createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724150551972
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd591000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-09-2024 16:00:00
tenderQueryClose27-08-2024 12:00:00
technicalBidOpen04-09-2024 16:30:00
publishedDate22-08-2024 14:52:27
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate23-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee491000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1724150552008
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT13903
titleImprovement from SH-131 Talur village to Buvanahalli road km 0.00 to 4.75 Sandur Taluk Ballari Dist & Construction of BT Road From SH-40 to Muraripura and CC Road in Muraripura Village in Sandur taluk Ballari district, Under 5054 (Plan) MDR Improvements for the year 2023-24
descriptionImprovement from SH-131 Talur village to Buvanahalli road km 0.00 to 4.75 Sandur Taluk Ballari Dist & Construction of BT Road From SH-40 to Muraripura and CC Road in Muraripura Village in Sandur taluk Ballari district, Under 5054 (Plan) MDR Improvements for the year 2023-24.
categoryWORKS
categoryTextWorks
ecv39392797.53
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount47000000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SANDUR/2023-24/5054/P1
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17241505520000NoneNoneRoadsCD PORTION1406226.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3820104145335NoneVo-1 5 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum254.1254.1107.43FalseNoneNoneFalseNoneFalse27297.9630
3820105145335NoneVo-1 15 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The anite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum6288.456288.4510.34FalseNoneNoneFalseNoneFalse65022.5730
3820106145335NoneVo-1 16 2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum6639.156639.1593.9FalseNoneNoneFalseNoneFalse623416.1850
3820107145335NoneVo-3 71 9.2(II)9.2 2900 Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Double Row . Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .II)1200 mm dia ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workMtr22723.0522723.0515.0FalseNoneNoneFalseNoneFalse340845.750
3820108145335NoneVo 3 18 2.11 C2.11 Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Sub structure Bridges ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workTonne90754.6590754.651.1FalseNoneNoneFalseNoneFalse99830.1150
3820109145335NoneVo-1 33 1.80Cbe approved ravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum497.7497.7401.73FalseNoneNoneFalseNoneFalse199941.0210
3820110145335NoneVolI Page 111 8Providing centering & Scuffolding for culvert ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum531.13531.1393.9FalseNoneNoneFalseNoneFalse49873.1070
17241505520000NoneNoneRoadsRoad Part32119200.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3820111145336None2.5.(IIA )Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials andtacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work100 Sqm412.65412.6554.9FalseNoneNoneFalseNoneFalse22654.4850
3820112145336None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of achinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum107.1107.11852.88FalseNoneNoneFalseNoneFalse198443.4480
3820113145336None3.7Compacting Original Ground Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum110.25110.253912.19FalseNoneNoneFalseNoneFalse431318.94750
3820114145336None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or orrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and requirement complete as per specifications, including cost of labour,rolling,water,all aterials,usage& all other appurtenaces required to complete the work. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum497.7497.7845.25FalseNoneNoneFalseNoneFalse420680.9250
3820115145336None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum517.65517.651578.81FalseNoneNoneFalseNoneFalse817270.99650
3820116145336None4.2 vby Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401For Grading -V Material ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum2418.152418.152619.02FalseNoneNoneFalseNoneFalse6333183.2130
3820117145336None4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum2686.952686.953843.28FalseNoneNoneFalseNoneFalse10326701.1960
3820118145336None5.1(i)A Prime Coat over WMM/WBM (i) Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm43.0543.0517081.25FalseNoneNoneFalseNoneFalse735347.81250
3820119145336None5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm12.612.617081.25FalseNoneNoneFalseNoneFalse215223.750
3820120145336None5.8(ii)cBituminous Macadam Grading - II for traffic 20 MSA C) Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum8044.058044.05854.06FalseNoneNoneFalseNoneFalse6870101.3430
3820121145336None5.31Semi Dense Bituminous Concrete 5.31 IRC-37:2018 Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum10659.610659.6427.03FalseNoneNoneFalseNoneFalse4551968.9880
3820122145336None8.16.(ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc(II)Ordinary KM stone ( precast) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workNos3073.353073.355.0FalseNoneNoneFalseNoneFalse15366.750
3820123145336None8.16.(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) 200 m stone (precast ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workNos884.1884.119.0FalseNoneNoneFalseNoneFalse16797.90
3820124145336None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place dentification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm9460.59460.51.8FalseNoneNoneFalseNoneFalse17028.90
3820125145336None8.5A Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.(IV) 60cm Equilateral Traingle ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workEach3754.83754.84.0FalseNoneNoneFalseNoneFalse15019.20
3820126145336None8.54Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 8 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workNos9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3820127145336None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm556.5556.5915.0FalseNoneNoneFalseNoneFalse509197.50
3820128145336None1.111Road maintenance for 3rd year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance Appruve rate sa per Bellary Circle Dated sbc/ae-1 /2023-24/2900 / dated 20/01/2024 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workPer Km28630.028630.04.58FalseNoneNoneFalseNoneFalse131125.40
3820129145336None1.112Road maintenance for 4th year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance Appruved rate sa per Bellary Circle Dated sbc/ae-1 /2023-24/2900 / dated 20/01/2024 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workPer Km47010.047010.04.58FalseNoneNoneFalseNoneFalse215305.80
3820130145336None1.1113Road maintenance for 5th year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance Appruved rate sa per Bellary Circle Dated sbc/ae-1 /2023-24/2900 / dated 20/01/2024 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workPer Km58300.058300.04.58FalseNoneNoneFalseNoneFalse267014.00
17241505520000NoneNoneRoadsBT Road From SH-40 to Muraripura4210262.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3820131145337NonePWD CSR 2023-24 Vol 3 page 9 item Code 2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.-By Mechanical Means using Dozer- In area of light jungle ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work100 Sqm412.65412.6514.85FalseNoneNoneFalseNoneFalse6127.85250
3820132145337NoneVol-3 P No 17 I No:3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum6.36.3237.94FalseNoneNoneFalseNoneFalse1499.0220
3820133145337NonePWD SR 2023-24 Vol-3 Page-26, I.No. 4.Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. - Wet Mix Macadam (Plant mix method) 17) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum2686.952686.95555.19FalseNoneNoneFalseNoneFalse1491767.77050
3820134145337NonePWD SR 2023-24 Vol-3 Page-31, I.No. 5.1Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm43.0543.053172.5FalseNoneNoneFalseNoneFalse136576.1250
3820135145337NonePWD SR 2023-24 Vol-3 Page-32, I.No. 5.6 CBituminous Macadam Grading - I for traffic 20 MSA Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compactio ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum7835.17835.1158.62FalseNoneNoneFalseNoneFalse1242803.5620
3820136145337NonePWD SR 2023-24 Vol-3 Page-31, I.No. 5.3Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsionusing emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm11.5511.553172.5FalseNoneNoneFalseNoneFalse36642.3750
3820137145337NonePWD SR 2023-24Vol-3 Page-43, I.No. 5.31Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum10659.610659.679.31FalseNoneNoneFalseNoneFalse845412.8760
3820138145337NonePWD SR 2023-24Vol-3P No:17, I No:3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum517.65517.65371.25FalseNoneNoneFalseNoneFalse192177.56250
3820139145337NonePWD SR 2023-24 Vol-3 Page-67,I.No.8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. () NOTE 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workSqm556.5556.5165.0FalseNoneNoneFalseNoneFalse91822.50
3820140145337NonePWD SR 2023-24 Vol-3 Page-74, I.No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS mouldedbody and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kgtested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workEach383.25383.25100.0FalseNoneNoneFalseNoneFalse38325.00
3820141145337NoneSE PWD Ballari letter no. 2900 Dated 20-01-2024Road maintenance for 3rd year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance approved vide SE PWD Ballari letter no. 2900 Dated 20-01-2024 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workPer Km31210.031210.00.82FalseNoneNoneFalseNoneFalse25592.20
3820142145337NoneSE PWD Ballari letter no. 2900 Dated 20-01-2024Road maintenance for 4th year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance (approved vide SE PWD Ballari letter no. 2900 Dated 20-01-2024) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workPer Km54730.054730.00.82FalseNoneNoneFalseNoneFalse44878.60
3820143145337NoneSE PWD Ballari letter no. 2900 Dated 20-01-2024Road maintenance for 5th year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance (approved vide SE PWD Ballari letter no. 2900 Dated 20-01-2024) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workPer Km69070.069070.00.82FalseNoneNoneFalseNoneFalse56637.40
17241505520000NoneNoneRoadsCC Road in Muraripura Village.1657107.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3820144145338NonePWD SR 2023-24 Vol-3 P No:17, I No:3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum110.25110.2586.25FalseNoneNoneFalseNoneFalse9509.06250
3820145145338NonePWD SR 2023-24 Vol-3 Page-23, I.No. 4.2 VConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material By Mix in Place Method ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum2476.952476.9564.69FalseNoneNoneFalseNoneFalse160233.89550
3820146145338NonePWD SR 2023-24 Vol 3 Page 26, I.No. 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. - Wet Mix Macadam Plant mix method ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum2686.952686.9586.25FalseNoneNoneFalseNoneFalse231749.43750
3820147145338NonePWD CSR 2023-24 Vol-1,P No. 149, I No.16.28Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum7091.77091.7172.5FalseNoneNoneFalseNoneFalse1223318.250
3820148145338NonePWD SR 2023-24 Vol-3 P No:17, I No:3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workCum517.65517.6525.88FalseNoneNoneFalseNoneFalse13396.7820
3820149145338NonePWD SR 2023-24 Vol-3 Page-78, I.No. 8.54Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of workEach9450.09450.02.0FalseNoneNoneFalseNoneFalse18900.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17241505530000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17241505530000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17241505530000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17241505530000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17241505530000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17241506370000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP portal on or before the last date and time of bid submission.None
17241506500000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17241506590000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of Karnataka Public Procurement Portal on or before the last date and time of bid submission.None
17241506690000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17241506790000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of Karnataka Public Procurement Portal on or before the last date and time of bid submission.None
17241506920000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of Karnataka Public Procurement Portal due to internet connectivity issues and technical glitches at bidders end.None
17241507010000NoneNoneELIGIBILITYAs per Karnataka State Government order No LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.07.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17241507090000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders, except GST, which will be paid separately.None
17241507180000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17241507280000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17241507370000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17241507460000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or whatsoever.None
17241507550000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period at his own cost.None
17241507630000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kp-procurement portal.None
17241507710000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17241507810000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per Government Circular No.PWD/159/CRM/2009 Dated 30-09-2010 (If applicable for this work).None
17241507880000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17241507960000NoneNoneELIGIBILITYAgency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17241508030000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand for works costing more than 10.00 crores, as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17241508120000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests as per approved Quality Assurance Plan (QAP) for satisfactory completion.None
17241508200000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17241508270000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17241508360000NoneNoneELIGIBILITYThe Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17241508450000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of Labour Act and applicable any other law as concerned to work.None
17241508530000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17241508620000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17241508710000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhs.None
17241508790000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17241508880000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17241509170000NoneNoneELIGIBILITYAgreed that, in case of Revision of GST during the agreed contract period, the department and the Contractor are bound to payment/refund accordingly.None
17241509250000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17241509330000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of or in connection with or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the arbitration Centre-Karnataka (Domestic and International) Rules 2012 by one or more arbitrators appointed in accordance with its rules.None
17241509420000NoneNoneELIGIBILITYIt is mandatory to furnish the information regarding works which are yet to be completed, as on date of submission of his tender, in format-5. The tenderer shall note that, deliberately not furnishing the correct information is liable for rejection of such tenders.None
17241509510000NoneNoneELIGIBILITYThe time stipulated for completion of work is 9 (Nine) calendar months including rainy season.None
17241509610000NoneNoneELIGIBILITYThe defect liability period for the work is 5 (Five) YearsNone
17241509700000NoneNoneELIGIBILITYAs Per the Government order, the defect liability period for this project is 5 (Five) Years (For Initial 2 years after completion of work, the road shall be maintained by the contractor at his own cast and risk. subsequently, for 3rd, 4th and 5th years, maintenance shall be carried out as per BOQ)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, achieved in at least two financial years an annual average financial turnover (in all classes of civil engineering construction works only) of Rs.788.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, satisfactorily completed as prime contractor, at least one Similar Nature of Work such as Construction/Improvements of Asphalt Road work of value not less than Rs.197.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer or equivalent.
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 had executed in any one Financial year, the following minimum quantities items of work (a)Earthwork Excavation/Formation of Road Embankment/Sub-grade-3826.00 Cum, (b) Granular sub-base-2147.00 Cum, (c) Wet Mix Macadam/Water bound macadam - 3588.00 Cum, (d) PCC/RCC-222.00 Cum, (e) Bituminous Macadam/Semi dense Bituminous Concrete-1216.00 Cum, (f) Steel reinforcement - 0.90 tonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificates of item wise quantity from competent authority not below the rank of Executive Engineer or equivalent.
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Tipper-2 Nos. and by Own / Hire / Lease Tipper - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own Hydraulic Excavator (CK-90)-1 No. (The Documents in proof of Ownership shall have to attested by Notary or Government Gazetted Officer) at the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted water tanker-2 Nos. and by Own / Hire / Lease - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate: Availability by Own Vibratory Road Roller-1 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own 40/60 TPH Capacity of HMP-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Paver Finisher-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted Mechanical Bitumen Sprayer-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own 60/70 TPH Capacity of Pug Mill-1No (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own/Hire/Lease -Hydraulic Excavator - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability of Self loading mobile concrete mixer by own-1 No and by own/hire/lease-1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneDetailed information on litigation in which the Tenderer is involved as concerned to Government worksCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs.132.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc. from an nationalized or scheduled bank. Conditional Line of Credit will not be acceptedFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-9
NoneNoneNoneNoneConstitutional and Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD under Class-II and above category
NoneNoneNoneNoneDetailed information on committed offers of works on hand and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneDetailed information of the works for which LOA received for the wokrs tendered from different departments either Central or StateOthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneDetailed information of the works for which Tenderer has submitted his tender in different departments either Central or State.OthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractor Registration certificate for having registered under Class-II and above category in KPWDTrueTechnical Bid
Annual Turnover Certificate issued by Chartered accountant compulsorily indicating UDINTrueTechnical Bid
Similar work done certificate issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
Quantity wise work done certificate issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
Un-conditional Bank line of credit from any Nationalized or scheduled bankTrueTechnical Bid
Documents of machineriesTrueTechnical Bid
Current contract commitmentsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1724153685000
version0
createdDateNone
modifiedDateNone
blockNumberoffice of the Executive Engineer, PWD, Division, Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone