createdTs1725862920844
version11
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee4240.00
emd254200.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose24-09-2024 17:29:00
tenderQueryClose23-09-2024 11:00:00
technicalBidOpen25-09-2024 17:30:00
publishedDate14-09-2024 14:52:46
publishedByPostMI_EE_DIV_KLB
publishedByUserKPE10480 - NAGANAGOUDA Y BHAVI
bidValidityPeriod90
noOfCalls2
preBidMeetingDate12-09-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonNAGANAGOUDA Y BHAVI
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber847220196
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1725862920847
version15
createdDateNone
modifiedDateNone
tenderNumberMI/2024-25/RT/WORK_INDENT2407/CALL-2
titleCOMPREHENSIVE DEVELOPMENT OF MAVINAKERE TANK IN SHAHAPUR TOWN IN SHAHAPUR TALUK YADGIR DISTRICT.
descriptionCOMPREHENSIVE DEVELOPMENT OF MAVINAKERE TANK IN SHAHAPUR TOWN IN SHAHAPUR TALUK YADGIR DISTRICT.
categoryWORKS
categoryTextWorks
ecv16944319.23
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location126
locationNameMinor Irrigation Division Kalaburagi
provisionalAmount20000000.0
groupOverheadTotalNone
fileNumberMIN/SHAH/CP/TANK/2024-25/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17258629210000NoneNoneRestoration of old and breached tanks and Desilting of tanksCOMPREHENSIVE DEVELOPMENT OF MAVINAKERE TANK IN SHAHAPUR TOWN IN SHAHAPUR TALUK YADGIR DISTRICT. (IMPROVEMENTS TO BUND)13037122.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3941903152515NoneMID01Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(By Mechanical Means using Dozer) In area of thorny jungle etc., complete with all lead and lift as per the direction of Engineer in Charge.100 Sqm508.2508.2241.0FalseNoneNoneFalseNoneFalse122476.20
3941904152515NoneMID02Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials etc., complete with all lead and lift as per the direction of Engineer in Charge.Each26.7826.78187.0FalseNoneNoneFalseNoneFalse5007.860
3941905152515NoneMID03Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations etc., complete with all lead and lift as per the direction of Engineer in Charge.Each53.0353.03140.0FalseNoneNoneFalseNoneFalse7424.20
3941906152515NoneMID04Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete.In all kinds of soils Depth upto 3 m etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum107.1107.11645.0FalseNoneNoneFalseNoneFalse176179.50
3941907152515NoneMID05Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum660.45660.4511805.23FalseNoneNoneFalseNoneFalse7796764.15350
3941908152515NoneMID06Providing hearting embankment using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using power roller and all other ancillary operations etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum531.3531.32675.48FalseNoneNoneFalseNoneFalse1421482.5240
3941909152515NoneMID07Providing cut-off trench filling using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using power roller and all other ancillary operations etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum542.85542.851645.0FalseNoneNoneFalseNoneFalse892988.250
3941910152515NoneMID08Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and greystove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 etc., complete with all lead and lift as per the direction of Engineer in Charge.No9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3941911152515NoneMID09De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery, labour & all necessary works as directed and complete as per specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum98.798.78962.5FalseNoneNoneFalseNoneFalse884598.750
3941912152515NoneMID10Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.300mm etc., complete with all lead and lift as per the direction of Engineer in Charge.Sqm477.75477.75520.0FalseNoneNoneFalseNoneFalse248430.00
3941913152515NoneMID11Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum476.7476.72343.75FalseNoneNoneFalseNoneFalse1117265.6250
3941914152515NoneMID12Providing & fixing corrugated G.S. sheet roofing including vertical /curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and includingcutting to size and shape wherever required as per the direction of Engineer in charge.0.63 mm thick with zinc coating not less than 275 g/ m² etc., complete with all lead and lift as per the direction of Engineer in Charge.Sqm922.95922.9536.0FalseNoneNoneFalseNoneFalse33226.20
3941915152515NoneMID13Construction of a permanent type barricade made of steel components, 1.5 m high from road level, fitted with 3 horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical support, painted with yellow and white strips, 150 mm in width at an angle of 45 degree, complete as per IRC:SP:55:2014 etc., complete with all lead and lift as per the direction of Engineer in Charge.Each5959.85959.854.0FalseNoneNoneFalseNoneFalse321829.20
17258629210000NoneNoneRestoration of old and breached tanks and Desilting of tanksCOMPREHENSIVE DEVELOPMENT OF MAVINAKERE TANK IN SHAHAPUR TOWN IN SHAHAPUR TALUK YADGIR DISTRICT. (CONSTRUCTION OF PIPE CULVERT)991143.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3941916152516NoneMID01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete.In all kinds of soils Depth upto 3 m etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum107.1107.157.6FalseNoneNoneFalseNoneFalse6168.960
3941917152516NoneMID02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6288.456288.4514.8FalseNoneNoneFalseNoneFalse93069.060
3941918152516NoneMID03Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1101.6. .750 mm Dia Pipe etc., complete with all lead and lift as per the direction of Engineer in Charge.m7002.457002.4520.0FalseNoneNoneFalseNoneFalse140049.00
3941919152516NoneMID04Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6601.356601.3549.2FalseNoneNoneFalseNoneFalse324786.420
3941920152516NoneMID05Providing Centering,scaffolding,shuttering etc. at 3 % of the Basic Rate for Foundation for all other types. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum198.04198.0449.2FalseNoneNoneFalseNoneFalse9743.5680
3941921152516NoneMID06Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls /returns /cutoff walls works & all necessary works as directed and complete as per specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum7302.757302.7542.0FalseNoneNoneFalseNoneFalse306715.50
3941922152516NoneMID07Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Foundation of Bridges etc., complete with all lead and lift as per the direction of Engineer in Charge.t90516.390516.31.222FalseNoneNoneFalseNoneFalse110610.91860
17258629210000NoneNoneRestoration of old and breached tanks and Desilting of tanksCOMPREHENSIVE DEVELOPMENT OF MAVINAKERE TANK IN SHAHAPUR TOWN IN SHAHAPUR TALUK YADGIR DISTRICT. (CONSTRUCTION OF WASTE WEIR)1877608.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3941923152517NoneMID01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete.In all kinds of soils Depth upto 3 m etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum107.1107.1119.34FalseNoneNoneFalseNoneFalse12781.3140
3941924152517NoneMID02Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6288.456288.4518.86FalseNoneNoneFalseNoneFalse118600.1670
3941925152517NoneMID03Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6601.356601.35100.49FalseNoneNoneFalseNoneFalse663369.66150
3941926152517NoneMID04Providing Centering,scaffolding,shuttering etc. at 3 % of the Foundation of All other types. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum198.04198.04100.49FalseNoneNoneFalseNoneFalse19901.03960
3941927152517NoneMID05Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls /returns /cutoff walls works & all necessary works as directed and complete as per specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum7302.757302.7594.95FalseNoneNoneFalseNoneFalse693396.11250
3941928152517NoneMID06Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification for all other type of Structures. etc., complete with all lead and lift as per the direction of Engineer in Charge.t82961.5582961.552.89FalseNoneNoneFalseNoneFalse239758.87950
3941929152517NoneMID07Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and completeas per specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum1341.91341.916.8FalseNoneNoneFalseNoneFalse22543.920
3941930152517NoneMID08Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, wheel tracks, seal seatss, guide rails, gate groove liners etc., with all accessories for canal escape / regulator stoplog gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint and all other ancillary operations complete as per specifications and approved drawings. etc., complete with all lead and lift as per the direction of Engineer in Charge.t192360.0192360.00.25FalseNoneNoneFalseNoneFalse48090.00
3941931152517NoneMID09Design, fabrication, supply, erection, testing and commissioning of sliding type interchangeable stoplog gate elements consisting of skin plate, stiffeners, horizontal and vertical girders, lifting hooks, bronze padded slide blocks, guide shoes, rubber seals etc., with all accessories for canal regulator vent including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coats of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings etc., complete with all lead and lift as per the direction of Engineer in Charge.t169050.0169050.00.35FalseNoneNoneFalseNoneFalse59167.50
17258629210000NoneNoneRestoration of old and breached tanks and Desilting of tanksCOMPREHENSIVE DEVELOPMENT OF MAVINAKERE TANK IN SHAHAPUR TOWN IN SHAHAPUR TALUK YADGIR DISTRICT. (CONSTRUCTION OF BOX CULVERT)1038444.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3941932152518NoneMID01Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum99.7599.75750.0FalseNoneNoneFalseNoneFalse74812.50
3941933152518NoneMID02Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Below LWL etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum111.44111.4467.96FalseNoneNoneFalseNoneFalse7573.46240
3941934152518NoneMID03Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Tonne90516.390516.31.999FalseNoneNoneFalseNoneFalse180942.08370
3941935152518NoneMID04Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6527.856527.8512.04FalseNoneNoneFalseNoneFalse78595.3140
3941936152518NoneMID05Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6601.356601.3542.3FalseNoneNoneFalseNoneFalse279237.1050
3941937152518NoneMID06Providing Centering,scaffolding,shuttering etc. at 3% of the Basic Rate for Foundation upto Plinth for all other types etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum198.04198.0442.3FalseNoneNoneFalseNoneFalse8377.0920
3941938152518NoneMID07Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum6639.156639.1546.19FalseNoneNoneFalseNoneFalse306662.33850
3941939152518NoneMID08Providing Centering,scaffolding,shuttering etc. at 5 % of the Basic Rate for Foundation, Sub structure of Cross drainages etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum331.96331.9646.19FalseNoneNoneFalseNoneFalse15333.23240
3941940152518NoneMID09Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and completeas per specification. etc., complete with all lead and lift as per the direction of Engineer in Charge.Cum1341.91341.913.5FalseNoneNoneFalseNoneFalse18115.650
3941941152518NoneMID10Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.300mm etc., complete with all lead and lift as per the direction of Engineer in Charge.Sqm477.75477.75144.0FalseNoneNoneFalseNoneFalse68796.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17258629210000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17258629210000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17258629210000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17258629210000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17258629210000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17258629210000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders The departments shall not be responsible for non accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17258629210000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17258629210000NoneNoneELIGIBILITYThe Tenderer shall obtain the work done certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the bid.None
17258629210000NoneNoneELIGIBILITYConditional Tenders are liable to be rejected .The Employer reserves the right to Reject any or all Tenders without assigning any reasonNone
17258629210000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17258629210000NoneNoneELIGIBILITYAll materials required for the work shall be procured by the tenderer himself and should be got tested by the quality control authorities at his own cost before use on workNone
17258629210000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders. Royalty shall be deducted as per KMMCR 1994 Amendment rule 2016, Also KMMCR 2016 Amendment Rule 36(3), 42(1), 44(3), 44(4)None
17258629210000NoneNoneELIGIBILITYAs per Karnataka State Govt Order No:LD/300/LET/2006/Bangalore Dt: 1-1-2007 and Govt Ltr No:PW/134/BMS/2007, Dt: 27-7-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17258629210000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17258629210000NoneNoneELIGIBILITYThe Rates are Exclusive of GST AND THE BIDDER SHALL QUOTE ITEM RATE EXCLUDING GSTNone
17258629210000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria .None
17258629210000NoneNoneELIGIBILITYUnique Document Identification Number (UDIN) from Practicing Chartered Account is PreferredNone
17258629210000NoneNoneELIGIBILITYName, address, telephone, email id and fax numbers of the contractor is to be provided for communication.None
17258629210000NoneNoneELIGIBILITYDuring the execution of work, if any minor minerals are required contractors have to abide by the Karnataka Minor Mineral Concession Rules 1994 (as amended up to date). As per the prevailing rules, for any use of Minor Minerals, the contractor has to submit the Mineral Dispatch Permit (MDP) obtained from Mines and Geology Department. If Mineral Dispatch Permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty and DMF contribution as per Karnataka Minor Mineral concession rules 1994 (as amended from time to time) will be deducted from contractors bills at the time of payment.None
17258629210000NoneNoneELIGIBILITYSub-Leasing/G.P.A of Work is Prohibited.None
17258629210000NoneNoneELIGIBILITYThe contractor has to furnish Additional Performance Security Deposit for unbalance tender as per clause 29.1 of ITT, to an amount equal to the difference in contract price and amount put to tender, in addition to 5% performance guarantee (in any of the form prescribed) while concluding the Agreement.None
17258629210000NoneNoneELIGIBILITYIn case of unbalanced tender i.e the rate(s) Quoted by the contractor for any item(s) of work is/ are below 75%of the estimate/recast rate(s) of the department then the contractor shall furnish an additional security in the form as stated in clause 29 of ITT for an amount equvivalant to the difference between quoted rate(s) and 75% of estimate/recast rate(s) and shall be valid as stated in clause 43 of condition of contract in case of contractor quoting rate above 125% of the estimated/recast rate, then, the amount over and above 125% will be witheld during the progress of work. The withheld amount will be released only after entire work contract is fully complete and so certified by the employerNone
17258629210000NoneNoneELIGIBILITYThe contractor have been registered as KPWD class-III & above Registration Certificate (up load registration certificate of original should be produced while opening the tender)None
17258629210000NoneNoneELIGIBILITYLetter of Credit should be in prescribed format(In Bankers Letter Head), if not, then the Bid is liable to be rejectedNone
17258629210000NoneNoneELIGIBILITYAddendum / Corrigendum will be published on the website for all modifications or corrections, if any.None
17258629210000NoneNoneELIGIBILITYThe period of completion is 06 (Six months) including monsoon.None
17258629210000NoneNoneELIGIBILITYThe intending bidders are advised to visit the site of work, and make themselves familiar with the local situation regarding the availability of the construction materials, workmen, land required for construction activities, etc.None
17258629210000NoneNoneELIGIBILITYThe necessary certificates/documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached to the e-tender document. The original certificate documents shall be produced for verification when demanded, otherwise, the tender will be treated as a non-responsive bid and rejected. The Tenderer shall obtain the work done certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer and countersigned by Superintending Engineer and scan the original certificate and attached the scanned file to the bidNone
17258629210000NoneNoneELIGIBILITYThe defects liability period is 1(ONE) year, i.e during the warranty period.None
17258629210000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17258629210000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17258629210000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the e-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17258629210000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17258629210000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17258629210000NoneNoneELIGIBILITYThe amount put to tender is Exclusive of GST. Hence GST will be paid separately. If the GST rates are revised during the contract period, payment will be made/ withdrawn accordinglyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneSatisfactorily completed (at least 90% of contract value) in the last five years (i.e 2019-20 to 2023-24) as a prime contractor for at least one similar work such as the Construction/Improvements of Tanks , to extent of 50% of the cost of the work of value not less than Rs. 84.72 lakhs. A weightage of 10% will be given per year to bring them to the price level of the FY 2024-25. (With Indent No.)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2 (c) Executed in any one year, during the last five years i.e. 2019-20 to 2023-24 the following minimum quantities of work 1. Earthwork in both Excavation & Embankment (Combined Quantity): 24058.00 Cum 2. Cement Concrete (Including RCC & PSC): 337.00 Cum 3. Steel works for RCC (Reinforcement Steel): 4.88 Tonne 4. Structural Steel: 0.48 Tonne 5.Pitching/Revetment: 532.00 SqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Quantity wise Workdone certificates
NoneNoneNoneNoneTenderers who meet the specified minimum qualifying criteria will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity (AxNx1.5-B), Where A is Maximum value of civil engineering works executed in any one year during the last five years i.e.2019-20 to 2023-24 (updated to 2024-25 price level) taking into account the completed as well as works in progress. N is Number of years (0.5 years) prescribed for completion of the works for which tenders are invited. B is Value, at 2024-25 price level, of existing commitments and ongoing works to be completed during the next 0.5 years (06 Calendar months) Note: The statements showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessed Available Tender Capacity
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of not less than Rs.104.22 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc., Bankers certificate should be in prescribed format without which the bidder is liable to be rejected)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAchieved in at least two financial years during the last five years (i.e 2019-20 to 2023-24) an average annual financial turnover (in all classes of civil engineering construction works only) of Rs. 338.88 lakhs. Financial turnover of previous years will be given a weightage of 10% per year to bring them to the price level of the FY 2024-25Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Audited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 3, Qualification Information.OthersSection 3, Qualification Information.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Section 3, Qualification Information.
NoneNoneNoneNoneThe tenderer shall be eligible Class-III and above KPWD Registered contractorOthersKPWD REGISTRATION CERTIFICATE CLASS 3 AND ABOVE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- KPWD REGISTRATION CERTIFICATE CLASS 3 AND ABOVE
NoneNoneNoneNoneThe Rates are Exclusive of GST AND THE BIDDER SHALL QUOTE ITEM RATE EXCLUDING GSTOthersThe Rates are Exclusive of GST AND THE BIDDER SHALL QUOTE ITEM RATE EXCLUDING GST
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The Rates are Exclusive of GST AND THE BIDDER SHALL QUOTE ITEM RATE EXCLUDING GST
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Kpwd Class III and above LicenseTrueTechnical Bid
Annual Turnover Certificate along With Profit and Loss Statement furnished by CA as per Bid DocumentTrueTechnical Bid
Similar Nature of Work done Certificate as per Bid DocumentTrueTechnical Bid
Quantity wise Work done certificate from competent authority Rank of Executive Engineer & above.TrueTechnical Bid
Bankers/LOC CertificateTrueTechnical Bid
GST Registration certificateTrueTechnical Bid
IT Returns for last five years 2019-20 to 2023-24TrueTechnical Bid
The Rates are Exclusive of GST AND THE BIDDER SHALL QUOTE ITEM RATE EXCLUDING GSTTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1725863056000
version0
createdDateNone
modifiedDateNone
blockNumberMINOR IRRIGATION DIVISION OFFICE KALABURAGI
streetNone
cityKALABURAGI
stateKarnataka
pin585101
tenderRecallDTONone