1725446153000 | 0 | None | None | Buildings | Construction Of Bus Shelters At Sogi Circle, Near JSS College And Near Thungabhadra Highschool in TMC Huvinahadagali Limits | 847137.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3917056 | 151132 | None | code01 | Earth work excavation for Foundation by manual means for all Buildings, Bridges, Retaining walls, Abutment Piers and such similar works as per drawing and technical Specifications, including setting out, providing shoring & strutting,barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. Common SR 2023-24 (V-1), I.No.1.4.1, Page No.5 | Cum | 254.1 | 254.1 | 33.12 | False | None | None | False | None | False | 8415.792 | 0 | 3917057 | 151132 | None | code02 | Providing and laying in position plain cement concrete of Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates @0.85 cum and fine aggregates @0.57cum machine mixed,machine mixed ,concrete laid in layer noexceeding15cms think well compacted in foundation and plinth including cost of al materials labour HOM of mechinery curing complete as per specifications.Specifications No.KBS 4.1,4.2, Mix 1:4:8 ( M5) Using 40 mm nominal size graded crushed coarse aggregatesCommon SR 2023-24 (V-1), I.No.2.1.2, Page No.15 | Cum | 6288.45 | 6288.45 | 1.944 | False | None | None | False | None | False | 12224.7468 | 0 | 3917058 | 151132 | None | code03 | Providing and laying in position Reinforced cement concrete M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) Common SR 2023-24 (V-1) I.No.2.5.1, Page No.16 | Cum | 6961.5 | 6961.5 | 7.128 | False | None | None | False | None | False | 49621.572 | 0 | 3917059 | 151132 | None | code04 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Column form works consider 10% | Sqm | 696.15 | 696.15 | 23.7599 | False | None | None | False | None | False | 16540.454385 | 0 | 3917060 | 151132 | None | code05 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR 2023-24, I.No.2.11a, P.No.18) | Tonne | 93929.85 | 93929.85 | 0.4419 | False | None | None | False | None | False | 41507.600715 | 0 | 3917061 | 151132 | None | code06 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Common SR 2023-24 (V-2), I.No.11.34B, Page No85 | Kg | 142.8 | 142.8 | 2917.98 | False | None | None | False | None | False | 416687.544 | 0 | 3917062 | 151132 | None | code07 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Common SR 2023-24 (V-2), I.No.11.34B, Page No85 | Kg | 142.8 | 142.8 | 828.0 | False | None | None | False | None | False | 118238.4 | 0 | 3917063 | 151132 | None | code08 | Providing & fixing corrugated G.S. sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. Common SR 2023-24 (V-2), I.No.11.34B, Page No85 | Sqm | 922.95 | 922.95 | 65.28 | False | None | None | False | None | False | 60250.176 | 0 | 3917064 | 151132 | None | code09 | Loosening, levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. PWD SR 2023-24 Vol:3 P.NO.17 I.No:3.7 | Cum | 110.25 | 110.25 | 12.6 | False | None | None | False | None | False | 1389.15 | 0 | 3917065 | 151132 | None | code10 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. PWD SR 2023-24 Vol:2 P.NO.63, I.No: 9.25 | Sqm | 840.0 | 840.0 | 84.0 | False | None | None | False | None | False | 70560.0 | 0 | 3917066 | 151132 | None | code11 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409, PWD SR 2023-24 Vol:3 P.NO.63, I.No: 8.1 | Mtr | 250.95 | 250.95 | 45.0 | False | None | None | False | None | False | 11292.75 | 0 | 3917067 | 151132 | None | code12 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates, Common SR 2023-24 (V-1), I.No.2.1.4 Page No 16 | Cum | 6724.2 | 6724.2 | 1.485 | False | None | None | False | None | False | 9985.437 | 0 | 3917068 | 151132 | None | code13 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Common SR 2023-24 (V-2), I.No.8.41, Page No 48 | Sqm | 175.35 | 175.35 | 14.85 | False | None | None | False | None | False | 2603.9475 | 0 | 3917069 | 151132 | None | code14 | Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. Common SR 2023-24 (V-2), I.No.8.36.1, Page No 47 | Sqm | 184.8 | 184.8 | 150.54 | False | None | None | False | None | False | 27819.792 | 0 |
|