tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1723448027000 | 1 | None | None | Roads | a1) Resurfacing of Road from NH-212 to join Biligere via Varauna-Hosakote from Ch. 12.70km to 16.25km. | 17855808.97 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754517 | 140965 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 43.2 | False | None | None | False | None | False | 20033.568 | 0 | 3754518 | 140965 | None | Common SR Vol- 3 , P.No : 17, I.No : 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST. | Cum | 581.74 | 581.74 | 360.0 | False | None | None | False | None | False | 209426.4 | 0 | 3754519 | 140965 | None | Common SR Vol-3 , P.No : 43, I.No : 5.32 | Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32. The rates are inclusive 18 percentage GST. | Sqm | 14.16 | 14.16 | 17100.0 | False | None | None | False | None | False | 242136.0 | 0 | 3754520 | 140965 | None | Common SR Vol-3 , P.No : 35, I.No : 5.12 C | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. The rates are inclusive 18 percentage GST. | Cum | 11149.82 | 11149.82 | 872.1 | False | None | None | False | None | False | 9723758.022 | 0 | 3754521 | 140965 | None | Common SR Vol-3 , P.No : 38, I.No : 5.16C | Bituminous Concrete Grading II for traffic 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST. | Cum | 12925.72 | 12925.72 | 513.0 | False | None | None | False | None | False | 6630894.36 | 0 | 3754522 | 140965 | None | Common SR Vol-3 , P.No:67, I.No : 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.The rates are inclusive 18 percentage GST. | Sqm | 625.4 | 625.4 | 726.4 | False | None | None | False | None | False | 454290.56 | 0 | 3754523 | 140965 | None | Common SR Vol-3 , P.No : 74, I.No : 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST. | Nos. | 430.7 | 430.7 | 1100.0 | False | None | None | False | None | False | 473770.0 | 0 | 3754524 | 140965 | None | Common SR Vol-3 , P.No :64, I.No : 8.6. A(iv) | Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST. | Nos. | 4252.72 | 4252.72 | 10.0 | False | None | None | False | None | False | 42527.2 | 0 | 3754525 | 140965 | None | Common SR Vol-3 , P.No :65, I.No : 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST. | Sqm | 10631.8 | 10631.8 | 2.7 | False | None | None | False | None | False | 28705.86 | 0 | 3754526 | 140965 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(i) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). The rates are inclusive 18 percentage GST. | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3754527 | 140965 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(ii) | Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).The rates are inclusive 18 percentage GST. | Each | 3453.86 | 3453.86 | 3.0 | False | None | None | False | None | False | 10361.58 | 0 | 3754528 | 140965 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST. | Each | 993.56 | 993.56 | 14.0 | False | None | None | False | None | False | 13909.84 | 0 |
| 1723448027000 | 1 | None | None | Roads | a2) Road from NTN at Kupparavalli to join Sutturu from Ch. 0.00km to 4.00km | 62610091.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754529 | 140966 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 58.8 | False | None | None | False | None | False | 27267.912 | 0 | 3754530 | 140966 | None | Common SR Vol-3 , P.No : 17, I.No : 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. The rates are inclusive 18 percentage GST. | Sqm | 7.08 | 7.08 | 3710.0 | False | None | None | False | None | False | 26266.8 | 0 | 3754531 | 140966 | None | Common SR Vol-3 , P.No : 17, I.No : 3.7 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. The rates are inclusive 18 percentage GST. | Cum | 123.9 | 123.9 | 102.0 | False | None | None | False | None | False | 12637.8 | 0 | 3754532 | 140966 | None | Common SR Vol- 1 , P.No : 7, I.No : 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. The rates are inclusive 18 percentage GST. | Cum | 559.32 | 559.32 | 405.0 | False | None | None | False | None | False | 226524.6 | 0 | 3754533 | 140966 | None | Common SR Vol- 3 , P.No :23, I.No : 4.1 A(v) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material. The rates are inclusive 18 percentage GST. | Cum | 2934.66 | 2934.66 | 244.5 | False | None | None | False | None | False | 717524.37 | 0 | 3754534 | 140966 | None | Common SR Vol- 3 , P.No : 26, I.No : 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. The rates are inclusive 18 percentage GST. | Cum | 3019.62 | 3019.62 | 881.75 | False | None | None | False | None | False | 2662549.935 | 0 | 3754535 | 140966 | None | Common SR Vol- 3 , P.No : 17, I.No : 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST. | Cum | 581.74 | 581.74 | 464.0 | False | None | None | False | None | False | 269927.36 | 0 | 3754536 | 140966 | None | Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i). The rates are inclusive 18 percentage GST. | Sqm | 48.38 | 48.38 | 1050.0 | False | None | None | False | None | False | 50799.0 | 0 | 3754537 | 140966 | None | Common SR Vol-3 , P.No : 43, I.No : 5.33 | Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom Common SR Vol-3 , P.No : 43, I.No : 5.33. The rates are inclusive 18 percentage GST. | Sqm | 17.7 | 17.7 | 1050.0 | False | None | None | False | None | False | 18585.0 | 0 | 3754538 | 140966 | None | Common SR Vol-3 , P.No : 43, I.No : 5.32 | Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32, The rates are inclusive 18 percentage GST. | Sqm | 14.16 | 14.16 | 50455.0 | False | None | None | False | None | False | 714442.8 | 0 | 3754539 | 140966 | None | Common SR Vol-3 , P.No : 35, I.No : 5.12 C | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Common SR Vol-3 , P.No : 35, I.No : 5.12 C. The rates are inclusive 18 percentage GST. | Cum | 11149.82 | 11149.82 | 2625.7 | False | None | None | False | None | False | 29276082.374 | 0 | 3754540 | 140966 | None | Common SR Vol-3 , P.No : 38, I.No : 5.16C | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST. | Cum | 12925.72 | 12925.72 | 1545.15 | False | None | None | False | None | False | 19972176.258 | 0 | 3754541 | 140966 | None | Common SR Vol-3 , P.No : 51, I.No : 6.6 | Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008, Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. The rates are inclusive 18 percentage GST. | Cum | 7993.32 | 7993.32 | 608.0 | False | None | None | False | None | False | 4859938.56 | 0 | 3754542 | 140966 | None | Common SR Vol-3 , P.No:67, I.No : 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. The rates are inclusive 18 percentage GST. | Sqm | 625.4 | 625.4 | 2211.89 | False | None | None | False | None | False | 1383316.006 | 0 | 3754543 | 140966 | None | Common SR Vol-3 , P.No : 74, I.No : 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST.
| Nos | 430.7 | 430.7 | 3308.0 | False | None | None | False | None | False | 1424755.6 | 0 | 3754544 | 140966 | None | Common SR Vol-3 , P.No :64, I.No : 8.6. A(iv) | Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST. | Nos | 4252.72 | 4252.72 | 10.0 | False | None | None | False | None | False | 42527.2 | 0 | 3754545 | 140966 | None | Common SR Vol-3 , P.No :65, I.No : 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST. | Sqm | 10631.8 | 10631.8 | 1.62 | False | None | None | False | None | False | 17223.516 | 0 | 3754546 | 140966 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(ii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast). The rates are inclusive 18 percentage GST. | Each | 3453.86 | 3453.86 | 5.0 | False | None | None | False | None | False | 17269.3 | 0 | 3754547 | 140966 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST. | Each | 993.56 | 993.56 | 16.0 | False | None | None | False | None | False | 15896.96 | 0 | 3754548 | 140966 | None | 10 volume 3 page no. 161 | Crack Groove Cutting: Groove shall be cut using hand held
electrically operated concrete cutting machine of size of 50 mm
wide and 75 mm deep on each side of the crack to form as "V"
groove all along the crack to fill the polyester resin/ Epoxy putty
(horizontal and vertical cracks). After the groove cutting, the
concrete shall be removed from the groove using the pneumatic
concrete chipping machine to form "V" groove. The item includes
the cost of hire charges for all machineries, tools and barges and
all labour charges etc., complete. The rates are inclusive 18 percentage GST. | m | 885.0 | 885.0 | 988.0 | False | None | None | False | None | False | 874380.0 | 0 |
| 1723448027000 | 1 | None | None | Roads | a) Construction of Retaining wall at Ch. 2.95 to 3.33 km 2 Sides | 9236490.54 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754549 | 140967 | None | Common SR Vol-1 , P.No : 8, I.No : 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth up to 3 m. The rates are inclusive 18 percentage GST. | Cum | 120.36 | 120.36 | 653.4 | False | None | None | False | None | False | 78643.224 | 0 | 3754550 | 140967 | None | Common SR Vol-1 , P.No : 15, I.No : 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST. | Cum | 7067.02 | 7067.02 | 103.95 | False | None | None | False | None | False | 734616.729 | 0 | 3754551 | 140967 | None | Common SR Vol-1 , P.No : 15, I.No : 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST. | Cum | 7418.66 | 7418.66 | 623.7 | False | None | None | False | None | False | 4627018.242 | 0 | 3754552 | 140967 | None | Common SR Vol-1 , P.No : 15, I.No : 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST. | Cum | 741.87 | 741.87 | 623.7 | False | None | None | False | None | False | 462704.319 | 0 | 3754553 | 140967 | None | Common SR Vol-1 , P.No : 18, I.No : 2.11h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification. The rates are inclusive 18 percentage GST. | Tonne | 93232.98 | 93232.98 | 15.51 | False | None | None | False | None | False | 1446043.5198 | 0 | 3754554 | 140967 | None | Common SR Vol-3 , P.No : 117, I.No : 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A.Granular material. The rates are inclusive 18 percentage GST. | Cum | 1378.24 | 1378.24 | 297.0 | False | None | None | False | None | False | 409337.28 | 0 | 3754555 | 140967 | None | Common SR Vol-3 , P.No : 117, I.No : 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. The rates are inclusive 18 percentage GST. | Mtr | 282.02 | 282.02 | 199.2 | False | None | None | False | None | False | 56178.384 | 0 | 3754556 | 140967 | None | Common SR Vol-3 , P.No : 69, I.No :8.25 i | Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier
Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. The rates are inclusive 18 percentage GST. | Mtr | 4295.2 | 4295.2 | 200.0 | False | None | None | False | None | False | 859040.0 | 0 | 3754557 | 140967 | None | Common SR Vol-3 , P.No : 117, I.No : 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. The rates are inclusive 18 percentage GST | Cum | 3158.86 | 3158.86 | 178.2 | False | None | None | False | None | False | 562908.852 | 0 |
| 1723448027000 | 1 | None | None | Roads | a) Maintenance of road upto 5 years (DLP) | 804668.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754558 | 140968 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 144.0 | False | None | None | False | None | False | 66778.56 | 0 | 3754559 | 140968 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 144.0 | False | None | None | False | None | False | 66778.56 | 0 | 3754560 | 140968 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 144.0 | False | None | None | False | None | False | 66778.56 | 0 | 3754561 | 140968 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST. | Sqm | 185.26 | 185.26 | 343.02 | False | None | None | False | None | False | 63547.8852 | 0 | 3754562 | 140968 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST. | Sqm | 185.26 | 185.26 | 686.05 | False | None | None | False | None | False | 127097.623 | 0 | 3754563 | 140968 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST. | Cum | 120.36 | 120.36 | 37.12 | False | None | None | False | None | False | 4467.7632 | 0 | 3754564 | 140968 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST. | Cum | 120.36 | 120.36 | 37.12 | False | None | None | False | None | False | 4467.7632 | 0 | 3754565 | 140968 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST. | Sqm | 114.46 | 114.46 | 413.62 | False | None | None | False | None | False | 47342.9452 | 0 | 3754566 | 140968 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST. | Sqm | 114.46 | 114.46 | 413.62 | False | None | None | False | None | False | 47342.9452 | 0 | 3754567 | 140968 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST. | Sqm | 114.46 | 114.46 | 413.62 | False | None | None | False | None | False | 47342.9452 | 0 | 3754568 | 140968 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST. | m | 7.08 | 7.08 | 11030.0 | False | None | None | False | None | False | 78092.4 | 0 | 3754569 | 140968 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST. | m | 7.08 | 7.08 | 11030.0 | False | None | None | False | None | False | 78092.4 | 0 | 3754570 | 140968 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST. | m | 7.08 | 7.08 | 11030.0 | False | None | None | False | None | False | 78092.4 | 0 | 3754571 | 140968 | None | 16.22 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22). The rates are inclusive 18 percentage GST. | Km | 2341.12 | 2341.12 | 7.25 | False | None | None | False | None | False | 16973.12 | 0 | 3754572 | 140968 | None | 16.24 (ii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)). The rates are inclusive 18 percentage GST. | Km | 243.08 | 243.08 | 7.25 | False | None | None | False | None | False | 1762.33 | 0 | 3754573 | 140968 | None | 16.24(iii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii). The rates are inclusive 18 percentage GST. | Km | 1339.3 | 1339.3 | 7.25 | False | None | None | False | None | False | 9709.925 | 0 |
| 1723448027000 | 1 | None | None | Roads | b) Improvements to roads Connecting to Basavanapura (NH-150A) to Bandipalya APMC (NH-150A) via Hulimavu-Hadinaru- Ayarahalli- Devalapura- Hosahundi Ch. 5.80 to Ch.8.55 Km Widening and resuface Ch. 8.55 to Ch 16.55 Km in Nanjangud Taluk, Varuna Constituency | 91882603.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754574 | 140969 | None | 2.5(ii)A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.0 | False | None | None | False | None | False | 119644.92 | 0 | 3754575 | 140969 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 5101.25 | False | None | None | False | None | False | 613986.45 | 0 | 3754576 | 140969 | None | 4.1 A(v) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rates are inclusive of 18 % GST. | Cum | 2934.66 | 2934.66 | 1457.5 | False | None | None | False | None | False | 4277266.95 | 0 | 3754577 | 140969 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rates are inclusive of 18 % GST. | Cum | 3019.62 | 3019.62 | 1237.5 | False | None | None | False | None | False | 3736779.75 | 0 | 3754578 | 140969 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Rates are inclusive of 18 % GST. | Cum | 581.74 | 581.74 | 2365.0 | False | None | None | False | None | False | 1375815.1 | 0 | 3754579 | 140969 | None | 5.33 | Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom. Rates are inclusive of 18 % GST. | Sqm | 17.7 | 17.7 | 4125.0 | False | None | None | False | None | False | 73012.5 | 0 | 3754580 | 140969 | None | 5.32 | Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. Rates are inclusive of 18 % GST. | Sqm | 14.16 | 14.16 | 75425.0 | False | None | None | False | None | False | 1068018.0 | 0 | 3754581 | 140969 | None | 5.12 C | Dense Graded Bituminous Macadam Grading - II for traffic Less than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates are inclusive of 18 % GST. | Cum | 11149.82 | 11149.82 | 4090.65 | False | None | None | False | None | False | 45610011.183 | 0 | 3754582 | 140969 | None | 5.16C | Bituminous Concrete Grading II for traffic Less than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Rates are inclusive of 18 % GST. | Cum | 12925.72 | 12925.72 | 2386.5 | False | None | None | False | None | False | 30847230.78 | 0 | 3754583 | 140969 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Rates are inclusive of 18 % GST. | Sqm | 625.4 | 625.4 | 3579.75 | False | None | None | False | None | False | 2238775.65 | 0 | 3754584 | 140969 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Rates are inclusive of 18 % GST. | Nos | 430.7 | 430.7 | 4181.0 | False | None | None | False | None | False | 1800756.7 | 0 | 3754585 | 140969 | None | 8.6. A(iv) | Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. Rates are inclusive of 18 % GST. | Nos | 4252.72 | 4252.72 | 5.0 | False | None | None | False | None | False | 21263.6 | 0 | 3754586 | 140969 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Rates are inclusive of 18 % GST. | Sqm | 10631.8 | 10631.8 | 1.62 | False | None | None | False | None | False | 17223.516 | 0 | 3754587 | 140969 | None | 8.16(i) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). Rates are inclusive of 18 % GST | Each | 5995.58 | 5995.58 | 2.0 | False | None | None | False | None | False | 11991.16 | 0 | 3754588 | 140969 | None | 8.16(ii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).Rates are inclusive of 18 % GST. | Each | 3453.86 | 3453.86 | 9.0 | False | None | None | False | None | False | 31084.74 | 0 | 3754589 | 140969 | None | 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast).Rates are inclusive of 18 % GST. | Each | 993.56 | 993.56 | 40.0 | False | None | None | False | None | False | 39742.4 | 0 |
| 1723448027000 | 1 | None | None | Roads | b) Construction of 1M x 1M Box Culvert | 462388.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754590 | 140970 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m.Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 49.88 | False | None | None | False | None | False | 6003.5568 | 0 | 3754591 | 140970 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST. | Cum | 7067.02 | 7067.02 | 4.28 | False | None | None | False | None | False | 30246.8456 | 0 | 3754592 | 140970 | None | 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST. | Cum | 7418.66 | 7418.66 | 7.54 | False | None | None | False | None | False | 55936.6964 | 0 | 3754593 | 140970 | None | 2.2.1 | B. Form Work Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST. | Cum | 1483.73 | 1483.73 | 7.54 | False | None | None | False | None | False | 11187.3242 | 0 | 3754594 | 140970 | None | 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) | Cum | 8074.74 | 8074.74 | 17.09 | False | None | None | False | None | False | 137997.3066 | 0 | 3754595 | 140970 | None | 2.5.2 | Form Work Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars formwork to be paid separately).Rates are inclusive of 18 % GST. | Cum | 1614.95 | 1614.95 | 17.09 | False | None | None | False | None | False | 27599.4955 | 0 | 3754596 | 140970 | None | 2.11 b | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges.Rates are inclusive of 18 % GST. | Tonne | 101723.08 | 101723.08 | 0.49 | False | None | None | False | None | False | 49844.3092 | 0 | 3754597 | 140970 | None | 2.11 c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges).Rates are inclusive of 18 % GST. | Tonne | 101990.94 | 101990.94 | 0.59 | False | None | None | False | None | False | 60174.6546 | 0 | 3754598 | 140970 | None | 2.11d | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges).Rates are inclusive of 18 % GST. | Tonne | 102256.44 | 102256.44 | 0.81 | False | None | None | False | None | False | 82827.7164 | 0 | 3754599 | 140970 | None | 13.14 | Painting on concrete surface : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2).Rates are inclusive of 18 % GST. | Sqm | 99.12 | 99.12 | 5.76 | False | None | None | False | None | False | 570.9312 | 0 |
| 1723448027000 | 1 | None | None | Roads | b) Maintenance of road upto 5 Years | 1324059.23 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754600 | 140971 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.48 | False | None | None | False | None | False | 119867.5152 | 0 | 3754601 | 140971 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.48 | False | None | None | False | None | False | 119867.5152 | 0 | 3754602 | 140971 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.48 | False | None | None | False | None | False | 119867.5152 | 0 | 3754603 | 140971 | None | 10.15(i) | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i) Rates are inclusive of 18 % GST. | Sqm | 310.34 | 310.34 | 397.75 | False | None | None | False | None | False | 123437.735 | 0 | 3754604 | 140971 | None | 10.15(i) | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i).Rates are inclusive of 18 % GST. | Sqm | 310.34 | 310.34 | 795.5 | False | None | None | False | None | False | 246875.47 | 0 | 3754605 | 140971 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 20.41 | False | None | None | False | None | False | 2456.5476 | 0 | 3754606 | 140971 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m . Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 20.41 | False | None | None | False | None | False | 2456.5476 | 0 | 3754607 | 140971 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST. | Sqm | 114.46 | 114.46 | 341.25 | False | None | None | False | None | False | 39059.475 | 0 | 3754608 | 140971 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST. | Sqm | 114.46 | 114.46 | 341.25 | False | None | None | False | None | False | 39059.475 | 0 | 3754609 | 140971 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST. | Sqm | 114.46 | 114.46 | 341.25 | False | None | None | False | None | False | 39059.475 | 0 | 3754610 | 140971 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST. | Mtr | 7.08 | 7.08 | 18200.0 | False | None | None | False | None | False | 128856.0 | 0 | 3754611 | 140971 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST. | Mtr | 7.08 | 7.08 | 18200.0 | False | None | None | False | None | False | 128856.0 | 0 | 3754612 | 140971 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST | Mtr | 7.08 | 7.08 | 18200.0 | False | None | None | False | None | False | 128856.0 | 0 | 3754613 | 140971 | None | 16.20 (i) | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909. Rates are inclusive of 18 % GST. | Nos | 2415.46 | 2415.46 | 12.0 | False | None | None | False | None | False | 28985.52 | 0 | 3754614 | 140971 | None | 16.22 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Rates are inclusive of 18 % GST. | Km | 2341.12 | 2341.12 | 14.4 | False | None | None | False | None | False | 33712.128 | 0 | 3754615 | 140971 | None | 16.24 (i) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint. Rates are inclusive of 18 % GST. | Km | 243.08 | 243.08 | 14.4 | False | None | None | False | None | False | 3500.352 | 0 | 3754616 | 140971 | None | 20.25 (ii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade. Rates are inclusive of 18 % GST. | Km | 1339.3 | 1339.3 | 14.4 | False | None | None | False | None | False | 19285.92 | 0 |
| 1723448027000 | 1 | None | None | Roads | b) HM Yard | 249297.55 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754617 | 140972 | None | 1.06 | PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) and Labour | Nos | 5617.0 | 5617.0 | 10.0 | False | None | None | False | None | False | 56170.0 | 0 | 3754618 | 140972 | None | IX a | 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) and labour Labour | Nos | 790.0 | 790.0 | 14.0 | False | None | None | False | None | False | 11060.0 | 0 | 3754619 | 140972 | None | XIX e | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e) | Set | 221.0 | 221.0 | 18.0 | False | None | None | False | None | False | 3978.0 | 0 | 3754620 | 140972 | None | XII a | LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) and labour | Nos | 561.0 | 561.0 | 12.0 | False | None | None | False | None | False | 6732.0 | 0 | 3754621 | 140972 | None | XII d | 1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d) | Nos | 65.0 | 65.0 | 18.0 | False | None | None | False | None | False | 1170.0 | 0 | 3754622 | 140972 | None | XIX c | No.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c) | Nos | 25.0 | 25.0 | 16.0 | False | None | None | False | None | False | 400.0 | 0 | 3754623 | 140972 | None | XX b | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) including 3 Percent Accessories and labour | Km | 66659.45 | 66659.45 | 1.0 | False | None | None | False | None | False | 66659.45 | 0 | 3754624 | 140972 | None | XX a | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) including 3 Percent Accessories & labour | Km | 41542.0 | 41542.0 | 1.0 | False | None | None | False | None | False | 41542.0 | 0 | 3754625 | 140972 | None | XXIII a | Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) and labour | Set | 1657.0 | 1657.0 | 4.0 | False | None | None | False | None | False | 6628.0 | 0 | 3754626 | 140972 | None | I b | Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL and labour | Nos | 2547.9 | 2547.9 | 8.0 | False | None | None | False | None | False | 20383.2 | 0 | 3754627 | 140972 | None | IX a | Releasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole and Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) | Nos | 231.8 | 231.8 | 8.0 | False | None | None | False | None | False | 1854.4 | 0 | 3754628 | 140972 | None | IX a | Releasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) | Nos | 231.8 | 231.8 | 8.0 | False | None | None | False | None | False | 1854.4 | 0 | 3754629 | 140972 | None | XX b | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b) | Km | 6268.1 | 6268.1 | 1.0 | False | None | None | False | None | False | 6268.1 | 0 | 3754630 | 140972 | None | XX a | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a) | Km | 4598.0 | 4598.0 | 1.0 | False | None | None | False | None | False | 4598.0 | 0 | 3754631 | 140972 | None | Round off | Chescom Charges | Lump Sum for Each | 20000.0 | 20000.0 | 1.0 | False | None | None | False | None | False | 20000.0 | 0 |
| 1723448027000 | 1 | None | None | Roads | c) Widening & Strengthening of road from Nh-766 Chikkahalli to join S-Kallahalli (SH-57) via Mosambayanahalli-Ayarahalli-Someshwarapura- Hebya-Kadakola (SH 150A)-Sindhuvalli-Talur- Kallahalli-Jayapura (SH-33)- Mahadevapura(SH-33)-Bettadabidu cross- Gumachahalli Ch 0.00 to 6.60 Km at Varuna Constituency in Mysore taluk | 59405829.52 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754632 | 140973 | None | 2.5(ii)a | Clearing and grubbing road land including weeds, shrubs, bushes, grass, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle - By Mechanical Means using, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a | 100 Sqm | 463.74 | 463.74 | 153.6 | False | None | None | False | None | False | 71230.464 | 0 | 3754633 | 140973 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 | Cum | 120.36 | 120.36 | 7589.96 | False | None | None | False | None | False | 913527.5856 | 0 | 3754634 | 140973 | None | 4.17(A) | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 26, I.No : 4.17(A) | Cum | 3019.62 | 3019.62 | 3175.0 | False | None | None | False | None | False | 9587293.5 | 0 | 3754635 | 140973 | None | 5.1 A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i) | Sqm | 48.38 | 48.38 | 12400.0 | False | None | None | False | None | False | 599912.0 | 0 | 3754636 | 140973 | None | 5.32 | Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with echanical broom Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 43, I.No : 5.32 | Sqm | 14.16 | 14.16 | 39375.0 | False | None | None | False | None | False | 557550.0 | 0 | 3754637 | 140973 | None | 5.12C | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA , Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 35, I.No : 5.12 C | Cum | 11149.82 | 11149.82 | 2025.0 | False | None | None | False | None | False | 22578385.5 | 0 | 3754638 | 140973 | None | 5.16C | Bituminous Concrete Grading II for traffic 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 38, I.No : 5.16C | Cum | 12925.72 | 12925.72 | 1177.5 | False | None | None | False | None | False | 15220035.3 | 0 | 3754639 | 140973 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Inclusive of GST 18 Percent.Common SR Vol- 3 , P.No : 15 , I.No : 3.6 | Cum | 581.74 | 581.74 | 4167.72 | False | None | None | False | None | False | 2424529.4328 | 0 | 3754640 | 140973 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of otherstructures graded with desired compaction, Inclusive of GST 18 Percent.Common SR Vol- 1 , P.No : 7 , I.No : 1.7 | Cum | 133.34 | 133.34 | 962.28 | False | None | None | False | None | False | 128310.4152 | 0 | 3754641 | 140973 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :57, I.No : 8.15 | Sqm | 625.4 | 625.4 | 1421.0 | False | None | None | False | None | False | 888693.4 | 0 | 3754642 | 140973 | None | 8.43 | Supplying and Fixing of Moulded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer PWD SOR for Roads & Bridges Inclusive of GST 18 Percent Common SR Vol-3 , Item No. VOL-III-8.43 Page No.74 | No | 430.7 | 430.7 | 1666.0 | False | None | None | False | None | False | 717546.2 | 0 | 3754643 | 140973 | None | 8.25A | Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Type - A, "W" : Metal Beam Crash Barrier Inclusive of GST 18 Percent Common SR Vol-3 , P.No :69, I.No : 8.25(A) | Mtr | 4295.2 | 4295.2 | 400.0 | False | None | None | False | None | False | 1718080.0 | 0 | 3754644 | 140973 | None | 10.14 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.4 | Rmtr | 189.98 | 189.98 | 400.0 | False | None | None | False | None | False | 75992.0 | 0 | 3754645 | 140973 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.5 | Rmtr | 259.6 | 259.6 | 400.0 | False | None | None | False | None | False | 103840.0 | 0 | 3754646 | 140973 | None | 8.16(i) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8- 1980, fixing in position including painting and printing etc Ordinary kilometre stone (Pre- cast) 5th Kilometer Stone Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(i) | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3754647 | 140973 | None | 8.16(ii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(ii) | Each | 3453.86 | 3453.86 | 5.0 | False | None | None | False | None | False | 17269.3 | 0 | 3754648 | 140973 | None | 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16. (iii) | Each | 993.56 | 993.56 | 27.0 | False | None | None | False | None | False | 26826.12 | 0 | 3754649 | 140973 | None | 8.6 A(iv) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :54, I.No : 8.6. A(iv) | No | 4252.72 | 4252.72 | 22.0 | False | None | None | False | None | False | 93559.84 | 0 | 3754650 | 140973 | None | 8.7 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :64, I.No : 8.7 | Sqm | 10631.8 | 10631.8 | 3.6 | False | None | None | False | None | False | 38274.48 | 0 | 3754651 | 140973 | None | 4.1A(v) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material, Inclusive of GST 18 Percent. Inclusive of GST 18 Percent Common SR Vol- 3 , P.No : 19, I.No : 4.1 A(v) | Cum | 2934.66 | 2934.66 | 1240.0 | False | None | None | False | None | False | 3638978.4 | 0 |
| 1723448027000 | 1 | None | None | Roads | c) Construction of Drain | 899958.67 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754652 | 140974 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 | Cum | 120.36 | 120.36 | 192.0 | False | None | None | False | None | False | 23109.12 | 0 | 3754653 | 140974 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3 | Cum | 7067.02 | 7067.02 | 24.0 | False | None | None | False | None | False | 169608.48 | 0 | 3754654 | 140974 | None | 2.4.2 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates , Inclusive of GST 18 Percent.Common SR Vol-1 , P.No : 16, I.No : 2.4.2 | Cum | 7461.14 | 7461.14 | 48.0 | False | None | None | False | None | False | 358134.72 | 0 | 3754655 | 140974 | None | 2.4.2 | Form work : Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.4.2 | Cum | 2611.4 | 2611.4 | 48.0 | False | None | None | False | None | False | 125347.2 | 0 | 3754656 | 140974 | None | 2.11h | Supplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications., Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 18, I.No : 2.11 h | Tonne | 93232.98 | 93232.98 | 2.4 | False | None | None | False | None | False | 223759.152 | 0 |
| 1723448027000 | 1 | None | None | Roads | c) Maintenance of road upto 5 Years (Including 2 Years Contract period) | 856028.7 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754657 | 140975 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a) | 100 Sqm | 463.74 | 463.74 | 148.8 | False | None | None | False | None | False | 69004.512 | 0 | 3754658 | 140975 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a) | 100 Sqm | 463.74 | 463.74 | 148.8 | False | None | None | False | None | False | 69004.512 | 0 | 3754659 | 140975 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a) | 100 Sqm | 463.74 | 463.74 | 148.8 | False | None | None | False | None | False | 69004.512 | 0 | 3754660 | 140975 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4) | Sqm | 185.26 | 185.26 | 181.5 | False | None | None | False | None | False | 33624.69 | 0 | 3754661 | 140975 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4) | Sqm | 185.26 | 185.26 | 363.0 | False | None | None | False | None | False | 67249.38 | 0 | 3754662 | 140975 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) | Cum | 120.36 | 120.36 | 412.09 | False | None | None | False | None | False | 49599.1524 | 0 | 3754663 | 140975 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) | Cum | 120.36 | 120.36 | 412.09 | False | None | None | False | None | False | 49599.1524 | 0 | 3754664 | 140975 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment Inclusive of GST 18 Percent .(Common SR Vol-3 , P.No : 91, I.No : 10.2) | Sqm | 114.46 | 114.46 | 465.0 | False | None | None | False | None | False | 53223.9 | 0 | 3754665 | 140975 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2) | Sqm | 114.46 | 114.46 | 465.0 | False | None | None | False | None | False | 53223.9 | 0 | 3754666 | 140975 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2) | Sqm | 114.46 | 114.46 | 465.0 | False | None | None | False | None | False | 53223.9 | 0 | 3754667 | 140975 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19) | Rmtr | 7.08 | 7.08 | 12400.0 | False | None | None | False | None | False | 87792.0 | 0 | 3754668 | 140975 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19) | Rmtr | 7.08 | 7.08 | 12400.0 | False | None | None | False | None | False | 87792.0 | 0 | 3754669 | 140975 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19) | Rmtr | 7.08 | 7.08 | 12400.0 | False | None | None | False | None | False | 87792.0 | 0 | 3754670 | 140975 | None | 16.22 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22) Inclusive of GST 18 Percent | Km | 2341.12 | 2341.12 | 6.6 | False | None | None | False | None | False | 15451.392 | 0 | 3754671 | 140975 | None | 16.24 (ii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)) | Km | 243.08 | 243.08 | 6.6 | False | None | None | False | None | False | 1604.328 | 0 | 3754672 | 140975 | None | 16.24(iii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii) | Km | 1339.3 | 1339.3 | 6.6 | False | None | None | False | None | False | 8839.38 | 0 |
| 1723448027000 | 1 | None | None | Roads | c) Electrical Pole Shifting | 811713.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3754673 | 140976 | None | 1.06 | PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) Labour (Bescom Part-III,Pg 1, I.No 1.06) Inclusive of GST 18 Percent | No | 6628.06 | 6628.06 | 30.0 | False | None | None | False | None | False | 198841.8 | 0 | 3754674 | 140976 | None | IXa | 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) Labour (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 Percent | No | 932.2 | 932.2 | 42.0 | False | None | None | False | None | False | 39152.4 | 0 | 3754675 | 140976 | None | XIXe | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e) Inclusive of GST 18 Percent | Set | 260.78 | 260.78 | 54.0 | False | None | None | False | None | False | 14082.12 | 0 | 3754676 | 140976 | None | XIIa | LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) Labour (Bescom Part-III, Pg 2, I.No XII a) Inclusive of GST 18 Percent | No | 661.98 | 661.98 | 36.0 | False | None | None | False | None | False | 23831.28 | 0 | 3754677 | 140976 | None | XIId | 1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d) Inclusive of GST 18 Percent | No | 76.7 | 76.7 | 54.0 | False | None | None | False | None | False | 4141.8 | 0 | 3754678 | 140976 | None | XIXc | No.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c) Inclusive of GST 18 Percent | No | 29.5 | 29.5 | 48.0 | False | None | None | False | None | False | 1416.0 | 0 | 3754679 | 140976 | None | XXb | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 Percent | Km | 78658.15 | 78658.15 | 3.0 | False | None | None | False | None | False | 235974.45 | 0 | 3754680 | 140976 | None | XXa | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 Percent | Km | 49019.56 | 49019.56 | 3.0 | False | None | None | False | None | False | 147058.68 | 0 | 3754681 | 140976 | None | XXIIIa | Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) Inclusive of GST 18 Percent | Set | 1955.26 | 1955.26 | 12.0 | False | None | None | False | None | False | 23463.12 | 0 | 3754682 | 140976 | None | I b | Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (1341*0.9) (Bescom Part-III, Pg 1, I.No I b) Inclusive of GST 18 Percent | No | 3006.52 | 3006.52 | 24.0 | False | None | None | False | None | False | 72156.48 | 0 | 3754683 | 140976 | None | IXa | Releasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 Percent | No | 273.52 | 273.52 | 24.0 | False | None | None | False | None | False | 6564.48 | 0 | 3754684 | 140976 | None | IX a | Releasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 Percent | No | 273.52 | 273.52 | 24.0 | False | None | None | False | None | False | 6564.48 | 0 | 3754685 | 140976 | None | XX b | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 Percent | Km | 7396.36 | 7396.36 | 3.0 | False | None | None | False | None | False | 22189.08 | 0 | 3754686 | 140976 | None | XX a | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 Percent | Km | 5425.64 | 5425.64 | 3.0 | False | None | None | False | None | False | 16276.92 | 0 |
| 1723453681000 | 1 | None | None | Roads | Package-1 a1) Resurfacing of Road from NH-212 to join Biligere via SH-84A from Ch. 12.70km to 16.25km, a2) Road from NTN at Kupparavalli to join Sutturu from Ch. 0.00km to 4.00km b)Improvements to roads Connecting to Basavanapura to Bandipalya APMC via Hulimavu-Hadinaru-Ayarahalli-Devalapura-Hosahundi Ch. 5.80 to Ch.8.55 Km Widening and resurface Ch. 8.55 to Ch 16.55 Km c) Widening & Strengthening of road from NH-766 Chikkahalli to join S-Kallahalli Ch 0.00 to 6.60 Km at Varuna in Mysore Dist | 246398937.96 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3756780 | 141113 | None | 1.06 | PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) and Labour | Nos | 5617.0 | 5617.0 | 10.0 | False | None | None | False | None | False | 56170.0 | 0 | 3756836 | 141113 | None | 1.06 | PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) Labour (Bescom Part-III,Pg 1, I.No 1.06) Inclusive of GST 18 Percent | No | 6628.06 | 6628.06 | 30.0 | False | None | None | False | None | False | 198841.8 | 0 | 3756753 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m.Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 49.88 | False | None | None | False | None | False | 6003.5568 | 0 | 3756815 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 | Cum | 120.36 | 120.36 | 192.0 | False | None | None | False | None | False | 23109.12 | 0 | 3756737 | 141113 | None | 2.5(ii)A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.0 | False | None | None | False | None | False | 119644.92 | 0 | 3756763 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.48 | False | None | None | False | None | False | 119867.5152 | 0 | 3756795 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including weeds, shrubs, bushes, grass, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle - By Mechanical Means using, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a | 100 Sqm | 463.74 | 463.74 | 153.6 | False | None | None | False | None | False | 71230.464 | 0 | 3756820 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a) | 100 Sqm | 463.74 | 463.74 | 148.8 | False | None | None | False | None | False | 69004.512 | 0 | 3756712 | 141113 | None | Common SR Vol-1 , P.No : 8, I.No : 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth up to 3 m. The rates are inclusive 18 percentage GST. | Cum | 120.36 | 120.36 | 653.4 | False | None | None | False | None | False | 78643.224 | 0 | 3756680 | 141113 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 43.2 | False | None | None | False | None | False | 20033.568 | 0 | 3756692 | 141113 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 58.8 | False | None | None | False | None | False | 27267.912 | 0 | 3756721 | 141113 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 144.0 | False | None | None | False | None | False | 66778.56 | 0 | 3756738 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 5101.25 | False | None | None | False | None | False | 613986.45 | 0 | 3756796 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1 | Cum | 120.36 | 120.36 | 7589.96 | False | None | None | False | None | False | 913527.5856 | 0 | 3756754 | 141113 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST. | Cum | 7067.02 | 7067.02 | 4.28 | False | None | None | False | None | False | 30246.8456 | 0 | 3756816 | 141113 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3 | Cum | 7067.02 | 7067.02 | 24.0 | False | None | None | False | None | False | 169608.48 | 0 | 3756764 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.48 | False | None | None | False | None | False | 119867.5152 | 0 | 3756821 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a) | 100 Sqm | 463.74 | 463.74 | 148.8 | False | None | None | False | None | False | 69004.512 | 0 | 3756681 | 141113 | None | Common SR Vol- 3 , P.No : 17, I.No : 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST. | Cum | 581.74 | 581.74 | 360.0 | False | None | None | False | None | False | 209426.4 | 0 | 3756713 | 141113 | None | Common SR Vol-1 , P.No : 15, I.No : 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST. | Cum | 7067.02 | 7067.02 | 103.95 | False | None | None | False | None | False | 734616.729 | 0 | 3756693 | 141113 | None | Common SR Vol-3 , P.No : 17, I.No : 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. The rates are inclusive 18 percentage GST. | Sqm | 7.08 | 7.08 | 3710.0 | False | None | None | False | None | False | 26266.8 | 0 | 3756722 | 141113 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 144.0 | False | None | None | False | None | False | 66778.56 | 0 | 3756781 | 141113 | None | IX a | 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) and labour Labour | Nos | 790.0 | 790.0 | 14.0 | False | None | None | False | None | False | 11060.0 | 0 | 3756837 | 141113 | None | IXa | 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) Labour (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 Percent | No | 932.2 | 932.2 | 42.0 | False | None | None | False | None | False | 39152.4 | 0 | 3756755 | 141113 | None | 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST. | Cum | 7418.66 | 7418.66 | 7.54 | False | None | None | False | None | False | 55936.6964 | 0 | 3756817 | 141113 | None | 2.4.2 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates , Inclusive of GST 18 Percent.Common SR Vol-1 , P.No : 16, I.No : 2.4.2 | Cum | 7461.14 | 7461.14 | 48.0 | False | None | None | False | None | False | 358134.72 | 0 | 3756765 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of 18 % GST. | 100 Sqm | 463.74 | 463.74 | 258.48 | False | None | None | False | None | False | 119867.5152 | 0 | 3756822 | 141113 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a) | 100 Sqm | 463.74 | 463.74 | 148.8 | False | None | None | False | None | False | 69004.512 | 0 | 3756739 | 141113 | None | 4.1 A(v) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rates are inclusive of 18 % GST. | Cum | 2934.66 | 2934.66 | 1457.5 | False | None | None | False | None | False | 4277266.95 | 0 | 3756797 | 141113 | None | 4.17(A) | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 26, I.No : 4.17(A) | Cum | 3019.62 | 3019.62 | 3175.0 | False | None | None | False | None | False | 9587293.5 | 0 | 3756714 | 141113 | None | Common SR Vol-1 , P.No : 15, I.No : 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST. | Cum | 7418.66 | 7418.66 | 623.7 | False | None | None | False | None | False | 4627018.242 | 0 | 3756694 | 141113 | None | Common SR Vol-3 , P.No : 17, I.No : 3.7 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. The rates are inclusive 18 percentage GST. | Cum | 123.9 | 123.9 | 102.0 | False | None | None | False | None | False | 12637.8 | 0 | 3756682 | 141113 | None | Common SR Vol-3 , P.No : 43, I.No : 5.32 | Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32. The rates are inclusive 18 percentage GST. | Sqm | 14.16 | 14.16 | 17100.0 | False | None | None | False | None | False | 242136.0 | 0 | 3756723 | 141113 | None | Common SR Vol-3 , P.No : 9, I.No : 2.52 A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST. | 100 Sqm | 463.74 | 463.74 | 144.0 | False | None | None | False | None | False | 66778.56 | 0 | 3756782 | 141113 | None | XIX e | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e) | Set | 221.0 | 221.0 | 18.0 | False | None | None | False | None | False | 3978.0 | 0 | 3756838 | 141113 | None | XIXe | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e) Inclusive of GST 18 Percent | Set | 260.78 | 260.78 | 54.0 | False | None | None | False | None | False | 14082.12 | 0 | 3756766 | 141113 | None | 10.15(i) | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i) Rates are inclusive of 18 % GST. | Sqm | 310.34 | 310.34 | 397.75 | False | None | None | False | None | False | 123437.735 | 0 | 3756724 | 141113 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST. | Sqm | 185.26 | 185.26 | 343.02 | False | None | None | False | None | False | 63547.8852 | 0 | 3756823 | 141113 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4) | Sqm | 185.26 | 185.26 | 181.5 | False | None | None | False | None | False | 33624.69 | 0 | 3756756 | 141113 | None | 2.2.1 | B. Form Work Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST. | Cum | 1483.73 | 1483.73 | 7.54 | False | None | None | False | None | False | 11187.3242 | 0 | 3756818 | 141113 | None | 2.4.2 | Form work : Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.4.2 | Cum | 2611.4 | 2611.4 | 48.0 | False | None | None | False | None | False | 125347.2 | 0 | 3756740 | 141113 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rates are inclusive of 18 % GST. | Cum | 3019.62 | 3019.62 | 1237.5 | False | None | None | False | None | False | 3736779.75 | 0 | 3756798 | 141113 | None | 5.1 A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i) | Sqm | 48.38 | 48.38 | 12400.0 | False | None | None | False | None | False | 599912.0 | 0 | 3756695 | 141113 | None | Common SR Vol- 1 , P.No : 7, I.No : 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. The rates are inclusive 18 percentage GST. | Cum | 559.32 | 559.32 | 405.0 | False | None | None | False | None | False | 226524.6 | 0 | 3756715 | 141113 | None | Common SR Vol-1 , P.No : 15, I.No : 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST. | Cum | 741.87 | 741.87 | 623.7 | False | None | None | False | None | False | 462704.319 | 0 | 3756683 | 141113 | None | Common SR Vol-3 , P.No : 35, I.No : 5.12 C | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. The rates are inclusive 18 percentage GST. | Cum | 11149.82 | 11149.82 | 872.1 | False | None | None | False | None | False | 9723758.022 | 0 | 3756783 | 141113 | None | XII a | LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) and labour | Nos | 561.0 | 561.0 | 12.0 | False | None | None | False | None | False | 6732.0 | 0 | 3756839 | 141113 | None | XIIa | LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) Labour (Bescom Part-III, Pg 2, I.No XII a) Inclusive of GST 18 Percent | No | 661.98 | 661.98 | 36.0 | False | None | None | False | None | False | 23831.28 | 0 | 3756767 | 141113 | None | 10.15(i) | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i).Rates are inclusive of 18 % GST. | Sqm | 310.34 | 310.34 | 795.5 | False | None | None | False | None | False | 246875.47 | 0 | 3756725 | 141113 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST. | Sqm | 185.26 | 185.26 | 686.05 | False | None | None | False | None | False | 127097.623 | 0 | 3756824 | 141113 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4) | Sqm | 185.26 | 185.26 | 363.0 | False | None | None | False | None | False | 67249.38 | 0 | 3756819 | 141113 | None | 2.11h | Supplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications., Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 18, I.No : 2.11 h | Tonne | 93232.98 | 93232.98 | 2.4 | False | None | None | False | None | False | 223759.152 | 0 | 3756757 | 141113 | None | 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) | Cum | 8074.74 | 8074.74 | 17.09 | False | None | None | False | None | False | 137997.3066 | 0 | 3756741 | 141113 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Rates are inclusive of 18 % GST. | Cum | 581.74 | 581.74 | 2365.0 | False | None | None | False | None | False | 1375815.1 | 0 | 3756799 | 141113 | None | 5.32 | Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with echanical broom Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 43, I.No : 5.32 | Sqm | 14.16 | 14.16 | 39375.0 | False | None | None | False | None | False | 557550.0 | 0 | 3756696 | 141113 | None | Common SR Vol- 3 , P.No :23, I.No : 4.1 A(v) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material. The rates are inclusive 18 percentage GST. | Cum | 2934.66 | 2934.66 | 244.5 | False | None | None | False | None | False | 717524.37 | 0 | 3756716 | 141113 | None | Common SR Vol-1 , P.No : 18, I.No : 2.11h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification. The rates are inclusive 18 percentage GST. | Tonne | 93232.98 | 93232.98 | 15.51 | False | None | None | False | None | False | 1446043.5198 | 0 | 3756684 | 141113 | None | Common SR Vol-3 , P.No : 38, I.No : 5.16C | Bituminous Concrete Grading II for traffic 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST. | Cum | 12925.72 | 12925.72 | 513.0 | False | None | None | False | None | False | 6630894.36 | 0 | 3756784 | 141113 | None | XII d | 1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d) | Nos | 65.0 | 65.0 | 18.0 | False | None | None | False | None | False | 1170.0 | 0 | 3756840 | 141113 | None | XIId | 1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d) Inclusive of GST 18 Percent | No | 76.7 | 76.7 | 54.0 | False | None | None | False | None | False | 4141.8 | 0 | 3756726 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST. | Cum | 120.36 | 120.36 | 37.12 | False | None | None | False | None | False | 4467.7632 | 0 | 3756768 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 20.41 | False | None | None | False | None | False | 2456.5476 | 0 | 3756825 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) | Cum | 120.36 | 120.36 | 412.09 | False | None | None | False | None | False | 49599.1524 | 0 | 3756758 | 141113 | None | 2.5.2 | Form Work Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars formwork to be paid separately).Rates are inclusive of 18 % GST. | Cum | 1614.95 | 1614.95 | 17.09 | False | None | None | False | None | False | 27599.4955 | 0 | 3756800 | 141113 | None | 5.12C | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA , Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 35, I.No : 5.12 C | Cum | 11149.82 | 11149.82 | 2025.0 | False | None | None | False | None | False | 22578385.5 | 0 | 3756742 | 141113 | None | 5.33 | Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom. Rates are inclusive of 18 % GST. | Sqm | 17.7 | 17.7 | 4125.0 | False | None | None | False | None | False | 73012.5 | 0 | 3756697 | 141113 | None | Common SR Vol- 3 , P.No : 26, I.No : 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. The rates are inclusive 18 percentage GST. | Cum | 3019.62 | 3019.62 | 881.75 | False | None | None | False | None | False | 2662549.935 | 0 | 3756717 | 141113 | None | Common SR Vol-3 , P.No : 117, I.No : 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A.Granular material. The rates are inclusive 18 percentage GST. | Cum | 1378.24 | 1378.24 | 297.0 | False | None | None | False | None | False | 409337.28 | 0 | 3756685 | 141113 | None | Common SR Vol-3 , P.No:67, I.No : 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.The rates are inclusive 18 percentage GST. | Sqm | 625.4 | 625.4 | 726.4 | False | None | None | False | None | False | 454290.56 | 0 | 3756785 | 141113 | None | XIX c | No.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c) | Nos | 25.0 | 25.0 | 16.0 | False | None | None | False | None | False | 400.0 | 0 | 3756841 | 141113 | None | XIXc | No.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c) Inclusive of GST 18 Percent | No | 29.5 | 29.5 | 48.0 | False | None | None | False | None | False | 1416.0 | 0 | 3756727 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST. | Cum | 120.36 | 120.36 | 37.12 | False | None | None | False | None | False | 4467.7632 | 0 | 3756769 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m . Rates are inclusive of 18 % GST. | Cum | 120.36 | 120.36 | 20.41 | False | None | None | False | None | False | 2456.5476 | 0 | 3756826 | 141113 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) | Cum | 120.36 | 120.36 | 412.09 | False | None | None | False | None | False | 49599.1524 | 0 | 3756759 | 141113 | None | 2.11 b | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges.Rates are inclusive of 18 % GST. | Tonne | 101723.08 | 101723.08 | 0.49 | False | None | None | False | None | False | 49844.3092 | 0 | 3756801 | 141113 | None | 5.16C | Bituminous Concrete Grading II for traffic 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 38, I.No : 5.16C | Cum | 12925.72 | 12925.72 | 1177.5 | False | None | None | False | None | False | 15220035.3 | 0 | 3756743 | 141113 | None | 5.32 | Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. Rates are inclusive of 18 % GST. | Sqm | 14.16 | 14.16 | 75425.0 | False | None | None | False | None | False | 1068018.0 | 0 | 3756698 | 141113 | None | Common SR Vol- 3 , P.No : 17, I.No : 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST. | Cum | 581.74 | 581.74 | 464.0 | False | None | None | False | None | False | 269927.36 | 0 | 3756718 | 141113 | None | Common SR Vol-3 , P.No : 117, I.No : 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. The rates are inclusive 18 percentage GST. | Mtr | 282.02 | 282.02 | 199.2 | False | None | None | False | None | False | 56178.384 | 0 | 3756686 | 141113 | None | Common SR Vol-3 , P.No : 74, I.No : 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST. | Nos. | 430.7 | 430.7 | 1100.0 | False | None | None | False | None | False | 473770.0 | 0 | 3756786 | 141113 | None | XX b | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) including 3 Percent Accessories and labour | Km | 66659.45 | 66659.45 | 1.0 | False | None | None | False | None | False | 66659.45 | 0 | 3756842 | 141113 | None | XXb | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 Percent | Km | 78658.15 | 78658.15 | 3.0 | False | None | None | False | None | False | 235974.45 | 0 | 3756728 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST. | Sqm | 114.46 | 114.46 | 413.62 | False | None | None | False | None | False | 47342.9452 | 0 | 3756770 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST. | Sqm | 114.46 | 114.46 | 341.25 | False | None | None | False | None | False | 39059.475 | 0 | 3756827 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment Inclusive of GST 18 Percent .(Common SR Vol-3 , P.No : 91, I.No : 10.2) | Sqm | 114.46 | 114.46 | 465.0 | False | None | None | False | None | False | 53223.9 | 0 | 3756760 | 141113 | None | 2.11 c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges).Rates are inclusive of 18 % GST. | Tonne | 101990.94 | 101990.94 | 0.59 | False | None | None | False | None | False | 60174.6546 | 0 | 3756802 | 141113 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Inclusive of GST 18 Percent.Common SR Vol- 3 , P.No : 15 , I.No : 3.6 | Cum | 581.74 | 581.74 | 4167.72 | False | None | None | False | None | False | 2424529.4328 | 0 | 3756744 | 141113 | None | 5.12 C | Dense Graded Bituminous Macadam Grading - II for traffic Less than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates are inclusive of 18 % GST. | Cum | 11149.82 | 11149.82 | 4090.65 | False | None | None | False | None | False | 45610011.183 | 0 | 3756699 | 141113 | None | Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i). The rates are inclusive 18 percentage GST. | Sqm | 48.38 | 48.38 | 1050.0 | False | None | None | False | None | False | 50799.0 | 0 | 3756719 | 141113 | None | Common SR Vol-3 , P.No : 69, I.No :8.25 i | Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier
Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. The rates are inclusive 18 percentage GST. | Mtr | 4295.2 | 4295.2 | 200.0 | False | None | None | False | None | False | 859040.0 | 0 | 3756687 | 141113 | None | Common SR Vol-3 , P.No :64, I.No : 8.6. A(iv) | Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST. | Nos. | 4252.72 | 4252.72 | 10.0 | False | None | None | False | None | False | 42527.2 | 0 | 3756787 | 141113 | None | XX a | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) including 3 Percent Accessories & labour | Km | 41542.0 | 41542.0 | 1.0 | False | None | None | False | None | False | 41542.0 | 0 | 3756843 | 141113 | None | XXa | ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 Percent | Km | 49019.56 | 49019.56 | 3.0 | False | None | None | False | None | False | 147058.68 | 0 | 3756803 | 141113 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of otherstructures graded with desired compaction, Inclusive of GST 18 Percent.Common SR Vol- 1 , P.No : 7 , I.No : 1.7 | Cum | 133.34 | 133.34 | 962.28 | False | None | None | False | None | False | 128310.4152 | 0 | 3756729 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST. | Sqm | 114.46 | 114.46 | 413.62 | False | None | None | False | None | False | 47342.9452 | 0 | 3756771 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST. | Sqm | 114.46 | 114.46 | 341.25 | False | None | None | False | None | False | 39059.475 | 0 | 3756828 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2) | Sqm | 114.46 | 114.46 | 465.0 | False | None | None | False | None | False | 53223.9 | 0 | 3756761 | 141113 | None | 2.11d | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges).Rates are inclusive of 18 % GST. | Tonne | 102256.44 | 102256.44 | 0.81 | False | None | None | False | None | False | 82827.7164 | 0 | 3756745 | 141113 | None | 5.16C | Bituminous Concrete Grading II for traffic Less than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Rates are inclusive of 18 % GST. | Cum | 12925.72 | 12925.72 | 2386.5 | False | None | None | False | None | False | 30847230.78 | 0 | 3756720 | 141113 | None | Common SR Vol-3 , P.No : 117, I.No : 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. The rates are inclusive 18 percentage GST | Cum | 3158.86 | 3158.86 | 178.2 | False | None | None | False | None | False | 562908.852 | 0 | 3756700 | 141113 | None | Common SR Vol-3 , P.No : 43, I.No : 5.33 | Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom Common SR Vol-3 , P.No : 43, I.No : 5.33. The rates are inclusive 18 percentage GST. | Sqm | 17.7 | 17.7 | 1050.0 | False | None | None | False | None | False | 18585.0 | 0 | 3756688 | 141113 | None | Common SR Vol-3 , P.No :65, I.No : 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST. | Sqm | 10631.8 | 10631.8 | 2.7 | False | None | None | False | None | False | 28705.86 | 0 | 3756788 | 141113 | None | XXIII a | Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) and labour | Set | 1657.0 | 1657.0 | 4.0 | False | None | None | False | None | False | 6628.0 | 0 | 3756844 | 141113 | None | XXIIIa | Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) Inclusive of GST 18 Percent | Set | 1955.26 | 1955.26 | 12.0 | False | None | None | False | None | False | 23463.12 | 0 | 3756730 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST. | Sqm | 114.46 | 114.46 | 413.62 | False | None | None | False | None | False | 47342.9452 | 0 | 3756772 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST. | Sqm | 114.46 | 114.46 | 341.25 | False | None | None | False | None | False | 39059.475 | 0 | 3756829 | 141113 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2) | Sqm | 114.46 | 114.46 | 465.0 | False | None | None | False | None | False | 53223.9 | 0 | 3756762 | 141113 | None | 13.14 | Painting on concrete surface : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2).Rates are inclusive of 18 % GST. | Sqm | 99.12 | 99.12 | 5.76 | False | None | None | False | None | False | 570.9312 | 0 | 3756746 | 141113 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Rates are inclusive of 18 % GST. | Sqm | 625.4 | 625.4 | 3579.75 | False | None | None | False | None | False | 2238775.65 | 0 | 3756804 | 141113 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :57, I.No : 8.15 | Sqm | 625.4 | 625.4 | 1421.0 | False | None | None | False | None | False | 888693.4 | 0 | 3756701 | 141113 | None | Common SR Vol-3 , P.No : 43, I.No : 5.32 | Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32, The rates are inclusive 18 percentage GST. | Sqm | 14.16 | 14.16 | 50455.0 | False | None | None | False | None | False | 714442.8 | 0 | 3756689 | 141113 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(i) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). The rates are inclusive 18 percentage GST. | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3756789 | 141113 | None | I b | Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL and labour | Nos | 2547.9 | 2547.9 | 8.0 | False | None | None | False | None | False | 20383.2 | 0 | 3756845 | 141113 | None | I b | Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (1341*0.9) (Bescom Part-III, Pg 1, I.No I b) Inclusive of GST 18 Percent | No | 3006.52 | 3006.52 | 24.0 | False | None | None | False | None | False | 72156.48 | 0 | 3756731 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST. | m | 7.08 | 7.08 | 11030.0 | False | None | None | False | None | False | 78092.4 | 0 | 3756773 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST. | Mtr | 7.08 | 7.08 | 18200.0 | False | None | None | False | None | False | 128856.0 | 0 | 3756830 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19) | Rmtr | 7.08 | 7.08 | 12400.0 | False | None | None | False | None | False | 87792.0 | 0 | 3756747 | 141113 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Rates are inclusive of 18 % GST. | Nos | 430.7 | 430.7 | 4181.0 | False | None | None | False | None | False | 1800756.7 | 0 | 3756805 | 141113 | None | 8.43 | Supplying and Fixing of Moulded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer PWD SOR for Roads & Bridges Inclusive of GST 18 Percent Common SR Vol-3 , Item No. VOL-III-8.43 Page No.74 | No | 430.7 | 430.7 | 1666.0 | False | None | None | False | None | False | 717546.2 | 0 | 3756702 | 141113 | None | Common SR Vol-3 , P.No : 35, I.No : 5.12 C | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Common SR Vol-3 , P.No : 35, I.No : 5.12 C. The rates are inclusive 18 percentage GST. | Cum | 11149.82 | 11149.82 | 2625.7 | False | None | None | False | None | False | 29276082.374 | 0 | 3756690 | 141113 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(ii) | Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).The rates are inclusive 18 percentage GST. | Each | 3453.86 | 3453.86 | 3.0 | False | None | None | False | None | False | 10361.58 | 0 | 3756790 | 141113 | None | IX a | Releasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole and Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) | Nos | 231.8 | 231.8 | 8.0 | False | None | None | False | None | False | 1854.4 | 0 | 3756846 | 141113 | None | IXa | Releasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 Percent | No | 273.52 | 273.52 | 24.0 | False | None | None | False | None | False | 6564.48 | 0 | 3756732 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST. | m | 7.08 | 7.08 | 11030.0 | False | None | None | False | None | False | 78092.4 | 0 | 3756774 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST. | Mtr | 7.08 | 7.08 | 18200.0 | False | None | None | False | None | False | 128856.0 | 0 | 3756831 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19) | Rmtr | 7.08 | 7.08 | 12400.0 | False | None | None | False | None | False | 87792.0 | 0 | 3756806 | 141113 | None | 8.25A | Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Type - A, "W" : Metal Beam Crash Barrier Inclusive of GST 18 Percent Common SR Vol-3 , P.No :69, I.No : 8.25(A) | Mtr | 4295.2 | 4295.2 | 400.0 | False | None | None | False | None | False | 1718080.0 | 0 | 3756748 | 141113 | None | 8.6. A(iv) | Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. Rates are inclusive of 18 % GST. | Nos | 4252.72 | 4252.72 | 5.0 | False | None | None | False | None | False | 21263.6 | 0 | 3756703 | 141113 | None | Common SR Vol-3 , P.No : 38, I.No : 5.16C | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST. | Cum | 12925.72 | 12925.72 | 1545.15 | False | None | None | False | None | False | 19972176.258 | 0 | 3756691 | 141113 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST. | Each | 993.56 | 993.56 | 14.0 | False | None | None | False | None | False | 13909.84 | 0 | 3756791 | 141113 | None | IX a | Releasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) | Nos | 231.8 | 231.8 | 8.0 | False | None | None | False | None | False | 1854.4 | 0 | 3756847 | 141113 | None | IX a | Releasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 Percent | No | 273.52 | 273.52 | 24.0 | False | None | None | False | None | False | 6564.48 | 0 | 3756807 | 141113 | None | 10.14 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.4 | Rmtr | 189.98 | 189.98 | 400.0 | False | None | None | False | None | False | 75992.0 | 0 | 3756733 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST. | m | 7.08 | 7.08 | 11030.0 | False | None | None | False | None | False | 78092.4 | 0 | 3756775 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST | Mtr | 7.08 | 7.08 | 18200.0 | False | None | None | False | None | False | 128856.0 | 0 | 3756832 | 141113 | None | 16.19 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19) | Rmtr | 7.08 | 7.08 | 12400.0 | False | None | None | False | None | False | 87792.0 | 0 | 3756749 | 141113 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Rates are inclusive of 18 % GST. | Sqm | 10631.8 | 10631.8 | 1.62 | False | None | None | False | None | False | 17223.516 | 0 | 3756704 | 141113 | None | Common SR Vol-3 , P.No : 51, I.No : 6.6 | Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008, Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. The rates are inclusive 18 percentage GST. | Cum | 7993.32 | 7993.32 | 608.0 | False | None | None | False | None | False | 4859938.56 | 0 | 3756792 | 141113 | None | XX b | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b) | Km | 6268.1 | 6268.1 | 1.0 | False | None | None | False | None | False | 6268.1 | 0 | 3756848 | 141113 | None | XX b | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 Percent | Km | 7396.36 | 7396.36 | 3.0 | False | None | None | False | None | False | 22189.08 | 0 | 3756808 | 141113 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.5 | Rmtr | 259.6 | 259.6 | 400.0 | False | None | None | False | None | False | 103840.0 | 0 | 3756776 | 141113 | None | 16.20 (i) | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909. Rates are inclusive of 18 % GST. | Nos | 2415.46 | 2415.46 | 12.0 | False | None | None | False | None | False | 28985.52 | 0 | 3756734 | 141113 | None | 16.22 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22). The rates are inclusive 18 percentage GST. | Km | 2341.12 | 2341.12 | 7.25 | False | None | None | False | None | False | 16973.12 | 0 | 3756833 | 141113 | None | 16.22 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22) Inclusive of GST 18 Percent | Km | 2341.12 | 2341.12 | 6.6 | False | None | None | False | None | False | 15451.392 | 0 | 3756750 | 141113 | None | 8.16(i) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). Rates are inclusive of 18 % GST | Each | 5995.58 | 5995.58 | 2.0 | False | None | None | False | None | False | 11991.16 | 0 | 3756705 | 141113 | None | Common SR Vol-3 , P.No:67, I.No : 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. The rates are inclusive 18 percentage GST. | Sqm | 625.4 | 625.4 | 2211.89 | False | None | None | False | None | False | 1383316.006 | 0 | 3756793 | 141113 | None | XX a | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a) | Km | 4598.0 | 4598.0 | 1.0 | False | None | None | False | None | False | 4598.0 | 0 | 3756849 | 141113 | None | XX a | Releasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 Percent | Km | 5425.64 | 5425.64 | 3.0 | False | None | None | False | None | False | 16276.92 | 0 | 3756777 | 141113 | None | 16.22 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Rates are inclusive of 18 % GST. | Km | 2341.12 | 2341.12 | 14.4 | False | None | None | False | None | False | 33712.128 | 0 | 3756735 | 141113 | None | 16.24 (ii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)). The rates are inclusive 18 percentage GST. | Km | 243.08 | 243.08 | 7.25 | False | None | None | False | None | False | 1762.33 | 0 | 3756834 | 141113 | None | 16.24 (ii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)) | Km | 243.08 | 243.08 | 6.6 | False | None | None | False | None | False | 1604.328 | 0 | 3756809 | 141113 | None | 8.16(i) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8- 1980, fixing in position including painting and printing etc Ordinary kilometre stone (Pre- cast) 5th Kilometer Stone Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(i) | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3756751 | 141113 | None | 8.16(ii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).Rates are inclusive of 18 % GST. | Each | 3453.86 | 3453.86 | 9.0 | False | None | None | False | None | False | 31084.74 | 0 | 3756706 | 141113 | None | Common SR Vol-3 , P.No : 74, I.No : 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST.
| Nos | 430.7 | 430.7 | 3308.0 | False | None | None | False | None | False | 1424755.6 | 0 | 3756794 | 141113 | None | Round off | Chescom Charges | Lump Sum for Each | 20000.0 | 20000.0 | 1.0 | False | None | None | False | None | False | 20000.0 | 0 | 3756778 | 141113 | None | 16.24 (i) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint. Rates are inclusive of 18 % GST. | Km | 243.08 | 243.08 | 14.4 | False | None | None | False | None | False | 3500.352 | 0 | 3756736 | 141113 | None | 16.24(iii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii). The rates are inclusive 18 percentage GST. | Km | 1339.3 | 1339.3 | 7.25 | False | None | None | False | None | False | 9709.925 | 0 | 3756835 | 141113 | None | 16.24(iii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii) | Km | 1339.3 | 1339.3 | 6.6 | False | None | None | False | None | False | 8839.38 | 0 | 3756810 | 141113 | None | 8.16(ii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(ii) | Each | 3453.86 | 3453.86 | 5.0 | False | None | None | False | None | False | 17269.3 | 0 | 3756752 | 141113 | None | 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast).Rates are inclusive of 18 % GST. | Each | 993.56 | 993.56 | 40.0 | False | None | None | False | None | False | 39742.4 | 0 | 3756707 | 141113 | None | Common SR Vol-3 , P.No :64, I.No : 8.6. A(iv) | Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST. | Nos | 4252.72 | 4252.72 | 10.0 | False | None | None | False | None | False | 42527.2 | 0 | 3756779 | 141113 | None | 20.25 (ii) | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade. Rates are inclusive of 18 % GST. | Km | 1339.3 | 1339.3 | 14.4 | False | None | None | False | None | False | 19285.92 | 0 | 3756811 | 141113 | None | 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16. (iii) | Each | 993.56 | 993.56 | 27.0 | False | None | None | False | None | False | 26826.12 | 0 | 3756708 | 141113 | None | Common SR Vol-3 , P.No :65, I.No : 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST. | Sqm | 10631.8 | 10631.8 | 1.62 | False | None | None | False | None | False | 17223.516 | 0 | 3756812 | 141113 | None | 8.6 A(iv) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :54, I.No : 8.6. A(iv) | No | 4252.72 | 4252.72 | 22.0 | False | None | None | False | None | False | 93559.84 | 0 | 3756709 | 141113 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(ii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast). The rates are inclusive 18 percentage GST. | Each | 3453.86 | 3453.86 | 5.0 | False | None | None | False | None | False | 17269.3 | 0 | 3756813 | 141113 | None | 8.7 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :64, I.No : 8.7 | Sqm | 10631.8 | 10631.8 | 3.6 | False | None | None | False | None | False | 38274.48 | 0 | 3756710 | 141113 | None | Common SR Vol-3 , P.No :67, I.No : 8.16(iii) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST. | Each | 993.56 | 993.56 | 16.0 | False | None | None | False | None | False | 15896.96 | 0 | 3756711 | 141113 | None | 10 volume 3 page no. 161 | Crack Groove Cutting: Groove shall be cut using hand held
electrically operated concrete cutting machine of size of 50 mm
wide and 75 mm deep on each side of the crack to form as "V"
groove all along the crack to fill the polyester resin/ Epoxy putty
(horizontal and vertical cracks). After the groove cutting, the
concrete shall be removed from the groove using the pneumatic
concrete chipping machine to form "V" groove. The item includes
the cost of hire charges for all machineries, tools and barges and
all labour charges etc., complete. The rates are inclusive 18 percentage GST. | m | 885.0 | 885.0 | 988.0 | False | None | None | False | None | False | 874380.0 | 0 | 3756814 | 141113 | None | 4.1A(v) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material, Inclusive of GST 18 Percent. Inclusive of GST 18 Percent Common SR Vol- 3 , P.No : 19, I.No : 4.1 A(v) | Cum | 2934.66 | 2934.66 | 1240.0 | False | None | None | False | None | False | 3638978.4 | 0 |
|
|
---|