tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1725612012000 | 1 | None | None | Buildings | Construction of Anganawadi Building at Ward No. 35, Rajeshwari Nagara-02 in Ballari City. | 1484365.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3933621 | 152019 | None | Vol 1 Pag No:8 Item No. 1.14.1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumpsand other deleterious matter including dressing of excavated surfaces, posing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 3 m depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 65.85 | False | None | None | False | None | False | 7052.535 | 0 | 3933622 | 152019 | None | Vol-1 Page No. 15 I.No.2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. C.C 1:3:6 40 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6288.45 | 6288.45 | 7.7 | False | None | None | False | None | False | 48421.065 | 0 | 3933623 | 152019 | None | Vol-1 Page No. 15 I.No.2.2.1 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all aterials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. ( For isolated footing) M-20 Design Mix ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6601.35 | 6601.35 | 6.68 | False | None | None | False | None | False | 44097.018 | 0 | 3933624 | 152019 | None | Vol-1 Page No. 111 I.No.1 a | Form work for foorting ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 528.11 | 528.11 | 6.68 | False | None | None | False | None | False | 3527.7748 | 0 | 3933625 | 152019 | None | Vol-1 Page No. 16 I.No.2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications (For coloumn) up to plinth M20 design mix ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6639.15 | 6639.15 | 14.98 | False | None | None | False | None | False | 99454.467 | 0 | 3933626 | 152019 | None | Volume-1 Page No. 111 I.No.9 | Form work for coloumn and shear wall ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 531.13 | 531.13 | 0.99 | False | None | None | False | None | False | 525.8187 | 0 | 3933627 | 152019 | None | Volume-1 Page No. 111 I.No.4 | Form work for cement concrete walls ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 531.13 | 531.13 | 13.99 | False | None | None | False | None | False | 7430.5087 | 0 | 3933628 | 152019 | None | Volume-1 Page No. 7 I.No.1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations and other similar works etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up to 50 m
and lift upto 1.5 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 56.76 | False | None | None | False | None | False | 15853.068 | 0 | 3933629 | 152019 | None | Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical
specifications. (For plinth Beam ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 2.68 | False | None | None | False | None | False | 18656.82 | 0 | 3933630 | 152019 | None | Volume-1 Page No. 111 I.No.2 | Form work for plinth beam ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3480.75 | 3480.75 | 2.68 | False | None | None | False | None | False | 9328.41 | 0 | 3933631 | 152019 | None | Vol 1 Pag No:7 Item No.1.11 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 454.65 | 454.65 | 33.4 | False | None | None | False | None | False | 15185.31 | 0 | 3933632 | 152019 | None | Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (For coloumns above plinth ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 2.67 | False | None | None | False | None | False | 18587.205 | 0 | 3933633 | 152019 | None | Volume-1 Page No. 111 I.No.9 | Form work for coloumns above plinth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4873.05 | 4873.05 | 2.68 | False | None | None | False | None | False | 13059.774 | 0 | 3933634 | 152019 | None | Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For Beams and lintle of Buildingsl) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 5.69 | False | None | None | False | None | False | 39610.935 | 0 | 3933635 | 152019 | None | Volume-1 Page No. 111 I.No.14 | Form work for lintle and RCC beams ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 4176.9 | 4176.9 | 5.69 | False | None | None | False | None | False | 23766.561 | 0 | 3933636 | 152019 | None | Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For chejja, staricase of Buildingsl) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 0.15 | False | None | None | False | None | False | 1044.225 | 0 | 3933637 | 152019 | None | Volume-1 Page No. 111 I.No.19 | Form work forChejja ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3132.68 | 3132.68 | 0.15 | False | None | None | False | None | False | 469.902 | 0 | 3933638 | 152019 | None | Volume-1 Page No. 16 I.No.2.5.1 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications. (For Roof slabs of Buildingsl) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6961.5 | 6961.5 | 8.25 | False | None | None | False | None | False | 57432.375 | 0 | 3933639 | 152019 | None | Volume-1 Page No. 111 I.No.19 | Form work for Roof Slab ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3480.75 | 3480.75 | 8.25 | False | None | None | False | None | False | 28716.1875 | 0 | 3933640 | 152019 | None | Vol 1 Pag No:18 Item No. 2.11(a) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and
technical specification for buildings ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | t | 93929.85 | 93929.85 | 3.87 | False | None | None | False | None | False | 363508.5195 | 0 | 3933641 | 152019 | None | Vol 2 Pag No:14 Item No. 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge o ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 8367.45 | 8367.45 | 28.04 | False | None | None | False | None | False | 234623.298 | 0 | 3933642 | 152019 | None | Vol 2 Pag No:42 Item No. 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 366.45 | 366.45 | 116.26 | False | None | None | False | None | False | 42603.477 | 0 | 3933643 | 152019 | None | Vol 2 Pag No:41 Item No. 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete
as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 327.6 | 327.6 | 285.7 | False | None | None | False | None | False | 93595.32 | 0 | 3933644 | 152019 | None | Vol 2 Pag No:45 Item No. 8.25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per pecifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 143.85 | 143.85 | 285.7 | False | None | None | False | None | False | 41097.945 | 0 | 3933645 | 152019 | None | Vol 2 Pag No:45 Item No. 8.25 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 93.45 | 93.45 | 116.26 | False | None | None | False | None | False | 10864.497 | 0 | 3933646 | 152019 | None | Vol 2 Pag No:86 Item No. 11.34.B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Kg | 192.15 | 192.15 | 128.52 | False | None | None | False | None | False | 24695.118 | 0 | 3933647 | 152019 | None | Vol 2 Pag No:48 Item No. 8.41 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of pproved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 175.35 | 175.35 | 13.46 | False | None | None | False | None | False | 2360.211 | 0 | 3933648 | 152019 | None | Vol 2 Pag No:77 Item No. 11.5.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 103755.75 | 103755.75 | 0.15 | False | None | None | False | None | False | 15563.3625 | 0 | 3933649 | 152019 | None | Vol 2 Pag No:100 Item No. 12.21 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with , stiles and rails of 30mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6029.1 | 6029.1 | 4.2 | False | None | None | False | None | False | 25322.22 | 0 | 3933650 | 152019 | None | Vol 2 Pag No:104 Item No. 12.54 | Providing & fixing factory made PVC Door frame of size 50x47mm with
a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam
sheet metered cut at corners & jointed 2 No.s of 150mm long brackets
of 15x15mm M.S Square tube, the entire door frame to be reinforced with
19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the
wall using M.S. Screws of 65/80mm size complete as per manufacturers
specification & direction of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 333.9 | 333.9 | 11.4 | False | None | None | False | None | False | 3806.46 | 0 | 3933651 | 152019 | None | Volume-II Iteam Code-12.55.1 p-104 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 2484.3 | 2484.3 | 3.15 | False | None | None | False | None | False | 7825.545 | 0 | 3933652 | 152019 | None | Vol 2 Pag No:64 Item No.9.34 | Providing flooring with 25mm thick polished Cuddapah slabs using cement
mortar 1:6, 25mm thick over existing cement concrete bed or top of roof
laid to line and level and jointed with cement slurry mixed with pigment
to match the shade of the slab , including cost of materials, labour, curing,
polishing complete as per specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 1732.5 | 1732.5 | 34.68 | False | None | None | False | None | False | 60083.1 | 0 | 3933653 | 152019 | None | Vol 2 Pag No:55 Item No.8.84 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 498.75 | 498.75 | 3.6 | False | None | None | False | None | False | 1795.5 | 0 | 3933654 | 152019 | None | Vol 2 Pag No:50 Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 105.0 | 105.0 | 24.3 | False | None | None | False | None | False | 2551.5 | 0 | 3933655 | 152019 | None | Vol 2 Pag No:218 Sl No.22.15.2 | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SSHandles 300 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 577.5 | 577.5 | 4.0 | False | None | None | False | None | False | 2310.0 | 0 | 3933656 | 152019 | None | Vol 2 Pag No:218 Sl No.22.15.4 | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16 mm dia 300 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 393.75 | 393.75 | 4.0 | False | None | None | False | None | False | 1575.0 | 0 | 3933657 | 152019 | None | Vol 2 Pag No:218 Sl No.22.15.6 | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolt 200x 10mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 157.5 | 157.5 | 4.0 | False | None | None | False | None | False | 630.0 | 0 | 3933658 | 152019 | None | Vol 2 Pag No:218 Sl No.22.15.8 | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 52.5 | 52.5 | 6.0 | False | None | None | False | None | False | 315.0 | 0 | 3933659 | 152019 | None | Vol 2 Pag No:218 Sl No.22.15.8 | Providing and fixing stainless steel fixtures conforming to 304 graded steel as per direction of engineer in charge S Door Stopper 75 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 105.0 | 105.0 | 2.0 | False | None | None | False | None | False | 210.0 | 0 | 3933660 | 152019 | None | Vol 2 P.No. 14 Item No.6.15 | Providing Half brick masonry with common burnt clay Non Modular bricks f class designation 3.5 in superstructure above plinth level up to floor 1 evel cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental harges complete as per the direction of engin ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 1084.65 | 1084.65 | 27.42 | False | None | None | False | None | False | 29741.103 | 0 | 3933661 | 152019 | None | Vol 1 Pag No:15 Item No. 2.1.4 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregate. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6527.85 | 6527.85 | 0.51 | False | None | None | False | None | False | 3329.2035 | 0 | 3933662 | 152019 | None | Vol 2 P.No. 125 Item No.13.48 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diamete ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 305.55 | 305.55 | 12.0 | False | None | None | False | None | False | 3666.6 | 0 | 3933663 | 152019 | None | Vol 2 P.No. 49 Item No.8.49 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | cm | 4.2 | 4.2 | 5000.0 | False | None | None | False | None | False | 21000.0 | 0 | 3933664 | 152019 | None | PWD CSR For 2023-24 Vol 2 Pag No:110 Item No. 1 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 7070.7 | 7070.7 | 4.32 | False | None | None | False | None | False | 30545.424 | 0 | 3933665 | 152019 | None | PWD CSR For 2023-24 Vol 2 Pag No:109 Item No. 1 | Providing and fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 6004.95 | 6004.95 | 1.42 | False | None | None | False | None | False | 8527.029 | 0 |
| 1725612012000 | 0 | None | None | Buildings | Water supply & Sanitation | 106424.6 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3933666 | 152020 | None | item3 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete for: PVC pipes 32mm dia., 10 kg/sqcm & class 5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 70.35 | 70.35 | 50.0 | False | None | None | False | None | False | 3517.5 | 0 | 3933667 | 152020 | None | item4 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete for:PVC pipes 25mm dia, 10 kg/sqcm & class 5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 50.4 | 50.4 | 50.0 | False | None | None | False | None | False | 2520.0 | 0 | 3933668 | 152020 | None | item5 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc PWD SR. 2023-24/ Pg- 85 I No.7.3 Rs. 2140.00/mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1461.6 | 1461.6 | 1.0 | False | None | None | False | None | False | 1461.6 | 0 | 3933669 | 152020 | None | item6 | Providing and fixing P.V.C. low level flushing cistern with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete.10 litre capacity - White ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 989.1 | 989.1 | 2.0 | False | None | None | False | None | False | 1978.2 | 0 | 3933670 | 152020 | None | item7 | Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings :Flat back wash basin of size 550x400 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 808.5 | 808.5 | 2.0 | False | None | None | False | None | False | 1617.0 | 0 | 3933671 | 152020 | None | item8 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complet. 40 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 92.4 | 92.4 | 1.0 | False | None | None | False | None | False | 92.4 | 0 | 3933672 | 152020 | None | item9 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing. Rectangular shape 453x357 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1068.9 | 1068.9 | 1.0 | False | None | None | False | None | False | 1068.9 | 0 | 3933673 | 152020 | None | item10 | Providing and fixing Pillar cock with high neck with 265mm Extended body made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class- Economy ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2627.1 | 2627.1 | 8.0 | False | None | None | False | None | False | 21016.8 | 0 | 3933674 | 152020 | None | item11 | Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for: Pipes of SN4, 160mm dia. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | m | 604.8 | 604.8 | 50.0 | False | None | None | False | None | False | 30240.0 | 0 | 3933675 | 152020 | None | item12 | Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5030.55 | 5030.55 | 2.0 | False | None | None | False | None | False | 10061.1 | 0 | 3933676 | 152020 | None | item13 | Providing GM gland cocks tested against hydraulic pressure of 20 Kg/ m² with ISI mark- For 25 mm dia GM gland cocks ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 538.65 | 538.65 | 5.0 | False | None | None | False | None | False | 2693.25 | 0 | 3933677 | 152020 | None | item14 | Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1121.4 | 1121.4 | 9.32 | False | None | None | False | None | False | 10451.448 | 0 | 3933678 | 152020 | None | PWD SR. 2023-24 Vol-2 Pg- 131 I No.14.1.1 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe,with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5128.2 | 5128.2 | 2.0 | False | None | None | False | None | False | 10256.4 | 0 | 3933679 | 152020 | None | PWD SR. 2023-24 Pg-23 I No.13.34 | Providing and placing on terrace (at all floor levels) polyethylenewater storage tank, IS : 12701 marked, with cover and suitable lockingarrangement and making necessary holes for inlet, outlet and overflowpipes but without fittings and the base support for tank. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Ltr | 9.45 | 9.45 | 1000.0 | False | None | None | False | None | False | 9450.0 | 0 |
| 1725612012000 | 0 | None | None | Buildings | Electrification | 55131.51 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3933680 | 152021 | None | item1 | Concealed Conduit SystemSupplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 69.3 | 69.3 | 24.0 | False | None | None | False | None | False | 1663.2 | 0 | 3933681 | 152021 | None | item2 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.Common Sr 2023-24 vol-6,pg no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 82.95 | 82.95 | 7.0 | False | None | None | False | None | False | 580.65 | 0 | 3933682 | 152021 | None | item3 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.Common Sr 2023-24 vol-6,pg no-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 82.95 | 82.95 | 2.0 | False | None | None | False | None | False | 165.9 | 0 | 3933683 | 152021 | None | item4 | Supplying and wiring adopting loop system in existing PVC Conduit/casing capping casing capping using 2x1.5Sqmm (Phase & Neutral)& 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box,the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outl.Short point upto 3Mtr from tapping point to out let via switch box . Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 282.45 | 282.45 | 2.0 | False | None | None | False | None | False | 564.9 | 0 | 3933684 | 152021 | None | item5 | Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch. Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 397.95 | 397.95 | 2.0 | False | None | None | False | None | False | 795.9 | 0 | 3933685 | 152021 | None | item6 | Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box.Common Sr 2023-24 vol-6,pg no-5 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 582.75 | 582.75 | 4.0 | False | None | None | False | None | False | 2331.0 | 0 | 3933686 | 152021 | None | item7 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 27.3 | 27.3 | 4.0 | False | None | None | False | None | False | 109.2 | 0 | 3933687 | 152021 | None | item8 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Point | 44.1 | 44.1 | 1.0 | False | None | None | False | None | False | 44.1 | 0 | 3933688 | 152021 | None | item9 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.10-12 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 274.05 | 274.05 | 1.0 | False | None | None | False | None | False | 274.05 | 0 | 3933689 | 152021 | None | item10 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.16 Way.Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 308.7 | 308.7 | 1.0 | False | None | None | False | None | False | 308.7 | 0 | 3933690 | 152021 | None | item11 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 361.2 | 361.2 | 1.0 | False | None | None | False | None | False | 361.2 | 0 | 3933691 | 152021 | None | item12 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module .Common SR 2023-24 vol-6,pg no-8 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 416.85 | 416.85 | 4.0 | False | None | None | False | None | False | 1667.4 | 0 | 3933692 | 152021 | None | item13 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 107.1 | 107.1 | 1.0 | False | None | None | False | None | False | 107.1 | 0 | 3933693 | 152021 | None | item14 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket Common SR 2023-24 vol-6,pg no-9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 179.55 | 179.55 | 2.0 | False | None | None | False | None | False | 359.1 | 0 | 3933694 | 152021 | None | item15 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293Stepped Fan Regulator Two Module Common SR 2023-24 vol-6,pg no-9 Stepped Fan Regulator Two Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 328.65 | 328.65 | 1.0 | False | None | None | False | None | False | 328.65 | 0 | 3933695 | 152021 | None | item16 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 247.8 | 247.8 | 1.0 | False | None | None | False | None | False | 247.8 | 0 | 3933696 | 152021 | None | item17 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone Socke Common SR 2023-24 vol-6,pg no-9 . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 163.8 | 163.8 | 2.0 | False | None | None | False | None | False | 327.6 | 0 | 3933697 | 152021 | None | item18 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Bakelite Ceiling Rose.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 81.9 | 81.9 | 4.0 | False | None | None | False | None | False | 327.6 | 0 | 3933698 | 152021 | None | item19 | Supplying And fixing/replacing of 6/16/32A electrical
accessories on existing switch board.6A Pendant Holder.Common SR 2023-24 Vol-6 page no-10 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 74.55 | 74.55 | 1.0 | False | None | None | False | None | False | 74.55 | 0 | 3933699 | 152021 | None | item20 | Supplying and fixing regular 4 Way MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2.Common SR 2023-24 Vol-6 page no-17 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 549.15 | 549.15 | 1.0 | False | None | None | False | None | False | 549.15 | 0 | 3933700 | 152021 | None | item21 | Supplying and fixingof 6to32 Amps Double pole miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 10845.45 | 10845.45 | 1.0 | False | None | None | False | None | False | 10845.45 | 0 | 3933701 | 152021 | None | item22 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.4 Way SP & N .Common SR 2023-24 Vol-6 page no-18 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1303.05 | 1303.05 | 1.0 | False | None | None | False | None | False | 1303.05 | 0 | 3933702 | 152021 | None | item23 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter.Common SR 2023-24 Vol-6 page no-19 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1449.0 | 1449.0 | 1.0 | False | None | None | False | None | False | 1449.0 | 0 | 3933703 | 152021 | None | item24 | Supplying capacitor type ceiling fan complete with down rod blades,shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.48" Sweep (1200 mm) Regular mode.Common SR 2023-24 Vol-6,Page no-30 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3133.2 | 3133.2 | 2.0 | False | None | None | False | None | False | 6266.4 | 0 | 3933704 | 152021 | None | item25 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 724.5 | 724.5 | 4.0 | False | None | None | False | None | False | 2898.0 | 0 | 3933705 | 152021 | None | item26 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degre ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 168.0 | 168.0 | 4.0 | False | None | None | False | None | False | 672.0 | 0 | 3933706 | 152021 | None | item27 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 161.7 | 161.7 | 8.0 | False | None | None | False | None | False | 1293.6 | 0 | 3933707 | 152021 | None | item28 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired.Common SR 2023-24,Vol-6 page no-57 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 330.75 | 330.75 | 4.0 | False | None | None | False | None | False | 1323.0 | 0 | 3933708 | 152021 | None | item29 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg.Common SR 2023-24,Vol-6 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 780.15 | 780.15 | 1.0 | False | None | None | False | None | False | 780.15 | 0 | 3933709 | 152021 | None | item30 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | No | 709.8 | 709.8 | 1.0 | False | None | None | False | None | False | 709.8 | 0 | 3933710 | 152021 | None | item31 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Bag | 325.5 | 325.5 | 1.0 | False | None | None | False | None | False | 325.5 | 0 | 3933711 | 152021 | None | item32 | Digging of Pit for providing GI Pipe type Earthing for Haed Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 3139.5 | 3139.5 | 1.2 | False | None | None | False | None | False | 3767.4 | 0 | 3933712 | 152021 | None | item33 | 1.1 kV XLPE or Heat-resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG able as per IS-1554 Part 1 or IS-7098 Par ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 83193.6 | 83193.6 | 0.1 | False | None | None | False | None | False | 8319.36 | 0 | 3933713 | 152021 | None | item34 | Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed.In Ordinary Soil. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 273.0 | 273.0 | 3.2 | False | None | None | False | None | False | 873.6 | 0 | 3933714 | 152021 | None | item35 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Pit | 3117.45 | 3117.45 | 1.0 | False | None | None | False | None | False | 3117.45 | 0 |
| 1725612012000 | 0 | None | None | Buildings | Motor & board | 15830.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3933715 | 152022 | None | item-1gem rate | crompton MONOBLOCK PUMP, 1 horsepowe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 10830.0 | 10830.0 | 1.0 | False | None | None | False | None | False | 10830.0 | 0 | 3933716 | 152022 | None | item2 gem rates | Unbranded Non Magnetic White Dry Erase Writing board of dimensions (in mm) 1200 x 1800 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5000.0 | 5000.0 | 1.0 | False | None | None | False | None | False | 5000.0 | 0 |
|
|
---|