createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1725336572391
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd42500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose12-09-2024 16:30:00
tenderQueryClose10-09-2024 16:30:00
technicalBidOpen13-09-2024 17:00:00
publishedDate03-09-2024 09:59:09
publishedByPostRDPR_EE_DIV_KRN
publishedByUserKPE18448 - S LAKSHMIKANTH
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonDhanalakshmi K S
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9972961399
tenderSupplierListNone
tenderSchedule
createdTs1725336572433
version4
createdDateNone
modifiedDateNone
tenderNumberRDPR/2024-25/BD/WORK_INDENT8408
titleConstruction of Goat and Sheep auction shed at Bettadapura Market yard in P.patna Taluk
descriptionConstruction of Goat and Sheep auction shed at Bettadapura Market yard in P.patna Taluk
categoryWORKS
categoryTextWorks
ecv1700000.00
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location974
locationNameRDPR Division Office K R Nagara
provisionalAmount1700000.0
groupOverheadTotal272699.42
fileNumberRDPR-APMC2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17253365720000NoneNoneBuildingsConstruction of Goat and Sheep auction shed at Bettadapura Market yard in P.patna Taluk1427300.58
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3905404150563NoneCode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ( P.NO. 8, I.No. 1.14.1,Volume No-1)2023-24Cum102.0102.023.08FalseNoneNoneFalseNoneFalse2354.160
3905405150563Nonecode02Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to omplete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (P.No.15, I.No.2.1.3) (Volume No-1) 2023-24Cum5989.05989.010.02FalseNoneNoneFalseNoneFalse60009.780
3905406150563Nonecode03Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(P.No.9, I.No. 5.3,Volume No-2) 2023-24Cum6205.06205.011.11FalseNoneNoneFalseNoneFalse68937.550
3905407150563Nonecode04Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (P.No.9, I.No. 5.2) Volume No-2) 2023-24Cum6618.06618.05.89FalseNoneNoneFalseNoneFalse38980.020
3905408150563Nonecode05Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (P.No.84, I.No. 11.32, Volume No-2) 2023-24Kgs83.083.0389.75FalseNoneNoneFalseNoneFalse32349.250
3905409150563Nonecode06Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P.No.16, I.No.2.5.1,Volume No -1, (2023-24)Cum9945.09945.019.45FalseNoneNoneFalseNoneFalse193430.250
3905410150563Nonecode07Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (P.No.82, I.No.11.16.2) (Volume No-2)2023-24Kgs147.0147.01356.23FalseNoneNoneFalseNoneFalse199365.810
3905411150563Nonecode08Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. 0.63 mm thick with zinc coating not less than 275 g/ m² (P.No. 21, I.No.7.1.1) (Volume No-2) 2023-24Sqm879.0879.0116.25FalseNoneNoneFalseNoneFalse102183.750
3905412150563Nonecode09Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I)- 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications (P.No.17, I.No.6.33, Volume No -2) 2023-24Sqm1231.01231.09.72FalseNoneNoneFalseNoneFalse11965.320
3905413150563Nonecode10Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No.42, I.No.8.5.2, Volume No -2) 2023-24Sqm349.0349.09.24FalseNoneNoneFalseNoneFalse3224.760
3905414150563Nonecode11Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No.42, I.No.8.8, Volume No-2) 2023-24Sqm371.0371.013.6FalseNoneNoneFalseNoneFalse5045.60
3905415150563Nonecode12Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P.No.45, I.No. 8.25, Volume No-2) 2023-24Sqm137.0137.09.24FalseNoneNoneFalseNoneFalse1265.880
3905416150563Nonecode13Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two coats applied @ 1.43 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P.No.46, I.No. 8.31 Volume No-2) 2023-24Sqm178.0178.013.6FalseNoneNoneFalseNoneFalse2420.80
3905417150563Nonecode14Providing and installing at site of work PVC pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jionting of approved type with all labour and lift charge, handling encasing the pipe all round to a depth not lessthan 15cms with gravel or selected earth available from the excavation etc., complete (PHE SR P.No.14, I.No.3.4.1)Rmtr124.63124.6325.0FalseNoneNoneFalseNoneFalse3115.750
3905418150563Nonecode15Construction of Sheep Shed - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ( P.NO. 8, I.No. 1.14.1,Volume No-1)2023-24Cum102.0102.019.48FalseNoneNoneFalseNoneFalse1986.960
3905419150563Nonecode16Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to omplete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (P.No.15, I.No.2.1.3) (Volume No-1) 2023-24Cum5989.05989.08.49FalseNoneNoneFalseNoneFalse50846.610
3905420150563Nonecode17Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(P.No.9, I.No. 5.3,Volume No-2) 2023-24Cum6205.06205.09.19FalseNoneNoneFalseNoneFalse57023.950
3905421150563Nonecode18Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (P.No.9, I.No. 5.2) Volume No-2) 2023-24Cum6618.06618.04.99FalseNoneNoneFalseNoneFalse33023.820
3905422150563Nonecode19Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (P.No.84, I.No. 11.32, Volume No-2) 2023-24Kgs83.083.0259.92FalseNoneNoneFalseNoneFalse21573.360
3905423150563Nonecode20Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P.No.16, I.No.2.5.1,Volume No -1, (2023-24)Cum9945.09945.014.56FalseNoneNoneFalseNoneFalse144799.20
3905424150563Nonecode21Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (P.No.82, I.No.11.16.2) (Volume No-2)2023-24Kgs147.0147.01958.32FalseNoneNoneFalseNoneFalse287873.040
3905425150563Nonecode22Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. 0.63 mm thick with zinc coating not less than 275 g/ m² (P.No. 21, I.No.7.1.1) (Volume No-2) 2023-24Sqm879.0879.090.0FalseNoneNoneFalseNoneFalse79110.00
3905426150563Nonecode23Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I)- 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications (P.No.17, I.No.6.33, Volume No -2) 2023-24Sqm1231.01231.09.72FalseNoneNoneFalseNoneFalse11965.320
3905427150563Nonecode24Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No.42, I.No.8.5.2, Volume No -2) 2023-24Sqm349.0349.09.24FalseNoneNoneFalseNoneFalse3224.760
3905428150563Nonecode25Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P.No.42, I.No.8.8, Volume No-2) 2023-24Sqm371.0371.013.6FalseNoneNoneFalseNoneFalse5045.60
3905429150563Nonecode26Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P.No.45, I.No. 8.25, Volume No-2) 2023-24Sqm137.0137.09.24FalseNoneNoneFalseNoneFalse1265.880
3905430150563Nonecode27Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two coats applied @ 1.43 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P.No.46, I.No. 8.31 Volume No-2) 2023-24Sqm178.0178.013.6FalseNoneNoneFalseNoneFalse2420.80
3905431150563Nonecode28Providing and installing at site of work PVC pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jionting of approved type with all labour and lift charge, handling encasing the pipe all round to a depth not lessthan 15cms with gravel or selected earth available from the excavation etc., complete (PHE SR P.No.14, I.No.3.4.1)Rmtr124.63124.6320.0FalseNoneNoneFalseNoneFalse2492.60
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17253365730000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17253365730000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17253365730000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17253365730000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17253365730000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17253365910000NoneNoneELIGIBILITYDepartment Registration Details.None
17253366250000NoneNoneELIGIBILITYWithin 21 days of receipt of Letter of Acceptance, the successful Tenderer shall deliver to the employer a Security Deposit in the form of NSC/DD/ FDR in favour of the Executive Engineer, P.R.E. Division, K R Nagar, for an amount equivalent to 5 percent of the Contract price plus additional security for unbalanced tenders in accordance with the conditions of contract for General Category.None
17253366590000NoneNoneELIGIBILITYAs per Karnataka State Government order No. LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/ BMS/2007 Dated 27-7-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund. The tenderer shall abide by the directions of Government towards recovery as modifed by the Government from time to time .None
17253366740000NoneNoneELIGIBILITYAll safety precautions, warnings, signs, deployment of security guards have to be ensured so that no un towards incident happens on account of negligence or any project activity .None
17253366870000NoneNoneELIGIBILITYAll materials required for the work, shall be procured by the tenderer himself and should be got tested by the Department quality control authorities at his own cost before use for the work. If employer wishes to engage third party inspecting agency for the said work, apart from the quality control authorities, then the contractor should cooperate with the third party for test .None
17253367020000NoneNoneELIGIBILITYIn the case of death of the contractor after executing the agreement/ commencement of the work, his legal heir, if is an eligible registered contractor and is willing, can execute and complete the work at the accepted tender rates in the same terms and condition of the contractor of the work.None
17253367160000NoneNoneELIGIBILITYThe tenderers are requested to abide instructions and conditions 2 of 33 KPPP-Portal contained in the Standard Tender Documents K/W-1 and further orders thereon .None
17253367420000NoneNoneELIGIBILITYSite investigation report. The tenderer before applying this tender has to visit the site along with Junior Engineer/Assistant Engineer/ Assistant Executive Engineer of PERIYAPATNA sub-Division and submit feasibility report to know the nature of work and working condition.None
17253367540000NoneNoneELIGIBILITYThe tenderer are Requested to Refer this Notification For More Imformation And fallow The condition.None
17253367670000NoneNoneELIGIBILITYGST Shall be Paid SeperatelyNone
17253367930000NoneNoneELIGIBILITYList of existing commitments and ongoing work .None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneDepartment Registration DetailsNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing workNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker DetailsNoneNone
NoneNoneNoneNoneWork Done Certificate Tenderer in his name should have satisfactorily completed as a prime contractor for at least one similar work for the KW 1 works of Sl. No.9 of this notification Improvement,or Constructions of buildings. value not less than 50 percent Rs 8.50 Lakh of the amount put to tender in any one of the last five financial year period 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 should be obtained from not below the rank of Executive Engineer,Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAnnual turnover certificate in all classes of civil engineering construction works only for least five financial years i.e. 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 obtained from the Competent authority Charted Accountant/Auditor.The tenderer must have achieved in at last one financial years of Last Five Financial Years an annual financial turnover not less than The amount put to tender Rs 17.00 Lakhs. Certificate should be in the prescribed form as in KW 1 Section 3 3.2aPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSubmission of K Form liquid assets /availability of credit facilities of not less than Rs 5.10 Lakhs Credit lines/ letter of credit certificates from Nationalized bank for meeting the fund requirement as per KW-1Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual Turnover Certificate in all classes of Civil Engineering works only for last Five Financial years ie., 2019-20, 2020-21, 2021-22 ,2022-23,and 2023-24 Certified from Charted Accountant with compulsory UDI number Profit and Loss, balance sheet shall be enclosed .Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNonePWD Contractor Civil Registration Certificate class 4 and aboveOthersTechnical
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Work Done Certificate Tenderer in his name should have satisfactorily completed as a prime contractor for at least one similar work for the KW 1 works of Sl. No.9 of this notification Improvement,or Constructions of buildings. value not less than 50 percent Rs 8.50 Lakh of the amount put to tender in any one of the last five financial year period 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 should be obtained from not below the rank of Executive Engineer,TrueTechnical Bid
Annual turnover certificate in all classes of civil engineering construction works only for least five financial years i.e. 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 obtained from the Competent authority Charted Accountant/Auditor.The tenderer must have achieved in at last one financial years of Last Five Financial Years an annual financial turnover not less than The amount put to tender Rs 17.00 Lakhs. Certificate should be in the prescribed form as in KW 1 Section 3 3.2aTrueTechnical Bid
Submission of K Form liquid assets /availability of credit facilities of not less than Rs 5.10 Lakhs Credit lines/ letter of credit certificates from Nationalized bank for meeting the fund requirement as per KW-1TrueTechnical Bid
PWD Contractor Civil Registration Certificate class 4 and aboveTrueTechnical Bid
Annual Turnover Certificate in all classes of Civil Engineering works only for last Five Financial years ie., 2019-20, 2020-21, 2021-22 ,2022-23,and 2023-24 Certified from Charted Accountant with compulsory UDI number Profit and Loss, balance sheet shall be enclosed .TrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone