1726140136000 | 0 | None | None | Buildings | Construction of New Government Unani Clinic in mulbagal | 1245655.58 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3983403 | 154257 | None | CSR_V3_pg n 9 I N 2.5 | Clearing and grubbing road land including uprooting wild vegetatiion, grass, bushes, shrubs, saplings and trees of girth upto 300 mm,removal of stumps of such trees cut earlier and disposal of userviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 484.0 | 484.0 | 2.4 | False | None | None | False | None | False | 1161.6 | 0 | 3983404 | 154257 | None | CSR_V1_pg n 5 I N 1.3 | Earth work in surface excavation by manual means for lowering & levelling the ground by chiselling and wedging in Hard rock for all works other than foundation & depth not exceeding 100 mm as per drawing and technical specifications, including setting out, barricading, caution lights, dressing of excavated surfaces, disposing off the excavated spalls/stuff & stacking the selected spall/ stuff for reuse in a radius of 50 m and lift upto 1.5 m including
cost of labour, tools, usage & other appurtenances required to complete the work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 177.0 | 177.0 | 30.0 | False | None | None | False | None | False | 5310.0 | 0 | 3983405 | 154257 | None | CSR_V1_pg n 6 I N 1.5.2 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. 2 Depth exceeding 1.5m, but not exceeding 3 m ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 445.0 | 445.0 | 79.97 | False | None | None | False | None | False | 35586.65 | 0 | 3983406 | 154257 | None | CSR_V1_pg n 15 I N 2.1.3 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in
layers not exceeding 150 mm thickness, well compacted using plate vibrators,
including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the
work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 5989.0 | 5989.0 | 14.96 | False | None | None | False | None | False | 89595.44 | 0 | 3983407 | 154257 | None | CSR_V2_pg n 9 I N 5.2 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6618.0 | 6618.0 | 24.19 | False | None | None | False | None | False | 160089.42 | 0 | 3983408 | 154257 | None | CSR_V2_pg n 9 I N 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6389.0 | 6389.0 | 25.78 | False | None | None | False | None | False | 164708.42 | 0 | 3983409 | 154257 | None | CSR_V1_pg n 15 I N 2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6287.0 | 6287.0 | 20.65 | False | None | None | False | None | False | 129826.55 | 0 | 3983410 | 154257 | None | CSR_V1_pg n 111 I N 1 a | Centering charges @ 8% over finished rates for the Foundation upto Plinth a. Isolated ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 502.96 | 502.96 | 11.75 | False | None | None | False | None | False | 5909.78 | 0 | 3983411 | 154257 | None | CSR_V1_pg n 111 I N 1 a | Centering charges @ 50% over finished rates for the Plinth Beams of Building As per the Revised rates 01-09-2022 ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 3143.5 | 3143.5 | 8.9 | False | None | None | False | None | False | 27977.15 | 0 | 3983412 | 154257 | None | CSR_V2_pg n 44 I N 8.19.1 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Sqm | 255.0 | 255.0 | 32.69 | False | None | None | False | None | False | 8335.95 | 0 | 3983413 | 154257 | None | CSR_V1_pg n 7 I N 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 266.0 | 266.0 | 78.47 | False | None | None | False | None | False | 20873.02 | 0 | 3983414 | 154257 | None | CSR_V2_pg n 13 I N 6.1 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 8220.0 | 8220.0 | 35.6 | False | None | None | False | None | False | 292632.0 | 0 | 3983415 | 154257 | None | CSR_V1_pg n 16 I N 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 6843.0 | 6843.0 | 7.22 | False | None | None | False | None | False | 49406.46 | 0 | 3983416 | 154257 | None | CSR_V1_pg n 115 I N 8 | Centering charges @ 70% over finished rates for the Columns & Pier ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4790.1 | 4790.1 | 5.32 | False | None | None | False | None | False | 25483.332 | 0 | 3983417 | 154257 | None | CSR_V1_pg n 115 I N 8 | Centering charges @ 60% over finished rates for the Beams & Lintels of Building ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | Cum | 4105.8 | 4105.8 | 1.9 | False | None | None | False | None | False | 7801.02 | 0 | 3983418 | 154257 | None | CSR_V1_pg n 18 I N 2.11 a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- With all lead and lift loading and unloading charges, hire charges of all machineries tools and plants, cost of all labour charges cost of farm work cost of all materials including all taxes etc complete for finished item of work and as per the Engineer - in charge of work. | MT | 89457.0 | 89457.0 | 2.47 | False | None | None | False | None | False | 220958.79 | 0 |
|