tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1725974340000 | 0 | None | None | Bridges | FOOTBRIDGE AT SORAKE | 1052515.67 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3953072 | 153106 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the In all kinds of soils Depth upto 3 m
(Item .No.1.14.1 Page No.8 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 130.83 | 130.83 | 94.08 | False | None | None | False | None | False | 12308.4864 | 0 | 3953073 | 153106 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates
(Item .No.2.1.3 Page No.15 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7317.55 | 7317.55 | 6.04 | False | None | None | False | None | False | 44198.002 | 0 | 3953074 | 153106 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(Item .No.2.2.3 Page No.15 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 8050.75 | 8050.75 | 9.4 | False | None | None | False | None | False | 75677.05 | 0 | 3953075 | 153106 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(Item .No.2.4.3 Page No.16 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 8515.22 | 8515.22 | 28.75 | False | None | None | False | None | False | 244812.575 | 0 | 3953076 | 153106 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(Item No.2.5.2 Page No.17 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 10033.24 | 10033.24 | 6.5 | False | None | None | False | None | False | 65216.06 | 0 | 3953077 | 153106 | None | 2.11b | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Foundations of Bridges
(Item No.2.11 (b) Page No.18 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Tonne | 96550.72 | 96550.72 | 0.58 | False | None | None | False | None | False | 55999.4176 | 0 | 3953078 | 153106 | None | 2.11c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Sub structure of Bridge
(Item No.2.11(c) Page No.18 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Tonne | 96804.96 | 96804.96 | 3.1 | False | None | None | False | None | False | 300095.376 | 0 | 3953079 | 153106 | None | 2.11d | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Super structure of Bridge
(Item No.2.11(d) Page No.18 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Tonne | 97056.96 | 97056.96 | 0.89 | False | None | None | False | None | False | 86380.6944 | 0 | 3953080 | 153106 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
(Item .No.12.4 Page No.117 SR.of PWD Vol-3. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 2998.24 | 2998.24 | 14.45 | False | None | None | False | None | False | 43324.568 | 0 | 3953081 | 153106 | None | 13.6 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
(Item .No.13.6 Page No.121 of PWD Uni SR V-3)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 4959.36 | 4959.36 | 17.4 | False | None | None | False | None | False | 86292.864 | 0 | 3953082 | 153106 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired ompaction. (Royalty shall be recovered @ Rs. 60.00/m3)
(Item .No 1.7 Page No.7 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 133.28 | 133.28 | 96.0 | False | None | None | False | None | False | 12794.88 | 0 | 3953083 | 153106 | None | 5.7 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Super structure in CM 1:6
(Item .No 5.7 Page No.9SR.of PWD Vol-2. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7565.6 | 7565.6 | 1.04 | False | None | None | False | None | False | 7868.224 | 0 | 3953084 | 153106 | None | 9.6.1 | Providing and laying Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand)
(Item .No 9.6.1 Page No.59 SR.of PWD Vol-2. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 1256.64 | 1256.64 | 6.75 | False | None | None | False | None | False | 8482.32 | 0 | 3953085 | 153106 | None | 8.55 | Providing and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirpes as shown in drawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 m with cement concrete M 10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer in charge of the work. The cost includes excavation, cost of all materials, cost of steel, painting, centering, transportation charges & fixing charges.
(Item .No.8.55 Page No.79 of PWD Uni SR V-3)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 6564.32 | 6564.32 | 1.08 | False | None | None | False | None | False | 7089.4656 | 0 | 3953086 | 153106 | None | 13.14 | Painting on Concrete Surface : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2
(Item .No 13.14 Page No.123 SR.of PWD Vol-3. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 94.08 | 94.08 | 21.0 | False | None | None | False | None | False | 1975.68 | 0 |
| 1725974340000 | 0 | None | None | Bridges | FOOTBRIDGE AT ELIYA | 639779.16 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3953087 | 153107 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the In all kinds of soils Depth upto 3 m
(Item .No.1.14.1 Page No.8 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 119.92 | 119.92 | 55.46 | False | None | None | False | None | False | 6650.7632 | 0 | 3953088 | 153107 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates
(Item .No.2.1.3 Page No.15 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 6707.68 | 6707.68 | 3.84 | False | None | None | False | None | False | 25757.4912 | 0 | 3953089 | 153107 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(Item .No.2.2.3 Page No.15 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7380.17 | 7380.17 | 5.88 | False | None | None | False | None | False | 43395.3996 | 0 | 3953090 | 153107 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(Item .No.2.4.3 Page No.16 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7805.95 | 7805.95 | 19.2 | False | None | None | False | None | False | 149874.24 | 0 | 3953091 | 153107 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(Item No.2.5.2 Page No.17 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 9196.99 | 9196.99 | 3.84 | False | None | None | False | None | False | 35316.4416 | 0 | 3953092 | 153107 | None | 2.11(h) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Foundations of Bridges
(Item No.2.11 (h) Page No.18 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Tonne | 82558.56 | 82558.56 | 2.88 | False | None | None | False | None | False | 237768.6528 | 0 | 3953093 | 153107 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
(Item .No.12.4 Page No.117 SR.of PWD Vol-3. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 2998.24 | 2998.24 | 7.56 | False | None | None | False | None | False | 22666.6944 | 0 | 3953094 | 153107 | None | 13.6 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
(Item .No.13.6 Page No.121 of PWD Uni SR V-3)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | m | 4959.36 | 4959.36 | 14.6 | False | None | None | False | None | False | 72406.656 | 0 | 3953095 | 153107 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired ompaction. (Royalty shall be recovered @ Rs. 60.00/m3)
(Item .No 1.7 Page No.7 SR.of PWD Vol-1. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 133.28 | 133.28 | 80.0 | False | None | None | False | None | False | 10662.4 | 0 | 3953096 | 153107 | None | 5.7 | Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less than 3.5 N/mm2 for saturated dry samples - For Super structure in CM 1:6
(Item .No 5.7 Page No.9SR.of PWD Vol-2. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Cum | 7565.6 | 7565.6 | 1.66 | False | None | None | False | None | False | 12558.896 | 0 | 3953097 | 153107 | None | 9.6.1 | Providing and laying Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand)
(Item .No 9.6.1 Page No.59 SR.of PWD Vol-2. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 1256.64 | 1256.64 | 10.8 | False | None | None | False | None | False | 13571.712 | 0 | 3953098 | 153107 | None | 8.55 | Providing and fixing RCC name board of size 1.35x0.60x0.04 m fixed in reinforced cement concrete poles of size 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirpes as shown in drawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 m with cement concrete M 10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer in charge of the work. The cost includes excavation, cost of all materials, cost of steel, painting, centering, transportation charges & fixing charges.
(Item .No.8.55 Page No.79 of PWD Uni SR V-3)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 6564.32 | 6564.32 | 1.08 | False | None | None | False | None | False | 7089.4656 | 0 | 3953099 | 153107 | None | 13.14 | Painting on Concrete Surface : Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2
(Item .No 13.14 Page No.123 SR.of PWD Vol-3. for the year 2023-24)
---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work. | Sqm | 94.08 | 94.08 | 21.9 | False | None | None | False | None | False | 2060.352 | 0 |
|
|
---|