1725962618000 | 0 | None | None | Buildings | Construction of toilet at kannada Higher primary school Khanapur in Khanapur taluka disc code 290108823705 | 449233.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3951194 | 153022 | None | code01 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. 1.4.1 In all kinds of soils Depth upto 1.5 m with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 242.0 | 242.0 | 12.2606 | False | None | None | False | None | False | 2967.0652 | 0 | 3951195 | 153022 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6217.0 | 6217.0 | 2.2195 | False | None | None | False | None | False | 13798.6315 | 0 | 3951196 | 153022 | None | code03 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 6618.0 | 6618.0 | 8.3846 | False | None | None | False | None | False | 55489.2828 | 0 | 3951197 | 153022 | None | code04 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 266.0 | 266.0 | 3.1413 | False | None | None | False | None | False | 835.5858 | 0 | 3951198 | 153022 | None | code05 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 1002.0 | 1002.0 | 0.7135 | False | None | None | False | None | False | 714.927 | 0 | 3951199 | 153022 | None | code06 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 8220.0 | 8220.0 | 12.7174 | False | None | None | False | None | False | 104537.028 | 0 | 3951200 | 153022 | None | code07 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:3 (1 cement :3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1060.0 | 1060.0 | 13.197 | False | None | None | False | None | False | 13988.82 | 0 | 3951201 | 153022 | None | code08 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.5.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates COAPING BEAM with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 10608.0 | 10608.0 | 2.358 | False | None | None | False | None | False | 25013.664 | 0 | 3951202 | 153022 | None | code09 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.5.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates b)CHAJJA with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 9613.5 | 9613.5 | 0.2234 | False | None | None | False | None | False | 2147.6559 | 0 | 3951203 | 153022 | None | code10 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. 2.5.1 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates c)SLABS, with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Cum | 9945.0 | 9945.0 | 2.2765 | False | None | None | False | None | False | 22639.7925 | 0 | 3951204 | 153022 | None | code11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Tonne | 89457.0 | 89457.0 | 0.3223 | False | None | None | False | None | False | 28831.9911 | 0 | 3951205 | 153022 | None | code12 | Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerin- charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 323.0 | 323.0 | 73.944 | False | None | None | False | None | False | 23883.912 | 0 | 3951206 | 153022 | None | code13 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 366.0 | 366.0 | 14.5154 | False | None | None | False | None | False | 5312.6364 | 0 | 3951207 | 153022 | None | code14 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 371.0 | 371.0 | 37.93 | False | None | None | False | None | False | 14072.03 | 0 | 3951208 | 153022 | None | code15 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 5719.0 | 5719.0 | 1.62 | False | None | None | False | None | False | 9264.78 | 0 | 3951209 | 153022 | None | code16 | Providing and fixing white vitreous china water closet squatting pan (Indian type) : Orissa pattern W.C. pan of size 580x440 mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Pan | 2331.0 | 2331.0 | 3.0 | False | None | None | False | None | False | 6993.0 | 0 | 3951210 | 153022 | None | code17 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 4478.0 | 4478.0 | 3.6 | False | None | None | False | None | False | 16120.8 | 0 | 3951211 | 153022 | None | code18 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 318.0 | 318.0 | 4.5 | False | None | None | False | None | False | 1431.0 | 0 | 3951212 | 153022 | None | code19 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. 12.55.1 -do- with both side prelam with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 2366.0 | 2366.0 | 4.5 | False | None | None | False | None | False | 10647.0 | 0 | 3951213 | 153022 | None | code20 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1449.0 | 1449.0 | 24.543 | False | None | None | False | None | False | 35562.807 | 0 | 3951214 | 153022 | None | code21 | White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 2561.0 | 2561.0 | 2.0 | False | None | None | False | None | False | 5122.0 | 0 | 3951215 | 153022 | None | code22 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Rmtr | 411.0 | 411.0 | 4.0 | False | None | None | False | None | False | 1644.0 | 0 | 3951216 | 153022 | None | code23 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 1650.0 | 1650.0 | 1.35 | False | None | None | False | None | False | 2227.5 | 0 | 3951217 | 153022 | None | code24 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Each | 1154.0 | 1154.0 | 3.0 | False | None | None | False | None | False | 3462.0 | 0 | 3951218 | 153022 | None | code25 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 32 mm nominal dia Pipes with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Rmtr | 400.0 | 400.0 | 4.0 | False | None | None | False | None | False | 1600.0 | 0 | 3951219 | 153022 | None | code26 | 25 mm nominal dia Pipes with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Rmtr | 318.0 | 318.0 | 18.0 | False | None | None | False | None | False | 5724.0 | 0 | 3951220 | 153022 | None | code27 | 15 mm nominal dia Pipes with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Rmtr | 182.0 | 182.0 | 6.0 | False | None | None | False | None | False | 1092.0 | 0 | 3951221 | 153022 | None | code28 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 13.5.3 25 mm nominal bore with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | No | 332.0 | 332.0 | 2.0 | False | None | None | False | None | False | 664.0 | 0 | 3951222 | 153022 | None | code29 | Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 g. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | No | 846.0 | 846.0 | 5.0 | False | None | None | False | None | False | 4230.0 | 0 | 3951223 | 153022 | None | code30 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Ltr | 9.0 | 9.0 | 1000.0 | False | None | None | False | None | False | 9000.0 | 0 | 3951224 | 153022 | None | code31 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 137.0 | 137.0 | 66.6207 | False | None | None | False | None | False | 9127.0359 | 0 | 3951225 | 153022 | None | code32 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 158.0 | 158.0 | 37.735 | False | None | None | False | None | False | 5962.13 | 0 | 3951226 | 153022 | None | code33 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 115.0 | 115.0 | 9.0 | False | None | None | False | None | False | 1035.0 | 0 | 3951227 | 153022 | None | code34 | Providing and laying red oxide flooring 40 mm thick, with an under layer of 30mm thick M-15 cement concrete and top layer of 10mm thick plaster with 1:3 cement mortar mixed with red oxide finished with floating coat of neat cement mixed with red oxide ( mix of same proportion ) , including cost of materials, labour, curing, complete as per specifications with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer-in-charge of the work | Sqm | 786.0 | 786.0 | 5.205 | False | None | None | False | None | False | 4091.13 | 0 |
|