createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1725443704847
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee750.00
emd59300.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose13-09-2024 17:00:00
tenderQueryClose12-09-2024 17:00:00
technicalBidOpen14-09-2024 17:00:01
publishedDate06-09-2024 14:39:21
publishedByPostPWD_EE_DIV_SMG
publishedByUserKPE12039 - NAGESH B S
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonNagesh BS
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08182228956
mobileNumber9480022700
tenderSupplierListNone
tenderSchedule
createdTs1725443704881
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/OW/WORK_INDENT15341
titleRepair of hard passage and construction of protection wall at ch 18.00 km in Balligavi Agrahara Muchudi road in Talagunda hobali in Shikaripura Taluk
descriptionRepair of hard passage and construction of protection wall at ch 18.00 km in Balligavi Agrahara Muchudi road in Talagunda hobali in Shikaripura Taluk
categoryWORKS
categoryTextWorks
ecv2960686.84
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1700
locationNamePWD Division Office Shivamogga
provisionalAmount3500000.0
groupOverheadTotal0.0
fileNumberpwd/subdivision/ae-4/skp/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17254437050000NoneNoneOther WorksPART A BOX CULVERT1704107.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3916630151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:11Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead MORTH Specification 202.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum1374.01374.010.0FalseNoneNoneFalseNoneFalse13740.00
3916631151103NonePWD Schedule of Rates 2023-2024, VOL.1, Page No:8,Mechanical Means: -In all kinds of soils Depth upto 3m Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the worketc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum102.0102.0707.99FalseNoneNoneFalseNoneFalse72214.980
3916632151103NonePWD Schedule of Rates 2023-2024, VOL.1, Page No:11Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum2682.02682.019.02FalseNoneNoneFalseNoneFalse51011.640
3916633151103NonePWD Schedule of Rates 2023-2024, VOL.1, Page No:15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries,curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum5989.05989.012.63FalseNoneNoneFalseNoneFalse75641.070
3916634151103NonePWD Schedule of Rates 2023-2024, VOL.1, Page No:15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. ) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesetc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum6475.616475.617.77FalseNoneNoneFalseNoneFalse50315.48970
3916635151103NonePWD Schedule of Rates 2023-2024, VOL.1, Page No:16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work Cum7603.27603.260.34FalseNoneNoneFalseNoneFalse458777.0880
3916636151103NonePWD Schedule of Rates 2023-2024, VOL.1, Page No:18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h.All other type of structuresetc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Tonne79011.079011.07.2FalseNoneNoneFalseNoneFalse568879.20
3916637151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification MORTH Specification No. 2700etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum6811.06811.04.5FalseNoneNoneFalseNoneFalse30649.50
3916638151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) MORTH Specification No. 1500,1600 1700 & 2704.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum11835.011835.09.0FalseNoneNoneFalseNoneFalse106515.00
3916639151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) MORTH Specification No. 2702etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work.Cum13971.013971.04.57FalseNoneNoneFalseNoneFalse63847.470
3916640151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:11Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Reference to MORTH Spection 710.1.4 of IRC:78 and 2200etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum2677.02677.036.32FalseNoneNoneFalseNoneFalse97228.640
3916641151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:11Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Reference to MORTH Specification No. 710.1.4 of IRC:78 & 2200etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum1168.01168.057.72FalseNoneNoneFalseNoneFalse67416.960
3916642151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Filler Joint (ii)Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. m137.0137.032.8FalseNoneNoneFalseNoneFalse4493.60
3916643151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Filler Joint (iii) Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications MORTH Specification No. 2605 etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. m231.0231.032.8FalseNoneNoneFalseNoneFalse7576.80
3916644151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Filler Joint (iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weightetc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. m48.048.032.8FalseNoneNoneFalseNoneFalse1574.40
3916645151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification MORTH Specification No. 2705etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. No3271.03271.04.0FalseNoneNoneFalseNoneFalse13084.00
3916646151103NonePWD Schedule of Rates 2023-2024, VOL.3, Page No:12Providing and laying of apron with cement concrete blocks of size 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cement content of 250 kg/m3as per IRC: 21-2000.MORTH Specification No.2503.etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum6368.06368.03.32FalseNoneNoneFalseNoneFalse21141.760
17254437050000NoneNoneOther WorksPART B ROAD WORK717366.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3916647151104NonePage No. 17 Item No.3.5 Vol-3 PWD SR 2023-24Scarifying the existing bituminous road surface to a depth of50 mm and disposal of scarified material by Mechanical Meansusing Hydraulic excavator with in all lifts and lead.(Page No. 17 Item No.3.5 Vol-3 PWD SR 2023-24) etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Sqm6.06.0423.5FalseNoneNoneFalseNoneFalse2541.00
3916648151104NonePage No. 23 Item No. 4.1 (V) Vol-3 PWD SR 202Construction of Granular Sub-Base of required grading asper design mixing in a mechanical mix plant at OMC, carriageof mixed Material to work site, spreading in uniform layerswith motor grader on prepared surface and compacting withvibratory power roller to achieve the desired density, completeas per clause 401 For Grading -V Material (Page No. 23 Item No. 4.1 (V) Vol-3 PWD SR 2023-24)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work Cum2487.02487.034.65FalseNoneNoneFalseNoneFalse86174.550
3916649151104NonePage No. 26 Item No. 4.17 Vol-3 PWD SR 2023-24Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification includingpremixing the Material with water at OMC in mechanical mixplant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course onwell prepared surface and compacting with vibratory roller toachieve the desired density.Wet Mix Macadam (Plant mix method)(Page No. 26 Item No. 4.17 Vol-3 PWD SR 2023-24)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum2559.02559.0107.8FalseNoneNoneFalseNoneFalse275860.20
3916650151104NonePage No. 31 Item No. 5.1 (i) Vol-3 PWD SR 2023-24Providing and applying primer coat with SS1 grade BituminousEmulsion on prepared surface of granular Base includingclearing of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means.Prime Coat over Stabilised soil base / Crusher RunMacadam( Page No. 31 Item No. 5.1 (i) Vol-3 PWD SR 2023-24)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Sqm41.041.0431.2FalseNoneNoneFalseNoneFalse17679.20
3916651151104NonePage No. 32 Item No. 5.8 C (ii) Vol-3 PWD SR 20Providing and laying Bituminous Macadam with 40/60 TPHcapacity hot mix plant using crushed aggregates of specifiedgrading premixed with bituminous binder VG-30 @ 3.4%by weight of mix, transported to site, laid over a previouslyprepared surface with mechanical paver finisher to the requiredgrade, level and alignment and rolled as per clauses 501.6 and501.7 to achieve the desired compaction( Page No. 32 Item No. 5.8 C (ii) Vol-3 PWD SR 2023-24)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum7661.07661.021.18FalseNoneNoneFalseNoneFalse162259.980
3916652151104NonePage No. 31 Item No. 5.3 (i) Vol-3 PWD SR 2023-Tack coat as Granular surface treated with primer, providing and applying tack coat with VG 10 Birumen using pressure distributor at the rate of 0.25 kg /m2 on Granular surface ( Page No. 31 Item No. 5.3 (i) Vol-3 PWD SR 2023-24)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Sqm12.012.0423.5FalseNoneNoneFalseNoneFalse5082.00
3916653151104NonePage No. 43 Item No. 5.31 Vol-3 PWD SR 2023-24Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (Page No. 43 Item No. 5.31 Vol-3 PWD SR 2023-24)Cum10152.010152.010.59FalseNoneNoneFalseNoneFalse107509.680
3916654151104NonePage No. 17 Item No. 3.6 Vol-3 PWD SR 2023-24Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts &leads, transporting to site, spreading, grading to required slopeand compacted to meet requirement of table No. 300-2 (Page No. 17 Item No. 3.6 Vol-3 PWD SR 2023-24)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum493.0493.0122.23FalseNoneNoneFalseNoneFalse60259.390
17254437050000NoneNoneOther WorksPART C PROTECTION WALL381661.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3916655151105None2023-24 PWD Uni SR Vol 1 P.No.8 INo.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (2023-24 PWD Uni SR Vol 1 P.No.8 INo.1.14.1)etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum102.0102.048.3FalseNoneNoneFalseNoneFalse4926.60
3916656151105None2023-24 PWD Uni SR Vol 1 P.No.11 INo.1.23Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. (2023-24 PWD Uni SR Vol 1 P.No.11 INo.1.23) complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum2682.02682.06.3FalseNoneNoneFalseNoneFalse16896.60
3916657151105None2023-24 PWD Uni SR Vol 1 P.No.15 INo.2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. with Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates (2023-24 PWD Uni SR Vol 1 P.No.15 INo.2.1.3)complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum5989.05989.04.2FalseNoneNoneFalseNoneFalse25153.80
3916658151105None2023-24 PWD Uni SR Vol 1 P.No.16 INo.2.3.1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete thework as per technical specifications.M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates (2023-24 PWD Uni SR Vol 1 P.No.16 INo.2.3.1)complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum6955.36955.323.1FalseNoneNoneFalseNoneFalse160667.430
3916659151105None2023-24 PWD Uni SR Vol 1 P.No.18 INo 2.11.hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. For All other type of structures (2023-24 PWD Uni SR Vol 1 P.No.18 INo 2.11.h) - etc., complete inclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Tonne79011.079011.01.36FalseNoneNoneFalseNoneFalse107454.960
3916660151105None2023-24 PWD Uni SR Vol 1 P.No.7 INo 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (2023-24 PWD Uni SR Vol 1 P.No.7 INo 1.8) - etc., complete i nclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum474.0474.083.95FalseNoneNoneFalseNoneFalse39792.30
3916661151105None2023-24 PWD Uni SR Vol 3 P.No.117 INo 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawingand Technical Specification.(2023-24 PWD Uni SR Vol 3 P.No.117 INo 12.4) etc., complete i nclding cost and conveyance of all materials wiht hire charges of machinery and equipments, wiht all lead and lift, loading and unloading charges, transportation charges, labour charges, labour charges abd all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work. Cum2677.02677.010.0FalseNoneNoneFalseNoneFalse26770.00
17254437050000NoneNoneOther WorksPART D DIVERSION OF ROAD157551.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3916662151106NonePWD Schedule of Rates 2023-2024, VOL. 3, Page No:9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. MORTH Specification No:201 (ii). By Mechanical Means B. In area of thorny jungle. 100 Sqm484.0484.01.68FalseNoneNoneFalseNoneFalse813.120
3916663151106NonePWD Schedule of Rates 2023-2024, VOL. 1, Page No:7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. . Cum474.0474.0164.82FalseNoneNoneFalseNoneFalse78124.680
3916664151106NonePWD Schedule of Rates 2023-2024, VOL. 3, Page No:1Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 MORTH Specification No. 305 Cum493.0493.078.75FalseNoneNoneFalseNoneFalse38823.750
3916665151106NonePWD Schedule of Rates 2023-2024, VOL. 3, Page No:1Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement. mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6.-(ii) 1000 mm dia Rmtr7958.07958.05.0FalseNoneNoneFalseNoneFalse39790.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17254437090000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17254437090000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17254437090000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17254437090000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17254437090000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17254450900000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17254450990000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17254451050000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17254451130000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17254451200000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Government orders.None
17254451300000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should furnish qualification information as per section 3 of Standard Tender Document attached to this tender. AND Should up-load Scan copy of pan card, Valid GST registration certificate & also up-load address proof certificate(Aadhar Card/DL/Pass port etc..)None
17254451460000NoneNoneELIGIBILITYAll Scanned Documents of the Original should be up-loaded, Executive Engineer/ Superintending Engineer/ Chief Engineer reserves the right to verify the Original Documents before approval, 0riginal documents / Certificates for qualification shall be produced when called for during evaluation of tender.None
17254451540000NoneNoneELIGIBILITYAll the Formats prescribed in the bid documents shall be filled in complete manner.None
17254451640000NoneNoneELIGIBILITYThe materials like bitumen, Steel, Cement etc., required for the work shall be procured by the tenderer themselves and should be got tested by the Quality Control Authority before use on the work and contractor should carryout additional test required if insisted by Engineer in charge of work at his own cost.None
17254451720000NoneNoneELIGIBILITYWork done certificate should be issued by competent authority not below the rank of Executive Engineer.None
17254451870000NoneNoneELIGIBILITYThe item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts labour, hire charges of machinery equipment etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17254452010000NoneNoneELIGIBILITYIf the tender of the successful tenderer is seriously unbalanced in relation to the Employers estimate of the cost of the work to be performed under the contract, the Employer may require the Tenderer to produce detailed price analysis for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, the Employer may require that the amount of the performance security set forth in Clause 24 be increased at the expense of the successful Tenderer to a level sufficient to protect the Employer against financial loss in the event of default of the successful under the contract.None
17254452140000NoneNoneELIGIBILITYThe Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17254452230000NoneNoneELIGIBILITYBidder must posses valid G S T Certificate.None
17254452320000NoneNoneELIGIBILITYEstimate rates are excluding GST as per Common SR 2023-24 and prevailing GST (18% of Amount Put to tender) amount is kept in form of Lump sum in sanctioned estimate according to guidelines in Common SR (GO:PWD 51 RDF 2019 Bangaluru Dt:18.03.2022). Therefore, amount put to Tender and ECV amount are excluding GST. KPPP-PORTAL format has No Options to add GST Separately at stage of Draft Tender Schedule Process for Overall amount put to Tender. Tender has been inviting through an Option with INCLUSIVE. But the item wise rates do not include GST. Hence, GST will be paid separately for the quoted amount accordingly. Declaration Certificate must be attached mandatorily.None
17254452420000NoneNoneELIGIBILITYAs per Government order FD 447 EXP-12 2022 dated 30/07/2022, 18% GST will be added to the Contract amount separately.None
17254452610000NoneNoneELIGIBILITYThe Employer reserves the rights to accept any Tender and to reject any or all Tenders as per Standard Tender Document Clause 22.None
17254452730000NoneNoneELIGIBILITYThe Successful bidder has to follow the Director of Mines Geology Department Circular Dated: 07-11-2023 regarding MDP Certificate along with the Running contractor bills, otherwise department will take necessary action as per the government Orders/Circulars.None
17254452810001NoneNoneELIGIBILITYAny deviation/error/mistakes found in units of items, they should be read as unified SR 2023-24 and the rates shall be quoted accordinglyNone
17254453250000NoneNoneELIGIBILITYContact details of contractor should mention valid Email ID, communication Address, Phone Number properlyNone
17254453350000NoneNoneELIGIBILITYStatement indicating the (A)Existing commitments and ongoing works, (B)Details of works for which tenders are already submitted . The statements should furnished as per statement 1.3 (A),(B) of Section 3 of Qualification information in Standard Bid document. The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.None
17254453570000NoneNoneELIGIBILITYTotal value of civil engineering works executed and payments received in the last five years (year-wise)None
17254453600000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17254453680000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17254453760000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17254453840000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17254453930000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17254454030000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the form of NSC/DD/FDR in the name of the Executive Engineer, Public works Department, Shivamogga Division, Shivamogga given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17254454120000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials.None
17254454200000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17254454320000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17254454420000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per Standard tender document Attached.None
17254454660000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer in charge of this work.None
17254454890000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17254455080000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17254455200000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public works Department, Shivamogga Division, Shivamogga during office hours on all working days.None
17254455340000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17254455470000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17254455550000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents appended here with.None
17254455660000NoneNoneELIGIBILITYWork sanctioned under head of Account Flood Damage Works 3054-04-337-1-10-200 MDR Maintenance.None
17254455740000NoneNoneELIGIBILITYThe tenderer should be a KPWD Class-III & above registered Contractor.None
17254455870000NoneNoneELIGIBILITYThe Tenderer should maintain the road during defective liability period of up to 1 YearNone
17254456060000NoneNoneELIGIBILITYThe Tenderer should submit the scanned copy of the last 5 years balance sheet indicating the civil work contract receipts certified by the chartered accountant. Submit the balance sheet indicating the contract receipts certified by the chartered accountant with UDIN No/Auditor & Tax consultant with their registration no, who ever is applicable.None
17254456160000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 (a) achieved in at least two financial years an Average of annual Financial Turn over (in all Clauses of Civil Engineering Construction Works only) of Rs.29.61 Lakhs, (in all classes of Civil Engineering Construction works only)None
17254456240000NoneNoneELIGIBILITYTo qualify for Award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 satisfactorily completed as prime contractor, at least one similar work such as culvert/Bridge work of value not less than Rs.14.80 lakhs. Work done Certificate issued by competent Authority of rank not less than Executive Engineer.None
17254456670000NoneNoneELIGIBILITYTenders not complying with above conditions, will not be considered for Tender Evaluation.None
17254456750000NoneNoneELIGIBILITYThe period for completion of the work is up to 06 Months (Including Monsoon)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneTo qualify for Award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 satisfactorily completed as prime contractor, at least one similar work such as Culvert/Bridge work of value not less than Rs.14.80 lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneStatement indicating the (A)Existing commitments and ongoing works, (B)Details of works for which tenders are already submitted . The statements should furnished as per statement 1.5 (A),(B) of Section 3 of Qualification information in Standard Bid document.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Section 3 Details
NoneNoneNoneNoneGST Declaration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- GST Declaration Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 (a) achieved in at least two financial years an Average of annual Financial Turn over (in all Clauses of Civil Engineering Construction Works only) of Rs.29.61 Lakhs, (in all classes of Civil Engineering Construction works only)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneGST Registration CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneThe Tenderer should be a PWD Class-III & above Registered contractor.OthersRegistration
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
The Tenderer should be a PWD Class-III & above Registered contractor.TrueTechnical Bid
To qualify for award of this contract, each Tenderer in its name should have in the last five years achieved in at least two financial years an Average of annual Financial Turn over of civil engineering construction works of Rs.29.61 Lakhs. Submit the balance sheet indicating the contract receipts certified by the chartered accountant/Auditor & Tax consultant who ever applicableTrueTechnical Bid
To qualify for Award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 satisfactorily completed as prime contractor, at least one similar work such as Culvert/Bridge work of value not less than Rs.14.80 lakhs.TrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
GST Declaration CertificateTrueTechnical Bid
Section 3 details - Existing commitments and on going works and Details of works for which tenders are already submittedTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone