1725607927000 | 0 | None | None | Other Works | Construction of Fencing at Chetana Colony 2nd Phase in ward no. 59, Hubli | 4179594.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3932797 | 151952 | None | 001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. | 100 Sqm | 357.0 | 357.0 | 19.3 | False | None | None | False | None | False | 6890.1 | 0 | 3932798 | 151952 | None | 002 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work In all kinds of soils Depth upto 1.5 m | Cum | 254.1 | 254.1 | 56.11 | False | None | None | False | None | False | 14257.551 | 0 | 3932799 | 151952 | None | 003 | Driven precast vertical M35 grade R.C.C. Piles excluding Reinforcement complete as per Drawing and & Technical Specification Size of pile - 300 mm x 300 mm | Mtr | 3725.4 | 3725.4 | 195.0 | False | None | None | False | None | False | 726453.0 | 0 | 3932800 | 151952 | None | 004 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates | Cum | 5947.2 | 5947.2 | 11.39 | False | None | None | False | None | False | 67738.608 | 0 | 3932801 | 151952 | None | 005 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. | Sqm | 1375.5 | 1375.5 | 104.1 | False | None | None | False | None | False | 143189.55 | 0 | 3932802 | 151952 | None | 006 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6639.15 | 6639.15 | 22.98 | False | None | None | False | None | False | 152567.667 | 0 | 3932803 | 151952 | None | 007 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding, 1. Foundation upto Plinth, a. Isolated | Cum | 531.13 | 531.13 | 1.2 | False | None | None | False | None | False | 637.356 | 0 | 3932804 | 151952 | None | 008 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding, 9. RCC Columns / Shaft (Slip Centering) | Cum | 4647.41 | 4647.41 | 4.41 | False | None | None | False | None | False | 20495.0781 | 0 | 3932805 | 151952 | None | 009 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding, 2. Plinth Beams of Buildings | Cum | 3319.58 | 3319.58 | 17.37 | False | None | None | False | None | False | 57661.1046 | 0 | 3932806 | 151952 | None | 010 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures. | Tonne | 82961.55 | 82961.55 | 4.443 | False | None | None | False | None | False | 368598.16665 | 0 | 3932807 | 151952 | None | 011 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding | Kgs | 176.4 | 176.4 | 9504.0 | False | None | None | False | None | False | 1676505.6 | 0 | 3932808 | 151952 | None | 012 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge | Kgs | 154.35 | 154.35 | 4281.0 | False | None | None | False | None | False | 660772.35 | 0 | 3932809 | 151952 | None | 013 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. | Kgs | 142.8 | 142.8 | 504.0 | False | None | None | False | None | False | 71971.2 | 0 | 3932810 | 151952 | None | 014 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge | Sqm | 349.65 | 349.65 | 317.44 | False | None | None | False | None | False | 110992.896 | 0 | 3932811 | 151952 | None | 015 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge | Sqm | 93.45 | 93.45 | 404.29 | False | None | None | False | None | False | 37780.9005 | 0 | 3932812 | 151952 | None | 016 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge | Sqm | 175.35 | 175.35 | 331.2 | False | None | None | False | None | False | 58075.92 | 0 | 3932813 | 151952 | None | 017 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work | Cum | 89.25 | 89.25 | 56.11 | False | None | None | False | None | False | 5007.8175 | 0 |
|