createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1725277780342
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1060.00
emd43000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose13-09-2024 17:30:00
tenderQueryClose12-09-2024 17:30:00
technicalBidOpen17-09-2024 11:00:00
publishedDate03-09-2024 16:29:56
publishedByPostMI_EE_DIV_BLR
publishedByUserKPE12538 - NAVEENKUMAR K V
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShilpa K
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392200293
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1725277780369
version6
createdDateNone
modifiedDateNone
tenderNumberMI/2024-25/AB/WORK_INDENT2506
titleConstruction of Check Dam across halla near Kannihalli village in Hagaribommanahalli Taluk of Vijayanagara District. (Reserved for ST Only)
descriptionConstruction of Check Dam across halla near Kannihalli village in Hagaribommanahalli Taluk of Vijayanagara District. (Reserved for ST Only)
categoryWORKS
categoryTextWorks
ecv4224375.11
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location136
locationNameMinor Irrigation Division Bellary
provisionalAmount5000000.0
groupOverheadTotal0.0
fileNumberAEE/MIGWDSD/HDL/ATALBHUJAL/KANNIHALLI/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17252777800000NoneNoneConstruction of Anicuts - BarragesConstruction of Check Dam across halla near Kannihalli village in Hagaribommanahalli Taluk of Vijayanagara District. (Reserved for ST Only)4224375.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3903900150473NoneMI001Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS)Sqm9.879.872040.0FalseNoneNoneFalseNoneFalse20134.80
3903901150473NoneMI002Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS)Each53.0353.03500.0FalseNoneNoneFalseNoneFalse26515.00
3903902150473NoneMI003Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS) In all kinds of soils Depth upto 3 mCum107.1107.1475.7FalseNoneNoneFalseNoneFalse50947.470
3903903150473NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS) In ordinary/soft rock without blasting upto 1.5 m depthCum381.15381.1561.95FalseNoneNoneFalseNoneFalse23612.24250
3903904150473NoneMI005Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS) Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregatesCum6463.86463.8130.36FalseNoneNoneFalseNoneFalse842620.9680
3903905150473NoneMI006Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS)Cum7302.757302.75321.78FalseNoneNoneFalseNoneFalse2349878.8950
3903906150473NoneMI007Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS) Dam & Allied Workst93284.193284.15.85FalseNoneNoneFalseNoneFalse545711.9850
3903907150473NoneMI008Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS)m353.85353.8533.0FalseNoneNoneFalseNoneFalse11677.050
3903908150473NoneMI009Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm (before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS)Cum660.45660.45216.0FalseNoneNoneFalseNoneFalse142657.20
3903909150473NoneMI010Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS) 300mm thickSqm477.75477.75320.0FalseNoneNoneFalseNoneFalse152880.00
3903910150473NoneMI011De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/formation of Embankment or as directed including cost of all machinery, labour & all necessary works etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work.( Ref As per relevant IS)Cum98.798.7585.0FalseNoneNoneFalseNoneFalse57739.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17252777810000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17252777810000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17252777810002NoneNoneELIGIBILITYContractor Registration certificate (Class 3 and Above) (Reserve for ST Only).None
17252777810000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17252777810000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17252779040000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP Portal due to internet connectivity issues and technical glitches at bidders end.None
17252779120000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17252779190000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17252779280000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17252779350000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17252779420000NoneNoneELIGIBILITYThe tenderer should maintain the scheme during the defective liability period.None
17252779520000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17252779730000NoneNoneELIGIBILITYThe tenderer shall scan & upload all the original documents required for this bid to the KPPP portal. The Original Documents shall be produced at the time of opening of Bid for physical verification.None
17252779810000NoneNoneELIGIBILITYEPF Registration Certificate of Contractor should be uploaded.None
17252779860000NoneNoneELIGIBILITYDuring the execution of work, if any minor minerals are required contractors have to abide by the Karnataka Minor Mineral Concession Rules 1994 (as amended up to date). As per the prevailing rules, for any use of Minor Minerals, the contractor has to submit the Mineral Dispatch Permit (MDP) obtained from Mines and Geology Department. If Mineral Dispatch Permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty and DMF contribution as per Karnataka Minor Mineral concession rules 1994 (as amended from time to time) will be deducted from contractors bills at the time of payment.None
17252779970000NoneNoneELIGIBILITYThe tenderer shall also disclose if there are any bankruptcy proceedings against him.None
17252780040000NoneNoneELIGIBILITYDrawings uploaded are for TENDER PURPOSE only.None
17252780100000NoneNoneELIGIBILITYThe contractor has to furnish Additional performance security deposit of an amount equal to the difference in the amount put to tender and the tendered amount in addition to security deposit of 5% of contract price.None
17252780170000NoneNoneELIGIBILITYAll materials like steel, cement etc., required for the above work should be procured by the contractor only at his own cost. And these materials will have to be got tested by the competent authority before put to use and certificate shall be submitted.None
17252780240000NoneNoneELIGIBILITYThe necessary certificates / documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached duly attested to e-tender document. The original certificates/document shall be produced on or before stipulated date and time for verification. Scanned signature of bidder/authorized representative of the bidder shall be attached while up loading bid document.None
17252780330000NoneNoneELIGIBILITYEach item of BOQ to be read as with all lead and lifts and as per the directions of Engineer in charge.None
17252780430000NoneNoneELIGIBILITYA copy of GST registration certificate to be uploaded.None
17252780500000NoneNoneELIGIBILITYLatest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos to be uploaded.None
17252780560000NoneNoneELIGIBILITYIf any of the dates mentioned above happens to be a general holiday, the next working day holds good.None
17252780620000NoneNoneELIGIBILITYIncomplete tender documents will be rejected.None
17252780810000NoneNoneELIGIBILITYCorrigendum will be published in web site for all modifications/corrections if any.None
17252780890000NoneNoneELIGIBILITYThe contractor /firm shall send the authorization letter for the representatives duly attesting their signature.None
17252780950000NoneNoneELIGIBILITYThe intending bidder are advised to visit the site of work before submission of the tenders.None
17252781010000NoneNoneELIGIBILITYIf any of the Contractor who have been black listed as per Government order are not eligible to participate in this tender.None
17252781070000NoneNoneELIGIBILITYAs per the Karnataka building and other construction workers welfare cess act 1996 1 % of the bill amount will be deducted from the bill.None
17252781180000NoneNoneELIGIBILITYThe tender Processing charges paid by the bidder are not refundable even if the tender are cancelled.None
17252781310000NoneNoneELIGIBILITYThe statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the work listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.None
17252781370000NoneNoneELIGIBILITYFurther information can be had from the office of the Executive Engineer, Minor Irrigation & Ground Water Development Division, Ballari during the office Hours.None
17252781750000NoneNoneELIGIBILITYThe work done certificate shall be issued not below the rank of Executive Engineer.None
17252782180000NoneNoneELIGIBILITYAll relevant documents as per KW-2 need to be uploaded while submitting bid in general documents provision in KPPP portal.None
17252782300000NoneNoneELIGIBILITYThe contractor shall quote the rates without adding GST either materials or works contract (Service). GST payable by the Contractor under this works Contract will be paid to the Contractor separately over and above the Contractor s bid amount. The increase if any in the GST shall not be paid in the extended period of Contract for which the Contractor alone is responsible for delay as determined by the Authority.None
17252782380000NoneNoneELIGIBILITYAnnual turnover certificate along with Balance sheet certified / attested by Chartered Accountants should be uploaded with 18-Digitis system generated unique number (UDIN Number)None
17252782450000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Tribe as prescribed in the tender document.None
17252782550000NoneNoneELIGIBILITYThe amount put to tender is Exclusive of GST. Hence GST will be paid separately.None
17252782620000NoneNoneELIGIBILITYThe department and contractor are bounded for Excess payment/recovery in case of revision in GST Rates.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 25% of contract value) in the last five years (i.e 2019-20 to 2023-24), as a prime contractor, at least one Similar work such as any Construction work of value not less than Rs.10.56 Lakhs .The weightage of 10% will be given per year to bring them to the price level of the FY 2024-25.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderers who meet the specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity (AxNx5.0 - B Where, A Maximum value of civil engineering works executed in any one year during the last five years i.e. 2019-20 to 2023-24 updated to 2024--25 price level) taking into account the completed as well as works in progress. N, Number of years (6 months)prescribed for completion of the works for which tenders are invited. B, Value, at 2024-25 price level, of existing commitments and on-going works to be completed during the next 6 months (6/12-0.5) year i.e. period of completion of the works for which Tenders are invited.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents as per Section 3 of Bid Document.
NoneNoneNoneNoneAchieved in at least one financial years during the last five years (i.e. 2019-20 to 2023-24) a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.42,24,375.11 Financial turn over of previous years will be given a weightage of 10% per year to bring to them to the price level of the FY 2024-25.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Profit & Loss Accounts Satement issued by the Chartered Accountant
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of not less than Rs.12.67 Lakhs Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etcFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneContractor Registration certificateOthersContractor Registration certificate, Class 3 and Above, (Reserve for ST Only).
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Attested copy of Registration certificate
NoneNoneNoneNoneSection 3, Qualification InformationOthersSection 3, Qualification Information
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Section 3, Qualification Information
NoneNoneNoneNoneThe contractor shall quote the rates without adding GST either materials or works contract (Service). GST payable by the Contractor under this works Contract will be paid to the Contractor separately over and above the Contractor s bid amount. The increase if any in the GST shall not be paid in the extended period of Contract for which the Contractor alone is responsible for delay as determined by the Authority.OthersGST
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- GST
NoneNoneNoneNoneBidders shall ensure upload of relevant document certifying his/her status as Scheduled Tribe as prescribed in the tender document.OthersBidders shall ensure upload of relevant document certifying his/her status as Scheduled Tribe as prescribed in the tender document.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bidders shall ensure upload of relevant document certifying his/her status as Scheduled Tribe as prescribed in the tender document.
NoneNoneNoneNoneThe amount put to tender is Exclusive of GST. Hence GST will be paid separately.OthersThe amount put to tender is Exclusive of GST. Hence GST will be paid separately.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The amount put to tender is Exclusive of GST. Hence GST will be paid separately.
NoneNoneNoneNoneThe department and contractor are bounded for Excess payment/recovery in case of revision in GST Rates.OthersThe department and contractor are bounded for Excess payment/recovery in case of revision in GST Rates.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The department and contractor are bounded for Excess payment/recovery in case of revision in GST Rates.
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractor Registration certificate, Class 3 and Above, Reserve for ST OnlyTrueTechnical Bid
Achieved in at least one financial years during the last five years ie 2019 20 to 2023 24 a minimum financial turnover in all classes of civil engineering construction works only of Rs.42,24,375.11 Financial turn over of previous years will be given a weightage of 10percent per year to bring to them to the price level of the FY2024 25TrueTechnical Bid
Satisfactorily completed at least 25percent of contract value in the last five years i.e. 2019 20 to 2023 24 as a prime contractor, at least one Similar work such as any Construction work of value not less than Rs.10.56 Lakhs. The weightage of 10percent will be given per year to bring them to the price level of the FY 2024 25TrueTechnical Bid
Liquid assets and or availability of credit facilities of not less than Rs.12.67 Lakhs Credit lines or letter of credit or certificates from banks for meeting the fund requirement etcTrueTechnical Bid
Bidders shall ensure upload of relevant document certifying his or her status as Scheduled Tribe as prescribed in the tender document.TrueTechnical Bid
The amount put to tender is Exclusive of GST. Hence GST will be paid separately.TrueTechnical Bid
The department and contractor are bounded for Excess payment/recovery in case of revision in GST Rates.TrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone