tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1724833014000 | 0 | None | None | Buildings | GROUND FLOOR | 1002712.49 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3872319 | 148432 | None | I.No. 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the wor. In all kinds of soils upto 3 m depth (PWD CSR For 2023-24 Vol 1 Pag No:8 Item No. 1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 40.83 | False | None | None | False | None | False | 4372.893 | 0 | 3872320 | 148432 | None | I.No. 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Bed concrete of mix 1:4:8 (PWD SR 2023-24 Volume-1 Page No. 15 I.No.2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 4.75 | False | None | None | False | None | False | 29870.1375 | 0 | 3872321 | 148432 | None | I.No. 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all aterials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- ( For footing) (PWD SR 2023-24 Volume-1 Page No. 15 I.No.2.2.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6601.35 | 6601.35 | 8.0 | False | None | None | False | None | False | 52810.8 | 0 | 3872322 | 148432 | None | I.No. 2.2.1 | Form work 8% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 528.11 | 528.11 | 8.0 | False | None | None | False | None | False | 4224.88 | 0 | 3872323 | 148432 | None | I.No. 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For coloumn) and shear wall (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6639.15 | 6639.15 | 4.97 | False | None | None | False | None | False | 32996.5755 | 0 | 3872324 | 148432 | None | I.No. 2.4.2 | Form work 8% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3319.58 | 3319.58 | 4.97 | False | None | None | False | None | False | 16498.3126 | 0 | 3872325 | 148432 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For plinth Beam) (Common 2023-2024 PWD SR (Vol-1) Sl No. 2.5.1 P.No-16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6639.15 | 6639.15 | 1.37 | False | None | None | False | None | False | 9095.6355 | 0 | 3872326 | 148432 | None | I.No. 2.5.1 | Formwork 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3319.58 | 3319.58 | 1.37 | False | None | None | False | None | False | 4547.8246 | 0 | 3872327 | 148432 | None | I.No. 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m (PWD SR 2023-24 Volume-1 Page No. 7 I.No.1.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 29.58 | False | None | None | False | None | False | 8261.694 | 0 | 3872328 | 148432 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For coloumns above plinth Beam ) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 1.43 | False | None | None | False | None | False | 9954.945 | 0 | 3872329 | 148432 | None | I.No. 2.5.1 | Form work 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4873.05 | 4873.05 | 1.43 | False | None | None | False | None | False | 6968.4615 | 0 | 3872330 | 148432 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Beams and lintle of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 3.06 | False | None | None | False | None | False | 21302.19 | 0 | 3872331 | 148432 | None | I.No. 2.5.1 | Form work 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4176.9 | 4176.9 | 3.06 | False | None | None | False | None | False | 12781.314 | 0 | 3872332 | 148432 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For chejja, staricase of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 0.31 | False | None | None | False | None | False | 2158.065 | 0 | 3872333 | 148432 | None | I.No. 2.5.1 | Form work 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3132.68 | 3132.68 | 0.31 | False | None | None | False | None | False | 971.1308 | 0 | 3872334 | 148432 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Roof Slab) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 5.18 | False | None | None | False | None | False | 36060.57 | 0 | 3872335 | 148432 | None | I.No. 2.5.1 | Form work 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 3480.75 | 3480.75 | 5.18 | False | None | None | False | None | False | 18030.285 | 0 | 3872336 | 148432 | None | I.No. 2.11(a) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification for buildings (PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.11(a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 93929.85 | 93929.85 | 2.84 | False | None | None | False | None | False | 266760.774 | 0 | 3872337 | 148432 | None | I.No. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specification (PWD CSR For 2023-24 Vol 2 Pag No:17 Item No. 6.32) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1375.5 | 1375.5 | 63.31 | False | None | None | False | None | False | 87082.905 | 0 | 3872338 | 148432 | None | I.No. 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 327.6 | 327.6 | 63.25 | False | None | None | False | None | False | 20720.7 | 0 | 3872339 | 148432 | None | I.No. 8.5.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:42 Item No. 8.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 366.45 | 366.45 | 61.48 | False | None | None | False | None | False | 22529.346 | 0 | 3872340 | 148432 | None | I.No. 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge (PWD CSR For 2023-24 Vol 2 Pag No:50 Item No.8.51) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 105.0 | 105.0 | 63.25 | False | None | None | False | None | False | 6641.25 | 0 | 3872341 | 148432 | None | I.No. 8.27 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:45 Item No. 8.27) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 55.65 | 55.65 | 124.73 | False | None | None | False | None | False | 6941.2245 | 0 | 3872342 | 148432 | None | I.No. 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.39) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 133.35 | 133.35 | 63.25 | False | None | None | False | None | False | 8434.3875 | 0 | 3872343 | 148432 | None | I.No. 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer (PWD CSR For 2023-24 Vol 2 Pag No:46 Item No. 8.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 186.9 | 186.9 | 72.28 | False | None | None | False | None | False | 13509.132 | 0 | 3872344 | 148432 | None | I.No. 11.34.B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD CSR For 2023-24 Vol 2 Pag No:86 Item No. 11.34.B) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 192.15 | 192.15 | 631.47 | False | None | None | False | None | False | 121336.9605 | 0 | 3872345 | 148432 | None | I.No. 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of equired colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 175.35 | 175.35 | 30.07 | False | None | None | False | None | False | 5272.7745 | 0 | 3872346 | 148432 | None | I.No. 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications (PWD CSR For 2023-24 Vol 2 Pag No:100 Item No. 12.13.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 103755.75 | 103755.75 | 0.07 | False | None | None | False | None | False | 7262.9025 | 0 | 3872347 | 148432 | None | I.No. 12.21 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures (PWD CSR For 2023-24 Vol 2 Pag No:100 Item No. 12.21) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6029.1 | 6029.1 | 2.1 | False | None | None | False | None | False | 12661.11 | 0 | 3872348 | 148432 | None | I.No. 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made (PWD CSR For 2023-24 Vol 2 Pag No:109 Item No. 12.85) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6004.95 | 6004.95 | 8.37 | False | None | None | False | None | False | 50261.4315 | 0 | 3872349 | 148432 | None | I.No. 9.36 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications (PWD CSR For 2023-24 Vol 2 Pag No:64 Item No.9.36) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1732.5 | 1732.5 | 22.24 | False | None | None | False | None | False | 38530.8 | 0 | 3872350 | 148432 | None | I.No. 9.9 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. (PWD CSR For 2023-24 Vol 2 Pag No:60 Item No.9.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1129.8 | 1129.8 | 4.5 | False | None | None | False | None | False | 5084.1 | 0 | 3872351 | 148432 | None | I.No. 10.14 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD CSR For 2023-24 Vol 2 Pag No:71 Item No.10.14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1161.3 | 1161.3 | 12.6 | False | None | None | False | None | False | 14632.38 | 0 | 3872352 | 148432 | None | I.No. 12.84 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC (PWD CSR For 2023-24 Vol 2 Pag No:108 Item No.12.84) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 5274.15 | 5274.15 | 8.37 | False | None | None | False | None | False | 44144.6355 | 0 |
| 1724833014000 | 0 | None | None | Buildings | FIRST FLOOR | 550785.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3872353 | 148433 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For coloumns above plinth Beam ) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 1.37 | False | None | None | False | None | False | 9632.6344 | 0 | 3872354 | 148433 | None | I.No. 2.5.1 | Form work 70% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4921.78 | 4921.78 | 1.37 | False | None | None | False | None | False | 6742.8386 | 0 | 3872355 | 148433 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Beams and lintle of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 2.92 | False | None | None | False | None | False | 20530.8704 | 0 | 3872356 | 148433 | None | I.No. 2.5.1 | Form work 60% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4218.67 | 4218.67 | 2.92 | False | None | None | False | None | False | 12318.5164 | 0 | 3872357 | 148433 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For chejja, staricase of Buildings) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 0.53 | False | None | None | False | None | False | 3726.4936 | 0 | 3872358 | 148433 | None | I.No. 2.5.1 | Form work 45% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3164.0 | 3164.0 | 0.53 | False | None | None | False | None | False | 1676.92 | 0 | 3872359 | 148433 | None | I.No. 2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates- (For Roof Slab) (PWD SR 2023-24 Volume-1 Page No. 16 I.No.2.5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7031.12 | 7031.12 | 4.84 | False | None | None | False | None | False | 34030.6208 | 0 | 3872360 | 148433 | None | I.No. 2.5.1 | Form work 50% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3515.56 | 3515.56 | 4.84 | False | None | None | False | None | False | 17015.3104 | 0 | 3872361 | 148433 | None | I.No. 2.11(a) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification for buildings (PWD CSR For 2023-24 Vol 1 Pag No:18 Item No. 2.11(a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 94869.15 | 94869.15 | 1.01 | False | None | None | False | None | False | 95817.8415 | 0 | 3872362 | 148433 | None | I.No. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specification (PWD CSR For 2023-24 Vol 2 Pag No:17 Item No. 6.32) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1389.26 | 1389.26 | 90.11 | False | None | None | False | None | False | 125186.2186 | 0 | 3872363 | 148433 | None | I.No. 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:41 Item No. 8.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 330.88 | 330.88 | 98.37 | False | None | None | False | None | False | 32548.6656 | 0 | 3872364 | 148433 | None | I.No. 8.5.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR For 2023-24 Vol 2 Pag No:42 Item No. 8.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 370.11 | 370.11 | 71.81 | False | None | None | False | None | False | 26577.5991 | 0 | 3872365 | 148433 | None | I.No. 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge (PWD CSR For 2023-24 Vol 2 Pag No:50 Item No.8.51) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 106.05 | 106.05 | 98.37 | False | None | None | False | None | False | 10432.1385 | 0 | 3872366 | 148433 | None | I.No. 8.27 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:45 Item No. 8.27) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 56.21 | 56.21 | 175.91 | False | None | None | False | None | False | 9887.9011 | 0 | 3872367 | 148433 | None | I.No. 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.39) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 134.68 | 134.68 | 98.37 | False | None | None | False | None | False | 13248.4716 | 0 | 3872368 | 148433 | None | I.No. 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer (PWD CSR For 2023-24 Vol 2 Pag No:46 Item No. 8.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 188.77 | 188.77 | 77.54 | False | None | None | False | None | False | 14637.2258 | 0 | 3872369 | 148433 | None | I.No. 11.34.B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD CSR For 2023-24 Vol 2 Pag No:86 Item No. 11.34.B) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 194.07 | 194.07 | 7.92 | False | None | None | False | None | False | 1537.0344 | 0 | 3872370 | 148433 | None | I.No. 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of equired colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.. (PWD CSR For 2023-24 Vol 2 Pag No:48 Item No. 8.41) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 177.1 | 177.1 | 7.92 | False | None | None | False | None | False | 1402.632 | 0 | 3872371 | 148433 | None | I.No. 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications (PWD CSR For 2023-24 Vol 2 Pag No:100 Item No. 12.13.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 103755.75 | 103755.75 | 0.07 | False | None | None | False | None | False | 7262.9025 | 0 | 3872372 | 148433 | None | I.No. 12.21 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures (PWD CSR For 2023-24 Vol 2 Pag No:100 Item No. 12.21) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6029.1 | 6029.1 | 2.1 | False | None | None | False | None | False | 12661.11 | 0 | 3872373 | 148433 | None | I.No. 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made (PWD CSR For 2023-24 Vol 2 Pag No:109 Item No. 12.85) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6065.0 | 6065.0 | 7.56 | False | None | None | False | None | False | 45851.4 | 0 | 3872374 | 148433 | None | I.No. 9.36 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications (PWD CSR For 2023-24 Vol 2 Pag No:64 Item No.9.36) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1749.83 | 1749.83 | 24.62 | False | None | None | False | None | False | 43080.8146 | 0 | 3872375 | 148433 | None | I.No. 9.9 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. (PWD CSR For 2023-24 Vol 2 Pag No:60 Item No.9.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1141.1 | 1141.1 | 1.64 | False | None | None | False | None | False | 1871.404 | 0 | 3872376 | 148433 | None | I.No. 10.14 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD CSR For 2023-24 Vol 2 Pag No:71 Item No.10.14) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1172.91 | 1172.91 | 2.65 | False | None | None | False | None | False | 3108.2115 | 0 |
| 1724833014000 | 0 | None | None | Buildings | WATER SUPPLY AND SANITATION | 83737.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3872377 | 148434 | None | I.No. 14.1.1 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe,with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ( PWD SR. 2023-24 Vol-2 Pg- 131 I No.14.1.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 6051.28 | 6051.28 | 2.0 | False | None | None | False | None | False | 12102.56 | 0 | 3872378 | 148434 | None | I.No. 13.34 | Providing and placing on terrace (at all floor levels) polyethylenewater storage tank, IS : 12701 marked, with cover and suitable lockingarrangement and making necessary holes for inlet, outlet and overflowpipes but without fittings and the base support for tank. (PWD SR. 2023-24/ Pg- 123 I No.13.34) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Ltr | 11.15 | 11.15 | 1000.0 | False | None | None | False | None | False | 11150.0 | 0 | 3872379 | 148434 | None | I.No. 13.32.3 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete for: PVC pipes 32mm dia., 10 kg/sqcm & class 5 (PWD SR. 2023-24/ Pg- 122 I No.13.32.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 83.01 | 83.01 | 50.0 | False | None | None | False | None | False | 4150.5 | 0 | 3872380 | 148434 | None | I.No. 10.1.1 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete for:PVC pipes 25mm dia, 10 kg/sqcm & class 5 (CSR2023-24 Volume-V Iteam Code-10.1.1 P-113) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 59.47 | 59.47 | 50.0 | False | None | None | False | None | False | 2973.5 | 0 | 3872381 | 148434 | None | I.No. 7.3 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc PWD SR. 2023-24/ Pg- 85 I No.7.3 Rs. 2140.00/mtr (CSR2023-24 Volume-II Iteam Code-7.3 P-85) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1724.69 | 1724.69 | 1.0 | False | None | None | False | None | False | 1724.69 | 0 | 3872382 | 148434 | None | I.No. 14.8.2 | Providing and fixing P.V.C. low level flushing cistern with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete.10 litre capacity - White (CSR2023-24 Volume-II Iteam Code-14.8.2 P-135) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1167.14 | 1167.14 | 2.0 | False | None | None | False | None | False | 2334.28 | 0 | 3872383 | 148434 | None | I.No. 14.25.2 | Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings :Flat back wash basin of size 550x400 mm (CSR2023-24 Volume-II Iteam Code-14.25.2 P-135) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 954.03 | 954.03 | 2.0 | False | None | None | False | None | False | 1908.06 | 0 | 3872384 | 148434 | None | I.No. 14.28 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complet. 40 mm dia (CSR2023-24 Volume-II Iteam Code-14.28.1.2 P-135) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 109.03 | 109.03 | 1.0 | False | None | None | False | None | False | 109.03 | 0 | 3872385 | 148434 | None | I.No. 14.32.3 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing. Rectangular shape 453x357 mm (CSR2023-24 Volume-II Iteam Code-14.32.3 P-136) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1261.3 | 1261.3 | 1.0 | False | None | None | False | None | False | 1261.3 | 0 | 3872386 | 148434 | None | I.No. 14.51A | Providing and fixing Pillar cock with high neck with 265mm Extended body made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class- Economy (CSR2023-24 Volume-II Iteam Code-14.51A P-139) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3099.98 | 3099.98 | 5.0 | False | None | None | False | None | False | 15499.9 | 0 | 3872387 | 148434 | None | I.No. 10.2.4 | Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for: Pipes of SN4, 160mm dia. (CSR2023-24 Volume-V Iteam Code-10.2.4 P-114) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 713.66 | 713.66 | 30.0 | False | None | None | False | None | False | 21409.8 | 0 | 3872388 | 148434 | None | I.No. 16.8.1 | Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. (CSR2023-24 Volume-V Iteam Code-16.8.1 P-190) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5936.05 | 5936.05 | 1.0 | False | None | None | False | None | False | 5936.05 | 0 | 3872389 | 148434 | None | I.No. 11.19.3 | Providing GM gland cocks tested against hydraulic pressure of 20 Kg/ m² with ISI mark- For 25 mm dia GM gland cocks (CSR2023-24 Volume-V Iteam Code-11.19.3 P-134) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 635.61 | 635.61 | 5.0 | False | None | None | False | None | False | 3178.05 | 0 |
| 1724833014000 | 0 | None | None | Buildings | ELECTRIFICATION | 41648.82 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3872390 | 148435 | None | I.No. 1.2.1 | Concealed Conduit SystemSupplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 69.3 | 69.3 | 23.0 | False | None | None | False | None | False | 1593.9 | 0 | 3872391 | 148435 | None | I.No. 1.3.2 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick
with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.Common Sr 2023-24 vol-6,pg no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 82.95 | 82.95 | 13.0 | False | None | None | False | None | False | 1078.35 | 0 | 3872392 | 148435 | None | I.No. 1.3.2 | Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral)& 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outl.Short point upto 3Mtr from tapping point to out let via switch box . Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 282.45 | 282.45 | 2.0 | False | None | None | False | None | False | 564.9 | 0 | 3872393 | 148435 | None | I.No. 2.2.1 | Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch. Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 397.95 | 397.95 | 2.0 | False | None | None | False | None | False | 795.9 | 0 | 3872394 | 148435 | None | I.No. 2.2.2 | Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 582.75 | 582.75 | 9.0 | False | None | None | False | None | False | 5244.75 | 0 | 3872395 | 148435 | None | I.No. 2.2.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.1.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 27.3 | 27.3 | 20.0 | False | None | None | False | None | False | 546.0 | 0 | 3872396 | 148435 | None | I.No. 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010.2.5 mm2 Common SR 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 44.1 | 44.1 | 70.0 | False | None | None | False | None | False | 3087.0 | 0 | 3872397 | 148435 | None | I.No. 2.3.3 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.10-12 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 274.05 | 274.05 | 1.0 | False | None | None | False | None | False | 274.05 | 0 | 3872398 | 148435 | None | I.No. 3.3.6 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.16 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 308.7 | 308.7 | 1.0 | False | None | None | False | None | False | 308.7 | 0 | 3872399 | 148435 | None | I.No. 3.3.7 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 361.2 | 361.2 | 1.0 | False | None | None | False | None | False | 361.2 | 0 | 3872400 | 148435 | None | I.No. 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 416.85 | 416.85 | 1.0 | False | None | None | False | None | False | 416.85 | 0 | 3872401 | 148435 | None | I.No. 3.5.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 1.0 | False | None | None | False | None | False | 107.1 | 0 | 3872402 | 148435 | None | I.No. 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.55 | 179.55 | 1.0 | False | None | None | False | None | False | 179.55 | 0 | 3872403 | 148435 | None | I.No. 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293Stepped Fan Regulator Two Module Common SR 2023-24 vol-6,pg no-9 Stepped Fan Regulator Two Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 328.65 | 328.65 | 2.0 | False | None | None | False | None | False | 657.3 | 0 | 3872404 | 148435 | None | I.No. 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 247.8 | 247.8 | 5.0 | False | None | None | False | None | False | 1239.0 | 0 | 3872405 | 148435 | None | I.No. 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone Socke Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 163.8 | 163.8 | 5.0 | False | None | None | False | None | False | 819.0 | 0 | 3872406 | 148435 | None | I.No. 3.6.11 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Bakelite Ceiling Rose.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 81.9 | 81.9 | 5.0 | False | None | None | False | None | False | 409.5 | 0 | 3872407 | 148435 | None | I.No. 3.14.5 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Pendant Holder.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 74.55 | 74.55 | 5.0 | False | None | None | False | None | False | 372.75 | 0 | 3872408 | 148435 | None | I.No. 3.14.6 | Supplying and fixing regular 4 Way MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2.Common SR 2023-24 Vol-6 page no-17 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 549.15 | 549.15 | 1.0 | False | None | None | False | None | False | 549.15 | 0 | 3872409 | 148435 | None | I.No. 5.17.4 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.4 Way SP & N .Common SR 2023-24 Vol-6 page no-18 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1303.05 | 1303.05 | 1.0 | False | None | None | False | None | False | 1303.05 | 0 | 3872410 | 148435 | None | I.No. 5.19.1 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Common SR 2023-24 Vol-6 page no-19 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1449.0 | 1449.0 | 1.0 | False | None | None | False | None | False | 1449.0 | 0 | 3872411 | 148435 | None | I.No. 5.3 | Supplying capacitor type ceiling fan complete with down rod blades,shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48" Sweep (1200 mm) Regular mode.Common SR 2023-24 Vol-6,Page no-30 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3133.2 | 3133.2 | 2.0 | False | None | None | False | None | False | 6266.4 | 0 | 3872412 | 148435 | None | I.No. 6.3.1 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED light fitting 1 x 4' - 20/22 W.Common SR 2023-24 Vol-6,Page no-43. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 724.5 | 724.5 | 1.0 | False | None | None | False | None | False | 724.5 | 0 | 3872413 | 148435 | None | I.No. 11.3.2 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.9W, 6500K.Common SR 2023-24 Vol-6,Page no-47 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 168.0 | 168.0 | 2.0 | False | None | None | False | None | False | 336.0 | 0 | 3872414 | 148435 | None | I.No. 13.11 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg.Common SR 2023-24,Vol-6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 780.15 | 780.15 | 1.0 | False | None | None | False | None | False | 780.15 | 0 | 3872415 | 148435 | None | I.No. 51.01 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 709.8 | 709.8 | 1.0 | False | None | None | False | None | False | 709.8 | 0 | 3872416 | 148435 | None | I.No. 54.02 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 325.5 | 325.5 | 1.0 | False | None | None | False | None | False | 325.5 | 0 | 3872417 | 148435 | None | I.No. 54.03 | Digging of Pit for providing GI Pipe type Earthing for Haed Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Bag | 3139.5 | 3139.5 | 1.0 | False | None | None | False | None | False | 3139.5 | 0 | 3872418 | 148435 | None | I.No. 1.6.2 | 1.1 kV, XLPE or Heat resistant PVC
insulated, PVC exutruted Inner Seath
Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip
thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, (9 GI Strips - 4 x 0.8 mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 83193.6 | 83193.6 | 0.03 | False | None | None | False | None | False | 2495.808 | 0 | 3872419 | 148435 | None | I.No. 32.01 | Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed.In Ordinary Soil. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 273.0 | 273.0 | 10.0 | False | None | None | False | None | False | 2730.0 | 0 | 3872420 | 148435 | None | I.No. 29.02 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. 2.5 to 25 Sqmm (Single/3.5/4 Core) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 21930.3 | 21930.3 | 0.03 | False | None | None | False | None | False | 657.909 | 0 | 3872421 | 148435 | None | I.No. 21.05 | Supplying heavy gauge PVC conduit pipe 25mm dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.25 mm dia 2 mm thick.Common Sr 2023-24 page no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 85.05 | 85.05 | 25.0 | False | None | None | False | None | False | 2126.25 | 0 |
|
|
---|