noticeInvitingTenderDTO
createdTs1724922900644
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1250.00
emd99940.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose05-09-2024 16:00:00
tenderQueryClose03-09-2024 17:30:00
technicalBidOpenNone
publishedDate29-08-2024 15:01:27
publishedByPostPWD_EE_DIV_HNS
publishedByUserKPE19216 - YATHEESH U R
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08222251955
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724922900646
version14
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT11152/CALL-2
titleIMPROVEMENTS TO ROAD FROM TARAKA MAIN ROAD TO JOIN MURKAL ROAD VIA DATTAHALLA FROM CH. 5.70 TO 6.70 KM IN H.D KOTE TALUK, MYSORE DISTRICT (WORKING CH.6.50 to 6.70KM)
descriptionIMPROVEMENTS TO ROAD FROM TARAKA MAIN ROAD TO JOIN MURKAL ROAD VIA DATTAHALLA FROM CH. 5.70 TO 6.70 KM IN H.D KOTE TALUK, MYSORE DISTRICT (WORKING CH.6.50 to 6.70KM)
categoryWORKS
categoryTextWorks
ecv4996666.72
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1676
locationNamePWD Special Division Office Hunasuru
provisionalAmount5000000.0
groupOverheadTotalNone
fileNumberAEE/PWDHDKOTE/5054MDR/DATTAHALLA/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17249229010001NoneNoneRoadsIMPROVEMENTS TO ROAD FROM TARAKA MAIN ROAD TO JOIN MURKAL ROAD VIA DATTAHALLA FROM CH. 5.70 TO 6.70 KM IN H.D KOTE TALUK, MYSORE DISTRICT (WORKING CH.6.50 to 6.70KM)3243973.39
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3877966148850None2.5 II aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical means using dozer A In area of light jungle Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.745.52FalseNoneNoneFalseNoneFalse2559.84480
3877967148850None1.12Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum120.36120.3699.24FalseNoneNoneFalseNoneFalse11944.52640
3877968148850None16.8bConstruction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. B) Mechanical Means Rate are inclusive GST 18% 7 ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m29.529.5200.0FalseNoneNoneFalseNoneFalse5900.00
3877969148850None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm7.087.08525.0FalseNoneNoneFalseNoneFalse3717.00
3877970148850None3.4Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm5.95.9750.0FalseNoneNoneFalseNoneFalse4425.00
3877971148850None3.11Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm4.724.721500.0FalseNoneNoneFalseNoneFalse7080.00
3877972148850None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum140.42140.42103.39FalseNoneNoneFalseNoneFalse14518.02380
3877973148850None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Rate are inclusive GST 18% CUM ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum559.32559.32250.11FalseNoneNoneFalseNoneFalse139891.52520
3877974148850None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum581.74581.74738.5FalseNoneNoneFalseNoneFalse429614.990
3877975148850None4.1 bvConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum2783.622783.62209.5FalseNoneNoneFalseNoneFalse583168.390
3877976148850None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum3019.623019.62297.5FalseNoneNoneFalseNoneFalse898336.950
3877977148850None5.1Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means.Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm48.3848.381130.0FalseNoneNoneFalseNoneFalse54669.40
3877978148850None5.33Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the prepared granular surface cleaned with mechanical broom Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm17.717.71130.0FalseNoneNoneFalseNoneFalse20001.00
3877979148850None5.12.cProviding and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum11149.8211149.8256.5FalseNoneNoneFalseNoneFalse629964.830
3877980148850None5.16cProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum12925.7212925.7233.9FalseNoneNoneFalseNoneFalse438181.9080
17249229010001NoneNoneRoadsROAD FURNITURES105847.18
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3877981148851None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm625.4625.455.0FalseNoneNoneFalseNoneFalse34397.00
3877982148851None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Nos430.7430.740.0FalseNoneNoneFalseNoneFalse17228.00
3877983148851None8.7Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
3877984148851None8.6A.IVProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each4252.724252.726.0FalseNoneNoneFalseNoneFalse25516.320
17249229010001NoneNoneRoadsCONSTRUCTION OF CC DRAIN1646846.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3877985148852None1.12Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum120.36120.36296.15FalseNoneNoneFalseNoneFalse35644.6140
3877986148852None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum7067.027067.0244.42FalseNoneNoneFalseNoneFalse313917.02840
3877987148852None2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum9674.199674.1992.87FalseNoneNoneFalseNoneFalse898442.02530
3877988148852None2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Tonne93232.9893232.983.48FalseNoneNoneFalseNoneFalse324450.77040
3877989148852None1.9Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum240.72240.72296.15FalseNoneNoneFalseNoneFalse71289.2280
3877990148852None2.5iiaClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical means using dozer A In area of light jungle ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.75463.756.69FalseNoneNoneFalseNoneFalse3102.48750
17249229010001NoneNoneRoadsIMPROVEMENTS TO ROAD FROM TARAKA MAIN ROAD TO JOIN MURKAL ROAD VIA DATTAHALLA FROM CH. 5.70 TO 6.70 KM IN H.D KOTE TALUK, MYSORE DISTRICT (WORKING CH.6.50 to 6.70KM)4996666.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3877991148853None1.12Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum120.36120.36296.15FalseNoneNoneFalseNoneFalse35644.6140
3877992148853None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm625.4625.455.0FalseNoneNoneFalseNoneFalse34397.00
3877993148853None2.5 II aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical means using dozer A In area of light jungle Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.74463.745.52FalseNoneNoneFalseNoneFalse2559.84480
3877994148853None1.12Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum120.36120.3699.24FalseNoneNoneFalseNoneFalse11944.52640
3877995148853None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Nos430.7430.740.0FalseNoneNoneFalseNoneFalse17228.00
3877996148853None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum7067.027067.0244.42FalseNoneNoneFalseNoneFalse313917.02840
3877997148853None8.7Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
3877998148853None2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum9674.199674.1992.87FalseNoneNoneFalseNoneFalse898442.02530
3877999148853None16.8bConstruction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. B) Mechanical Means Rate are inclusive GST 18% 7 ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)m29.529.5200.0FalseNoneNoneFalseNoneFalse5900.00
3878000148853None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm7.087.08525.0FalseNoneNoneFalseNoneFalse3717.00
3878001148853None2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Tonne93232.9893232.983.48FalseNoneNoneFalseNoneFalse324450.77040
3878002148853None8.6A.IVProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm equilateral triangle Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Each4252.724252.726.0FalseNoneNoneFalseNoneFalse25516.320
3878003148853None3.4Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm5.95.9750.0FalseNoneNoneFalseNoneFalse4425.00
3878004148853None1.9Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Rates are inclusive of GST 18 percent ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum240.72240.72296.15FalseNoneNoneFalseNoneFalse71289.2280
3878005148853None2.5iiaClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical means using dozer A In area of light jungle ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)100 Sqm463.75463.756.69FalseNoneNoneFalseNoneFalse3102.48750
3878006148853None3.11Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm4.724.721500.0FalseNoneNoneFalseNoneFalse7080.00
3878007148853None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum140.42140.42103.39FalseNoneNoneFalseNoneFalse14518.02380
3878008148853None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Rate are inclusive GST 18% CUM ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum559.32559.32250.11FalseNoneNoneFalseNoneFalse139891.52520
3878009148853None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum581.74581.74738.5FalseNoneNoneFalseNoneFalse429614.990
3878010148853None4.1 bvConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum2783.622783.62209.5FalseNoneNoneFalseNoneFalse583168.390
3878011148853None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum3019.623019.62297.5FalseNoneNoneFalseNoneFalse898336.950
3878012148853None5.1Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means.Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm48.3848.381130.0FalseNoneNoneFalseNoneFalse54669.40
3878013148853None5.33Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the prepared granular surface cleaned with mechanical broom Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Sqm17.717.71130.0FalseNoneNoneFalseNoneFalse20001.00
3878014148853None5.12.cProviding and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum11149.8211149.8256.5FalseNoneNoneFalseNoneFalse629964.830
3878015148853None5.16cProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Rate are inclusive GST 18% ---- including the cost and conveyance of all materials, cost of labour hire charges of all machineries, equipments and all lead, lift, loading and unloading charges and all other incidental charges etc., complete and the work shall be carried out as per as per approved design, drawings and standard technical detailed specifications and as per the directions of the Engineer in charge of the work. (Rates are INCLUSIVE of 18 percent GST)Cum12925.7212925.7233.9FalseNoneNoneFalseNoneFalse438181.9080
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17249229010000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17249229010000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17249229010000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of KPP portal due to internet connectivity issues and technical glitches at bidders endNone
17249229010000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17249229010000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17249229010000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer in its name should have in the last five years i.e. 2019-20 to 2023-24) (a) achieved in two financial years a minimum average annual financial turnover of Rs. 49.97 lakhsNone
17249229010000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer in its name should have in the last five years i.e. 2019-20 to 2023-24) (b) satisfactorily completed as prime contractor, at least one similar work such as Road construction (Asphalting work) work of value not less than Rs. 24.99 lakhsNone
17249229010000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17249229010000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17249229010000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17249229010000NoneNoneELIGIBILITYList of existing commitments and ongoing worksNone
17249229010000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17249229010000NoneNoneELIGIBILITYBanker Details for referenceNone
17249229010000NoneNoneELIGIBILITYConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNone
17249229010000NoneNoneELIGIBILITYReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNone
17249229010000NoneNoneELIGIBILITYQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNone
17249229010000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17249229010000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17249229010000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing Karnataka Public Procurement Portal.None
17249229010000NoneNoneELIGIBILITYContractors Should be registered with KPWD as Class-3 and above Contractor.None
17249229010000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17249229010000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17249229010000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17249229010000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17249229010000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents Contractors Should be registered with KPWD as Class-3 and above Contractor and further orders thereon.None
17249229010000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and complete the work at the accepted tender rates irrespective of the cost of the workNone
17249229010000NoneNoneELIGIBILITYThe tenderer should maintain the Building/Roads/Bridges works during the defective liability period for 1 yearsNone
17249229010000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to any adjacent structures/utilities above or below the ground and also to the existing canal CD works and other similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost. Damage to physical property and personal injury and death will be the personal risk of the contractor.None
17249229010000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17249229010000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own costNone
17249229010000NoneNoneELIGIBILITYContractor should execute the project with least impact to the environment till the completion of project.None
17249229010000NoneNoneELIGIBILITYAll materials required for the work like bitumen, steel, cement etc., shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17249229010000NoneNoneELIGIBILITYAll the items in the tender including all lead, lifts,loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and convence of all matiral and all other such incidental charges necessary for successful completion of works as per the detalied technical specification and direction of Engineer-in-charge of this workNone
17249229010000NoneNoneELIGIBILITYWhen embankments are constructed disputes arising on account of damages to the existing field channels, bunds and other private properties, if any, has to be resolved by the contractor. All precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17249229010000NoneNoneELIGIBILITYContractor should follow strictly the privaling rules of labour act & The contractor should employ only registered labours as per Govt. Circular No. PWD/198/BMS/2009/ Dated: 24-06-2009None
17249229010000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt. orders. As per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17249229010000NoneNoneELIGIBILITYThe successful tenderer should provide monthly physical and financial progress to be achieved in Bar chart/Milestone chart/PERT chart during agreement.None
17249229010000NoneNoneELIGIBILITYThe returns submitted to the I.T. along with the Profit and Loss account statement,Balance sheet should be uploaded for the financial turnover criteria attested by registered Chartered Accountant.None
17249229010000NoneNoneELIGIBILITYThe rates are INCLUSIVE of 18 percent GST.None
17249229010000NoneNoneELIGIBILITYBidders should quote rates INCLUSIVE of 18 percent GST.None
17249229010000NoneNoneELIGIBILITYThe Amount put to tender is INCLUSIVE of 18 percent GST.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate from CA with UDIN last 5 years TurnoverTrueTechnical Bid
Contractor Registration Sertificate Class 3 and above licenceTrueTechnical Bid
Work Done Certificate in last 5 years any one year Rs. 24.99 lakhs Asphalt Road work from EE and above rankTrueTechnical Bid
Contractor contact details and address and mobile numberTrueTechnical Bid
GST Certificate, Pan Card & Tin CertificateTrueTechnical Bid
Existing Commitments work details B-Value should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
To qualify for award of this contract, each tenderer in its name should have in the last five years i.e. 2019-20 to 2023-24 a. achieved in two financial years a minimum average annual financial turnover of Rs. 49.97 lakhs.TrueTechnical Bid