1726126734000 | 0 | None | None | Buildings | construction of compound wall at SWM site in SNo 78 of 1B Malagi village TP Rattihalli | 1056757.51 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3966238 | 153703 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. (PWD DSR.2023-24/Vol-1 Pg-8 Item No.1.14.1) In all kinds of soils Depth upto 3 m | Cum | 105.06 | 105.06 | 109.84 | False | None | None | False | None | False | 11539.7904 | 0 | 3966239 | 153703 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.(PWD Common SR 2023-24 Vol-1 P No-15, I No-2.1.2) | Cum | 5833.92 | 5833.92 | 11.27 | False | None | None | False | None | False | 65748.2784 | 0 | 3966240 | 153703 | None | code03 | Providing Coursed rubble masonry (second sort) with hard stone in
foundation & plinth with Cement mortar 1 6 (1 cement 6 coarse sand) (PWD DSR. 2023-24 Pg-9 Item No.5.3 Vol-2) | Cum | 6391.15 | 6391.15 | 31.62 | False | None | None | False | None | False | 202088.163 | 0 | 3966241 | 153703 | None | code04 | Formwork shall be added on percentage basis to the finished concrete item rate as 3 DSR 2023-24 Vol-1 Page No.111 | Cum | 194.27 | 194.27 | 7.62 | False | None | None | False | None | False | 1480.3374 | 0 | 3966242 | 153703 | None | code05 | Providing and laying in position Cement Concrete for all Foundation works.
The granite/trap/basalt crushed graded coarse aggregates and fine aggregates
as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. ( PWD DSR.2023-24 Pg-15 Item No.2.2.1 Vol-1) | Cum | 6475.61 | 6475.61 | 7.26 | False | None | None | False | None | False | 47012.9286 | 0 | 3966243 | 153703 | None | code06 | Formwork shall be added on percentage basis to the finished concrete item rate as 50% DSR 2023-24 Vol-1 Page No.111 | Cum | 3256.35 | 3256.35 | 3.38 | False | None | None | False | None | False | 11006.463 | 0 | 3966244 | 153703 | None | code07 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (PWD DSR.2023-24 Vol-1 Pg-16 I No. 2.3.1) | Cum | 6417.85 | 6417.85 | 3.38 | False | None | None | False | None | False | 21692.333 | 0 | 3966245 | 153703 | None | code08 | Formwork shall be added on percentage basis to the finished concrete item rate as 70 DSR 2023-24 Vol-1 Page No.111 | Cum | 4780.23 | 4780.23 | 5.28 | False | None | None | False | None | False | 25239.6144 | 0 | 3966246 | 153703 | None | code09 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. ( PWD DSR.2023-24 Vol-1 Pg-16 Item No.2.5.1) | Cum | 6828.9 | 6828.9 | 5.28 | False | None | None | False | None | False | 36056.592 | 0 | 3966247 | 153703 | None | code10 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.( PWD SR.2023-24 Vol-1, Pg-18 I No.2.11(h )) | Tonne | 81381.33 | 81381.33 | 1.2 | False | None | None | False | None | False | 97657.596 | 0 | 3966248 | 153703 | None | code11 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work.(PWD Common SR 2023-24 Vol-2 P No-14, I No-6.8) | Cum | 8208.07 | 8208.07 | 37.26 | False | None | None | False | None | False | 305832.6882 | 0 | 3966249 | 153703 | None | code12 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners
wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Vol-2 Item No. - 8.8, Page No.42) | Sqm | 382.13 | 382.13 | 348.84 | False | None | None | False | None | False | 133302.2292 | 0 | 3966250 | 153703 | None | code13 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface
even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Vol-2 Item No. - 8.27, Page No.45) | Sqm | 54.59 | 54.59 | 348.84 | False | None | None | False | None | False | 19043.1756 | 0 | 3966251 | 153703 | None | code14 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Vol-2 Item No. - 8.39, Page No.48) | Sqm | 130.81 | 130.81 | 384.84 | False | None | None | False | None | False | 50340.9204 | 0 | 3966252 | 153703 | None | code15 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.(PWD SR 2023-24 Vol-2 Item No. - 11.25.2, Page No.84) | Kg | 140.08 | 140.08 | 205.0 | False | None | None | False | None | False | 28716.4 | 0 |
|