createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1725530758152
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd566000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose17-09-2024 16:00:00
tenderQueryClose11-09-2024 12:00:00
technicalBidOpen18-09-2024 16:30:00
publishedDate06-09-2024 19:10:51
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate09-09-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee466000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1725530758188
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT14925
titleImprovement of D Antapura to Malapura road from Km 3.10 to 7.00 in Sandur Taluk Ballari district, Under 5054 (Plan) Improvements of MDR.
descriptionImprovement of D Antapura to Malapura road from Km 3.10 to 7.00 in Sandur Taluk Ballari district, Under 5054 (Plan) Improvements of MDR.
categoryWORKS
categoryTextWorks
ecv37688915.80
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount45000000.0
groupOverheadTotalNone
fileNumberPWD/AEE/SANDUR/APPENDIX-E/5054/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17255307580000NoneNoneRoadsConstruction Road from Km 3.10 to 6.7035011622.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3928729151559NonePWD SR 2023-24 Vol-3, P No:17, I No: 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (PWD SR 2023-24 Vol-3, P No:17, I No: 3.5) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm6.36.312187.5FalseNoneNoneFalseNoneFalse76781.250
3928730151559NonePWD CSR 2023-24 Vol-3, P No. 12, I No.2.19 202Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3in volume and stock piling at designated locations and disposal of dismantled materials and stacking serviceable and unserviceable materials separately (PWD CSR 2023-24 Vol-3, P No. 12, I No.2.19 202) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum591.15591.1533.0FalseNoneNoneFalseNoneFalse19507.950
3928731151559NonePWD SR 2023-24 Vol-3, P No:17, I No:3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ( PWD SR 2023-24 Vol-3, P No:17, I No:3.7) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum110.25110.25288.75FalseNoneNoneFalseNoneFalse31834.68750
3928732151559NonePWD CSR 2023-24 Vol-1,P No. 08, I No.1.14.1Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing ofexcavated surfaces, disposing off or levelling the excavated earth or sorting& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenacesrequired to complete the work (PWD CSR 2023-24 Vol-1,P No. 08, I No.1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum107.1107.13084.0FalseNoneNoneFalseNoneFalse330296.40
3928733151559NonePWD CSR 2023-24 Vol-1,P No. 07, I No.1.7Construction of Embankment with approved materials deposited at site from road way cutting and excavation from drain and foundation of other structuresgraded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (PWD CSR 2023-24 Vol-1,P No. 07, I No.1.7) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum124.95124.951542.0FalseNoneNoneFalseNoneFalse192672.90
3928734151559NonePWD SR 2023-24 Vol-3 P No:17, I No:3.6Construction of sub-grade and earthen shoulders with approvedmaterial obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ( PWD SR 2023-24/Vol-3/P No:17, I No:3.6) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum517.65517.65136.0FalseNoneNoneFalseNoneFalse70400.40
3928735151559NonePWD SR 2023-24, Vol-3, P No:79, I No: 8.56.1Providing and laying Double wall Corrugated HDPE pipes for Electrical Telecommunication & Signalling lines having flexibility & anti termite, anti corrosive, good abrasion, fatigue strength & UV resistant and capable of withstanding vehicular traffic and earth loads conforming to IS 16205:2017 as per technical specifications. b. 63mm Outer dia (PWD SR 2023-24, Vol-3, P No:79, I No: 8.56.1 ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.m99.7599.75700.0FalseNoneNoneFalseNoneFalse69825.00
3928736151559NonePWD SR 2023-24, Vol-3, P No:79, I No: 8.56.1Providing and laying Double wall Corrugated HDPE pipes for Electrical Telecommunication & Signalling lines having flexibility & anti termite, anti corrosive, good abrasion, fatigue strength & UV resistant and capable of withstanding vehicular traffic and earth loads conforming to IS 16205:2017 as per technical specifications. c.110mm outer dia (PWD SR 2023-24, Vol-3, P No:79, I No: 8.56.1 ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.m210.0210.0100.0FalseNoneNoneFalseNoneFalse21000.00
3928737151559NonePWD SR 2023-24, Vol-3 , Page-23, I.No. 4.2 VConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material By Mix in Place Method (PWD SR 2023-24, Vol-3 , Page-23, I.No. 4.2 V ) Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material By Mix in Place Method (PWD SR 2023-24, Vol-3 , Page-23, I.No. 4.2 V ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum2476.952476.951926.6FalseNoneNoneFalseNoneFalse4772091.870
3928738151559NonePWD SR 2023-24, Vol-3, Page-26, I.No. 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. - Wet Mix Macadam (Plant mix method) (PWD SR 2023-24, Vol-3, Page-26, I.No. 4.17) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum2686.952686.954635.87FalseNoneNoneFalseNoneFalse12456350.89650
3928739151559NonePWD SR 2023-24, Vol-3, Page-31, I.No. 5.1Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (PWD SR 2023-24, Vol-3/ Page-31, I.No. 5.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm43.0543.0517875.0FalseNoneNoneFalseNoneFalse769518.750
3928740151559NonePWD SR 2023-24, Vol-3, Page-149, I.No16.28Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conformingto IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (PWD SR 2023-24/Vol-3/ Page-149, I.No16.28 ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum7091.77091.7392.7FalseNoneNoneFalseNoneFalse2784910.590
3928741151559NonePWD SR 2023-24,Vol-3, Page-32, I.No. 5.6 CBituminous Macadam Grading - I for traffic less than 20 MSA Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (PWD SR 2023-24/Vol-3/ Page-32, I.No. 5.6 C ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum7835.17835.1893.75FalseNoneNoneFalseNoneFalse7002620.6250
3928742151559NonePWD SR 2023-24, Vol-3, Page-31, I.No. 5.3Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsionusing emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (PWD SR 2023-24/Vol-3/ Page-31, I.No. 5.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm12.612.617875.0FalseNoneNoneFalseNoneFalse225225.00
3928743151559NonePWD SR 2023-24, Vol-3 Page-43, I.No. 5.31Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (PWD SR 2023-24/Vol-3/ Page-43, I.No. 5.31) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum10659.610659.6446.88FalseNoneNoneFalseNoneFalse4763562.0480
3928744151559NonePWD SR 2023-24, Vol-3, Page-67, I.No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (PWD SR 2023-24/Vol-3/ Page-67, I.No. 8.15) NOTE 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be appliedon concrete surface.2. Cost of painter is already included in usage charges of road marking machine. (PWD SR 2023-24/Vol-3/ Page-67, I.No. 8.15) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm556.5556.5650.0FalseNoneNoneFalseNoneFalse361725.00
3928745151559NonePWD SR 2023-24 Vol-3, Page-64, I.No. 8.6Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (PWD SR 2023-24/Vol-3/ Page-64, I.No. 8.6) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each4985.44985.48.0FalseNoneNoneFalseNoneFalse39883.20
3928746151559NonePWD SR 2021-22, Vol-3, P No:74, I No:8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/-2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer (PWD SR 2021-22/Vol-3/P No:74, I No:8.43 ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each383.25383.25620.0FalseNoneNoneFalseNoneFalse237615.00
3928747151559NonePWD SR 2023-24, Vol-3, Page-78, I.No. 8..54Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 (PWD SR 2023-24/Vol-3/ Page-78, I.No. 8.54) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each9450.09450.02.0FalseNoneNoneFalseNoneFalse18900.00
3928748151559NonePWD SR 2023-24,Vol-3 Page-78, I.No. 8..54Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (PWD SR 2023-24/Vol-3/ Page-78, I.No. 8.54) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Nos3765.33765.316.0FalseNoneNoneFalseNoneFalse60244.80
3928749151559NonePWD SR 2023-24 Vol-3, Page-65 I.No. 8.8Providing and erecting direction and place identification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area exceeding 0.9 m2 fixed over back support frame of min 40 x 40 x 5mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (PWD SR 2023-24/Vol-3/ Page-65 I.No. 8.8) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm10187.110187.12.0FalseNoneNoneFalseNoneFalse20374.20
3928750151559NonePWD SR 2023-24, Vol-3, Page-65 I.No. 8.6Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (vi) 90 cm circular (PWD SR 2023-24/Vol-3/ Page-65 I.No. 8.6) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each6741.06741.010.0FalseNoneNoneFalseNoneFalse67410.00
3928751151559NonePWD SR 2023-24, Vol-3, Page-65 I.No. 8.6Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (PWD SR 2023-24/Vol-3/ Page-65 I.No. 8.6) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each6956.256956.256.0FalseNoneNoneFalseNoneFalse41737.50
3928752151559NonePWD SR 2023-24, Vol-3, Page-67 I.No. 8.16Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone ( Precast) (PWD SR 2023-24/Vol-3/ Page-67 I.No. 8.16) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each3073.353073.353.0FalseNoneNoneFalseNoneFalse9220.050
3928753151559NonePWD SR 2023-24, Vol-3, Page-67 I.No. 8.16Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) 200m stone ( Precast)(PWD SR 2023-24/Vol-3/ Page-67 I.No. 8.16) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each884.1884.114.0FalseNoneNoneFalseNoneFalse12377.40
3928754151559NonePWD SR 2023-24, Vol-3, Page-80 I.No. 8.60.1Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Bituminous Macadam (BM) Gr II and Semi Dense Bituminous acadam (SDBC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 (PWD SR 2023-24/Vol-3/ Page-80 I.No. 8.60.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Nos36676.536676.52.0FalseNoneNoneFalseNoneFalse73353.00
3928755151559NoneVide Circular PWD Circle BallariRoad maintenance for 3rd year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Per Km28630.028630.03.6FalseNoneNoneFalseNoneFalse103068.00
3928756151559NoneVide Circular PWD Circle BallariRoad maintenance for 4th year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Per Km47010.047010.03.6FalseNoneNoneFalseNoneFalse169236.00
3928757151559NoneVide Circular PWD Circle BallariRoad maintenance for 5th year for road with BM+SDBC As wearing coat maintenance of road for 3rd year by cleaning and uprooting vegetation on either side of the road, maintenance of surface drains by clearing, cleaning, reshaping outside drains. stripping exercise from shoulder surface and making up loss of material, regularities and Shoulder wherever necessary, maintenance and painting of 200 m and kilometre stones, whitewash of parapet walls of CD works and tree trunks, patching of Shallow and deep potholes using premix betumen mixess corresponding to the layer of the road and repair to CDS including vent clearance ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Per Km58300.058300.03.6FalseNoneNoneFalseNoneFalse209880.00
17255307580000NoneNoneRoadsCC Drain at Malapura Village limits345368.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3928758151560NonePWD CSR 2023-24, Vol-1, P No. 05, I No.1.4.1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (PWD CSR 2023-24/ Vol-1, P No. 05, I No.1.4.1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum254.1254.144.64FalseNoneNoneFalseNoneFalse11343.0240
3928759151560NonePWD CSR 2023-24 Vol-1, P No. 15, I No.2.1.2Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (PWD CSR 2023-24/ Vol-1, P No. 15, I No.2.1.2) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum5947.25947.25.58FalseNoneNoneFalseNoneFalse33185.3760
3928760151560NonePWD CSR 2023-24 Vol-1, P No. 16, I No.2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD CSR 2023-24/ Vol-1, P No. 16, I No.2.4.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum6652.86652.824.64FalseNoneNoneFalseNoneFalse163924.9920
3928761151560NonePWD CSR 2023-24 Vol 1 P.No-111 Addendum I Formwork,centering and scaffolding for Cement concrete drains 35% PWD CSR 2023-24 Vol 1 P.No-111 Addendum I ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum2136.652136.6524.64FalseNoneNoneFalseNoneFalse52647.0560
3928762151560NonePWD CSR 2023-24 Vol-1, P No. 18, I No.2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures (PWD CSR 2023-24/ Vol-1, P No. 18, I No.2.11 h) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.MT82961.5582961.550.95FalseNoneNoneFalseNoneFalse78813.47250
3928763151560NonePWD CSR 2023-24 Vol-1,P No. 07, I No.1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (PWD CSR 2023-24/Vol-1,P No. 07, I No.1.9) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum279.3279.319.53FalseNoneNoneFalseNoneFalse5454.7290
17255307580000NoneNoneRoadsConstruction of Box Cell Culvert (2 m X 2 m - 2 Vent) at Km 5.201953297.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3928764151561NonePWD CSR 2023-24 Vol-3,P No. 10 I No.2.8 (ii)Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead - By Mechanical Means (a) Cement Concrete Grade M-15 & M-20 (PWD CSR 2023-24/Vol-3,P No. 10 I No.2.8 (ii)) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum754.95754.951.5FalseNoneNoneFalseNoneFalse1132.4250
3928765151561NoneItem No.2.10 (iv) B Pg.No 10 Vol - 3Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead-By Manual means (b) Rubble stone masonry in cement mortar. Item No.2.10 (iv) B Pg.No 10 Vol - 3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum640.5640.53.15FalseNoneNoneFalseNoneFalse2017.5750
3928766151561NoneItem No.2.17 (ix) C Pg.No 11 Vol - 3Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead-Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.(Above 900 mm) Item No.2.17 (ix) C Pg.No 11 Vol - 3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.m1442.71442.710.0FalseNoneNoneFalseNoneFalse14427.00
3928767151561NoneItem No.1.14.1 Pg.No 8 Vol - 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work- In all kinds of soils Depth upto 3 m Item No.1.14.1 Pg.No 8 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum107.1107.1132.38FalseNoneNoneFalseNoneFalse14177.8980
3928768151561NoneItem No.1.23Pg.No 11 Vol - 1Providing and Filling in foundation with granite / trap broken metal 100mm and down size with approved Sand including hand packing, ramming, watering including cost of all materials and labour with all lead and lift complete as per specifications. Item No.1.23Pg.No 11 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum2816.12816.123.04FalseNoneNoneFalseNoneFalse64882.9440
3928769151561NoneItem No.2.1.3 Pg.No 15 Vol - 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Item No.2.1.3 Pg.No 15 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum6288.456288.4512.41FalseNoneNoneFalseNoneFalse78039.66450
3928770151561NoneItem No. 2.11 C Pg.No 18 Vol - 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (c) Sub-Structure Item No. 2.11 C Pg.No 18 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.MT90754.6590754.656.16FalseNoneNoneFalseNoneFalse559048.6440
3928771151561NoneItem No.2.4.3 Pg.No 16 Vol - 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item No.2.4.3 Pg.No 16 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum6652.86652.847.12FalseNoneNoneFalseNoneFalse313479.9360
3928772151561NoneAddendum I, Page no-111, Sl.no 6 Vol-IAdd Extra for Formwork, Centering shuttering complete with all lead and lift as per the directions of engineer in charge & Scaffolding (PWD SR 2023-24, Addendum I, Page no-111, Sl.no 6 Vol-I" ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum1330.561330.5647.12FalseNoneNoneFalseNoneFalse62695.98720
3928773151561NoneItem No.2.4.2 Pg.No 16 Vol - 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item No.2.4.2 Pg.No 16 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum6639.156639.1521.53FalseNoneNoneFalseNoneFalse142940.89950
3928774151561NoneAddendum I, Page no-111, Sl.no 6 Vol-IAdd Extra for Formwork, Centering shuttering complete with all lead and lift as per the directions of engineer in charge & Scaffolding (PWD SR 2023-24, Addendum I, Page no-111, Sl.no 6 Vol-I" ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum1327.831327.8321.53FalseNoneNoneFalseNoneFalse28588.17990
3928775151561NoneItem No.2.5.2 Pg.No 16 Vol - 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item No.2.5.2 Pg.No 16 Vol - 1 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item No.2.5.2 Pg.No 16 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum7185.157185.1520.19FalseNoneNoneFalseNoneFalse145068.17850
3928776151561NoneAddendum I, Page no-111, Sl.no 6 Vol-IAdd Extra for Formwork, Centering shuttering complete with all lead and lift as per the directions of engineer in charge & Scaffolding (PWD SR 2023-24, Addendum I, Page no-111, Sl.no 6 Vol-I ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum1437.031437.0320.19FalseNoneNoneFalseNoneFalse29013.63570
3928777151561NoneItem No.2.4.1 Pg.No 16 Vol - 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates Item No.2.4.1 Pg.No 16 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum6724.26724.23.84FalseNoneNoneFalseNoneFalse25820.9280
3928778151561NoneAddendum I, Page no-111, Sl.no 6 Vol-IAdd Extra for Formwork, Centering shuttering complete with all lead and lift as per the directions of engineer in charge & Scaffolding (PWD SR 2023-24, Addendum I, Page no-111, Sl.no 6 Vol-I ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum1344.841344.843.84FalseNoneNoneFalseNoneFalse5164.18560
3928779151561NoneItem No.14.1.a Pg.No 129 Vol - 3Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates. Item No.14.1.a Pg.No 129 Vol - 3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum2007.62007.61.72FalseNoneNoneFalseNoneFalse3453.0720
3928780151561NoneItem No.13.2 Pg.No 121 Vol - 3Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) Item No.13.2 Pg.No 121 Vol - 3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum14669.5514669.553.97FalseNoneNoneFalseNoneFalse58238.11350
3928781151561NoneAddendum I, Page no-111, Sl.no 6 Vol-IAdd Extra for Formwork, Centering shuttering complete with all lead and lift as per the directions of engineer in charge & Scaffolding (PWD SR 2023-24, Addendum I, Page no-111, Sl.no 6 Vol-I" ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum2933.912933.913.97FalseNoneNoneFalseNoneFalse11647.62270
3928782151561NoneItem No.8.10 Pg.No 66 Vol - 3Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Item No.8.10 Pg.No 66 Vol - 3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm114.45114.4517.51FalseNoneNoneFalseNoneFalse2004.01950
3928783151561NoneItem No.14.4 A Pg.No 129 Vol - 3Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.Stone/Boulder Item No.14.4 A Pg.No 129 Vol - 3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sqm2007.62007.6192.0FalseNoneNoneFalseNoneFalse385459.20
3928784151561NoneItem No.1.7 Pg.No 7 Vol - 1Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structuresgraded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) Item No.1.7 Pg.No 7 Vol - 1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum124.95124.9548.0FalseNoneNoneFalseNoneFalse5997.60
17255307580000NoneNoneRoadsInstallation of bio sensor lights and adequate High Mast light at Malapura village in Sandur taluk378626.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3928785151562NoneCSR 2023-24 PWD Elec Vol-6Chapter-4,It No - 4.5.1Fabrication, Supplying, Erection, Testing and Commissioning of ……Mtrs long polygon high mast with Single / Multiple  telescopic sections having, ( minimum overlap distance of 1.5 times of top section)  thickness as per BSEN 10025 grade S 355 JO /ASTM A572-50 steel sheet plate for shaft suitable to withstand a wind velocity of 47 m/sec as per IS 875 part 3(as per GA Drawing).Base plate  as per IS 2062/ASTM A572-50. The mast shall be Galvanized in single Hot-dip as per BSEN ISO 1461/ASTM A123 with an average 70 microns as per IS 2629, and welded as per BS 5135 Single L-Seam joint. The mast shall have 2way head frame with  die cast LM-6 pulleys, stainless steel axle, Phosphorus Bronze bearing bush press-fitted with separate guides for 2 runs of 5mm dia, stainless steel wire rope of AISI 304grade 7/19-core, (Factor of Safety as per TR no-7). 2.5sqmm EPR insulated PCP sheathed trailing power cable housed inside the bottom shaft of mast with door having  locking arrangement. The mast shall have power tool operating on 230/ 415V, 50Hz, 1/3 phases reversible geared motor. The mast shall have lantern of 2 segments, suitable dia  with max load  carrying capacity as per IS 1239. The mast shall be erected on existing  RCC footing.  The mast shall be supplied with 3mm thick template, lightning arrester of 1.2m length galvanized pipe with top arrow fitted on top of the head frame cover and GLS type aviation twin lamps fitting with wiring complete. ( excluding foundation) as per technical data. 12 m/12.5 m - Top 100 mm and Bottom 310 mm dia ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each137550.0137550.01.0FalseNoneNoneFalseNoneFalse137550.00
3928786151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-4 It No.11.9.6Supply of LED floodlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation.Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/clear glass material,delivering superior light output. Rated life Burning Hrs 50000hr Lumen Maintenance of 70, CCT 5500K, IP 66optical and electrical compartment impact resistance of complete luminaire IK08. Power Factor more than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 130lm/w, nominal CRI more than 75. Luminaire manufacturer should have inhouse facility accredited by NABL/CPRI any Government certified agency Design Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer Cree, Nichia, Lumileds ,Osram make LED Source. LED Floodlight 200W ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each19510.0519510.058.0FalseNoneNoneFalseNoneFalse156080.40
3928787151562NoneCSR 2023-24 PWD Ele Vol-6 Chapter-13 It No - 13.5Fixing halogen/metal halide / SVL / IL / LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each170.1170.18.0FalseNoneNoneFalseNoneFalse1360.80
3928788151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-2 It No -2.5.10Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade copper with flexible copper conductor confirming to table 3 class 5 of IS:8130-1984 and PVC insulation and sheathed suitable for working voltage upto 1100Volts as per IS-694:1990 - 5C X 2.5Sqmm ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Mtr279.3279.315.0FalseNoneNoneFalseNoneFalse4189.50
3928789151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.19.Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. Double Door 6Way SP &N ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each1880.551880.551.0FalseNoneNoneFalseNoneFalse1880.550
3928790151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.18.Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps SP ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each435.75435.752.0FalseNoneNoneFalseNoneFalse871.50
3928791151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.18.Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 40Amps DP ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each1113.01113.01.0FalseNoneNoneFalseNoneFalse1113.00
3928792151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.13.Supply and fixing of 4pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 40Amps ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each2370.92370.91.0FalseNoneNoneFalseNoneFalse2370.90
3928793151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.18.Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K 40Amps TPN ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each3196.03196.01.0FalseNoneNoneFalseNoneFalse3196.00
3928794151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.47Supplying and fixing Microprocessor based Electronic timer (without contactor, Din Mounting using necessary bolts, nuts and washers etc.,.) 3-120sec setting. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each2430.752430.751.0FalseNoneNoneFalseNoneFalse2430.750
3928795151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.42.Fabricating supplying and mounting MS box made out 14SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Sq CM0.530.538000.0FalseNoneNoneFalseNoneFalse4240.00
3928796151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.41.Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. flat … with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40x40x6mm ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Mtr320.25320.256.0FalseNoneNoneFalseNoneFalse1921.50
3928797151562NoneDSR 2019-20, Page No-43-44, It No- 6.18.3Supplying and running GI conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. GI Wire 8SWG ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Mtr19.9519.953.0FalseNoneNoneFalseNoneFalse59.850
3928798151562NoneDSR 2019-20, Page No-40, It No- 6.3.1Supplying and running of GI strips for grounding connections, using necessary fixing materials as required. GI strip 25x3mm ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Mtr78.7578.755.0FalseNoneNoneFalseNoneFalse393.750
3928799151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-5 It No - 5.30Supplying, fixing and wiring electronic 5 to 20Amps single phase Class-1 Accuracy with Temper Proof Energy Meter. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each1449.01449.01.0FalseNoneNoneFalseNoneFalse1449.00
3928800151562NoneBescom 2023-24 Part-III Sl.No.198 Item.No.32.02 Co1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, (9 GI Strips - 4 x 0.8 mm)" ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Km106168.65106168.650.04FalseNoneNoneFalseNoneFalse4246.7460
3928801151562NoneBescom 2023-24 Part-III Sl.No.217 Item.No.33.02 CoCompression type Aluminium Tubular in Line Connector for Aluminum Conductor A)10sqmm ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.No4.24.24.0FalseNoneNoneFalseNoneFalse16.80
3928802151562NoneBescom 2023-24 Part-IV Sl.No.202 Item.No.29.03 PagEarth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. Hard Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum408.45408.4512.0FalseNoneNoneFalseNoneFalse4901.40
3928803151562NoneBescom 2023-24 Part-IV Sl.No.206 Item.No.29.07 PagRefilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum60.960.912.0FalseNoneNoneFalseNoneFalse730.80
3928804151562NoneBescom 2023-24 Part-IV Sl.No.167 Item.No.20.05 PagLaying of cable in Existing Trench/GI pipe/Stone Ware using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable. 2.5 to 25 Sqmm ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Km16966.9516966.950.04FalseNoneNoneFalseNoneFalse678.6780
3928805151562NoneCSR 2023-24 PWD Elec Vol-6 Chapter-12 It No.12.56 Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Each3307.53307.51.0FalseNoneNoneFalseNoneFalse3307.50
3928806151562NonePWD Civil SR Vol-I 2023-24 P.No.06 It.No.1.5.1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum313.95313.954.5FalseNoneNoneFalseNoneFalse1412.7750
3928807151562NonePWD Civil SR Vol-I 2023-24 P.No.18 It.No.2.11.aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Kg93929.8593929.850.15FalseNoneNoneFalseNoneFalse14089.47750
3928808151562NonePWD Civil SR Vol-I 2023-24 P.No.15 It.No. 2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregate ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum6527.856527.851.4FalseNoneNoneFalseNoneFalse9138.990
3928809151562NonePWD Civil SR Vol-I 2023-24 Page No 16 Item No 2.5.Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Cum7185.157185.151.6FalseNoneNoneFalseNoneFalse11496.240
3928810151562NoneGescom Deposit ChargesProviding Gescom Deposit Charges for New Single Phase Meter Connection ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-incharge of work.Rs9500.09500.01.0FalseNoneNoneFalseNoneFalse9500.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17255307610000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17255307610000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17255307610000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17255307610000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17255307610000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17255313110000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP portal on or before the last date and time of bid submission.None
17255313200000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17255313280000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of Karnataka Public Procurement Portal on or before the last date and time of bid submission.None
17255313370000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17255313450000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of Karnataka Public Procurement Portal on or before the last date and time of bid submission.None
17255313540000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of Karnataka Public Procurement Portal due to internet connectivity issues and technical glitches at bidders end.None
17255313720000NoneNoneELIGIBILITYAs per Karnataka State Government order No LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.07.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17255313800000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders, except GST, which will be paid separately.None
17255313890000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17255313970000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17255314070000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17255314170000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or whatsoever.None
17255314270000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period at his own cost.None
17255314350000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kp-procurement portal.None
17255314430000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17255314520000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per Government Circular No.PWD/159/CRM/2009 Dated 30-09-2010 (If applicable for this work).None
17255314600000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17255314680000NoneNoneELIGIBILITYAgency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17255314770000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand for works costing more than 10.00 crores, as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17255314850000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests as per approved Quality Assurance Plan (QAP) for satisfactory completion.None
17255314930000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17255315010000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17255315090000NoneNoneELIGIBILITYThe Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17255315200000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of Labour Act and applicable any other law as concerned to work.None
17255315280000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17255315370000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17255315460000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhs.None
17255315550000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17255315640000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17255315790000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17255315880000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of or in connection with or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the arbitration Centre-Karnataka (Domestic and International) Rules 2012 by one or more arbitrators appointed in accordance with its rules.None
17255316010000NoneNoneELIGIBILITYIt is mandatory to furnish the information regarding works which are yet to be completed, as on date of submission of his tender, in format-5. The tenderer shall note that, deliberately not furnishing the correct information is liable for rejection of such tenders.None
17255316360000NoneNoneELIGIBILITYThe time stipulated for completion of work is 9 (Nine) calendar months including rainy season.None
17255316460000NoneNoneELIGIBILITYThe defect liability period for the work is 5 (Five) YearsNone
17255316880000NoneNoneELIGIBILITYAs Per the Government order, the defect liability period for this project is 5 (Five) Years (For Initial 2 years after completion of work, the road shall be maintained by the contractor at his own cast and risk. subsequently, for 3rd, 4th and 5th years, maintenance shall be carried out as per BOQ)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, achieved in at least two financial years an annual average financial turnover (in all classes of civil engineering construction works only) of Rs.754.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, satisfactorily completed as prime contractor, at least one Similar Nature of Work such as Improvements of Asphalt Road work of value not less than Rs.189.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer or equivalent.
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24 had executed in any one Financial year, the following minimum quantities items of work (a)Earthwork Excavation/Formation of Road Embankment/Sub-grade-4003.00 Cum, (b) Granular sub-base-1542.00 Cum, (c) Wet Mix Macadam/Water bound macadam - 3709.00 Cum, (d) Cement concrete works such as PCC/RCC-425.00 Cum, (e) Bituminous Macadam/Semi dense Bituminous Concrete-1073.00 Cum, (f) Steel reinforcement - 5.70 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificates of item wise quantity from competent authority not below the rank of Executive Engineer or equivalent
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Tipper-2 Nos. and by Own / Hire / Lease Tipper - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own Hydraulic Excavator (CK-90)-1 No. (The Documents in proof of Ownership shall have to attested by Notary or Government Gazetted Officer) at the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted water tanker-2 Nos. and by Own / Hire / Lease - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate: Availability by Own Vibratory Road Roller-1 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own 40/60 TPH Capacity of HMP-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Paver Finisher-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted Mechanical Bitumen Sprayer-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own 60/70 TPH Capacity of Pug Mill-1No (The original documents in proof of Ownership shall have to be scanned and up-loaded in the kp-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own/Hire/Lease -Hydraulic Excavator - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability of Self loading mobile concrete mixer by own-1 No and by own/hire/lease-1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents of machinaries
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs.126.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc. from an nationalized or scheduled bank. Conditional Line of Credit will not be acceptedFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-9
NoneNoneNoneNoneConstitutional and Legal Status of the TendererOthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD under Class-III and above category
NoneNoneNoneNoneDetailed information on committed offers of works on hand and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneDetailed information of the works for which LOA received for the wokrs tendered from different departments either Central or StateOthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneDetailed information of the works for which Tenderer has submitted his tender in different departments either Central or StateOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneDetailed information on litigation in which the Tenderer is involved as concerned to Government worksOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractor Registration certificate for having registered under Class-II and above category in KPWDTrueTechnical Bid
Annual Turnover Certificate issued by Chartered accountant compulsorily indicating UDINTrueTechnical Bid
Similar work done certificate issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
Quantity wise work done certificate issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
Un-conditional Bank line of credit from any Nationalized or scheduled bankTrueTechnical Bid
Documents of machineriesTrueTechnical Bid
Current contract commitmentsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1725533176000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, PWD, Division, Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone