1726130183000 | 0 | None | None | Buildings | Construction of New Health and Wellness Center, ground Floor wellness area building in Patrahalli village under Nangali Primary health Center of Mulbagal Taluk | 2787899.86 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3982222 | 154168 | None | CSR_V3_pg n 9 I N 2.5 | Clearing and grubbing road land including uprooting wild vegetatiion, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,removal of stumps of such trees cut earlier and disposal of userviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 484.0 | 484.0 | 7.2 | False | None | None | False | None | False | 3484.8 | 0 | 3982223 | 154168 | None | CSR_V1_pg n 5 I N 1.3 | Earth work in surface excavation by manual means for lowering & levelling the ground by chiselling and wedging in Hard rock for all works other than foundation & depth not exceeding 100 mm as per drawing and technical specifications, including setting out, barricading, caution lights, dressing of excavated surfaces, disposing off the excavated spalls/stuff & stacking the selected spall/ stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 177.0 | 177.0 | 40.0 | False | None | None | False | None | False | 7080.0 | 0 | 3982224 | 154168 | None | CSR_V1_pg n 6 I N 1.5.2 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. 2 Depth exceeding 1.5m, but not exceeding 3 m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 445.0 | 445.0 | 103.82 | False | None | None | False | None | False | 46199.9 | 0 | 3982225 | 154168 | None | CSR_V1_pg n 15 I N 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 5989.0 | 5989.0 | 30.77 | False | None | None | False | None | False | 184281.53 | 0 | 3982226 | 154168 | None | CSR_V2_pg n 9 I N 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6389.0 | 6389.0 | 59.94 | False | None | None | False | None | False | 382956.66 | 0 | 3982227 | 154168 | None | CSR_V1_pg n 15 I N 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6287.0 | 6287.0 | 19.46 | False | None | None | False | None | False | 122345.02 | 0 | 3982228 | 154168 | None | CSR_V1_pg n 111 I N 1 a | Centering charges @ 8% over finished rates for the Foundation upto Plinth a. Isolated ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 502.96 | 502.96 | 14.77 | False | None | None | False | None | False | 7428.7192 | 0 | 3982229 | 154168 | None | CSR_V1_pg n 111 I N 2 | Centering charges @ 50% over finished rates for the Plinth Beams of Building As per the Revised rates 01-09-2022 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3143.5 | 3143.5 | 4.64 | False | None | None | False | None | False | 14585.84 | 0 | 3982230 | 154168 | None | CSR_V2_pg n 44 I N 8.19.1 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 255.0 | 255.0 | 19.53 | False | None | None | False | None | False | 4980.15 | 0 | 3982231 | 154168 | None | CSR_V1_pg n 7 I N 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 266.0 | 266.0 | 103.82 | False | None | None | False | None | False | 27616.12 | 0 | 3982232 | 154168 | None | CSR_V2_pg n 14 I N 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7969.0 | 7969.0 | 46.5 | False | None | None | False | None | False | 370558.5 | 0 | 3982233 | 154168 | None | CSR_V1_pg n 16 I N 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6843.0 | 6843.0 | 34.59 | False | None | None | False | None | False | 236699.37 | 0 | 3982234 | 154168 | None | CSR_V1_pg n 111 I N 9 | Centering charges @ 70% over finished rates for the Columns & Pier ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4790.1 | 4790.1 | 5.27 | False | None | None | False | None | False | 25243.827 | 0 | 3982235 | 154168 | None | CSR_V1_pg n 112 I N 14 | Centering charges @ 60% over finished rates for the Beams & Lintels of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4105.8 | 4105.8 | 8.44 | False | None | None | False | None | False | 34652.952 | 0 | 3982236 | 154168 | None | CSR_V1_pg n 112 I N 15 | Centering charges @ 50% over finished rates for the Roof (Straight & Arched) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3421.5 | 3421.5 | 19.33 | False | None | None | False | None | False | 66137.595 | 0 | 3982237 | 154168 | None | CSR_V1_pg n 112 I N 19 | Centering charges @ 45% over finished rates for the Chajja ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3079.35 | 3079.35 | 0.42 | False | None | None | False | None | False | 1293.327 | 0 | 3982238 | 154168 | None | CSR_V2_pg n 99 I N 12.11 | Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 138074.0 | 138074.0 | 0.095 | False | None | None | False | None | False | 13117.03 | 0 | 3982239 | 154168 | None | CSR_V2_pg n 100 I N 12.18 | Providing and fixing in position fully panelled Matti/Nandi wood shutters for doors with, stiles and rails of 35mm. thick with bottom and lock rails 80mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 6576.0 | 6576.0 | 2.8 | False | None | None | False | None | False | 18412.8 | 0 | 3982240 | 154168 | None | CSR_V2_pg n 77 I N 11.5.1 | Providing and fixing of Aluminium composite panel of approved make and colour for wall cladding for Brick/Rcc/stone walls & coloumns/beams with necessary aluminium frame works at required level made out of 50x25x4mm C section or equivalent. The panel should consist of 3mm thick non-halogenated FR grade mineral based polymer ( 2 hrs fire resistance as per ASTM E119-12 and clause B, S1, do as per ENT 13501-1sandwiched between 0.50 skins thick aluminium sheet making a total panel thickness of 4mm. The surfaces will be finished with PVDF based coating on topsides and service coating on reverse sides would be in polyester paint. The system shall be fixed using GI brackets, aluminium L cleats and stainless steel bolts and nuts complete with spring washer and cap nuts and all other necessary accessories, sealing shall be done with necessary rods etc., complete ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 3989.0 | 3989.0 | 11.34 | False | None | None | False | None | False | 45235.26 | 0 | 3982241 | 154168 | None | CSR_V2_pg n 104 I N 12.55.2 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges -do- with one side prelam ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 2040.0 | 2040.0 | 5.4 | False | None | None | False | None | False | 11016.0 | 0 | 3982242 | 154168 | None | CSR_V2_pg n 86 I N 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 168.0 | 168.0 | 206.4 | False | None | None | False | None | False | 34675.2 | 0 | 3982243 | 154168 | None | CSR_V2_pg n 109 I N 12.86 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 5390.0 | 5390.0 | 10.32 | False | None | None | False | None | False | 55624.8 | 0 | 3982244 | 154168 | None | CSR_V2_pg n 62 I N 9.22.2 | Providing and laying Polished Glazed Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). Size of Tile 600x600 mm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1326.0 | 1326.0 | 82.7 | False | None | None | False | None | False | 109660.2 | 0 | 3982245 | 154168 | None | CSR_V2_pg n 60 I N 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 889.0 | 889.0 | 25.44 | False | None | None | False | None | False | 22616.16 | 0 | 3982246 | 154168 | None | CSR_V2_pg n 65 I N 9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 1392.0 | 1392.0 | 14.05 | False | None | None | False | None | False | 19557.6 | 0 | 3982247 | 154168 | None | CSR_V2_pg n 41 I N 8.2.1 | Providing 15 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 295.0 | 295.0 | 199.55 | False | None | None | False | None | False | 58867.25 | 0 | 3982248 | 154168 | None | CSR_V2_pg n 41 I N 8.4.1 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Walls and Ceiling ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 323.0 | 323.0 | 380.51 | False | None | None | False | None | False | 122904.73 | 0 | 3982249 | 154168 | None | CSR_V2_pg n 50 I N 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 90.0 | 90.0 | 380.43 | False | None | None | False | None | False | 34238.7 | 0 | 3982250 | 154168 | None | CSR_V2_pg n 46 I N 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 174.0 | 174.0 | 199.55 | False | None | None | False | None | False | 34721.7 | 0 | 3982251 | 154168 | None | CSR_V2_pg n 48 I N 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 127.0 | 127.0 | 380.43 | False | None | None | False | None | False | 48314.61 | 0 | 3982252 | 154168 | None | CSR_V2_pg n 48 I N 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 115.0 | 115.0 | 12.71 | False | None | None | False | None | False | 1461.65 | 0 | 3982253 | 154168 | None | CSR_V1_pg n 18 I N 2.11 a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification for buildings ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Tonne | 89457.0 | 89457.0 | 4.0 | False | None | None | False | None | False | 357828.0 | 0 | 3982254 | 154168 | None | CSR_V2_pg n 84 I N 11.26.2 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. E.R.W. tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Kg | 130.0 | 130.0 | 238.5 | False | None | None | False | None | False | 31005.0 | 0 | 3982255 | 154168 | None | CSR_V5_pg n 113 I N 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 411.0 | 411.0 | 11.2 | False | None | None | False | None | False | 4603.2 | 0 | 3982256 | 154168 | None | CSR_V6_Ele_pg n 2 I N 1.1.2 | Supplying heavy gauge PVC conduit pipe 25 dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 25 mm dia 2 mm thick (Electrical SR 2023-24, Pg no.2, It no. 1.1.2) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 81.0 | 81.0 | 150.0 | False | None | None | False | None | False | 12150.0 | 0 | 3982257 | 154168 | None | CSR_V6_Ele_pg n 2 I N 1.1.3 | Supplying heavy gauge PVC conduit pipe 25 dia 2 mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 32 mm dia 2.5 mm thick (Electrical SR 2023-24, Pg no.2, It no. 1.1.3) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 106.0 | 106.0 | 65.0 | False | None | None | False | None | False | 6890.0 | 0 | 3982258 | 154168 | None | CSR_V6_Ele_pg n 2 I N 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box. 19/20 mm deep Junction box. (Electrical SR 2023-24, Pg no.2, It no. 1.5.1) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 49.0 | 49.0 | 8.0 | False | None | None | False | None | False | 392.0 | 0 | 3982259 | 154168 | None | CSR_V6_Ele_pg n 3 I N 1.6.6 | Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete. 4" x 4" x 3" ( 101 x 101 x 76 mm. (Electrical SR 2023-24, Pg no.3, It no. 1.6.6) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 74.0 | 74.0 | 4.0 | False | None | None | False | None | False | 296.0 | 0 | 3982260 | 154168 | None | CSR_V6_Ele_pg n 3 I N 1.7.1 | Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. upto 50 mm conduit in brick wall (Electrical SR 2023-24, Pg no.3, It no. 1.7.1) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 29.0 | 29.0 | 60.0 | False | None | None | False | None | False | 1740.0 | 0 | 3982261 | 154168 | None | CSR_V6_Ele_pg n 5 I N 2.1.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch (Electrical SR 2023-24, Pg no.5, It no. 2.1.1) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 285.0 | 285.0 | 8.0 | False | None | None | False | None | False | 2280.0 | 0 | 3982262 | 154168 | None | CSR_V6_Ele_pg n 5 I N 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010. 1.50sqmm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 26.0 | 26.0 | 120.0 | False | None | None | False | None | False | 3120.0 | 0 | 3982263 | 154168 | None | CSR_V6_Ele_pg n 5 I N 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010. 2.5sqmm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 42.0 | 42.0 | 90.0 | False | None | None | False | None | False | 3780.0 | 0 | 3982264 | 154168 | None | CSR_V6_Ele_pg n 5 I N 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS 694:2010. 4sqmm ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 63.0 | 63.0 | 80.0 | False | None | None | False | None | False | 5040.0 | 0 | 3982265 | 154168 | None | CSR_V6_Ele_pg n 9 I N 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch (Electrical SR 2023-24, Pg no.9, It no. 3.6.3) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 171.0 | 171.0 | 20.0 | False | None | None | False | None | False | 3420.0 | 0 | 3982266 | 154168 | None | CSR_V6_Ele_pg n 9 I N 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 357.0 | 357.0 | 7.0 | False | None | None | False | None | False | 2499.0 | 0 | 3982267 | 154168 | None | CSR_V6_Ele_pg n 43 I N 11.3.2 | Supplying of feet PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1x4 20/22 W ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 690.0 | 690.0 | 8.0 | False | None | None | False | None | False | 5520.0 | 0 | 3982268 | 154168 | None | CSR_V6_Ele_pg n 38 I N 11.11.2 | Supplying & fixing of retrofit type - LED bulb 5 W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95 power loss should 5% of lamp Wage short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 5 W 6500K ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 136.0 | 136.0 | 6.0 | False | None | None | False | None | False | 816.0 | 0 | 3982269 | 154168 | None | CSR_V6_Ele_pg n 30 I N 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model. (Electrical SR 2023-24, Pg no.30, It no. 6.3.1) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 2984.0 | 2984.0 | 7.0 | False | None | None | False | None | False | 20888.0 | 0 | 3982270 | 154168 | None | CSR_V6_Ele_pg n 43 I N 12.46 | Supplying & Fixing of 70-150 W lamp holder 2 Pin. (Electrical SR 2023-24, Pg no.43, It no. 12.46) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 63.0 | 63.0 | 20.0 | False | None | None | False | None | False | 1260.0 | 0 | 3982271 | 154168 | None | CSR_V6_Ele_pg n 54 I N 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 3510.0 | 3510.0 | 1.0 | False | None | None | False | None | False | 3510.0 | 0 | 3982272 | 154168 | None | CSR_V6_Ele_pg n 38 I N 9.2.2 | Supplying, erecting, testing & commissioning of OFF- LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with all accessories complete and Excluding batteries and wiring complete. 1.5 kVA OFF LINE UPS ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 20133.0 | 20133.0 | 1.0 | False | None | None | False | None | False | 20133.0 | 0 | 3982273 | 154168 | None | CSR_V6_Ele_pg n 39 I N 9.5.7 | Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries. 100 AH capacity ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 12430.0 | 12430.0 | 2.0 | False | None | None | False | None | False | 24860.0 | 0 | 3982274 | 154168 | None | CSR_V1_pg n 5 I N 1.4.1 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 272.0 | 272.0 | 10.13 | False | None | None | False | None | False | 2755.36 | 0 | 3982275 | 154168 | None | CSR_V1_pg n 15 I N 2.1.2 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 5664.0 | 5664.0 | 0.75 | False | None | None | False | None | False | 4248.0 | 0 | 3982276 | 154168 | None | CSR_V2_pg n 14 I N 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD CSR-2023-24, Vol-2, Pg no. 14, It no. 6.8) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 7969.0 | 7969.0 | 2.78 | False | None | None | False | None | False | 22153.82 | 0 | 3982277 | 154168 | None | CSR_V2_pg n 41 I N 8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD CSR-2023-24, Vol-2, Pg no. 41, It no. 8.1.1) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 255.0 | 255.0 | 10.99 | False | None | None | False | None | False | 2802.45 | 0 | 3982278 | 154168 | None | CSR_V1_pg n 16 I N 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. including centering charges ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 10264.5 | 10264.5 | 0.94 | False | None | None | False | None | False | 9648.63 | 0 | 3982279 | 154168 | None | CSR_V1_pg n 18 I N 2.11 (a) | Steel Fabrication : Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Tonne | 89457.0 | 89457.0 | 0.084 | False | None | None | False | None | False | 7514.388 | 0 | 3982280 | 154168 | None | CSR_V5_pg n 85 I N 7.3 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 2140.0 | 2140.0 | 1.0 | False | None | None | False | None | False | 2140.0 | 0 | 3982281 | 154168 | None | CSR_V2_pg n 122 I N 13.31.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of
Engineer in Charge.Internal work - Exposed on wall. 20 mm nominal dia Pipes (PWD CSR-2023-24, Vol-2, Pg no. 122, It no. 13.31.2) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 242.0 | 242.0 | 35.0 | False | None | None | False | None | False | 8470.0 | 0 | 3982282 | 154168 | None | CSR_V2_pg n 122 I N 13.31.3 | Providing and fixing Chlorinated Polyvinyl Chloride CPVC pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.Internal work Exposed on wall 25 mm nominal dia Pipes ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Rmtr | 318.0 | 318.0 | 90.0 | False | None | None | False | None | False | 28620.0 | 0 | 3982283 | 154168 | None | CSR_V2_pg n 123 I N 13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Ltr | 9.0 | 9.0 | 1000.0 | False | None | None | False | None | False | 9000.0 | 0 | 3982284 | 154168 | None | CSR_V5_pg n 149 I N 13.4.1 | Providing, Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications, to work site with testing of as per instructions of engineer incharge of work and latest amendments etc, complete. 0.50 HP/0.37kW - 5 STG (stage) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 10170.0 | 10170.0 | 1.0 | False | None | None | False | None | False | 10170.0 | 0 | 3982285 | 154168 | None | CSR_V2_pg n 117 I N 13.4.1 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 549.0 | 549.0 | 1.0 | False | None | None | False | None | False | 549.0 | 0 | 3982286 | 154168 | None | CSR_V2_pg n 117 I N 13.3.2 | Providing and fixing brass stop cock of approved quality : 20 mm nominal bore. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | No | 305.0 | 305.0 | 6.0 | False | None | None | False | None | False | 1830.0 | 0 |
|