1725443438000 | 0 | None | None | Other Works | Construction of Check Dam at Latitude 13.544395 Longitude 77.901675 near Bayappanahalli village Dibburuhalli GP Shidlaghatta Tq. | 593060.97 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3916621 | 151101 | None | code01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer (In area of light jungle) & with all lead and lift. and as per direction of the Engineer in charge of work. | Sqm | 393.0 | 393.0 | 7.5 | False | None | None | False | None | False | 2947.5 | 0 | 3916622 | 151101 | None | code02 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m& with all lead and lift. and as per direction of the Engineer in charge of work. | Cum | 102.0 | 102.0 | 55.54 | False | None | None | False | None | False | 5665.08 | 0 | 3916623 | 151101 | None | code03 | Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications& with all lead and lift. and as per direction of the Engineer in charge of work. | Cum | 2682.0 | 2682.0 | 1.8 | False | None | None | False | None | False | 4827.6 | 0 | 3916624 | 151101 | None | code04 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. & with all lead and lift. and as per direction of the Engineer in charge of work. | Cum | 6067.0 | 6067.0 | 6.75 | False | None | None | False | None | False | 40952.25 | 0 | 3916625 | 151101 | None | code05 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification. & with all lead and lift. and as per direction of the Engineer in charge of work. | Cum | 6955.0 | 6955.0 | 58.26 | False | None | None | False | None | False | 405198.3 | 0 | 3916626 | 151101 | None | code06 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works & with all lead and lift. and as per direction of the Engineer in charge of work. | t | 88842.0 | 88842.0 | 1.22 | False | None | None | False | None | False | 108387.24 | 0 | 3916627 | 151101 | None | code07 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification. & with all lead and lift. and as per direction of the Engineer in charge of work. | Sqm | 735.0 | 735.0 | 30.0 | False | None | None | False | None | False | 22050.0 | 0 | 3916628 | 151101 | None | code08 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete/masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1: 4 proportion including 100 mm thick sand backing at labour & all necessary works as directed and complete as per specification., complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work.& with all lead and lift. and as per direction of the Engineer in charge of work. | Mtr | 337.0 | 337.0 | 9.0 | False | None | None | False | None | False | 3033.0 | 0 |
|