1726146430000 | 0 | None | None | Buildings | Construction of Toilet Governmenet PRE-UNIVERSITY COLLEGE IN Harohalli, at Kanakapura Taluk. | 656659.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3991336 | 154501 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 105.06 | 105.06 | 19.91 | False | None | None | False | None | False | 2091.7446 | 0 | 3991337 | 154501 | None | code02 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 5779.33 | 5779.33 | 7.54 | False | None | None | False | None | False | 43576.1482 | 0 | 3991338 | 154501 | None | code03 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 6580.67 | 6580.67 | 11.83 | False | None | None | False | None | False | 77849.3261 | 0 | 3991339 | 154501 | None | code04 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 488.22 | 488.22 | 8.06 | False | None | None | False | None | False | 3935.0532 | 0 | 3991340 | 154501 | None | code05 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super lasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 10143.9 | 10143.9 | 6.45 | False | None | None | False | None | False | 65428.155 | 0 | 3991341 | 154501 | None | code06 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Buildings ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Tonne | 92140.71 | 92140.71 | 0.58 | False | None | None | False | None | False | 53441.6118 | 0 | 3991342 | 154501 | None | code07 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 1267.93 | 1267.93 | 86.46 | False | None | None | False | None | False | 109625.2278 | 0 | 3991343 | 154501 | None | code08 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 262.65 | 262.65 | 20.16 | False | None | None | False | None | False | 5295.024 | 0 | 3991344 | 154501 | None | code09 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 303.85 | 303.85 | 117.96 | False | None | None | False | None | False | 35842.146 | 0 | 3991345 | 154501 | None | code10 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 396.55 | 396.55 | 60.15 | False | None | None | False | None | False | 23852.4825 | 0 | 3991346 | 154501 | None | code11 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Kgs | 188.49 | 188.49 | 54.0 | False | None | None | False | None | False | 10178.46 | 0 | 3991347 | 154501 | None | code12 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour,usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 4612.34 | 4612.34 | 3.78 | False | None | None | False | None | False | 17434.6452 | 0 | 3991348 | 154501 | None | code13 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 327.54 | 327.54 | 26.1 | False | None | None | False | None | False | 8548.794 | 0 | 3991349 | 154501 | None | code14 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | m | 1635.64 | 1635.64 | 8.1 | False | None | None | False | None | False | 13248.684 | 0 | 3991350 | 154501 | None | code15 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.Internal work - Exposed on wall 25 mm nominal dia Pipes ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | m | 327.54 | 327.54 | 30.0 | False | None | None | False | None | False | 9826.2 | 0 | 3991351 | 154501 | None | code16 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For:PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | m | 423.33 | 423.33 | 36.0 | False | None | None | False | None | False | 15239.88 | 0 | 3991352 | 154501 | None | code17 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Each | 2637.83 | 2637.83 | 2.0 | False | None | None | False | None | False | 5275.66 | 0 | 3991353 | 154501 | None | code18 | Providing and fixing white vitreous china water closet squatting pan (Indian type) :Orissa pattern W.C. pan of size 580x440 mm ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Each | 2400.93 | 2400.93 | 4.0 | False | None | None | False | None | False | 9603.72 | 0 | 3991354 | 154501 | None | code19 | Providing and fixing white vitreous china pedestal type (European type/ wash down type) water closet pan. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Each | 2350.46 | 2350.46 | 2.0 | False | None | None | False | None | False | 4700.92 | 0 | 3991355 | 154501 | None | code20 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Each | 1188.62 | 1188.62 | 3.0 | False | None | None | False | None | False | 3565.86 | 0 | 3991356 | 154501 | None | code21 | Providing and fixing brass bib cock of approved quality : 20 mm nominal bore. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Each | 314.15 | 314.15 | 10.0 | False | None | None | False | None | False | 3141.5 | 0 | 3991357 | 154501 | None | code22 | Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 1699.5 | 1699.5 | 2.7 | False | None | None | False | None | False | 4588.65 | 0 | 3991358 | 154501 | None | code23 | Providing Cement mortar 1:5 (1 cement : 5 fine sand) including cost of all materials, labour and usage charges of machinery complete as per the direction of engineer incharge of work. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Cum | 4375.44 | 4375.44 | 1.51 | False | None | None | False | None | False | 6606.9144 | 0 | 3991359 | 154501 | None | code24 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 1108.28 | 1108.28 | 20.16 | False | None | None | False | None | False | 22342.9248 | 0 | 3991360 | 154501 | None | code25 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 1139.18 | 1139.18 | 58.8 | False | None | None | False | None | False | 66983.784 | 0 | 3991361 | 154501 | None | code26 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 141.11 | 141.11 | 148.68 | False | None | None | False | None | False | 20980.2348 | 0 | 3991362 | 154501 | None | code27 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 179.22 | 179.22 | 65.75 | False | None | None | False | None | False | 11783.715 | 0 | 3991363 | 154501 | None | code28 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift and loading and unloading charges cost and conveyance of all materials, labour charges hire charges of equipment and all other incidental charges etc., complete as per standard technical specification and direction of the Engineer in charge of the work. | Sqm | 172.01 | 172.01 | 9.72 | False | None | None | False | None | False | 1671.9372 | 0 |
|