1725521369000 | 0 | None | None | Other Works | Construction of Compound wall in SWM site Harihara | 253941.83 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3927401 | 151445 | None | 001 | Earth work excavation by manual means for drains, canals, waste weir, draft,approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. .[Valumme-I PNO-5,INO-1.4.1 Of 2023-24 PWD SR] 320 16 336 0
| Cum | 249.26 | 249.26 | 7.2 | False | None | None | False | None | False | 1794.672 | 0 | 3927402 | 151445 | None | 002 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. (Volume 1 P No. 54 I No 3.1 PWD SR 2023-24)
| Cum | 87.55 | 87.55 | 7.2 | False | None | None | False | None | False | 630.36 | 0 | 3927403 | 151445 | None | 003 | Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. (P. No.-54 INO-1.23 of Vol 4 WRD SR of PWD SR- 2023-24 )
| Cum | 2762.46 | 2762.46 | 3.0 | False | None | None | False | None | False | 8287.38 | 0 | 3927404 | 151445 | None | 004 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates(Volume 1,P No.15, I No 2.1.2 PWD SR 2023-24]
| Cum | 5833.92 | 5833.92 | 1.8 | False | None | None | False | None | False | 10501.056 | 0 | 3927405 | 151445 | None | 005 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand)(P. No.-9,INO-5.1.1 of Vol 2 WRD SR of PWD SR- 2023-24 )
| Cum | 5833.92 | 5833.92 | 5.76 | False | None | None | False | None | False | 33603.3792 | 0 | 3927406 | 151445 | None | 006 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)(P. No.-9,INO-5.3 of Vol 2 WRD SR of PWD SR- 2023-24 )
| Cum | 5833.92 | 5833.92 | 3.24 | False | None | None | False | None | False | 18901.9008 | 0 | 3927407 | 151445 | None | 007 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)-Mix 1:2:4 (M10) Using 20 mm nominal size graded crushed coarse aggregates[Volumme-I,PNO-15, INO-2.1.4 Of PWD SR For 2023-2024] | Cum | 6403.51 | 6403.51 | 1.88 | False | None | None | False | None | False | 12038.5988 | 0 | 3927408 | 151445 | None | 008 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.[Volumme-I,PNO-17, INO-6.32 Of PWD SR For 2023-2024] | Sqm | 1349.3 | 1349.3 | 50.4 | False | None | None | False | None | False | 68004.72 | 0 | 3927409 | 151445 | None | 009 | Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.[Volumme-II,PNO-42, INO-8.6.2 Of PWD SR For 2023-2024] 329 16.45 345.45 | Sqm | 441.87 | 441.87 | 60.8 | False | None | None | False | None | False | 26865.696 | 0 | 3927410 | 151445 | None | 010 | Forming groove of uniform size in the top layer of plaster as per approved pattern including repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge: 20 mm to 25 mm wide to required depth[Volumme-II,PNO-54, INO-8.80 Of PWD SR For 2023-2024] 51 2.55 53.55 | m | 67.98 | 67.98 | 24.0 | False | None | None | False | None | False | 1631.52 | 0 | 3927411 | 151445 | None | 011 | Providing White washing with lime to give an even shade :New work (three coats) with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.[Volumme-II,PNO-44, INO-8.21 Of PWD SR For 2023-2024] 19 0.95 19.95 | Sqm | 26.78 | 26.78 | 60.8 | False | None | None | False | None | False | 1628.224 | 0 | 3927412 | 151445 | None | 012 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.[Volumme-II,PNO-47, INO-8.33.3 Of PWD SR For 2023-2024] 106 106 | Sqm | 143.17 | 143.17 | 28.8 | False | None | None | False | None | False | 4123.296 | 0 | 3927413 | 151445 | None | 013 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.[Volumme-II,PNO-47, INO-8.33.3 Of PWD SR For 2023-2024] | Sqm | 91.67 | 91.67 | 60.8 | False | None | None | False | None | False | 5573.536 | 0 | 3927414 | 151445 | None | 014 | Providing and fixing 1 mm thick M.S. sheet sliding-shutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and T- iron guide at the top and bottom respectively, including applying a priming coat of approved steel primer including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.[Volumme-II,PNO-77, INO-11.4Of PWD SR For 2023-2024] | Sqm | 5377.63 | 5377.63 | 9.5 | False | None | None | False | None | False | 51087.485 | 0 | 3927415 | 151445 | None | 015 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804[pg no.78 : item no.8.54, V3] | Nos | 9270.0 | 9270.0 | 1.0 | False | None | None | False | None | False | 9270.0 | 0 |
|