1725113843000 | 0 | None | None | Water supply/sewage lines | Construction & Setting up of Grey Water Treatment System in Kadabagere Village, Kadabagere Gram Panchayat in Bangalore North Taluk, Bangalore Urban District. | 3372851.93 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3897444 | 150022 | None | SBM-01 | Clearingandgrubbingroadlandincludinguprootingrankvegetation,grass,bushes,shrubs,saplingsandtreesgirthupto300mm,removalofstumpsoftreescutearlieranddisposalofunserviceablematerialsandstackingofserviceablematerialtobeusedorauctioned,includingremovalanddisposaloftoporganicsoilnotexceeding150mminthickness.ByMechanicalMeansusingDozer.Inareaof thorny jungle | Sqm | 484.0 | 484.0 | 240.0 | False | None | None | False | None | False | 116160.0 | 0 | 3897445 | 150022 | None | SBM-02 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth (Vol-1, Page No.6, Item No.1.5.1 CSR-2023-24) | Cum | 299.0 | 299.0 | 1227.88 | False | None | None | False | None | False | 367136.12 | 0 | 3897446 | 150022 | None | SBM-03 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Vol-1, Page No.15, Item No.2.1.3 CSR-2023-24) | Cum | 5989.0 | 5989.0 | 43.21 | False | None | None | False | None | False | 258784.69 | 0 | 3897447 | 150022 | None | SBM-04 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Vol-1, Page No.15, Item No.2.2.1 CSR-2023-24) | Cum | 6287.0 | 6287.0 | 72.99 | False | None | None | False | None | False | 458888.13 | 0 | 3897448 | 150022 | None | SBM-05 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications (Vol-2, Page No.17, Item No. 6.33 CSR-2023-24) | Sqm | 1231.0 | 1231.0 | 27.48 | False | None | None | False | None | False | 33827.88 | 0 | 3897449 | 150022 | None | SBM-06 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (Vol-2, Page No.42, Item No. 8.5.1 CSR-2023-24) | Sqm | 366.0 | 366.0 | 86.26 | False | None | None | False | None | False | 31571.16 | 0 | 3897450 | 150022 | None | SBM-07 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder(Vol-3, Item no-14.4, Page no-129 CSR2023-24) | Cum | 1912.0 | 1912.0 | 470.02 | False | None | None | False | None | False | 898678.24 | 0 | 3897451 | 150022 | None | SBM-08 | Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings.A) 20 mm down graded coarse aggregate layer (Vol-4, Page no.42, I.No. 2.35.3) | Cum | 1966.0 | 1966.0 | 183.8 | False | None | None | False | None | False | 361350.8 | 0 | 3897452 | 150022 | None | SBM-09 | Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings B) 40 mm down graded coarse aggregate layer (Vol-4, Page no.43, I.No. 2.35.4) | Cum | 1806.0 | 1806.0 | 183.8 | False | None | None | False | None | False | 331942.8 | 0 | 3897453 | 150022 | None | SBM-10 | Supplying & errection of RCC rings for well steining of 0.3Mtr Depth using M-20 grade concrete using clean graded granite or trap or jelly of approved quality 20mm and down size well compacted including centering, formwork and plastering for both faces with C.M 1:3 proportion as per design using 6.50mm M.S. coil at the rate of 10kgs/ring including cost of steel and fgabrication, bailing out of water, errection etc., complete)[Vide SR-2019-20, Page No.115, Item No.11.20.1)for 1.20m dia (clear) rings of steining thickness 0.075mm upto 18M | Each | 1142.27 | 1142.27 | 73.0 | False | None | None | False | None | False | 83385.71 | 0 | 3897454 | 150022 | None | SBM-11 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD Common SR 2023-24 Vol-1 I.N1.10, P.no-35 | Cum | 160.0 | 160.0 | 18.96 | False | None | None | False | None | False | 3033.6 | 0 | 3897455 | 150022 | None | SBM-12 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification .(Vol-1, Page No.18, Item No. 2.11.h,CSR-2023-24) | t | 82171.44 | 82171.44 | 2.17 | False | None | None | False | None | False | 178312.0248 | 0 | 3897456 | 150022 | None | SBM-13 | Providing and removing centering, shuttering, strutting, propping etc., for columns, pillars, post and struts, square / rectangular / polygon in plan including cost of all materials, labour complete as per specificaiton. Specification No. KBS 4.6.2 | Cum | 306.09 | 306.09 | 104.0 | False | None | None | False | None | False | 31833.36 | 0 | 3897457 | 150022 | None | SBM-14 | Providing and removing centering, shuttering, strutting, propping etc., for edges of slabs and breaks in floor including cost of all materials, labour complete as per specificaiton. Specification No. KBS 4.6.2 | Cum | 650.02 | 650.02 | 14.0 | False | None | None | False | None | False | 9100.28 | 0 | 3897458 | 150022 | None | SBM-15 | Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter criteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings C)brick bats | Cum | 1476.0 | 1476.0 | 8.4 | False | None | None | False | None | False | 12398.4 | 0 | 3897459 | 150022 | None | SBM-16 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour,including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approvedtype with all labour and lift charges, handling charges including encasing the pipe alround to a depth not less than 15 cms withgravel or selected earth available from the excavation etc. complete. for PVC pipe of 10kg\cum,90 mm | Rmtr | 382.96 | 382.96 | 19.0 | False | None | None | False | None | False | 7276.24 | 0 | 3897460 | 150022 | None | SBM-17 | Planting of polythene bagged seedlings after tearing with blade andremovingpolythenebagsintrenches/pitsincludingscoopingsoiltorequireddepth,pressingsoilgentlyaroundseedling after planting. | LS | 3500.0 | 3500.0 | 12.0 | False | None | None | False | None | False | 42000.0 | 0 | 3897461 | 150022 | None | SBM-18 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with
approved steel primer all complete. Fixed to steel windows by welding (11.34A Vol-2 CSR-2023-24) | Kg | 168.0 | 168.0 | 735.0 | False | None | None | False | None | False | 123480.0 | 0 | 3897462 | 150022 | None | SBM-19 | Providing and laying 100mm thick pre-cast cover slabs over Road side drains / utility ducts / Rain water harvesting pit of width not exceeding 1000 mm using M20 concrete reinforced with TMT bars Fe 550 @ 6kg/ m2, slabs jointed in CM 1:3 proportion and nicely finished Including providing holes in the Cover slabs wherever necessary for easy drain age of surface water including of labour, materials, scaffolding, usage of machinery, curing, lead and lift charges etc, Complete. PWD Common SR-2023-24 Vol-2 I.No.17.14, Page-177 | Sqm | 1170.0 | 1170.0 | 20.25 | False | None | None | False | None | False | 23692.5 | 0 |
|