2.1.3 Vol-1 2024-25) | 2.1 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications..Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 6288.45 | 6288.45 | 57.99 | False | None | None | False | None | False | 364667.2155 | 0 | 3865520 | 148051 | None | P.No.17 I.No. 2.4.2) 2024-25 SR Vol I | 2.4 Providing and laying in position Reinforced cement concrete for allSub structures of building, Irrigation works, Sub structure works ofbridges, Drain works & other parallel works from 0.50m to 3.50 mheight. The granite/trap/basalt crushed graded coarse aggregates andfine aggregates as per relevant IS Codes machine mixed with superplasticisers, laid in layers, well compacted using needle vibrators,providing weep holes wherever necesary, including all lead & lifts, costof all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technicalspecifications. (The cost of steel reinforcement & formwork to be paidseparately)2.4.2 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates m ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 6639.15 | 6639.15 | 10.0 | False | None | None | False | None | False | 66391.5 | 0 | 3865521 | 148051 | None | Page No.16, Item.No 2.4.3 Vol-1 2024-25 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 6652.8 | 6652.8 | 229.76 | False | None | None | False | None | False | 1528547.328 | 0 | 3865522 | 148051 | None | SR 2024-25 | Form work 35% for finished concrete rate---Wall & Slab Qty ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 2323.7 | 2323.7 | 186.31 | False | None | None | False | None | False | 432928.547 | 0 | 3865523 | 148051 | None | Page No.18, Item.No 2.11(h) Vol-1 2024-25) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Tonne | 82961.55 | 82961.55 | 9.59 | False | None | None | False | None | False | 795601.2645 | 0 | 3865524 | 148051 | None | Page No.7, Item.No 1.10 Vol-1 2024-25) | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 168.0 | 168.0 | 4278.14 | False | None | None | False | None | False | 718727.52 | 0 | 3865525 | 148051 | None | P NO 26 I NO 4.27) Volume III 2024-25 SR | Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uiform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 2686.95 | 2686.95 | 20.0 | False | None | None | False | None | False | 53739.0 | 0 | 3865526 | 148051 | None | 49, Item No.6.5)Vol.3 2024-25) | 16.28 1501 Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including
construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.m3 6,754.00 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Cum | 7091.7 | 7091.7 | 20.0 | False | None | None | False | None | False | 141834.0 | 0 | 3865527 | 148051 | None | Page No.188, Item.No.16.3.7 &16.3.13 Vol-5 2024-25 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.)16.3.13 RCC NP3 Class pipe of 1200 mm dia. m 9345 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | m | 9812.25 | 9812.25 | 1130.3 | False | None | None | False | None | False | 11090786.175 | 0 | 3865528 | 148051 | None | P.No.82. item no 11.25.2) Volume II 2024-25 SR | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Kg | 113.4 | 113.4 | 360.0 | False | None | None | False | None | False | 40824.0 | 0 | 3865529 | 148051 | None | Vol-03 SR-2024-25 I.No. 8.55 PG NO-79) | Providing and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirpes as shown in drawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 m with cement concrete M 10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer in charge of the work. The cost includes excavation, cost of all materials, cost of steel, painting, centering, transportation charges & fixing charges.No. 5,861.0 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 6154.05 | 6154.05 | 1.0 | False | None | None | False | None | False | 6154.05 | 0 | 3865530 | 148051 | None | Page No.188, ol-5 2023-24) | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack tocorrect position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts asdirected and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 1398.6 | 1398.6 | 57.0 | False | None | None | False | None | False | 79720.2 | 0 | 3865531 | 148051 | None | Page No.188, Item.No.16.15.3 Vol-5 2023-24) | 16.40 Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm
thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. 16.40.1 Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 1.0 M depth & Medium duty SFRC cover & frameEach 24349 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 25566.45 | 25566.45 | 2.0 | False | None | None | False | None | False | 51132.9 | 0 | 3865532 | 148051 | None | Page No.188, Item.No.16.15.3 Vol-5 2023-24) | 16.40 Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm
thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. 16.40.1 Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. ,16.40.2 Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 2.0 m depth& Medium duty SFRC cover & frameEach 46455 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 48777.75 | 48777.75 | 2.0 | False | None | None | False | None | False | 97555.5 | 0 | 3865533 | 148051 | None | SR 2024-25 P.No.20, I.NO.45.01) | 11 kV, Jointing & Cable Termination Kit as per IS-13573 Heat Shrinkable Type Transition Jointing Kit for XLPE Cable 343- 3x95 Sqmm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 10758.3 | 10758.3 | 7.0 | False | None | None | False | None | False | 75308.1 | 0 | 3865534 | 148051 | None | SR 2024-25 P.No.20, I.NO.45.02) | 11 kV, Jointing & Cable Termination Kit as per IS-13573 Heat Shrinkable Type Transition Jointing Kit for XLPE Cable 343- 3x240 Sqmm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 13297.2 | 13297.2 | 7.0 | False | None | None | False | None | False | 93080.4 | 0 | 3865535 | 148051 | None | SR 2024-25 P.No.20, I.NO.45.03) | 11 kV, Jointing & Cable Termination Kit as per IS-13573 Heat Shrinkable Type Transition Jointing Kit for XLPE Cable 343- 3 x 400 Sqmm ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 13541.85 | 13541.85 | 5.0 | False | None | None | False | None | False | 67709.25 | 0 | 3865536 | 148051 | None | consider 190 of the erection cost | Relesing and Refixing :Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth bescom 2SR 2021-22 for 11 kV SYSTEM SR 2024-25 Item No2.02 page No.02 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 1803.67 | 1803.67 | 26.0 | False | None | None | False | None | False | 46895.42 | 0 | 3865537 | 148051 | None | bescom SR 2024-25 for 11 kV SYSTEM SR Item | Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | No | 525.8 | 525.8 | 26.0 | False | None | None | False | None | False | 13670.8 | 0 | 3865538 | 148051 | None | Bescom 2024-25 part 4 11kv materials SR Item | ACSR Conductor as per IS-398 (Part -2/1996) Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Km | 67666.5 | 67666.5 | 0.2 | False | None | None | False | None | False | 13533.3 | 0 | 3865539 | 148051 | None | bescom SR 2024-25 for 11 kV Labour item no 6.0 | Stringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Rabbit ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. The rates are inclusive of all lead and lift, hire chargers of machinery, labour, incidental charges all etc complete. | Km | 1803.67 | 1803.67 | 2.4 | False | None | None | False | None | False | 4328.808 | 0 |
|