createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724841540577
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1370.00
emd54600.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-09-2024 16:30:00
tenderQueryClose05-09-2024 16:00:00
technicalBidOpen09-09-2024 10:30:00
publishedDate30-08-2024 11:27:12
publishedByPostKRRDA_EE_DIV_RCR
publishedByUserKPE10482 - MENAKA PATEL
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonAnnapurna
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08532295367
mobileNumber9986808194
tenderSupplierListNone
tenderSchedule
createdTs1724841540580
version13
createdDateNone
modifiedDateNone
tenderNumberKRRDA/2024-25/RD/WORK_INDENT96/CALL-2
titleConstruction of CC road and drain in J. JADALDINNI village of Deodurga Taluka.
descriptionConstruction of CC road and drain in J. JADALDINNI village of Deodurga Taluka.
categoryWORKS
categoryTextWorks
ecv5459263.97
deptNameKarnataka Rural Road Development Agency
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2703
locationNameKRRDA Division Office Raichur
provisionalAmount6500000.0
groupOverheadTotalNone
fileNumberPMGSY/2023-24/KKRDB/DEO/JJADALDINNI
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17248415410001NoneNoneRoadsConstruction of CC road and drain in J. JADALDINNI village of Deodurga Taluka.5459263.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3873364148495NoneI.No-3.4 (ii), PWD SR 2023-24, Vol.IIIScarifyingExistingGranularSurfacetoaDepthof50mmby Mechanical Means using Hydraulic excavator.Sqm5.255.254188.0FalseNoneNoneFalseNoneFalse21987.00
3873365148495NoneI.No-3.7, PWD SR 2023-24, Vol.IIILoosening, leveling and Compacting original ground supporting embankmenttofacilitateplacementoffirstlayerofembankment, scarified to a depth of150mm,mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.Cum110.25110.25628.2FalseNoneNoneFalseNoneFalse69259.050
3873366148495NoneI.No-3.6, PWD SR 2023-24, Vol.IIIConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2Cum517.65517.65418.8FalseNoneNoneFalseNoneFalse216791.820
3873367148495NoneI.No-4.14,B (ii)a , PWD SR 2023-24, Vol.IIIProviding,laying,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.Cum2198.72198.7314.1FalseNoneNoneFalseNoneFalse690611.670
3873368148495NoneI.No-16.27 , PWD SR 2023-24, Vol.IIIProviding and constructing un-reinforced plain cement concrete pavement,thickness as per design,over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of125micron thick polythene film,wedges,steel plates including levelling the formwork asperdrawing),spreadingtheconcretewith shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc.,complete as per the directions of the Engineer-in-charge of the work.Cum6692.76692.7616.2FalseNoneNoneFalseNoneFalse4124041.740
3873369148495NoneI.No-8.54 , PWD SR 2023-24, Vol.IIIProvidingandfixingboarddisplayinginformation,such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of1.20mx0.90msizemadeout18gauge(1.25mm)thickmild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. anglesof size 35mmx35mmx3mmduly painted includingTwo M.S.angleironpostsofsize65mmx65mmx6mm,3.65mlong painted with alternate black and white bands of 25 cm width includingallfixturesetc.andfixingtheboardsin1:4:8concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804No9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3873370148495NoneI.No-1.4.1 PWD Common SR 2023-24, Vol.I.Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.Cum254.1254.142.25FalseNoneNoneFalseNoneFalse10735.7250
3873371148495NoneI.No-2.1.2 PWD Common SR 2023-24, Vol.I.Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregatesCum5947.25947.26.5FalseNoneNoneFalseNoneFalse38656.80
3873372148495NoneI.No-2.4.1 PWD Common SR 2023-24, Vol.I.Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 20 M15 Mix 1:2:4 (M15) Using nominal size graded crushed coarse aggregatesCum6724.26724.215.5FalseNoneNoneFalseNoneFalse104225.10
3873373148495NonePWD COMMON SR2023-24 PAGE NO 111 VOLUME-1Addendum I Percentage Additionalities for Formwork, Centering & ScaffoldingCum2353.472353.4715.5FalseNoneNoneFalseNoneFalse36478.7850
3873374148495NoneI.No-2.5.1 PWD Common SR 2023-24, Vol.I.Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Using 20 M 20 Design Mix nominal size graded crushed coarse aggregatesCum6961.56961.54.06FalseNoneNoneFalseNoneFalse28263.690
3873375148495NoneI.No-2.11 h PWD Common SR 2023-24, Vol.I.Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.MT82961.5582961.551.311FalseNoneNoneFalseNoneFalse108762.592050
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17248415410000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17248415410000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17248415410000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17248415410000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17248415410000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17248415410000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet-connectivity issues and technical glitches at bidders end.None
17248415410000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & MaxRs.7500/-) soon after contract has been issued to bidder.None
17248415410000NoneNoneELIGIBILITYRoyalty Charges will be Deducted in every bill of contract as per rulesNone
17248415410000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17248415410000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March of succeeding year(Both Days inclusive)None
17248415410000NoneNoneELIGIBILITYAs per Karnataka State Government Order LD/300/LET /2006 Bangalore dated 01.01.2007 and Government Letter No PW/134/BMS/2007 dated27.07.2007, a sum Amounting to 1% of the bill amount will be deducted towards constructions labor welfare fund.None
17248415410000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reasonNone
17248415410000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17248415410000NoneNoneELIGIBILITYAll materials required for the work, shall be procured by the Tenderer himself and should be got tested by the quality control authorities at his own cost before use on work.None
17248415410000NoneNoneELIGIBILITYThe KPWD Code, KTTP Act/Rules ,Delegation of Powers and other Government Orders issued by the Government from time to time will applyNone
17248415410000NoneNoneELIGIBILITYTenderer shall obtain the work done certificate in the prescribed Format from the competent authority not below the rank of Executive Engineer (District Level Officer) and scan the original certificates and attach the scanned file to the tender. The original certificate shall be produced at the time of opening of Technical Bids for physical verification.None
17248415410000NoneNoneELIGIBILITYThe Item Rates quoted shall include cost of Royalty charges on constructive materials & other taxes as per the ratesprevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loadingand unloading with all leads and lifts, labour, hire charges of machinery & equipment etc., complete and all incidentalcharges. All the items shall be executed as directed by the Engineer- in-charge of the work.None
17248415410000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the Bidder.None
17248415410000NoneNoneELIGIBILITYWHEN THE CONTRACT MANAGEMENT BECOMES OPERATIONAL THE BIDDER SHALL PAY AN AMOUNT EQUIVALENT TOTHE TENDER PROCESSING FEENone
17248415410000NoneNoneELIGIBILITYThe contractor shall furnish an affidavit stating that the exiting commitments, Furnished are true & if found false action may be taken as per Rules.None
17248415410000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic &International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17248415410000NoneNoneELIGIBILITYDefect and liability period 1 (One) years from date of completion of this workNone
17248415410000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next section.None
17248415410000NoneNoneELIGIBILITYThe period for completion of work is 03 (Three) months including the monsoon season.None
17248415410000NoneNoneELIGIBILITYQualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded.None
17248415410000NoneNoneELIGIBILITYName, Address, telephone No., Fax No., and email ID of the Tenderers BankersNone
17248415410000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17248415410000NoneNoneELIGIBILITYLatest Income Tax Clearance CertificateNone
17248415410000NoneNoneELIGIBILITYAssessed Tender Capacity shall be more than the Tendered AmountNone
17248415410000NoneNoneELIGIBILITYInformation on works for which Tenders have been submitted and works which are yetNone
17248415410000NoneNoneELIGIBILITYReport on the financial standing of the tenderer, such as profit and loss statements and auditors report for the last five yearsNone
17248415410000NoneNoneELIGIBILITYIf any damage Occurs during construction of work contractor should pay the expenditureNone
17248415410000NoneNoneELIGIBILITYContractor will be dis-qualified if, Made misleading or false representations in the forms, statements and attachments submitted in proof of the qualification requirements.None
17248415410000NoneNoneELIGIBILITYContractor will be dis-qualified if, Record of poor performance such as abandoning the works, not properly completing the contract, inordinate delays in completion, litigation history, or financial failures etc.None
17248415410000NoneNoneELIGIBILITYContractor will be dis-qualified if, Participated in the previous Tender for the same work and had quoted unreasonably high tender prices and could not furnish rational justification.None
17248415410000NoneNoneELIGIBILITYThe additional Performance Security for unbalanced bids of Contract is repaid to the Contractor when the construction work is complete.None
17248415410000NoneNoneELIGIBILITYSecurity deposit deducted from each bill will be returned to the contractor after the completion of work, and Performance Security Deposit (Submitted during LOA) will be return after the DLP period i.e., one year after completion.None
17248415410000NoneNoneELIGIBILITYConditional LOC (Line of Credit) not allowedNone
17248415410000NoneNoneELIGIBILITYCASTE CERTIFICATE TO BE SUBMITTED FOR RESERVED WORKS (SC)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMandating satisfactory completion as a prime contractor for at least one civil work amounting Rs.13.65 lakhs ( to an extent of 25% of the cost of the work, for all works consisting upto and Rs. 100.00 Lakh.)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year for a continuous period of 12 months the following minimum quantities of work. Earthwork-33.80 Cum, subgrade -335.04 cum, WBM -251.28 Cum, Cement Concrete - 513.80 Cum Steel-1.048 MT, usually 80 % of the annual requirementPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneQualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNoneTotal value of civil engineering works executed and payments received in the last five years (year-wise)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneList of works for which tenders already submittedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNoneTenderer should be a Registered PWD Class-3 & above Contractor.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than one time the annual payments from this contract (Rs.54.60 Lakhs)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid Assets and/or availability of Credit facilities of not less than Rs.16.38 Lakhs (Credit lines/Letter of credit/certificates from the Bank for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Reserved Category CertificateTrueTechnical Bid
PWD Registration Certificate Class-3 & AboveTrueTechnical Bid
Line of credictTrueTechnical Bid
Annual Turnover Certificate from 2019-20 to 2023-24TrueTechnical Bid
Work Done Certificate from 2019-20 to 2023-24TrueTechnical Bid
Quantities wise work done certificate from 2019-20 to 2023-24TrueTechnical Bid
Other documents as per KW-3 bid documentTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone