createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726031114628
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd12800.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-09-2024 17:30:00
tenderQueryClose18-09-2024 17:00:00
technicalBidOpen23-09-2024 11:00:00
publishedDate11-09-2024 17:04:36
publishedByPostTP_CO_TKK
publishedByUserKPE17666 - PARASURAM
bidValidityPeriod90
noOfCalls3
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonJunior Engineer TP Tekklakote
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8050456298
tenderSupplierListNone
tenderSchedule
createdTs1726031114631
version22
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT22395/CALL-3
titleConstruction of Compound wall and Development work at ward 11 and 16 at TP Tekkalakote
descriptionConstruction of Compound wall and Development work at ward 11 and 16 at TP Tekkalakote
categoryWORKS
categoryTextWorks
ecv844629.89
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2237
locationNameDMA Town Panchayat Tekkalkote
provisionalAmount1020000.0
groupOverheadTotalNone
fileNumberTP/TKT/SFC/2024-25/08
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17260311150001NoneNoneOther WorksConstruction of Compound wall and Development work at ward 11 and 16 at TP Tekkalakote844629.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3953906153170None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. ( In all kinds of soils Depth upto 3 m (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 - 2024 GOVERNMENT OF KARNATAKA VOLUME - 1 I.No.1.14.1 P.No.08)Cum107.1107.163.9FalseNoneNoneFalseNoneFalse6843.690
3953907153170None2.1.2Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates) (COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 - 2024GOVERNMENT OF KARNATAKA VOLUME - 1 I.No.2.1.2 P.No.15)Cum5947.25947.26.39FalseNoneNoneFalseNoneFalse38002.6080
3953908153170None5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 Item No 5.3, P.No.09)Cum6515.256515.2552.39FalseNoneNoneFalseNoneFalse341333.94750
3953909153170None2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal sizegraded crushed coarse aggregates VOL-1 PWD DSR 2023-24 I.NO 2.2.1 P NO:15Cum6601.356601.351.52FalseNoneNoneFalseNoneFalse10034.0520
3953910153170NoneA 7Formwork shall be added on percentage basis to the finished concrete item rate for Drain formwork shall be considerd as 8% DSR 2023-24 Volume-II Page No. A(7)Cum528.11528.111.52FalseNoneNoneFalseNoneFalse802.72720
3953911153170None2.3.1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates VOL-1 PWD DSR 2023-24 I.NO 2.3.1 P NO:16Cum6639.156639.152.45FalseNoneNoneFalseNoneFalse16265.91750
3953912153170NoneA 7Formwork shall be added on percentage basis to the finished concrete item rate for Drain formwork shall be considerd as 50% DSR 2023-24 Volume-II Page No. A(7)Cum3319.583319.582.45FalseNoneNoneFalseNoneFalse8132.9710
3953913153170None2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. VOL-1 PWD DSR 2023-24 I.NO 2.5.1 P NO:16 M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.54.8FalseNoneNoneFalseNoneFalse33415.20
3953914153170NoneA 7Formwork shall be added on percentage basis to the finished concrete item rate for Drain formwork shall be considerd as 70% DSR 2023-24 Volume-II Page No. A(7)Cum4873.054873.054.8FalseNoneNoneFalseNoneFalse23390.640
3953915153170None2.11 HSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (All other type of structures)(COMMON SCHEDULE OF RATES FOR ENGINEERING DEPARTMENTS 2023 - 2024 GOVERNMENT OF KARNATAKAVOLUME - 1, P.No.71, I.No.2.11 h)Tonne82961.682961.60.626FalseNoneNoneFalseNoneFalse51933.96160
3953916153170None6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ( public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.6.8 P.No.14)Cum8367.458367.4528.42FalseNoneNoneFalseNoneFalse237802.9290
3953917153170None8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.8.8 P.No.42)Sqm389.55389.5575.0FalseNoneNoneFalseNoneFalse29216.250
3953918153170None8.27Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.8.27 P.No.45)Cum55.6555.6575.0FalseNoneNoneFalseNoneFalse4173.750
3953919153170None8.39Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.8.39 P.No.48)Sqm133.35133.3575.0FalseNoneNoneFalseNoneFalse10001.250
3953920153170None11.25.2Providing and fixing Steel work welded in built up sections/ framedwork, including cutting, hoisting, fixing in position and applying a primingcoat of approved steel primer using structural steel etc. as required. Ingratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinerycomplete as per specifications and as per directions of the Engineer-in-Charge.(public works department SCHEDULE OF RATES for BUILDINGS 2023 - 2024 VOLUME - 2 I.No.11.25.2 P.No.84)Kg142.8142.8100.0FalseNoneNoneFalseNoneFalse14280.00
3953921153170None1.1FOR TC SHIFTINGEach14000.014000.01.0FalseNoneNoneFalseNoneFalse14000.00
3953922153170None1.2FOR POLE SHIFTINGEach5000.05000.01.0FalseNoneNoneFalseNoneFalse5000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17260311150000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17260311150000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17260311150000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17260311150000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17260311150000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each tenderer in its name should have in the last five years i.e. 2019-2020 to 2023-24 mandating satisfactory completed as a prime contractor for atleast any construction work to an extent of Rs 2.11 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonePWD Contractor Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneTo qualify for award of this contract each tenderer in its name should have in the last five years (2019-20 to 2023-24) Achieved in at least two financial years an average annual financial turnover in all classes of civil engineering construction works only of Rs.10.20 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and or availability of credit facilities of not less than Rs 2.53 Lakhs in the form of Credit lines or Letters of Credit or Certificates from Banks for meeting the fund requirement (Conditional bankers certificate not acceptable)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneST Caste CeritificateOthersCaste certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Caste certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Registration certificateTrueTechnical Bid
Annual Turnover CertificateTrueTechnical Bid
Bankers CertificateTrueTechnical Bid
Work done CertificateTrueTechnical Bid
Reserved Category CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone