1725677497000 | 0 | None | None | Other Works | Construction of Shed in Veereshwara burial ground in Sargur TP lim | 253471.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3939340 | 152336 | None | code1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. CSR-2023-24 I.NO.1.14.1, PN-8 Volume -1 | Cum | 105.06 | 105.06 | 12.096 | False | None | None | False | None | False | 1270.80576 | 0 | 3939341 | 152336 | None | code2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:3:6 Using 40 mm and down size graded crushed coarse aggregates Revised Rate W.E.F From 04-01-2023. CSR-2023-24 I.NO.2.1.3, PN-16 VOLUME-1 2023-24 | Cum | 6168.67 | 6168.67 | 1.296 | False | None | None | False | None | False | 7994.59632 | 0 | 3939342 | 152336 | None | code3 | Providing and laying in position Reinforced cement concrete for allSub structures of building, Irrigation works, Sub structure works ofbridges, Drain works & other parallel works from 0.50m to 3.50 mheight. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with superplasticisers, laid in layers, well compacted using needle vibrators,providing weep holes wherever necesary, including all lead & lifts, costof all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other. appurtenances required to complete the work as per technicalspecifications. (The cost of steel reinforcement & formwork to be paidseparately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Page No.17 Revised Rate W.E.F From 04-01- CSR-2023-24 I.NO.2.4.3, PN-16 VOLUME-1 2023-24 | Cum | 6526.08 | 6526.08 | 2.592 | False | None | None | False | None | False | 16915.59936 | 0 | 3939343 | 152336 | None | code4 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.. Revised Rate W.E.F From 04-01-2023. CSR-2023-24 I.NO.2.5.2, PN-17 Volume -1 2023-24 | Cum | 11633.09 | 11633.09 | 1.4283 | False | None | None | False | None | False | 16615.542447 | 0 | 3939344 | 152336 | None | code5 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.. Revised Rate W.E.F From 04-01-2023. CSR-2023-24 I.NO.2.5.2, PN-17 Volume -1 2023-24 | Cum | 11154.09 | 11154.09 | 1.6028 | False | None | None | False | None | False | 17877.775452 | 0 | 3939345 | 152336 | None | code6 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.. Revised Rate W.E.F From 04-01-2023. CSR-2023-24 I.NO.2.5.2, PN-17 Volume -1 2023-24 | Cum | 10469.79 | 10469.79 | 6.75 | False | None | None | False | None | False | 70671.0825 | 0 | 3939346 | 152336 | None | code7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. CSR-2023-24 I.NO.1.10, PN-7 volume-1 2023-24 | Cum | 164.8 | 164.8 | 3.0344 | False | None | None | False | None | False | 500.06912 | 0 | 3939347 | 152336 | None | code8 | Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications.CSR 2023-24 Sl. No.2.11, Page No18 Volume1. | Tonne | 92140.71 | 92140.71 | 1.32 | False | None | None | False | None | False | 121625.7372 | 0 |
|