createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1724930943215
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd505000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose10-09-2024 16:00:00
tenderQueryClose06-09-2024 12:00:00
technicalBidOpen11-09-2024 16:30:00
publishedDate02-09-2024 20:15:27
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate02-09-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee405000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumber8392266123
tenderSupplierListNone
tenderSchedule
createdTs1724930943248
version11
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BR/WORK_INDENT13697
titleConstruction of Bridge and protection wall to SH-128 Highway Connecting SH-61 with Deodurga-Amarapura- Bhogavthi-Hirekotnekal-Ayanur-Olaballari- Ibrahimpura-Kundralli-Raravi-Darur-Talur-Ballari- Rupanagudi-Chellagurki Road at Km 228.00 in Ballari taluk under 5054-Appendix-E (Plan) for the Year 2023-24.
descriptionConstruction of Bridge and protection wall to SH-128 Highway Connecting SH-61 with Deodurga-Amarapura- Bhogavthi-Hirekotnekal-Ayanur-Olaballari- Ibrahimpura-Kundralli-Raravi-Darur-Talur-Ballari- Rupanagudi-Chellagurki Road at Km 228.00 in Ballari taluk under 5054-Appendix-E (Plan) for the Year 2023-24.
categoryWORKS
categoryTextWorks
ecv33604756.03
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount400000000.0
groupOverheadTotal0.0
fileNumberPWD/BLY/2024-25/Appendix-E/03
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17249309430001NoneNoneBridges/CulvertsBridge21495637.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3880060148978NoneI.No. 2.5(ii)bClearing and Grubbing road land including uprooting rank vegetation Grass shurbs saplings and tress Girth up to 300mm Removel of stumps of trees cut earlier and disposal of unserviceble materials and stacking of servicable materials to be used or acuctioned including Removal and disposal of Top organic soil not not exceeding 150mm in thickness (ii) By mechnical Means using Dozer In area of thorny jungle (PWD Common SR 2021-22 Volume-iii 2.5(ii)b P.No-9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.100 Sqm508.2508.231.0FalseNoneNoneFalseNoneFalse15754.20
3880061148978NoneI.No. 2.7 I (B)Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Cement Concrete Grade M-15 & M-20 (PWD SR 2021-22 Volume-3 2.7 I (B) ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum979.65979.65147.0FalseNoneNoneFalseNoneFalse144008.550
3880062148978NoneI.No. 2.10ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Rubble stone masonry in lime mortar (PWD SR 2021-22 Volume-3 2.10A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum546.0546.0157.5FalseNoneNoneFalseNoneFalse85995.00
3880063148978NoneI.No. 8.24.2Excavation and removal of silt and silt mixed with sand from canal bed including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete.in slussy condition (PWD SR 2021-22 Volume-4 WRD 8.24.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum373.8373.82325.0FalseNoneNoneFalseNoneFalse869085.00
3880064148978NoneI.No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (PWD Common SR 2021-22 Volume-1 1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum112.46112.461375.74FalseNoneNoneFalseNoneFalse154715.72040
3880065148978NoneI.No. 11.36Sand Filling in Wells complete as per Drawing and Technical Specifications. (PWD Common SR 2021-22 Volume-III 11.36) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2710.052710.05377.68FalseNoneNoneFalseNoneFalse1023531.6840
3880066148978NoneI.No. 2.1.6Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:2:4 20mm nominal size graded crushed coarse aggregates Design (PWD Common SR 2021-22 Volume-I 2.1.6) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6555.156555.15152.67FalseNoneNoneFalseNoneFalse1000774.75050
3880067148978NoneI.No. 2.2.3Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M25 Design Mix Using 20 mm nominal size graded crushed coarse-aggregates (PWD Common SR 2021-22 Volume-I 2.2.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.8313.79FalseNoneNoneFalseNoneFalse2087582.1120
3880068148978NoneI.No. 2.2.3Additionalities for Formwork, Centering & Scaffolding, Box Culverts 20% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7309.567309.56196.19FalseNoneNoneFalseNoneFalse1434062.57640
3880069148978NoneI.No. 2.2.3Additionalities for Formwork, Centering & Scaffolding Earth retaining structures 10% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum665.28665.28117.6FalseNoneNoneFalseNoneFalse78236.9280
3880070148978NoneI.No. 2.2.1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse-aggregates -Foundation Works (PWD Common SR 2021-22 Volume-I 2.2.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6601.356601.3513.5FalseNoneNoneFalseNoneFalse89118.2250
3880071148978NoneI.No. 2.2.1Additionalities for Formwork, Centering & Scaffolding Earth retaining structures10% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum660.13660.1313.5FalseNoneNoneFalseNoneFalse8911.7550
3880072148978NoneI.No. 14.8BCurtain wall Complete as per drawings and technical specification cement concrete Grade of M-15 (PWD Common SR 2021-22 Volume-III 14.8B) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6560.46560.459.07FalseNoneNoneFalseNoneFalse387522.8280
3880073148978NoneI.No. 2.4.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the equirements of relevant IS codes, labour, Usage charges of machinery, curing and all other M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD Common SR 2021-22 Volume-1 2.4.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.8282.74FalseNoneNoneFalseNoneFalse1881012.6720
3880074148978NoneI.No. 2.4.3Additionalities for Formwork, Centering & Scaffolding Sub str.Box Culverts 20% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1330.561330.56160.34FalseNoneNoneFalseNoneFalse213341.99040
3880075148978NoneI.No. 2.4.3Additionalities for Formwork, Centering & Scaffolding Earth retaining structures 10% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum665.28665.28122.4FalseNoneNoneFalseNoneFalse81430.2720
3880076148978NoneI.No. 2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (PWD Common SR 2021-22 Volume-1 2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.15146.93FalseNoneNoneFalseNoneFalse1055714.08950
3880077148978NoneI.No. 2.5.2Additionalities for Formwork, Centering & Scaffolding Sup str.Box Culverts 20% ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1437.031437.03146.93FalseNoneNoneFalseNoneFalse211142.81790
3880078148978NoneI.No. 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. (PWD Common SR 2021-22 Volume-III 13.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.5510.5FalseNoneNoneFalseNoneFalse75091.2750
3880079148978NoneI.No. 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (PWD Common SR 2021-22 Volume-III 13.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12421.512421.521.0FalseNoneNoneFalseNoneFalse260851.50
3880080148978NoneI.No. 9.3Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.For Foundation (PWD Road SR 2021-22 Volume-3 9.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90516.390516.332.06FalseNoneNoneFalseNoneFalse2901952.5780
3880081148978NoneI.No. 9.3Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.For Sub structure of Bridge (PWD Road SR 2021-22 Volume-3 9.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.6529.29FalseNoneNoneFalseNoneFalse2658203.69850
3880082148978NoneI.No. 9.3Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.For Super structure of Bridge (PWD Road SR 2021-22 Volume-3 9.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90885.990885.918.42FalseNoneNoneFalseNoneFalse1674118.2780
3880083148978NoneI.No. 13.15(II)Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. (PWD Road SR 2021-22 Volume-III 13.15(II)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr143.85143.852.0FalseNoneNoneFalseNoneFalse287.70
3880084148978NoneI.No. 13.16Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. (PWD Road SR 2021-22 Volume-III 13.16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1884.751884.7540.0FalseNoneNoneFalseNoneFalse75390.00
3880085148978NoneI.No. 14.9Construction of flexible apron 1m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (PWD Road SR 2021-22 Volume-III 14.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2151.452151.45294.75FalseNoneNoneFalseNoneFalse634139.88750
3880086148978NoneI.No. 14.1Provinding and Laying Boulders Apron on river bed for protection against scour with stone boulders weighing not less than 40kg each complete as per drawings and Technical specification (PWD Road SR 2021-22 Volume-III 14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.6104.46FalseNoneNoneFalseNoneFalse209713.8960
3880087148978NoneI.No. 14.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (PWD Road SR 2021-22 Volume-III 14.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.612.33FalseNoneNoneFalseNoneFalse24753.7080
3880088148978NoneI.No. 14.7(i)A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching or pitching with stones in wire crates or it can be in PCC M15 nominal mix if cement concert block have been used for pitching . Rates for toe wall can be adopted from respective clauses depending upon approved design. The rate for excavation for foundation, dry rubble masonry and PCC M15 have been analysed and given in respective chapters of different volumes. Curtain wall complete as per drawing and Technical specification A Stone masonry in cement mortar (1:3) (PWD Road SR 2021-22 Volume-III 14.7(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6193.956193.9524.66FalseNoneNoneFalseNoneFalse152742.8070
3880089148978NoneI.No. 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (PWD Road SR 2021-22 Volume-12.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.8582.8FalseNoneNoneFalseNoneFalse232738.380
3880090148978NoneI.No. 13.4Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2 extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (PWD Road SR 2021-22 Volume-13.4 (2706 and 2200)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No250.95250.9580.0FalseNoneNoneFalseNoneFalse20076.00
3880091148978NoneI.No. 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification (PWD Road SR 2021-22 Volume-13.7 (2706 and 2200)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No3434.553434.5512.0FalseNoneNoneFalseNoneFalse41214.60
3880092148978NoneI.No. 9.1Laying Reinforced cement concrete pipe NP4/prestressed concrete pip for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia (PWD Road SR 2021-22 Volume-9.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.958.5FalseNoneNoneFalseNoneFalse84600.0750
3880093148978NoneI.No. 8.18Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD Road SR 2021-22 Volumeiii 8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No785.4785.440.0FalseNoneNoneFalseNoneFalse31416.00
3880094148978NoneI.No. 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD Road SR 2021-22 Volume-1- 1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.71870.0FalseNoneNoneFalseNoneFalse930699.00
3880095148978NoneI.No. 12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular Material (PWD SR 2021-22 Volume-3 12.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.4336.0FalseNoneNoneFalseNoneFalse412070.40
3880096148978NoneI.No. 13.20Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) (PWD SR 2021-22 Volume-3 13.20) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.5517.29FalseNoneNoneFalseNoneFalse253636.51950
17249309430001NoneNoneBridges/CulvertsRoad12109118.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3880097148979NoneI.No. 2.5(II)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungl (PWD SR Roads & Bridges 2023-24 Volume-III P.No-7, Sl.No-2.5(II)a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.100 Sqm412.65412.658.44FalseNoneNoneFalseNoneFalse3482.7660
3880098148979NoneI.No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (PWD Common SR 2023-24 Volume-I P.o-8 Sl.No-1.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.75109.55FalseNoneNoneFalseNoneFalse10927.61250
3880099148979NoneI.No. 1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (PWD SR Roads & Bridges 2023-24 Volume-I P.No-7 Sl.No-1.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum124.95124.9565.73FalseNoneNoneFalseNoneFalse8212.96350
3880100148979NoneI.No. 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work (PWD SR Roads & Bridges 2023-24 Volume-I P.No-7 Sl.No-1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.73283.58FalseNoneNoneFalseNoneFalse1634237.7660
3880101148979NoneI.No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (PWD SR Roads & Bridges 2023-24 Volume-III P.No-17 Sl.No-3.6) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum517.65517.651815.03FalseNoneNoneFalseNoneFalse939550.27950
3880102148979NoneI.No. 4.2 ( V)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material (PWD SR Roads & Bridges 2023-24 Volume-III P.No 19, Item No.4.2 ( V)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2476.952476.95919.24FalseNoneNoneFalseNoneFalse2276911.5180
3880103148979NoneI.No. 4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in m3 2,394.00 uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (PWD SR Roads & Bridges 2023-24 Volume-III P.No-24 Sl.No-4.17) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2686.952686.95891.1FalseNoneNoneFalseNoneFalse2394341.1450
3880104148979NoneI.No. 5.1 A (i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. (PWD SR Roads & Bridges 2023-24 Volume-III Page 31, Item No.5.1 A (i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm43.0543.053517.5FalseNoneNoneFalseNoneFalse151428.3750
3880105148979NoneI.No. 5.4 (ii)Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (PWD SR Roads & Bridges 2023-24 Volume-III Page 31, Item No.5.4 (ii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm14.714.73517.5FalseNoneNoneFalseNoneFalse51707.250
3880106148979NoneI.No. 5.13 CProviding and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects (PWD SR Roads & Bridges 2023-24 Volume-III P-35, I-5.13 C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum9515.19515.1246.23FalseNoneNoneFalseNoneFalse2342903.0730
3880107148979NoneI.No. 5.15Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (PWD SR Roads & Bridges 2023-24 Volume-III P-37,I-5.15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum11552.111552.1140.7FalseNoneNoneFalseNoneFalse1625380.470
3880108148979NoneI.No. 8.5 (VII)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 xmm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 ofIRC:67:2012 (PWD SR Roads & Bridges 2023-24 Volume-III Page 65Item No.8.5 (VII)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5461.055461.052.0FalseNoneNoneFalseNoneFalse10922.10
3880109148979NoneI.No. 8.6 (IX)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium cmposite material sheet depending on the size of the sign fixed over the bac support rame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by eans of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67.90x75 cm rectangular (PWD SR Roads & Bridges 2023-24 Volume-III Page 65 Item No.8.6 (IX)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each6981.456981.452.0FalseNoneNoneFalseNoneFalse13962.90
3880110148979NoneI.No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (PWD SR Roads & Bridges 2023-24 Volume-III Page 65 Item 8.7 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm9460.59460.52.0FalseNoneNoneFalseNoneFalse18921.00
3880111148979NoneI.No. 8.16 (II)Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc ( odrinary KM stone (pre cast)) (PWD SR Roads & Bridges 2023-24 Volume-III Page 67 Item No.8.16 (II)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3073.353073.351.0FalseNoneNoneFalseNoneFalse3073.350
3880112148979NoneI.No. 8.16 (III)Hectometer stone (precast) Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary 200 m stone (PWD SR Roads & Bridges 2023-24 Volume-III Page 67 Item Item No.8.16 (III)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each884.1884.17.0FalseNoneNoneFalseNoneFalse6188.70
3880113148979NoneI.No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes (PWD SR Roads & Bridges 2023-24 Volume-III Page 67 Item Item No.8.15 ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.5556.5189.95FalseNoneNoneFalseNoneFalse105707.1750
3880114148979NoneI.No. 8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint (PWD SR Roads & Bridges 2023-24 Volume-III Page 71 Item Item No.8.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr189.0189.015.0FalseNoneNoneFalseNoneFalse2835.00
3880115148979NoneI.No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by theengineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer (PWD SR Roads & Bridges 2023-24 Volume-III Page 72 Item Item No.8.43) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos383.25383.25237.0FalseNoneNoneFalseNoneFalse90830.250
3880116148979NoneI.No. 8.32Supplying & fixing of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in accordance to ASTMD 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand tempertures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow (amber) as per requirement and typicl frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be less than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mmrespectively. The weight of the marker shall not exceed 0.5 kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the Engineer (PWD SR Roads & Bridges 2023-24 Volume-III Page 72 Item Item No.8.32) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos2205.02205.0120.0FalseNoneNoneFalseNoneFalse264600.00
3880117148979NoneI.No. 21Road maintenance for 3rd year for road with BM+SDBC as wearing coat: Maintenance of road for 3rd year by clearing and uprooting vegetation on either sides of the road, maintenance of surface drains by clearing, cleaning, reshaping, deepening of side drains, stripping excess soil from the shoulder surface and making up loss of material / irregularities on shoulder wherever necessary, maintenance & painting of 200mm meter and Km stone, white washing of parapet walls of CD work and tree trucks, patching shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. (Superintendent Engineer, PWD Ballari Circle Approved Rates Vide Letter No. SBC/AE-1/2023-24/2900 Dated: 20/01/2024 SL No. 01) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km32770.532770.50.94FalseNoneNoneFalseNoneFalse30804.270
3880118148979NoneI.No. 22Road maintenance for 4th year for road with BM+SDBC as wearing coat: Maintenance of road for 4th year by clearing and uprooting vegetation on either sides of the road, maintenance of surface drains by clearing, cleaning, reshaping, deepening of side drains, stripping excess soil from the shoulder surface and making up loss of material / irregularities on shoulder wherever necessary, maintenance & painting of 200mm meter and Km stone, white washing of parapet walls of CD work and tree trucks, patching shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. (Superintendent Engineer, PWD Ballari Circle Approved Rates Vide Letter No. SBC/AE-1/2023-24/2900 Dated: 20/01/2024 SL No. 02) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km57466.557466.50.94FalseNoneNoneFalseNoneFalse54018.510
3880119148979NoneI.No. 23Road maintenance for 5th year for road with BM+SDBC as wearing coat: Maintenance of road for 5th year by clearing and uprooting vegetation on either sides of the road, maintenance of surface drains by clearing, cleaning, reshaping, deepening of side drains, stripping excess soil from the shoulder surface and making up loss of material / irregularities on shoulder wherever necessary, maintenance & painting of 200mm meter and Km stone, white washing of parapet walls of CD work and tree trucks, patching shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. (Superintendent Engineer, PWD Ballari Circle Approved Rates Vide Letter No. SBC/AE-1/2023-24/2900 Dated: 20/01/2024 SL No. 02) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km72523.572523.50.94FalseNoneNoneFalseNoneFalse68172.090
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17249309440000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17249309440000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17249309440000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17249309440000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17249309440000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17249359220000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17249359280000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17249359330000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17249359400000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17249359460000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17249359510000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17249359570000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17249359630000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17249359690000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building/Bridge during the defect liability period.None
17249359760000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing KPP-procurement portal.None
17249359820000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17249359870000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17249359930000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17249359980000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the e-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17249360040000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17249360090000NoneNoneELIGIBILITYThe time stipulated for completion of work is 9 (Nine) calendar months including rainy season.None
17249360160000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17249360210000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17249360260000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17249360330000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17249360390001NoneNoneELIGIBILITYThe defect liability period for the work is 24 (Twenty four) calendar months.None
17249360460000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17249360530000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date of bid submission.None
17249360590000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches.None
17249360670000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17249360750000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17249360820000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082099 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works, Ports and Inlnad Water Transport Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works, Ports and Inlnad Water Transport Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17249360940000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17249361000000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17249361070000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17249361140000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17249361200000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17249361260000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17249361320000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17249361380000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17249361440000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21 - 2021-22, 2022-23 and 2023-24 satisfactorily completed as prime contractor, at least one similar work such as - CONSTRUCTION OF BRIDGE WORKS not less than Rs.168.10 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21 - 2021-22, 2022-23 and 2023-24 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.672.50 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment/Subgrade : 8677.00 Cum, (b) GSB : 735.00 Cum, (c) WBM/ WMM : 713.00 Cum, (d) DBM/BM/BC/SDBC : 310.00 Cum, (e) PCC/ RCC : 623.00 Cum and (f) Fabric Steel : 63.82 MT.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Tipper-2 Nos. and by Own / Hire / Lease Tipper - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own 40/60 TPH Capacity of HMP-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership0 documents.
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Paver Finisher-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership0 documents.
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own Hydraulic Excavator (CK-90)-1 No. (The Documents in proof of Ownership shall have to attested by Notary or Government Gazetted Officer) at the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase Invoice and Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted Mechanical Bitumen Sprayer-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership0 documents.
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted water tanker-2 Nos. and by Own / Hire / Lease - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase Invoice and Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer shall further demonstrate: Availability by Own Vibratory Road Roller-1 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase Invoice and Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own 60/70 TPH Capacity of Pug Mill-1No (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership0 documents.
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.112.10 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneConstitutional or Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD under Class-I category
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Annual Turnover Certificate for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Similar nature of workdone certificateTrueTechnical Bid
Bank line of creditTrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
Existing Commitments / Ongoing worksTrueTechnical Bid
Quantity wise workdone certificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1725092032000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone