1725889898000 | 0 | None | None | Other Works | Construction of burning unit required for cremation at Brahmin crematorium and Development of Road work for Harijan Colony Crematorium in Ward No. 13 of Gubbi Town Panchayth Limits | 964993.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3945777 | 152779 | None | PWD CSR 2023-24, VOL-1, Page -6, Item No 1.5 | Earth work excavation by manual means for drains,canals, waste weir draft,approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.
In ordinary/soft rock without blasting upto 1.5 m depth ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 307.97 | 307.97 | 9.7335 | False | None | None | False | None | False | 2997.625995 | 0 | 3945778 | 152779 | None | PWD SRRB 2023-24, VOL-3, Page -15, Item No 3.1 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 87.55 | 87.55 | 9.7335 | False | None | None | False | None | False | 852.167925 | 0 | 3945779 | 152779 | None | PWD CSR 2023-24, VOL-1, Page -15, Item No 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thick ness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appur tenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)
Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 6168.67 | 6168.67 | 9.9365 | False | None | None | False | None | False | 61294.989455 | 0 | 3945780 | 152779 | None | PWD CSR 2023-24, VOL-1, Page -16, Item No 2.3.1 | Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 6512.69 | 6512.69 | 2.655 | False | None | None | False | None | False | 17291.19195 | 0 | 3945781 | 152779 | None | PWD CSR 2023-24, VOL-1, Page -16, Item No 2.3.1 | Formwork
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
For Drain works consider 8% of item concrete rate ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 521.01 | 521.01 | 2.655 | False | None | None | False | None | False | 1383.28155 | 0 | 3945782 | 152779 | None | PWD SRRB 2023-24, VOL-1, Page -8, Item No 2.11(h) | Supplying, Fitting and Placing Thermo-Mechanically Treated bars of grade Fe-500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Tonne | 81381.33 | 81381.33 | 0.125 | False | None | None | False | None | False | 10172.66625 | 0 | 3945783 | 152779 | None | PWD CSR 2023-24, VOL-1, Page -7, Item No 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 273.98 | 273.98 | 40.5 | False | None | None | False | None | False | 11096.19 | 0 | 3945784 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -09, Item No 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth withCement mortar 1:6 (1 cement : 6 coarse sand)ons. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 6580.67 | 6580.67 | 5.67 | False | None | None | False | None | False | 37312.3989 | 0 | 3945785 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -13, Item No 6.2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 8217.34 | 8217.34 | 1.7999 | False | None | None | False | None | False | 14790.390266 | 0 | 3945786 | 152779 | None | PWD CSR 2023-24, VOL-2, Page 41, Item No 8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Sqm | 262.65 | 262.65 | 7.44 | False | None | None | False | None | False | 1954.116 | 0 | 3945787 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -46, Item No 8.33.1 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree
angle with 10 years life) ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Sqm | 162.74 | 162.74 | 20.04 | False | None | None | False | None | False | 3261.3096 | 0 | 3945788 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -49, Item No 8.44 | Floor painting with floor enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Sqm | 142.14 | 142.14 | 60.0 | False | None | None | False | None | False | 8528.4 | 0 | 3945789 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -59, Item No 9.1 | Providing and laying Cement concrete flooring 40 mm thick with 20 mm nominal size stone aggregate using 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry complete. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Sqm | 464.53 | 464.53 | 45.0 | False | None | None | False | None | False | 20903.85 | 0 | 3945790 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -82, Item No 11.16.1 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Kg | 140.08 | 140.08 | 960.0 | False | None | None | False | None | False | 134476.8 | 0 | 3945791 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -21, Item No 7.1.1 | Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved
surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge.
0.63 mm thick with zinc coating not less than 275 g/ m² ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Sqm | 905.37 | 905.37 | 68.25 | False | None | None | False | None | False | 61791.5025 | 0 | 3945792 | 152779 | None | PWD CSR 2023-24, VOL-2, Page -84, Item No 11.25.2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Kg | 140.08 | 140.08 | 1250.0 | False | None | None | False | None | False | 175100.0 | 0 | 3945793 | 152779 | None | PWD CSR 2023-24, VOL-1, Page No -8, Item No 1.12 | Mechanical Means
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 97.85 | 97.85 | 52.0 | False | None | None | False | None | False | 5088.2 | 0 | 3945794 | 152779 | None | PWD CSR 2023-24, VOL-1, Page No -7, Item No 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water,all materials,usage& all other appurtenaces required to complete the work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 488.22 | 488.22 | 26.0 | False | None | None | False | None | False | 12693.72 | 0 | 3945795 | 152779 | None | PWD SRRB 2023-24, VOL-3, Page -26, Item No 4.17 | Wet Mix Macadam (Plant mix method),
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including pre mixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 2635.77 | 2635.77 | 39.0 | False | None | None | False | None | False | 102795.03 | 0 | 3945796 | 152779 | None | PWD SRRB 2023-24, VOL-3, Page -149, Item No16.28 | PQC
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,Mix laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 6956.62 | 6956.62 | 39.0 | False | None | None | False | None | False | 271308.18 | 0 | 3945797 | 152779 | None | PWD SRRB 2023-24, VOL-3, Page -17, Item No 3.6 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 507.79 | 507.79 | 19.5 | False | None | None | False | None | False | 9901.905 | 0 |
|