1725533163000 | 0 | None | None | Water supply/sewage lines | Construction of 6 No Manhole for UGD network sytem near Doomavathi Daivasthana at Katipalla 7th block of 5th Katipalla north ward in MCC limits | 988570.71 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3929546 | 151621 | None | code01 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (Page No. 10 Item No.-1.17.1 common SR 2021-22 VOLUME-1 ). i) All kinds of soils. Depth upto 1.50 m | Cum | 217.28 | 217.28 | 50.06 | False | None | None | False | None | False | 10877.0368 | 0 | 3929547 | 151621 | None | code02 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (Page No. 10 Item No.-1.17.1 common SR 2021-22 VOLUME-1 ).ii) All kinds of soils. Depth exceeding 1.50 m, but not exceeding 3.00m | Cum | 275.52 | 275.52 | 50.06 | False | None | None | False | None | False | 13792.5312 | 0 | 3929548 | 151621 | None | code03 | Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. (Page No. 10 Item No.-1.19.3 common SR 2021-22 VOLUME-1 ).i) Ordinary/soft rock (without requiring blasting) Depth exceeding 3.00 m, but not exceeding 4.50m | Cum | 536.48 | 536.48 | 34.22 | False | None | None | False | None | False | 18358.3456 | 0 | 3929549 | 151621 | None | code04 | Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. (Page No. 10 Item No.-1.19.3 common SR 2021-22 VOLUME-1 ).ii) Ordinary/soft rock (without requiring blasting) Depth exceeding 4.50 m, but not exceeding 6.0m | Cum | 616.95 | 616.95 | 19.39 | False | None | None | False | None | False | 11962.6605 | 0 | 3929550 | 151621 | None | code05 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 110mm dia., 6 kg/sqcm & class 3 (P No. 134 Sl No. 1.7W.S and UGD WORKS S.R 2021-22 VOLUME -V). | Rmtr | 410.39 | 410.39 | 36.0 | False | None | None | False | None | False | 14774.04 | 0 | 3929551 | 151621 | None | code06 | Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 supplying and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer. Constructing Pre-cast RCC Machinehole 1.50m internal dia. , 5.0 M depth & SFRC cover & frame (P No. 190 Sl No.18 .5 W.S and UGD WORKS S.R 2021-22 VOLUME -V) | No | 147725.76 | 147725.76 | 6.0 | False | None | None | False | None | False | 886354.56 | 0 | 3929552 | 151621 | None | code07 | Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete. (Page No. 7 Item No.-1.11 common SR 2021-22 VOLUME-1 ). | Cum | 2438.24 | 2438.24 | 4.32 | False | None | None | False | None | False | 10533.1968 | 0 | 3929553 | 151621 | None | code08 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications (Page No. 7 Item No.-1.10 common SR 2021-22 VOLUME-1 ). | Cum | 136.64 | 136.64 | 72.11 | False | None | None | False | None | False | 9853.1104 | 0 | 3929554 | 151621 | None | code09 | Disposal off the excess excavated earth of all types by vehicle including loading, unloading with all lead and lifts, labour, HOM of machineries etc. for Distance of 4 to 5 km (P No. 63 Sl No. 4.5 W.S and UGD WORKS S.R 2021-22 VOLUME -V). | Cum | 147.84 | 147.84 | 81.61 | False | None | None | False | None | False | 12065.2224 | 0 |
|