createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1723448026690
version9
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2464000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-09-2024 17:00:00
tenderQueryClose06-09-2024 17:30:00
technicalBidOpen10-09-2024 17:01:00
publishedDate14-08-2024 16:10:20
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-08-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnTrue
emdBankGuarantee2364000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212402810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1723448026723
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT14149
titlePackage-1 a1) Resurfacing of Road from NH-212 to join Biligere via SH-84A from Ch. 12.70km to 16.25km, a2) Road from NTN at Kupparavalli to join Sutturu from Ch. 0.00km to 4.00km b)Improvements to roads Connecting to Basavanapura to Bandipalya APMC via Hulimavu-Hadinaru-Ayarahalli-Devalapura-Hosahundi Ch. 5.80 to Ch.8.55 Km Widening and resurface Ch. 8.55 to Ch 16.55 Km c) Widening & Strengthening of road from NH-766 Chikkahalli to join S-Kallahalli Ch 0.00 to 6.60 Km at Varuna in Mysore Dist
descriptionPackage-1 a1) Resurfacing of Road from NH-212 to join Biligere via varuna-Hosakote from Ch. 12.70km to 16.25km. a2) Road from NTN at Kupparavalli to join Sutturu from Ch. 0.00km to 4.00km b)Improvements to roads Connecting to Basavanapura (NH-150A) to Bandipalya APMC (NH-150A) via Hulimavu-Hadinaru-Ayarahalli-Devalapura-Hosahundi Ch. 5.80 to Ch.8.55 Km Widening and resurface Ch. 8.55 to Ch 16.55 Km c) Widening & Strengthening of road from Nh-766 Chikkahalli to join S-Kallahalli (SH-57) via Mosambayanahalli-Ayarahalli-Someshwarapura-Hebya-Kadakola (SH 150A)-Sindhuvalli-Talur-Kallahalli-Jayapura (SH-33)-Mahadevapura (SH-33)-Bettadabidu cross-Gumachahalli Ch 0.00 to 6.60 Km at Varuna Constituency in Mysore District.
categoryWORKS
categoryTextWorks
ecv246398937.96
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1674
locationNamePWD Division Office Mysuru
provisionalAmount257000000.0
groupOverheadTotalNone
fileNumberKPWD/MYS/NO2SPL/ORF/P1/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17234480270001NoneNoneRoadsa1) Resurfacing of Road from NH-212 to join Biligere via Varauna-Hosakote from Ch. 12.70km to 16.25km.17855808.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754517140965NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.7443.2FalseNoneNoneFalseNoneFalse20033.5680
3754518140965NoneCommon SR Vol- 3 , P.No : 17, I.No : 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST.Cum581.74581.74360.0FalseNoneNoneFalseNoneFalse209426.40
3754519140965NoneCommon SR Vol-3 , P.No : 43, I.No : 5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32. The rates are inclusive 18 percentage GST.Sqm14.1614.1617100.0FalseNoneNoneFalseNoneFalse242136.00
3754520140965NoneCommon SR Vol-3 , P.No : 35, I.No : 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. The rates are inclusive 18 percentage GST.Cum11149.8211149.82872.1FalseNoneNoneFalseNoneFalse9723758.0220
3754521140965NoneCommon SR Vol-3 , P.No : 38, I.No : 5.16CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST.Cum12925.7212925.72513.0FalseNoneNoneFalseNoneFalse6630894.360
3754522140965NoneCommon SR Vol-3 , P.No:67, I.No : 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.The rates are inclusive 18 percentage GST.Sqm625.4625.4726.4FalseNoneNoneFalseNoneFalse454290.560
3754523140965NoneCommon SR Vol-3 , P.No : 74, I.No : 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST.Nos.430.7430.71100.0FalseNoneNoneFalseNoneFalse473770.00
3754524140965NoneCommon SR Vol-3 , P.No :64, I.No : 8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST.Nos.4252.724252.7210.0FalseNoneNoneFalseNoneFalse42527.20
3754525140965NoneCommon SR Vol-3 , P.No :65, I.No : 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST.Sqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
3754526140965NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). The rates are inclusive 18 percentage GST.Each5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3754527140965NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(ii)Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).The rates are inclusive 18 percentage GST.Each3453.863453.863.0FalseNoneNoneFalseNoneFalse10361.580
3754528140965NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST.Each993.56993.5614.0FalseNoneNoneFalseNoneFalse13909.840
17234480270001NoneNoneRoadsa2) Road from NTN at Kupparavalli to join Sutturu from Ch. 0.00km to 4.00km62610091.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754529140966NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.7458.8FalseNoneNoneFalseNoneFalse27267.9120
3754530140966NoneCommon SR Vol-3 , P.No : 17, I.No : 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. The rates are inclusive 18 percentage GST.Sqm7.087.083710.0FalseNoneNoneFalseNoneFalse26266.80
3754531140966NoneCommon SR Vol-3 , P.No : 17, I.No : 3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. The rates are inclusive 18 percentage GST.Cum123.9123.9102.0FalseNoneNoneFalseNoneFalse12637.80
3754532140966NoneCommon SR Vol- 1 , P.No : 7, I.No : 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. The rates are inclusive 18 percentage GST.Cum559.32559.32405.0FalseNoneNoneFalseNoneFalse226524.60
3754533140966NoneCommon SR Vol- 3 , P.No :23, I.No : 4.1 A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material. The rates are inclusive 18 percentage GST.Cum2934.662934.66244.5FalseNoneNoneFalseNoneFalse717524.370
3754534140966NoneCommon SR Vol- 3 , P.No : 26, I.No : 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. The rates are inclusive 18 percentage GST.Cum3019.623019.62881.75FalseNoneNoneFalseNoneFalse2662549.9350
3754535140966NoneCommon SR Vol- 3 , P.No : 17, I.No : 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST.Cum581.74581.74464.0FalseNoneNoneFalseNoneFalse269927.360
3754536140966NoneCommon SR Vol-3 , P.No : 31, I.No : 5.1 A(i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i). The rates are inclusive 18 percentage GST.Sqm48.3848.381050.0FalseNoneNoneFalseNoneFalse50799.00
3754537140966NoneCommon SR Vol-3 , P.No : 43, I.No : 5.33Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom Common SR Vol-3 , P.No : 43, I.No : 5.33. The rates are inclusive 18 percentage GST.Sqm17.717.71050.0FalseNoneNoneFalseNoneFalse18585.00
3754538140966NoneCommon SR Vol-3 , P.No : 43, I.No : 5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32, The rates are inclusive 18 percentage GST.Sqm14.1614.1650455.0FalseNoneNoneFalseNoneFalse714442.80
3754539140966NoneCommon SR Vol-3 , P.No : 35, I.No : 5.12 CDense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Common SR Vol-3 , P.No : 35, I.No : 5.12 C. The rates are inclusive 18 percentage GST.Cum11149.8211149.822625.7FalseNoneNoneFalseNoneFalse29276082.3740
3754540140966NoneCommon SR Vol-3 , P.No : 38, I.No : 5.16CBituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST.Cum12925.7212925.721545.15FalseNoneNoneFalseNoneFalse19972176.2580
3754541140966NoneCommon SR Vol-3 , P.No : 51, I.No : 6.6Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008, Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. The rates are inclusive 18 percentage GST.Cum7993.327993.32608.0FalseNoneNoneFalseNoneFalse4859938.560
3754542140966NoneCommon SR Vol-3 , P.No:67, I.No : 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. The rates are inclusive 18 percentage GST.Sqm625.4625.42211.89FalseNoneNoneFalseNoneFalse1383316.0060
3754543140966NoneCommon SR Vol-3 , P.No : 74, I.No : 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST. Nos430.7430.73308.0FalseNoneNoneFalseNoneFalse1424755.60
3754544140966NoneCommon SR Vol-3 , P.No :64, I.No : 8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST.Nos4252.724252.7210.0FalseNoneNoneFalseNoneFalse42527.20
3754545140966NoneCommon SR Vol-3 , P.No :65, I.No : 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST.Sqm10631.810631.81.62FalseNoneNoneFalseNoneFalse17223.5160
3754546140966NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast). The rates are inclusive 18 percentage GST.Each3453.863453.865.0FalseNoneNoneFalseNoneFalse17269.30
3754547140966NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST.Each993.56993.5616.0FalseNoneNoneFalseNoneFalse15896.960
3754548140966None10 volume 3 page no. 161Crack Groove Cutting: Groove shall be cut using hand held electrically operated concrete cutting machine of size of 50 mm wide and 75 mm deep on each side of the crack to form as "V" groove all along the crack to fill the polyester resin/ Epoxy putty (horizontal and vertical cracks). After the groove cutting, the concrete shall be removed from the groove using the pneumatic concrete chipping machine to form "V" groove. The item includes the cost of hire charges for all machineries, tools and barges and all labour charges etc., complete. The rates are inclusive 18 percentage GST.m885.0885.0988.0FalseNoneNoneFalseNoneFalse874380.00
17234480270001NoneNoneRoadsa) Construction of Retaining wall at Ch. 2.95 to 3.33 km 2 Sides9236490.54
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754549140967NoneCommon SR Vol-1 , P.No : 8, I.No : 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth up to 3 m. The rates are inclusive 18 percentage GST.Cum120.36120.36653.4FalseNoneNoneFalseNoneFalse78643.2240
3754550140967NoneCommon SR Vol-1 , P.No : 15, I.No : 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST.Cum7067.027067.02103.95FalseNoneNoneFalseNoneFalse734616.7290
3754551140967NoneCommon SR Vol-1 , P.No : 15, I.No : 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST.Cum7418.667418.66623.7FalseNoneNoneFalseNoneFalse4627018.2420
3754552140967NoneCommon SR Vol-1 , P.No : 15, I.No : 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST.Cum741.87741.87623.7FalseNoneNoneFalseNoneFalse462704.3190
3754553140967NoneCommon SR Vol-1 , P.No : 18, I.No : 2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification. The rates are inclusive 18 percentage GST.Tonne93232.9893232.9815.51FalseNoneNoneFalseNoneFalse1446043.51980
3754554140967NoneCommon SR Vol-3 , P.No : 117, I.No : 12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A.Granular material. The rates are inclusive 18 percentage GST.Cum1378.241378.24297.0FalseNoneNoneFalseNoneFalse409337.280
3754555140967NoneCommon SR Vol-3 , P.No : 117, I.No : 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. The rates are inclusive 18 percentage GST.Mtr282.02282.02199.2FalseNoneNoneFalseNoneFalse56178.3840
3754556140967NoneCommon SR Vol-3 , P.No : 69, I.No :8.25 iMetal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. The rates are inclusive 18 percentage GST.Mtr4295.24295.2200.0FalseNoneNoneFalseNoneFalse859040.00
3754557140967NoneCommon SR Vol-3 , P.No : 117, I.No : 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. The rates are inclusive 18 percentage GSTCum3158.863158.86178.2FalseNoneNoneFalseNoneFalse562908.8520
17234480270001NoneNoneRoadsa) Maintenance of road upto 5 years (DLP)804668.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754558140968NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.74144.0FalseNoneNoneFalseNoneFalse66778.560
3754559140968NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.74144.0FalseNoneNoneFalseNoneFalse66778.560
3754560140968NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.74144.0FalseNoneNoneFalseNoneFalse66778.560
3754561140968None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST.Sqm185.26185.26343.02FalseNoneNoneFalseNoneFalse63547.88520
3754562140968None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST.Sqm185.26185.26686.05FalseNoneNoneFalseNoneFalse127097.6230
3754563140968None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST.Cum120.36120.3637.12FalseNoneNoneFalseNoneFalse4467.76320
3754564140968None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST.Cum120.36120.3637.12FalseNoneNoneFalseNoneFalse4467.76320
3754565140968None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST.Sqm114.46114.46413.62FalseNoneNoneFalseNoneFalse47342.94520
3754566140968None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST.Sqm114.46114.46413.62FalseNoneNoneFalseNoneFalse47342.94520
3754567140968None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST.Sqm114.46114.46413.62FalseNoneNoneFalseNoneFalse47342.94520
3754568140968None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST.m7.087.0811030.0FalseNoneNoneFalseNoneFalse78092.40
3754569140968None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST.m7.087.0811030.0FalseNoneNoneFalseNoneFalse78092.40
3754570140968None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST.m7.087.0811030.0FalseNoneNoneFalseNoneFalse78092.40
3754571140968None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22). The rates are inclusive 18 percentage GST.Km2341.122341.127.25FalseNoneNoneFalseNoneFalse16973.120
3754572140968None16.24 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)). The rates are inclusive 18 percentage GST.Km243.08243.087.25FalseNoneNoneFalseNoneFalse1762.330
3754573140968None16.24(iii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii). The rates are inclusive 18 percentage GST.Km1339.31339.37.25FalseNoneNoneFalseNoneFalse9709.9250
17234480270001NoneNoneRoadsb) Improvements to roads Connecting to Basavanapura (NH-150A) to Bandipalya APMC (NH-150A) via Hulimavu-Hadinaru- Ayarahalli- Devalapura- Hosahundi Ch. 5.80 to Ch.8.55 Km Widening and resuface Ch. 8.55 to Ch 16.55 Km in Nanjangud Taluk, Varuna Constituency91882603.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754574140969None2.5(ii)AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.0FalseNoneNoneFalseNoneFalse119644.920
3754575140969None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Rates are inclusive of 18 % GST.Cum120.36120.365101.25FalseNoneNoneFalseNoneFalse613986.450
3754576140969None4.1 A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rates are inclusive of 18 % GST.Cum2934.662934.661457.5FalseNoneNoneFalseNoneFalse4277266.950
3754577140969None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rates are inclusive of 18 % GST.Cum3019.623019.621237.5FalseNoneNoneFalseNoneFalse3736779.750
3754578140969None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Rates are inclusive of 18 % GST.Cum581.74581.742365.0FalseNoneNoneFalseNoneFalse1375815.10
3754579140969None5.33Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom. Rates are inclusive of 18 % GST.Sqm17.717.74125.0FalseNoneNoneFalseNoneFalse73012.50
3754580140969None5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. Rates are inclusive of 18 % GST.Sqm14.1614.1675425.0FalseNoneNoneFalseNoneFalse1068018.00
3754581140969None5.12 CDense Graded Bituminous Macadam Grading - II for traffic Less than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates are inclusive of 18 % GST.Cum11149.8211149.824090.65FalseNoneNoneFalseNoneFalse45610011.1830
3754582140969None5.16CBituminous Concrete Grading II for traffic Less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Rates are inclusive of 18 % GST.Cum12925.7212925.722386.5FalseNoneNoneFalseNoneFalse30847230.780
3754583140969None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Rates are inclusive of 18 % GST.Sqm625.4625.43579.75FalseNoneNoneFalseNoneFalse2238775.650
3754584140969None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Rates are inclusive of 18 % GST.Nos430.7430.74181.0FalseNoneNoneFalseNoneFalse1800756.70
3754585140969None8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. Rates are inclusive of 18 % GST.Nos4252.724252.725.0FalseNoneNoneFalseNoneFalse21263.60
3754586140969None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Rates are inclusive of 18 % GST.Sqm10631.810631.81.62FalseNoneNoneFalseNoneFalse17223.5160
3754587140969None8.16(i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). Rates are inclusive of 18 % GSTEach5995.585995.582.0FalseNoneNoneFalseNoneFalse11991.160
3754588140969None8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).Rates are inclusive of 18 % GST.Each3453.863453.869.0FalseNoneNoneFalseNoneFalse31084.740
3754589140969None8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast).Rates are inclusive of 18 % GST.Each993.56993.5640.0FalseNoneNoneFalseNoneFalse39742.40
17234480270001NoneNoneRoadsb) Construction of 1M x 1M Box Culvert462388.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754590140970None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m.Rates are inclusive of 18 % GST.Cum120.36120.3649.88FalseNoneNoneFalseNoneFalse6003.55680
3754591140970None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST.Cum7067.027067.024.28FalseNoneNoneFalseNoneFalse30246.84560
3754592140970None2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST.Cum7418.667418.667.54FalseNoneNoneFalseNoneFalse55936.69640
3754593140970None2.2.1B. Form Work Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST.Cum1483.731483.737.54FalseNoneNoneFalseNoneFalse11187.32420
3754594140970None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)Cum8074.748074.7417.09FalseNoneNoneFalseNoneFalse137997.30660
3754595140970None2.5.2Form Work Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars formwork to be paid separately).Rates are inclusive of 18 % GST.Cum1614.951614.9517.09FalseNoneNoneFalseNoneFalse27599.49550
3754596140970None2.11 bSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges.Rates are inclusive of 18 % GST.Tonne101723.08101723.080.49FalseNoneNoneFalseNoneFalse49844.30920
3754597140970None2.11 cSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges).Rates are inclusive of 18 % GST.Tonne101990.94101990.940.59FalseNoneNoneFalseNoneFalse60174.65460
3754598140970None2.11dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges).Rates are inclusive of 18 % GST.Tonne102256.44102256.440.81FalseNoneNoneFalseNoneFalse82827.71640
3754599140970None13.14Painting on concrete surface : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2).Rates are inclusive of 18 % GST.Sqm99.1299.125.76FalseNoneNoneFalseNoneFalse570.93120
17234480270001NoneNoneRoadsb) Maintenance of road upto 5 Years1324059.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754600140971None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.48FalseNoneNoneFalseNoneFalse119867.51520
3754601140971None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.48FalseNoneNoneFalseNoneFalse119867.51520
3754602140971None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.48FalseNoneNoneFalseNoneFalse119867.51520
3754603140971None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i) Rates are inclusive of 18 % GST.Sqm310.34310.34397.75FalseNoneNoneFalseNoneFalse123437.7350
3754604140971None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i).Rates are inclusive of 18 % GST.Sqm310.34310.34795.5FalseNoneNoneFalseNoneFalse246875.470
3754605140971None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. Rates are inclusive of 18 % GST.Cum120.36120.3620.41FalseNoneNoneFalseNoneFalse2456.54760
3754606140971None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m . Rates are inclusive of 18 % GST.Cum120.36120.3620.41FalseNoneNoneFalseNoneFalse2456.54760
3754607140971None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST.Sqm114.46114.46341.25FalseNoneNoneFalseNoneFalse39059.4750
3754608140971None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST.Sqm114.46114.46341.25FalseNoneNoneFalseNoneFalse39059.4750
3754609140971None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST.Sqm114.46114.46341.25FalseNoneNoneFalseNoneFalse39059.4750
3754610140971None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST.Mtr7.087.0818200.0FalseNoneNoneFalseNoneFalse128856.00
3754611140971None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST.Mtr7.087.0818200.0FalseNoneNoneFalseNoneFalse128856.00
3754612140971None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GSTMtr7.087.0818200.0FalseNoneNoneFalseNoneFalse128856.00
3754613140971None16.20 (i)Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909. Rates are inclusive of 18 % GST.Nos2415.462415.4612.0FalseNoneNoneFalseNoneFalse28985.520
3754614140971None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Rates are inclusive of 18 % GST.Km2341.122341.1214.4FalseNoneNoneFalseNoneFalse33712.1280
3754615140971None16.24 (i)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint. Rates are inclusive of 18 % GST.Km243.08243.0814.4FalseNoneNoneFalseNoneFalse3500.3520
3754616140971None20.25 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade. Rates are inclusive of 18 % GST.Km1339.31339.314.4FalseNoneNoneFalseNoneFalse19285.920
17234480270001NoneNoneRoadsb) HM Yard249297.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754617140972None1.06PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) and LabourNos5617.05617.010.0FalseNoneNoneFalseNoneFalse56170.00
3754618140972NoneIX a11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) and labour LabourNos790.0790.014.0FalseNoneNoneFalseNoneFalse11060.00
3754619140972NoneXIX e11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e)Set221.0221.018.0FalseNoneNoneFalseNoneFalse3978.00
3754620140972NoneXII aLT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) and labourNos561.0561.012.0FalseNoneNoneFalseNoneFalse6732.00
3754621140972NoneXII d1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d)Nos65.065.018.0FalseNoneNoneFalseNoneFalse1170.00
3754622140972NoneXIX cNo.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c)Nos25.025.016.0FalseNoneNoneFalseNoneFalse400.00
3754623140972NoneXX bACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) including 3 Percent Accessories and labourKm66659.4566659.451.0FalseNoneNoneFalseNoneFalse66659.450
3754624140972NoneXX aACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) including 3 Percent Accessories & labourKm41542.041542.01.0FalseNoneNoneFalseNoneFalse41542.00
3754625140972NoneXXIII aGuy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) and labourSet1657.01657.04.0FalseNoneNoneFalseNoneFalse6628.00
3754626140972NoneI bReleasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL and labourNos2547.92547.98.0FalseNoneNoneFalseNoneFalse20383.20
3754627140972NoneIX aReleasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole and Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a)Nos231.8231.88.0FalseNoneNoneFalseNoneFalse1854.40
3754628140972NoneIX aReleasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a)Nos231.8231.88.0FalseNoneNoneFalseNoneFalse1854.40
3754629140972NoneXX bReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b)Km6268.16268.11.0FalseNoneNoneFalseNoneFalse6268.10
3754630140972NoneXX aReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a)Km4598.04598.01.0FalseNoneNoneFalseNoneFalse4598.00
3754631140972NoneRound offChescom ChargesLump Sum for Each20000.020000.01.0FalseNoneNoneFalseNoneFalse20000.00
17234480270001NoneNoneRoadsc) Widening & Strengthening of road from Nh-766 Chikkahalli to join S-Kallahalli (SH-57) via Mosambayanahalli-Ayarahalli-Someshwarapura- Hebya-Kadakola (SH 150A)-Sindhuvalli-Talur- Kallahalli-Jayapura (SH-33)- Mahadevapura(SH-33)-Bettadabidu cross- Gumachahalli Ch 0.00 to 6.60 Km at Varuna Constituency in Mysore taluk59405829.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754632140973None2.5(ii)aClearing and grubbing road land including weeds, shrubs, bushes, grass, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle - By Mechanical Means using, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a100 Sqm463.74463.74153.6FalseNoneNoneFalseNoneFalse71230.4640
3754633140973None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1Cum120.36120.367589.96FalseNoneNoneFalseNoneFalse913527.58560
3754634140973None4.17(A)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 26, I.No : 4.17(A)Cum3019.623019.623175.0FalseNoneNoneFalseNoneFalse9587293.50
3754635140973None5.1 A(i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i)Sqm48.3848.3812400.0FalseNoneNoneFalseNoneFalse599912.00
3754636140973None5.32Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with echanical broom Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 43, I.No : 5.32Sqm14.1614.1639375.0FalseNoneNoneFalseNoneFalse557550.00
3754637140973None5.12CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA , Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 35, I.No : 5.12 CCum11149.8211149.822025.0FalseNoneNoneFalseNoneFalse22578385.50
3754638140973None5.16CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 38, I.No : 5.16CCum12925.7212925.721177.5FalseNoneNoneFalseNoneFalse15220035.30
3754639140973None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Inclusive of GST 18 Percent.Common SR Vol- 3 , P.No : 15 , I.No : 3.6Cum581.74581.744167.72FalseNoneNoneFalseNoneFalse2424529.43280
3754640140973None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of otherstructures graded with desired compaction, Inclusive of GST 18 Percent.Common SR Vol- 1 , P.No : 7 , I.No : 1.7Cum133.34133.34962.28FalseNoneNoneFalseNoneFalse128310.41520
3754641140973None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :57, I.No : 8.15Sqm625.4625.41421.0FalseNoneNoneFalseNoneFalse888693.40
3754642140973None8.43Supplying and Fixing of Moulded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer PWD SOR for Roads & Bridges Inclusive of GST 18 Percent Common SR Vol-3 , Item No. VOL-III-8.43 Page No.74No430.7430.71666.0FalseNoneNoneFalseNoneFalse717546.20
3754643140973None8.25AProviding and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Type - A, "W" : Metal Beam Crash Barrier Inclusive of GST 18 Percent Common SR Vol-3 , P.No :69, I.No : 8.25(A)Mtr4295.24295.2400.0FalseNoneNoneFalseNoneFalse1718080.00
3754644140973None10.14Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.4Rmtr189.98189.98400.0FalseNoneNoneFalseNoneFalse75992.00
3754645140973None10.1.5Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.5Rmtr259.6259.6400.0FalseNoneNoneFalseNoneFalse103840.00
3754646140973None8.16(i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8- 1980, fixing in position including painting and printing etc Ordinary kilometre stone (Pre- cast) 5th Kilometer Stone Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(i)Each5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3754647140973None8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(ii)Each3453.863453.865.0FalseNoneNoneFalseNoneFalse17269.30
3754648140973None8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16. (iii)Each993.56993.5627.0FalseNoneNoneFalseNoneFalse26826.120
3754649140973None8.6 A(iv)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :54, I.No : 8.6. A(iv)No4252.724252.7222.0FalseNoneNoneFalseNoneFalse93559.840
3754650140973None8.7Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :64, I.No : 8.7Sqm10631.810631.83.6FalseNoneNoneFalseNoneFalse38274.480
3754651140973None4.1A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material, Inclusive of GST 18 Percent. Inclusive of GST 18 Percent Common SR Vol- 3 , P.No : 19, I.No : 4.1 A(v)Cum2934.662934.661240.0FalseNoneNoneFalseNoneFalse3638978.40
17234480270001NoneNoneRoadsc) Construction of Drain899958.67
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754652140974None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1Cum120.36120.36192.0FalseNoneNoneFalseNoneFalse23109.120
3754653140974None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3Cum7067.027067.0224.0FalseNoneNoneFalseNoneFalse169608.480
3754654140974None2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates , Inclusive of GST 18 Percent.Common SR Vol-1 , P.No : 16, I.No : 2.4.2Cum7461.147461.1448.0FalseNoneNoneFalseNoneFalse358134.720
3754655140974None2.4.2Form work : Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.4.2Cum2611.42611.448.0FalseNoneNoneFalseNoneFalse125347.20
3754656140974None2.11hSupplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications., Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 18, I.No : 2.11 hTonne93232.9893232.982.4FalseNoneNoneFalseNoneFalse223759.1520
17234480270001NoneNoneRoadsc) Maintenance of road upto 5 Years (Including 2 Years Contract period)856028.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754657140975None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a)100 Sqm463.74463.74148.8FalseNoneNoneFalseNoneFalse69004.5120
3754658140975None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a)100 Sqm463.74463.74148.8FalseNoneNoneFalseNoneFalse69004.5120
3754659140975None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a)100 Sqm463.74463.74148.8FalseNoneNoneFalseNoneFalse69004.5120
3754660140975None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4)Sqm185.26185.26181.5FalseNoneNoneFalseNoneFalse33624.690
3754661140975None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4)Sqm185.26185.26363.0FalseNoneNoneFalseNoneFalse67249.380
3754662140975None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1)Cum120.36120.36412.09FalseNoneNoneFalseNoneFalse49599.15240
3754663140975None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1)Cum120.36120.36412.09FalseNoneNoneFalseNoneFalse49599.15240
3754664140975None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment Inclusive of GST 18 Percent .(Common SR Vol-3 , P.No : 91, I.No : 10.2)Sqm114.46114.46465.0FalseNoneNoneFalseNoneFalse53223.90
3754665140975None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2)Sqm114.46114.46465.0FalseNoneNoneFalseNoneFalse53223.90
3754666140975None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2)Sqm114.46114.46465.0FalseNoneNoneFalseNoneFalse53223.90
3754667140975None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19)Rmtr7.087.0812400.0FalseNoneNoneFalseNoneFalse87792.00
3754668140975None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19)Rmtr7.087.0812400.0FalseNoneNoneFalseNoneFalse87792.00
3754669140975None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19)Rmtr7.087.0812400.0FalseNoneNoneFalseNoneFalse87792.00
3754670140975None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22) Inclusive of GST 18 PercentKm2341.122341.126.6FalseNoneNoneFalseNoneFalse15451.3920
3754671140975None16.24 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i))Km243.08243.086.6FalseNoneNoneFalseNoneFalse1604.3280
3754672140975None16.24(iii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii)Km1339.31339.36.6FalseNoneNoneFalseNoneFalse8839.380
17234480270001NoneNoneRoadsc) Electrical Pole Shifting811713.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3754673140976None1.06PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) Labour (Bescom Part-III,Pg 1, I.No 1.06) Inclusive of GST 18 PercentNo6628.066628.0630.0FalseNoneNoneFalseNoneFalse198841.80
3754674140976NoneIXa11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) Labour (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 PercentNo932.2932.242.0FalseNoneNoneFalseNoneFalse39152.40
3754675140976NoneXIXe11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e) Inclusive of GST 18 PercentSet260.78260.7854.0FalseNoneNoneFalseNoneFalse14082.120
3754676140976NoneXIIaLT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) Labour (Bescom Part-III, Pg 2, I.No XII a) Inclusive of GST 18 PercentNo661.98661.9836.0FalseNoneNoneFalseNoneFalse23831.280
3754677140976NoneXIId1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d) Inclusive of GST 18 PercentNo76.776.754.0FalseNoneNoneFalseNoneFalse4141.80
3754678140976NoneXIXcNo.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c) Inclusive of GST 18 PercentNo29.529.548.0FalseNoneNoneFalseNoneFalse1416.00
3754679140976NoneXXbACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 PercentKm78658.1578658.153.0FalseNoneNoneFalseNoneFalse235974.450
3754680140976NoneXXaACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 PercentKm49019.5649019.563.0FalseNoneNoneFalseNoneFalse147058.680
3754681140976NoneXXIIIaGuy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) Inclusive of GST 18 PercentSet1955.261955.2612.0FalseNoneNoneFalseNoneFalse23463.120
3754682140976NoneI bReleasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (1341*0.9) (Bescom Part-III, Pg 1, I.No I b) Inclusive of GST 18 PercentNo3006.523006.5224.0FalseNoneNoneFalseNoneFalse72156.480
3754683140976NoneIXaReleasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 PercentNo273.52273.5224.0FalseNoneNoneFalseNoneFalse6564.480
3754684140976NoneIX aReleasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 PercentNo273.52273.5224.0FalseNoneNoneFalseNoneFalse6564.480
3754685140976NoneXX bReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 PercentKm7396.367396.363.0FalseNoneNoneFalseNoneFalse22189.080
3754686140976NoneXX aReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 PercentKm5425.645425.643.0FalseNoneNoneFalseNoneFalse16276.920
17234536810001NoneNoneRoadsPackage-1 a1) Resurfacing of Road from NH-212 to join Biligere via SH-84A from Ch. 12.70km to 16.25km, a2) Road from NTN at Kupparavalli to join Sutturu from Ch. 0.00km to 4.00km b)Improvements to roads Connecting to Basavanapura to Bandipalya APMC via Hulimavu-Hadinaru-Ayarahalli-Devalapura-Hosahundi Ch. 5.80 to Ch.8.55 Km Widening and resurface Ch. 8.55 to Ch 16.55 Km c) Widening & Strengthening of road from NH-766 Chikkahalli to join S-Kallahalli Ch 0.00 to 6.60 Km at Varuna in Mysore Dist246398937.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3756780141113None1.06PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) and LabourNos5617.05617.010.0FalseNoneNoneFalseNoneFalse56170.00
3756836141113None1.06PSC Pole - 9 Mtr Long, 200 Kg WL (Bescom Part-III,Pg 1, I.No 1.06) Labour (Bescom Part-III,Pg 1, I.No 1.06) Inclusive of GST 18 PercentNo6628.066628.0630.0FalseNoneNoneFalseNoneFalse198841.80
3756753141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m.Rates are inclusive of 18 % GST.Cum120.36120.3649.88FalseNoneNoneFalseNoneFalse6003.55680
3756815141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1Cum120.36120.36192.0FalseNoneNoneFalseNoneFalse23109.120
3756737141113None2.5(ii)AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.0FalseNoneNoneFalseNoneFalse119644.920
3756763141113None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.48FalseNoneNoneFalseNoneFalse119867.51520
3756795141113None2.5(ii)aClearing and grubbing road land including weeds, shrubs, bushes, grass, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned in Light jungle - By Mechanical Means using, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a100 Sqm463.74463.74153.6FalseNoneNoneFalseNoneFalse71230.4640
3756820141113None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a)100 Sqm463.74463.74148.8FalseNoneNoneFalseNoneFalse69004.5120
3756712141113NoneCommon SR Vol-1 , P.No : 8, I.No : 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth up to 3 m. The rates are inclusive 18 percentage GST.Cum120.36120.36653.4FalseNoneNoneFalseNoneFalse78643.2240
3756680141113NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.7443.2FalseNoneNoneFalseNoneFalse20033.5680
3756692141113NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.7458.8FalseNoneNoneFalseNoneFalse27267.9120
3756721141113NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.74144.0FalseNoneNoneFalseNoneFalse66778.560
3756738141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Rates are inclusive of 18 % GST.Cum120.36120.365101.25FalseNoneNoneFalseNoneFalse613986.450
3756796141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 8, I.No : 1.14.1Cum120.36120.367589.96FalseNoneNoneFalseNoneFalse913527.58560
3756754141113None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST.Cum7067.027067.024.28FalseNoneNoneFalseNoneFalse30246.84560
3756816141113None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 15, I.No : 2.1.3Cum7067.027067.0224.0FalseNoneNoneFalseNoneFalse169608.480
3756764141113None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.48FalseNoneNoneFalseNoneFalse119867.51520
3756821141113None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a)100 Sqm463.74463.74148.8FalseNoneNoneFalseNoneFalse69004.5120
3756681141113NoneCommon SR Vol- 3 , P.No : 17, I.No : 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST.Cum581.74581.74360.0FalseNoneNoneFalseNoneFalse209426.40
3756713141113NoneCommon SR Vol-1 , P.No : 15, I.No : 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST.Cum7067.027067.02103.95FalseNoneNoneFalseNoneFalse734616.7290
3756693141113NoneCommon SR Vol-3 , P.No : 17, I.No : 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. The rates are inclusive 18 percentage GST.Sqm7.087.083710.0FalseNoneNoneFalseNoneFalse26266.80
3756722141113NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.74144.0FalseNoneNoneFalseNoneFalse66778.560
3756781141113NoneIX a11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) and labour LabourNos790.0790.014.0FalseNoneNoneFalseNoneFalse11060.00
3756837141113NoneIXa11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (Bescom Part-III, Pg 2, I.No IX a) Labour (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 PercentNo932.2932.242.0FalseNoneNoneFalseNoneFalse39152.40
3756755141113None2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST.Cum7418.667418.667.54FalseNoneNoneFalseNoneFalse55936.69640
3756817141113None2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates , Inclusive of GST 18 Percent.Common SR Vol-1 , P.No : 16, I.No : 2.4.2Cum7461.147461.1448.0FalseNoneNoneFalseNoneFalse358134.720
3756765141113None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of 18 % GST.100 Sqm463.74463.74258.48FalseNoneNoneFalseNoneFalse119867.51520
3756822141113None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 9, I.No : 2.5(ii)a)100 Sqm463.74463.74148.8FalseNoneNoneFalseNoneFalse69004.5120
3756739141113None4.1 A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rates are inclusive of 18 % GST.Cum2934.662934.661457.5FalseNoneNoneFalseNoneFalse4277266.950
3756797141113None4.17(A)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Inclusive of GST 18 Percent. Common SR Vol- 3 , P.No : 26, I.No : 4.17(A)Cum3019.623019.623175.0FalseNoneNoneFalseNoneFalse9587293.50
3756714141113NoneCommon SR Vol-1 , P.No : 15, I.No : 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST.Cum7418.667418.66623.7FalseNoneNoneFalseNoneFalse4627018.2420
3756694141113NoneCommon SR Vol-3 , P.No : 17, I.No : 3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. The rates are inclusive 18 percentage GST.Cum123.9123.9102.0FalseNoneNoneFalseNoneFalse12637.80
3756682141113NoneCommon SR Vol-3 , P.No : 43, I.No : 5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32. The rates are inclusive 18 percentage GST.Sqm14.1614.1617100.0FalseNoneNoneFalseNoneFalse242136.00
3756723141113NoneCommon SR Vol-3 , P.No : 9, I.No : 2.52 AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle. The rates are inclusive 18 percentage GST.100 Sqm463.74463.74144.0FalseNoneNoneFalseNoneFalse66778.560
3756782141113NoneXIX e11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e)Set221.0221.018.0FalseNoneNoneFalseNoneFalse3978.00
3756838141113NoneXIXe11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (CESC SR 3/ XIX e) (Bescom Part-III, Pg 3, I.No XIX e) Inclusive of GST 18 PercentSet260.78260.7854.0FalseNoneNoneFalseNoneFalse14082.120
3756766141113None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i) Rates are inclusive of 18 % GST.Sqm310.34310.34397.75FalseNoneNoneFalseNoneFalse123437.7350
3756724141113None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST.Sqm185.26185.26343.02FalseNoneNoneFalseNoneFalse63547.88520
3756823141113None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4)Sqm185.26185.26181.5FalseNoneNoneFalseNoneFalse33624.690
3756756141113None2.2.1B. Form Work Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Rates are inclusive of 18 % GST.Cum1483.731483.737.54FalseNoneNoneFalseNoneFalse11187.32420
3756818141113None2.4.2Form work : Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 16, I.No : 2.4.2Cum2611.42611.448.0FalseNoneNoneFalseNoneFalse125347.20
3756740141113None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rates are inclusive of 18 % GST.Cum3019.623019.621237.5FalseNoneNoneFalseNoneFalse3736779.750
3756798141113None5.1 A(i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i)Sqm48.3848.3812400.0FalseNoneNoneFalseNoneFalse599912.00
3756695141113NoneCommon SR Vol- 1 , P.No : 7, I.No : 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. The rates are inclusive 18 percentage GST.Cum559.32559.32405.0FalseNoneNoneFalseNoneFalse226524.60
3756715141113NoneCommon SR Vol-1 , P.No : 15, I.No : 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. The rates are inclusive 18 percentage GST.Cum741.87741.87623.7FalseNoneNoneFalseNoneFalse462704.3190
3756683141113NoneCommon SR Vol-3 , P.No : 35, I.No : 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. The rates are inclusive 18 percentage GST.Cum11149.8211149.82872.1FalseNoneNoneFalseNoneFalse9723758.0220
3756783141113NoneXII aLT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) and labourNos561.0561.012.0FalseNoneNoneFalseNoneFalse6732.00
3756839141113NoneXIIaLT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS (Bescom Part-III, Pg 2, I.No XII a) Labour (Bescom Part-III, Pg 2, I.No XII a) Inclusive of GST 18 PercentNo661.98661.9836.0FalseNoneNoneFalseNoneFalse23831.280
3756767141113None10.15(i)Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification common SR Volume 3, page No 93, I.No 10.15(i).Rates are inclusive of 18 % GST.Sqm310.34310.34795.5FalseNoneNoneFalseNoneFalse246875.470
3756725141113None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to (Common SR Vol-3 , P.No : 91, I.No : 10.4). The rates are inclusive 18 percentage GST.Sqm185.26185.26686.05FalseNoneNoneFalseNoneFalse127097.6230
3756824141113None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of ompleted excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.4)Sqm185.26185.26363.0FalseNoneNoneFalseNoneFalse67249.380
3756819141113None2.11hSupplying, Fitting and Placing TMT Fe 550 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications., Inclusive of GST 18 Percent. Common SR Vol-1 , P.No : 18, I.No : 2.11 hTonne93232.9893232.982.4FalseNoneNoneFalseNoneFalse223759.1520
3756757141113None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)Cum8074.748074.7417.09FalseNoneNoneFalseNoneFalse137997.30660
3756741141113None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Rates are inclusive of 18 % GST.Cum581.74581.742365.0FalseNoneNoneFalseNoneFalse1375815.10
3756799141113None5.32Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with echanical broom Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 43, I.No : 5.32Sqm14.1614.1639375.0FalseNoneNoneFalseNoneFalse557550.00
3756696141113NoneCommon SR Vol- 3 , P.No :23, I.No : 4.1 A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material. The rates are inclusive 18 percentage GST.Cum2934.662934.66244.5FalseNoneNoneFalseNoneFalse717524.370
3756716141113NoneCommon SR Vol-1 , P.No : 18, I.No : 2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, aping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification. The rates are inclusive 18 percentage GST.Tonne93232.9893232.9815.51FalseNoneNoneFalseNoneFalse1446043.51980
3756684141113NoneCommon SR Vol-3 , P.No : 38, I.No : 5.16CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST.Cum12925.7212925.72513.0FalseNoneNoneFalseNoneFalse6630894.360
3756784141113NoneXII d1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d)Nos65.065.018.0FalseNoneNoneFalseNoneFalse1170.00
3756840141113NoneXIId1.1 kV Ceramic Pin Insulator With GI pin (Bescom Part-III, Pg 3, I.No XII d) Inclusive of GST 18 PercentNo76.776.754.0FalseNoneNoneFalseNoneFalse4141.80
3756726141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST.Cum120.36120.3637.12FalseNoneNoneFalseNoneFalse4467.76320
3756768141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. Rates are inclusive of 18 % GST.Cum120.36120.3620.41FalseNoneNoneFalseNoneFalse2456.54760
3756825141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1)Cum120.36120.36412.09FalseNoneNoneFalseNoneFalse49599.15240
3756758141113None2.5.2Form Work Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars formwork to be paid separately).Rates are inclusive of 18 % GST.Cum1614.951614.9517.09FalseNoneNoneFalseNoneFalse27599.49550
3756800141113None5.12CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA , Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 35, I.No : 5.12 CCum11149.8211149.822025.0FalseNoneNoneFalseNoneFalse22578385.50
3756742141113None5.33Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom. Rates are inclusive of 18 % GST.Sqm17.717.74125.0FalseNoneNoneFalseNoneFalse73012.50
3756697141113NoneCommon SR Vol- 3 , P.No : 26, I.No : 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. The rates are inclusive 18 percentage GST.Cum3019.623019.62881.75FalseNoneNoneFalseNoneFalse2662549.9350
3756717141113NoneCommon SR Vol-3 , P.No : 117, I.No : 12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification . A.Granular material. The rates are inclusive 18 percentage GST.Cum1378.241378.24297.0FalseNoneNoneFalseNoneFalse409337.280
3756685141113NoneCommon SR Vol-3 , P.No:67, I.No : 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.The rates are inclusive 18 percentage GST.Sqm625.4625.4726.4FalseNoneNoneFalseNoneFalse454290.560
3756785141113NoneXIX cNo.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c)Nos25.025.016.0FalseNoneNoneFalseNoneFalse400.00
3756841141113NoneXIXcNo.8 Strain Insulators (Bescom Part-III, Pg 3, I.No XIX c) Inclusive of GST 18 PercentNo29.529.548.0FalseNoneNoneFalseNoneFalse1416.00
3756727141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1). The rates are inclusive 18 percentage GST.Cum120.36120.3637.12FalseNoneNoneFalseNoneFalse4467.76320
3756769141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m . Rates are inclusive of 18 % GST.Cum120.36120.3620.41FalseNoneNoneFalseNoneFalse2456.54760
3756826141113None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Inclusive of GST 18 Percent (Common SR Vol-1 , P.No : 8, I.No : 1.14.1)Cum120.36120.36412.09FalseNoneNoneFalseNoneFalse49599.15240
3756759141113None2.11 bSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges.Rates are inclusive of 18 % GST.Tonne101723.08101723.080.49FalseNoneNoneFalseNoneFalse49844.30920
3756801141113None5.16CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Inclusive of GST 18 Percent Common SR Vol-3 , P.No : 38, I.No : 5.16CCum12925.7212925.721177.5FalseNoneNoneFalseNoneFalse15220035.30
3756743141113None5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. Rates are inclusive of 18 % GST.Sqm14.1614.1675425.0FalseNoneNoneFalseNoneFalse1068018.00
3756698141113NoneCommon SR Vol- 3 , P.No : 17, I.No : 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. The rates are inclusive 18 percentage GST.Cum581.74581.74464.0FalseNoneNoneFalseNoneFalse269927.360
3756718141113NoneCommon SR Vol-3 , P.No : 117, I.No : 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. The rates are inclusive 18 percentage GST.Mtr282.02282.02199.2FalseNoneNoneFalseNoneFalse56178.3840
3756686141113NoneCommon SR Vol-3 , P.No : 74, I.No : 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST.Nos.430.7430.71100.0FalseNoneNoneFalseNoneFalse473770.00
3756786141113NoneXX bACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) including 3 Percent Accessories and labourKm66659.4566659.451.0FalseNoneNoneFalseNoneFalse66659.450
3756842141113NoneXXbACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 PercentKm78658.1578658.153.0FalseNoneNoneFalseNoneFalse235974.450
3756728141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST.Sqm114.46114.46413.62FalseNoneNoneFalseNoneFalse47342.94520
3756770141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST.Sqm114.46114.46341.25FalseNoneNoneFalseNoneFalse39059.4750
3756827141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment Inclusive of GST 18 Percent .(Common SR Vol-3 , P.No : 91, I.No : 10.2)Sqm114.46114.46465.0FalseNoneNoneFalseNoneFalse53223.90
3756760141113None2.11 cSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges).Rates are inclusive of 18 % GST.Tonne101990.94101990.940.59FalseNoneNoneFalseNoneFalse60174.65460
3756802141113None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2, Inclusive of GST 18 Percent.Common SR Vol- 3 , P.No : 15 , I.No : 3.6Cum581.74581.744167.72FalseNoneNoneFalseNoneFalse2424529.43280
3756744141113None5.12 CDense Graded Bituminous Macadam Grading - II for traffic Less than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates are inclusive of 18 % GST.Cum11149.8211149.824090.65FalseNoneNoneFalseNoneFalse45610011.1830
3756699141113NoneCommon SR Vol-3 , P.No : 31, I.No : 5.1 A(i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means Common SR Vol-3 , P.No : 31, I.No : 5.1 A(i). The rates are inclusive 18 percentage GST.Sqm48.3848.381050.0FalseNoneNoneFalseNoneFalse50799.00
3756719141113NoneCommon SR Vol-3 , P.No : 69, I.No :8.25 iMetal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. The rates are inclusive 18 percentage GST.Mtr4295.24295.2200.0FalseNoneNoneFalseNoneFalse859040.00
3756687141113NoneCommon SR Vol-3 , P.No :64, I.No : 8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST.Nos.4252.724252.7210.0FalseNoneNoneFalseNoneFalse42527.20
3756787141113NoneXX aACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) including 3 Percent Accessories & labourKm41542.041542.01.0FalseNoneNoneFalseNoneFalse41542.00
3756843141113NoneXXaACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 PercentKm49019.5649019.563.0FalseNoneNoneFalseNoneFalse147058.680
3756803141113None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of otherstructures graded with desired compaction, Inclusive of GST 18 Percent.Common SR Vol- 1 , P.No : 7 , I.No : 1.7Cum133.34133.34962.28FalseNoneNoneFalseNoneFalse128310.41520
3756729141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST.Sqm114.46114.46413.62FalseNoneNoneFalseNoneFalse47342.94520
3756771141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST.Sqm114.46114.46341.25FalseNoneNoneFalseNoneFalse39059.4750
3756828141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2)Sqm114.46114.46465.0FalseNoneNoneFalseNoneFalse53223.90
3756761141113None2.11dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges).Rates are inclusive of 18 % GST.Tonne102256.44102256.440.81FalseNoneNoneFalseNoneFalse82827.71640
3756745141113None5.16CBituminous Concrete Grading II for traffic Less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Rates are inclusive of 18 % GST.Cum12925.7212925.722386.5FalseNoneNoneFalseNoneFalse30847230.780
3756720141113NoneCommon SR Vol-3 , P.No : 117, I.No : 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. The rates are inclusive 18 percentage GSTCum3158.863158.86178.2FalseNoneNoneFalseNoneFalse562908.8520
3756700141113NoneCommon SR Vol-3 , P.No : 43, I.No : 5.33Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom Common SR Vol-3 , P.No : 43, I.No : 5.33. The rates are inclusive 18 percentage GST.Sqm17.717.71050.0FalseNoneNoneFalseNoneFalse18585.00
3756688141113NoneCommon SR Vol-3 , P.No :65, I.No : 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST.Sqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
3756788141113NoneXXIII aGuy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) and labourSet1657.01657.04.0FalseNoneNoneFalseNoneFalse6628.00
3756844141113NoneXXIIIaGuy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (Bescom Part-III, Pg 3, I.No XXIII a) Inclusive of GST 18 PercentSet1955.261955.2612.0FalseNoneNoneFalseNoneFalse23463.120
3756730141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2). The rates are inclusive 18 percentage GST.Sqm114.46114.46413.62FalseNoneNoneFalseNoneFalse47342.94520
3756772141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment. Rates are inclusive of 18 % GST.Sqm114.46114.46341.25FalseNoneNoneFalseNoneFalse39059.4750
3756829141113None10.2Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 91, I.No : 10.2)Sqm114.46114.46465.0FalseNoneNoneFalseNoneFalse53223.90
3756762141113None13.14Painting on concrete surface : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2).Rates are inclusive of 18 % GST.Sqm99.1299.125.76FalseNoneNoneFalseNoneFalse570.93120
3756746141113None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Rates are inclusive of 18 % GST.Sqm625.4625.43579.75FalseNoneNoneFalseNoneFalse2238775.650
3756804141113None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :57, I.No : 8.15Sqm625.4625.41421.0FalseNoneNoneFalseNoneFalse888693.40
3756701141113NoneCommon SR Vol-3 , P.No : 43, I.No : 5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Common SR Vol-3 , P.No : 43, I.No : 5.32, The rates are inclusive 18 percentage GST.Sqm14.1614.1650455.0FalseNoneNoneFalseNoneFalse714442.80
3756689141113NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). The rates are inclusive 18 percentage GST.Each5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3756789141113NoneI bReleasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL and labourNos2547.92547.98.0FalseNoneNoneFalseNoneFalse20383.20
3756845141113NoneI bReleasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (1341*0.9) (Bescom Part-III, Pg 1, I.No I b) Inclusive of GST 18 PercentNo3006.523006.5224.0FalseNoneNoneFalseNoneFalse72156.480
3756731141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST.m7.087.0811030.0FalseNoneNoneFalseNoneFalse78092.40
3756773141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST.Mtr7.087.0818200.0FalseNoneNoneFalseNoneFalse128856.00
3756830141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19)Rmtr7.087.0812400.0FalseNoneNoneFalseNoneFalse87792.00
3756747141113None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Rates are inclusive of 18 % GST.Nos430.7430.74181.0FalseNoneNoneFalseNoneFalse1800756.70
3756805141113None8.43Supplying and Fixing of Moulded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer PWD SOR for Roads & Bridges Inclusive of GST 18 Percent Common SR Vol-3 , Item No. VOL-III-8.43 Page No.74No430.7430.71666.0FalseNoneNoneFalseNoneFalse717546.20
3756702141113NoneCommon SR Vol-3 , P.No : 35, I.No : 5.12 CDense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Common SR Vol-3 , P.No : 35, I.No : 5.12 C. The rates are inclusive 18 percentage GST.Cum11149.8211149.822625.7FalseNoneNoneFalseNoneFalse29276082.3740
3756690141113NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(ii)Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).The rates are inclusive 18 percentage GST.Each3453.863453.863.0FalseNoneNoneFalseNoneFalse10361.580
3756790141113NoneIX aReleasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole and Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a)Nos231.8231.88.0FalseNoneNoneFalseNoneFalse1854.40
3756846141113NoneIXaReleasing & Refixing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 PercentNo273.52273.5224.0FalseNoneNoneFalseNoneFalse6564.480
3756732141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST.m7.087.0811030.0FalseNoneNoneFalseNoneFalse78092.40
3756774141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST.Mtr7.087.0818200.0FalseNoneNoneFalseNoneFalse128856.00
3756831141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19)Rmtr7.087.0812400.0FalseNoneNoneFalseNoneFalse87792.00
3756806141113None8.25AProviding and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Type - A, "W" : Metal Beam Crash Barrier Inclusive of GST 18 Percent Common SR Vol-3 , P.No :69, I.No : 8.25(A)Mtr4295.24295.2400.0FalseNoneNoneFalseNoneFalse1718080.00
3756748141113None8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. Rates are inclusive of 18 % GST.Nos4252.724252.725.0FalseNoneNoneFalseNoneFalse21263.60
3756703141113NoneCommon SR Vol-3 , P.No : 38, I.No : 5.16CBituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. The rates are inclusive 18 percentage GST.Cum12925.7212925.721545.15FalseNoneNoneFalseNoneFalse19972176.2580
3756691141113NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST.Each993.56993.5614.0FalseNoneNoneFalseNoneFalse13909.840
3756791141113NoneIX aReleasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a)Nos231.8231.88.0FalseNoneNoneFalseNoneFalse1854.40
3756847141113NoneIX aReleasing and refixing of LT 4/2 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS Labour (122*1.9) (Bescom Part-III, Pg 2, I.No IX a) Inclusive of GST 18 PercentNo273.52273.5224.0FalseNoneNoneFalseNoneFalse6564.480
3756807141113None10.14Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.4Rmtr189.98189.98400.0FalseNoneNoneFalseNoneFalse75992.00
3756733141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19). The rates are inclusive 18 percentage GST.m7.087.0811030.0FalseNoneNoneFalseNoneFalse78092.40
3756775141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GSTMtr7.087.0818200.0FalseNoneNoneFalseNoneFalse128856.00
3756832141113None16.19The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 147, I.No : 16.19)Rmtr7.087.0812400.0FalseNoneNoneFalseNoneFalse87792.00
3756749141113None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Rates are inclusive of 18 % GST.Sqm10631.810631.81.62FalseNoneNoneFalseNoneFalse17223.5160
3756704141113NoneCommon SR Vol-3 , P.No : 51, I.No : 6.6Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008, Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. The rates are inclusive 18 percentage GST.Cum7993.327993.32608.0FalseNoneNoneFalseNoneFalse4859938.560
3756792141113NoneXX bReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b)Km6268.16268.11.0FalseNoneNoneFalseNoneFalse6268.10
3756848141113NoneXX bReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM Labour (3299*1.9) (Bescom Part-III, Pg 3, I.No XX b) Inclusive of GST 18 PercentKm7396.367396.363.0FalseNoneNoneFalseNoneFalse22189.080
3756808141113None10.1.5Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 63mm dia., 6 kg/sqcm & class 3 Inclusive of GST 18 Percent Common SR Vol-5 , P.No :113, I.No : 10.1.5Rmtr259.6259.6400.0FalseNoneNoneFalseNoneFalse103840.00
3756776141113None16.20 (i)Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909. Rates are inclusive of 18 % GST.Nos2415.462415.4612.0FalseNoneNoneFalseNoneFalse28985.520
3756734141113None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22). The rates are inclusive 18 percentage GST.Km2341.122341.127.25FalseNoneNoneFalseNoneFalse16973.120
3756833141113None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22) Inclusive of GST 18 PercentKm2341.122341.126.6FalseNoneNoneFalseNoneFalse15451.3920
3756750141113None8.16(i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast). Rates are inclusive of 18 % GSTEach5995.585995.582.0FalseNoneNoneFalseNoneFalse11991.160
3756705141113NoneCommon SR Vol-3 , P.No:67, I.No : 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. The rates are inclusive 18 percentage GST.Sqm625.4625.42211.89FalseNoneNoneFalseNoneFalse1383316.0060
3756793141113NoneXX aReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a)Km4598.04598.01.0FalseNoneNoneFalseNoneFalse4598.00
3756849141113NoneXX aReleasing & Restringing of ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Weasel ACSR (6/2.59 mm Al+1/2.59 mm St), Std Wt: 128 Kg/KM Labour (2420*1.9) (Bescom Part-III, Pg 3, I.No XX a) Inclusive of GST 18 PercentKm5425.645425.643.0FalseNoneNoneFalseNoneFalse16276.920
3756777141113None16.22Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Rates are inclusive of 18 % GST.Km2341.122341.1214.4FalseNoneNoneFalseNoneFalse33712.1280
3756735141113None16.24 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)). The rates are inclusive 18 percentage GST.Km243.08243.087.25FalseNoneNoneFalseNoneFalse1762.330
3756834141113None16.24 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i))Km243.08243.086.6FalseNoneNoneFalseNoneFalse1604.3280
3756809141113None8.16(i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8- 1980, fixing in position including painting and printing etc Ordinary kilometre stone (Pre- cast) 5th Kilometer Stone Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(i)Each5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3756751141113None8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast).Rates are inclusive of 18 % GST.Each3453.863453.869.0FalseNoneNoneFalseNoneFalse31084.740
3756706141113NoneCommon SR Vol-3 , P.No : 74, I.No : 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. The rates are inclusive 18 percentage GST. Nos430.7430.73308.0FalseNoneNoneFalseNoneFalse1424755.60
3756794141113NoneRound offChescom ChargesLump Sum for Each20000.020000.01.0FalseNoneNoneFalseNoneFalse20000.00
3756778141113None16.24 (i)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint. Rates are inclusive of 18 % GST.Km243.08243.0814.4FalseNoneNoneFalseNoneFalse3500.3520
3756736141113None16.24(iii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii). The rates are inclusive 18 percentage GST.Km1339.31339.37.25FalseNoneNoneFalseNoneFalse9709.9250
3756835141113None16.24(iii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade Inclusive of GST 18 Percent (Common SR Vol-3 , P.No : 148, I.No : 16.24 (iii)Km1339.31339.36.6FalseNoneNoneFalseNoneFalse8839.380
3756810141113None8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16(ii)Each3453.863453.865.0FalseNoneNoneFalseNoneFalse17269.30
3756752141113None8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast).Rates are inclusive of 18 % GST.Each993.56993.5640.0FalseNoneNoneFalseNoneFalse39742.40
3756707141113NoneCommon SR Vol-3 , P.No :64, I.No : 8.6. A(iv)Retro-Reflectorised Traffic Signs : Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle. The rates are inclusive 18 percentage GST.Nos4252.724252.7210.0FalseNoneNoneFalseNoneFalse42527.20
3756779141113None20.25 (ii)Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade. Rates are inclusive of 18 % GST.Km1339.31339.314.4FalseNoneNoneFalseNoneFalse19285.920
3756811141113None8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) Inclusive of GST 18 Percent Common SR Vol-3 , P.No :67, I.No : 8.16. (iii)Each993.56993.5627.0FalseNoneNoneFalseNoneFalse26826.120
3756708141113NoneCommon SR Vol-3 , P.No :65, I.No : 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. The rates are inclusive 18 percentage GST.Sqm10631.810631.81.62FalseNoneNoneFalseNoneFalse17223.5160
3756812141113None8.6 A(iv)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangle, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :54, I.No : 8.6. A(iv)No4252.724252.7222.0FalseNoneNoneFalseNoneFalse93559.840
3756709141113NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast). The rates are inclusive 18 percentage GST.Each3453.863453.865.0FalseNoneNoneFalseNoneFalse17269.30
3756813141113None8.7Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing, Inclusive of GST 18 Percent. Common SR Vol-3 , P.No :64, I.No : 8.7Sqm10631.810631.83.6FalseNoneNoneFalseNoneFalse38274.480
3756710141113NoneCommon SR Vol-3 , P.No :67, I.No : 8.16(iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast). The rates are inclusive 18 percentage GST.Each993.56993.5616.0FalseNoneNoneFalseNoneFalse15896.960
3756711141113None10 volume 3 page no. 161Crack Groove Cutting: Groove shall be cut using hand held electrically operated concrete cutting machine of size of 50 mm wide and 75 mm deep on each side of the crack to form as "V" groove all along the crack to fill the polyester resin/ Epoxy putty (horizontal and vertical cracks). After the groove cutting, the concrete shall be removed from the groove using the pneumatic concrete chipping machine to form "V" groove. The item includes the cost of hire charges for all machineries, tools and barges and all labour charges etc., complete. The rates are inclusive 18 percentage GST.m885.0885.0988.0FalseNoneNoneFalseNoneFalse874380.00
3756814141113None4.1A(v)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material, Inclusive of GST 18 Percent. Inclusive of GST 18 Percent Common SR Vol- 3 , P.No : 19, I.No : 4.1 A(v)Cum2934.662934.661240.0FalseNoneNoneFalseNoneFalse3638978.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17234480280000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17234480280000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17234480280000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17234480280000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17234480280000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17234488090000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of eProcurement portal due to internet connectivity issues and technical glitches at bidders endNone
17234488660000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17234488800000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17234488940000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17234489180000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17234489350000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17234489690000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17234489820000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17234489940000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17234490210000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4None
17234490320000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17234490430000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials.None
17234490560000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17234490760000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17234490890000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17234491750000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.5 of STD tender document AttachedNone
17234491970000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this workNone
17234492110000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private propertiesNone
17234492300000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17234492490000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Mysore Division, Mysore during office hours on all working days.None
17234492590000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17234492780000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17234492920000NoneNoneELIGIBILITYThe successful contractor should setup material testing laboratory at the work site before commencement of work.None
17234493190000NoneNoneELIGIBILITYThe difference in cost deposited by the lowest successful tenderer (for unbalanced) along with the performance security will be released to the contractor 30 days after the completion of defects liability period.None
17234493560000NoneNoneELIGIBILITYAll the uploaded documents in e-portal should be got verified at the Division office within 3 working days from the stipulated date of opening of Technical Bid by producing the original documents at the Division office, failing which the tender is liable for rejection. No separate communication will be made in this regard.None
17234493720000NoneNoneELIGIBILITYThe returns submitted to the I.T. along with the Profit and Loss account statement submitted to the I.T. Department should be uploaded for the financial turnover criteria as per tender document attested by Chartered Accountant.None
17234493850000NoneNoneELIGIBILITYBankers Certificate for the stipulated amount as per clause 3.3 (b) should be submitted in the format as prescribed in the bid document only. Otherwise tender is liable for rejection.None
17234494020000NoneNoneELIGIBILITYFor the vehicles / machineries / equipments for which RTO registration is statutory, for such vehicles / machineries / equipments the contractor should upload the Registration Certificate documents issued by RTO. For machineries and other equipments for which RTO registration is not applicable, for such machineries and equipments, purchase invoice document should be uploaded. If there is sale deed for such machineries and equipments, original invoice along with registered sale deed attested by Govt. registered NOTARY should be uploaded. Otherwise tender is liable for rejection.None
17234494650000NoneNoneELIGIBILITYThe contractor who participates in tenders for more than one work for which tenders are invited in this IFT, the tenderer must fulfill all the conditions and criteria cumulatively for the participated works. (ITT Section 3.4)None
17234495080000NoneNoneELIGIBILITYGST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17234495240001NoneNoneELIGIBILITYThe success-full contractor should complete the whole work with in 11 months from the date of handing over of site (including rainy season)None
17234496210000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the prescribed form in the favour of the Executive Engineer, Public Works Department, Mysore Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17234496320001NoneNoneELIGIBILITYContractors should be registered as KPWD/CPWD Class I Civil Contractor.None
17234497470000NoneNoneELIGIBILITYRs 1,00,000.00 of the EMD should be paid through e-payment as specified in e-procurement portal and the remaining balance amount of EMD must be produced in the form of Bank Guarantee by uploading the scan copy of the Bank Guarantee. The original copy should be produced at the time of Technical Bid Opening.None
17234498050000NoneNoneELIGIBILITYThe defect liability period for this project shall be total 5 Years (Five) (Initial 2 years DLP without any financial implications and subsequent 3 years DLP nominal maintenance should be carried out as per BOQ)None
17234498330000NoneNoneELIGIBILITYThe GST of 18% will not be paid seperately, the amount put to tender is inclusive of GST Amount.None
17234498570000NoneNoneELIGIBILITYRegarding Appealing aggrieved contractors may appeal to the prescribed (Appellant) authority within 30 days as per KTTP and appeal should be through e-proc only as per Govt. order No: pwd/572/CRM-2020(E) Bangalore DT.09-10-2020. The same will not be considered if appeal through LettersNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMandating satisfactory completion as a prime contractor for at least one similar work to an extent of 50% of the cost of the work, such as Road work of value not less than Rs. 1231.99 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe existing commitments and on-going works to be completed during the next 11 monthsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The statements showing the value of existing commitments and on-going works
NoneNoneNoneNoneExecuted in the last five years in any one year the following minimum quantities of work 1)Earthwork Excavation 11290.91 cum 2)Embankment/Subgrade/Earthen shoulder 7216.80 cum 3)Granular Sub base 2353.60 cum 4)WMM 4235.40 cum 5)MSS/BM/DBM/SDBC/BC of 12188.48 Cum, 6) CC/PCC/RCC of 1149.25 Cum and 7) Steel of 15.84 tonnes.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLabour Certificate
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs.4927.98 lakhs)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 672.00 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneIncome Tax Balance sheets and Annual Turnover Certificate issued by the CA with Membership No. with UDIN - 2019-20 to 2023-24Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded Hot Mix Plant Not less than 40/60 TPH 1 own and 1 Hire, Asphalt Paver Finisher 1 own and 1 Hire, Smooth wheeled roller 1 own and 1 Hire, Asphalt vibratory roller 1 own and 1 Hire, Tipper/HGV 3 own and 3 Hire, Motar Grader 1 own and 1 Hire, Excavator 1 own and 2 Hire, Pugmill 1 own, Vehicle mounted bitumen sprayer 1own and 1 Hire, Concrete mixer with Hooper 2 own and 2 Hire, weigh batch concrete mixer 1own, Water tanker 1own and 1 HireOthersCapabilities of Vendor
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Critical Machineries
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CATrueTechnical Bid
KPWD/CPWD Registration CertificateTrueTechnical Bid
Work Done Certificate for Similar nature work, duly attested by the Officer Not below the rank of E.E.TrueTechnical Bid
Banker Certificate - Line of Credit in the prescribed formTrueTechnical Bid
Income Tax Balance sheets and Annual Turnover Certificate issued by the CA with Membership No. with UDIN - 2019-20 to 2023-24TrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
GST Certificate, Pan Card & Tin CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1723629872000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer, Public Works Department, Mysore Division, Mysore
streetNone
cityMysore
stateKarnataka
pin570005
tenderRecallDTONone