tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1726639283000 | 1 | None | None | Roads | Road estimate | 21201918.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4019326 | 155778 | None | 001 | Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle( Uni SR-2023-24, Volume 3, Page No 9, Sl No 2.4 (ii) B ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4019327 | 155778 | None | 002 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work, In all kinds of soils Depth upto 3 m. ( Uni SR-2023-24, Volume 1, Page No 08, Item No 1.14.1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 765.46 | False | None | None | False | None | False | 78076.92 | 0 | 4019328 | 155778 | None | 003 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 6.0 | 6.0 | 7875.0 | False | None | None | False | None | False | 47250.0 | 0 | 4019329 | 155778 | None | 004 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ( Uni SR-2023-24, Volume 3, Page No 7, Sl No 1.7) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 119.0 | 119.0 | 229.64 | False | None | None | False | None | False | 27327.16 | 0 | 4019330 | 155778 | None | 005 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ( Uni SR-2023-24, Volume 3, Page No 7, Sl No 1.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 474.0 | 474.0 | 2132.86 | False | None | None | False | None | False | 1010975.64 | 0 | 4019331 | 155778 | None | 006 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope
and compacted to meet requirement of table No. 300-2 ( Uni SR-2023-24, Volume 3, Page No 17, Sl No 3.6) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 493.0 | 493.0 | 1361.75 | False | None | None | False | None | False | 671342.75 | 0 | 4019332 | 155778 | None | 007 | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material Common SR Vol- 3 , P.No : 19, I.No : 4.1 A(v) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2487.0 | 2487.0 | 2074.05 | False | None | None | False | None | False | 5158162.35 | 0 | 4019333 | 155778 | None | 008 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density Common SR Vol- 3 , P.No : 26, I.No : 4.17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2559.0 | 2559.0 | 2409.25 | False | None | None | False | None | False | 6165270.75 | 0 | 4019334 | 155778 | None | 009 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means ( Uni SR-2023-24, Volume 3, Page No 31, Item No 5.1 A(i)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 41.0 | 41.0 | 11522.5 | False | None | None | False | None | False | 472422.5 | 0 | 4019335 | 155778 | None | 0010 | Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom Common SR Vol-3 , P.No : 31, I.No : 5.3(ii) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 14.0 | 14.0 | 11522.5 | False | None | None | False | None | False | 161315.0 | 0 | 4019336 | 155778 | None | 0011 | Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to Common SR Vol-3 , P.No : 32, I.No : 5.8 (c) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7661.0 | 7661.0 | 576.12 | False | None | None | False | None | False | 4413655.32 | 0 | 4019337 | 155778 | None | 0012 | Mix Seal Surfacing Providing, laying and rolling of Close-Graded Premix Carpet (OGPC) surfacing material by Manual Means of 20 mm thickness composed 13.2 mm to 0.9 mm (Type-B) aggregates using VG30 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification.Common SR Vol-3 , P.No : 134, I.No : 20.13 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 227.0 | 227.0 | 11522.5 | False | None | None | False | None | False | 2615607.5 | 0 | 4019338 | 155778 | None | 0013 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.( Uni SR-2023-24, Volume 3, Page No 67, Sl No 8.15) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 530.0 | 530.0 | 419.0 | False | None | None | False | None | False | 222070.0 | 0 | 4019339 | 155778 | None | 0014 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a inimum value of 500 Kg. Fixing will be by drilling holes on the road for the hanks to go inside, without nails and using epoxy resin based dhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.Common SR Vol-3 , P.No : 74, I.No : 8.43 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | No | 365.0 | 365.0 | 170.0 | False | None | None | False | None | False | 62050.0 | 0 | 4019340 | 155778 | None | 0014 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangleCommon SR Vol-3 , P.No :54, I.No : 8.6. A(iv) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 3604.0 | 3604.0 | 10.0 | False | None | None | False | None | False | 36040.0 | 0 | 4019341 | 155778 | None | 0015 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Common SR Vol-3 , P.No :65, I.No : 8.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 9010.0 | 9010.0 | 4.5 | False | None | None | False | None | False | 40545.0 | 0 |
| 1726639283000 | 1 | None | None | Roads | Construction of BOX culvert | 1568536.67 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4019342 | 155779 | None | 001 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead .B.Rubble stone masonry in cement mortar.( 2023-24 SR Vol-3 page No 8. I.No 2.10(iv)B ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 481.0 | 481.0 | 32.4 | False | None | None | False | None | False | 15584.4 | 0 | 4019343 | 155779 | None | 002 | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works Above 600 mm to 900 mm dia( 2023-24 SR Vol-3 page No 11, I.No 2.17 (ix) B) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Rmtr | 1096.0 | 1096.0 | 45.0 | False | None | None | False | None | False | 49320.0 | 0 | 4019344 | 155779 | None | 003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( 2023-24 SR Vol-1 page No 8. I.No 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 239.62 | False | None | None | False | None | False | 24441.24 | 0 | 4019345 | 155779 | None | 004 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( 2023-24 SR Vol-1 page No 15. I.No 2.1.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 5989.0 | 5989.0 | 12.75 | False | None | None | False | None | False | 76359.75 | 0 | 4019346 | 155779 | None | 005 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( 2023-24 SR Vol-1 page No 15. I.No 2.2.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6287.0 | 6287.0 | 27.77 | False | None | None | False | None | False | 174589.99 | 0 | 4019347 | 155779 | None | 006 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( 2023-24 SR Vol-1 page No 15. I.No 2.2.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1257.0 | 1257.0 | 27.77 | False | None | None | False | None | False | 34906.89 | 0 | 4019348 | 155779 | None | 007 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) ( 2023-24 SR Vol-1 page No 16. I.No 2.5.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6843.0 | 6843.0 | 45.09 | False | None | None | False | None | False | 308550.87 | 0 | 4019349 | 155779 | None | 008 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre Spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. Common SR Vol-3 , P.No :121, I.No : 13.5 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2264.0 | 2264.0 | 16.0 | False | None | None | False | None | False | 36224.0 | 0 | 4019350 | 155779 | None | 009 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)( 2023-24 SR Vol-1 page No 16. I.No 2.5.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1368.6 | 1368.6 | 45.08 | False | None | None | False | None | False | 61696.488 | 0 | 4019351 | 155779 | None | 010 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges( 2023-24 SR Vol-1 page No 18, I.No 2.11 b) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 86206.0 | 86206.0 | 1.81 | False | None | None | False | None | False | 156032.86 | 0 | 4019352 | 155779 | None | 011 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges ( 2023-24 SR Vol-1 page No 18, I.No 2.11 c) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 86433.0 | 86433.0 | 1.83 | False | None | None | False | None | False | 158172.39 | 0 | 4019353 | 155779 | None | 012 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges ( 2023-24 SR Vol-1 page No 18, I.No 2.11 d) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 86658.0 | 86658.0 | 1.7 | False | None | None | False | None | False | 147318.6 | 0 | 4019354 | 155779 | None | 013 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ( 2023-24 SR Vol-3 page No. 117. I.No 12.4) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2677.0 | 2677.0 | 30.0 | False | None | None | False | None | False | 80310.0 | 0 | 4019355 | 155779 | None | 014 | PCC M15 Grade leveling course below approach slab complete as
per drawing and Technical specification ( P No-121, I No-13.8 VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6811.0 | 6811.0 | 3.38 | False | None | None | False | None | False | 23021.18 | 0 | 4019356 | 155779 | None | 015 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ( P No-122, I No-13.9 VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 11835.0 | 11835.0 | 4.5 | False | None | None | False | None | False | 53257.5 | 0 | 4019357 | 155779 | None | 016 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ( P No-121, I No-13.2 VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 13971.0 | 13971.0 | 2.81 | False | None | None | False | None | False | 39258.51 | 0 | 4019358 | 155779 | None | 017 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.( 2023-24 SR Vol-3 page No 123. I.No 13.14) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 84.0 | 84.0 | 18.0 | False | None | None | False | None | False | 1512.0 | 0 | 4019359 | 155779 | None | 018 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.( 2023-24 SR Vol-3 page No 7. I.No 1.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 474.0 | 474.0 | 270.0 | False | None | None | False | None | False | 127980.0 | 0 |
| 1726639283000 | 1 | None | None | Roads | Maintainance | 225132.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4019360 | 155780 | None | 001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4019361 | 155780 | None | 002 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4019362 | 155780 | None | 003 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4019363 | 155780 | None | 004 | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification (Data rate). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 240.0 | 240.0 | 57.76 | False | None | None | False | None | False | 13862.4 | 0 | 4019364 | 155780 | None | 005 | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification (Data rate). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 240.0 | 240.0 | 115.5 | False | None | None | False | None | False | 27720.0 | 0 | 4019365 | 155780 | None | 006 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 18.56 | False | None | None | False | None | False | 1893.12 | 0 | 4019366 | 155780 | None | 007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 18.19 | False | None | None | False | None | False | 1855.38 | 0 | 4019367 | 155780 | None | 008 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 97.0 | 97.0 | 105.0 | False | None | None | False | None | False | 10185.0 | 0 | 4019368 | 155780 | None | 009 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 97.0 | 97.0 | 105.0 | False | None | None | False | None | False | 10185.0 | 0 | 4019369 | 155780 | None | 010 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 97.0 | 97.0 | 105.0 | False | None | None | False | None | False | 10185.0 | 0 | 4019370 | 155780 | None | 011 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Mtr | 6.0 | 6.0 | 4050.0 | False | None | None | False | None | False | 24300.0 | 0 | 4019371 | 155780 | None | 012 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Mtr | 6.0 | 6.0 | 4060.0 | False | None | None | False | None | False | 24360.0 | 0 | 4019372 | 155780 | None | 013 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Mtr | 6.0 | 6.0 | 4060.0 | False | None | None | False | None | False | 24360.0 | 0 | 4019373 | 155780 | None | 014 | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909 (Common SR Vol-3 , P.No : 147, I.No : 16.20 i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | No | 2047.0 | 2047.0 | 3.0 | False | None | None | False | None | False | 6141.0 | 0 | 4019374 | 155780 | None | 015 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Km | 2047.0 | 2047.0 | 4.0 | False | None | None | False | None | False | 8188.0 | 0 | 4019375 | 155780 | None | 016 | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Km | 206.0 | 206.0 | 1.0 | False | None | None | False | None | False | 206.0 | 0 | 4019376 | 155780 | None | 017 | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade (Common SR Vol-3 , P.No : 148, I.No : 20.25 (ii)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Km | 1135.0 | 1135.0 | 2.0 | False | None | None | False | None | False | 2270.0 | 0 |
| 1726642742000 | 0 | None | None | Roads | One time improvements to road from National high way 766 to via jio rubber factory join to state highway in mysuru taluk. | 22995587.26 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4020316 | 155828 | None | 001 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead .B.Rubble stone masonry in cement mortar.( 2023-24 SR Vol-3 page No 8. I.No 2.10(iv)B ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 481.0 | 481.0 | 32.4 | False | None | None | False | None | False | 15584.4 | 0 | 4020334 | 155828 | None | 001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4020300 | 155828 | None | 001 | Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle( Uni SR-2023-24, Volume 3, Page No 9, Sl No 2.4 (ii) B ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4020301 | 155828 | None | 002 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work, In all kinds of soils Depth upto 3 m. ( Uni SR-2023-24, Volume 1, Page No 08, Item No 1.14.1 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 765.46 | False | None | None | False | None | False | 78076.92 | 0 | 4020335 | 155828 | None | 002 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4020317 | 155828 | None | 002 | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works Above 600 mm to 900 mm dia( 2023-24 SR Vol-3 page No 11, I.No 2.17 (ix) B) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Rmtr | 1096.0 | 1096.0 | 45.0 | False | None | None | False | None | False | 49320.0 | 0 | 4020302 | 155828 | None | 003 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 6.0 | 6.0 | 7875.0 | False | None | None | False | None | False | 47250.0 | 0 | 4020318 | 155828 | None | 003 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( 2023-24 SR Vol-1 page No 8. I.No 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 239.62 | False | None | None | False | None | False | 24441.24 | 0 | 4020336 | 155828 | None | 003 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer, A. In area of light jungle ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | 100 Sqm | 393.0 | 393.0 | 50.4 | False | None | None | False | None | False | 19807.2 | 0 | 4020303 | 155828 | None | 004 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ( Uni SR-2023-24, Volume 3, Page No 7, Sl No 1.7) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 119.0 | 119.0 | 229.64 | False | None | None | False | None | False | 27327.16 | 0 | 4020319 | 155828 | None | 004 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( 2023-24 SR Vol-1 page No 15. I.No 2.1.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 5989.0 | 5989.0 | 12.75 | False | None | None | False | None | False | 76359.75 | 0 | 4020337 | 155828 | None | 004 | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification (Data rate). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 240.0 | 240.0 | 57.76 | False | None | None | False | None | False | 13862.4 | 0 | 4020338 | 155828 | None | 005 | Patching of Shallow Paotholes using SDBC Gr II 25mm thick : Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification (Data rate). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 240.0 | 240.0 | 115.5 | False | None | None | False | None | False | 27720.0 | 0 | 4020304 | 155828 | None | 005 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ( Uni SR-2023-24, Volume 3, Page No 7, Sl No 1.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 474.0 | 474.0 | 2132.86 | False | None | None | False | None | False | 1010975.64 | 0 | 4020320 | 155828 | None | 005 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( 2023-24 SR Vol-1 page No 15. I.No 2.2.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6287.0 | 6287.0 | 27.77 | False | None | None | False | None | False | 174589.99 | 0 | 4020339 | 155828 | None | 006 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 18.56 | False | None | None | False | None | False | 1893.12 | 0 | 4020321 | 155828 | None | 006 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( 2023-24 SR Vol-1 page No 15. I.No 2.2.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1257.0 | 1257.0 | 27.77 | False | None | None | False | None | False | 34906.89 | 0 | 4020305 | 155828 | None | 006 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope
and compacted to meet requirement of table No. 300-2 ( Uni SR-2023-24, Volume 3, Page No 17, Sl No 3.6) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 493.0 | 493.0 | 1361.75 | False | None | None | False | None | False | 671342.75 | 0 | 4020306 | 155828 | None | 007 | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material Common SR Vol- 3 , P.No : 19, I.No : 4.1 A(v) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2487.0 | 2487.0 | 2074.05 | False | None | None | False | None | False | 5158162.35 | 0 | 4020322 | 155828 | None | 007 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) ( 2023-24 SR Vol-1 page No 16. I.No 2.5.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6843.0 | 6843.0 | 45.09 | False | None | None | False | None | False | 308550.87 | 0 | 4020340 | 155828 | None | 007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, horing, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1 , P.No : 8, I.No : 1.14.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 18.19 | False | None | None | False | None | False | 1855.38 | 0 | 4020307 | 155828 | None | 008 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density Common SR Vol- 3 , P.No : 26, I.No : 4.17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2559.0 | 2559.0 | 2409.25 | False | None | None | False | None | False | 6165270.75 | 0 | 4020323 | 155828 | None | 008 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre Spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. Common SR Vol-3 , P.No :121, I.No : 13.5 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2264.0 | 2264.0 | 16.0 | False | None | None | False | None | False | 36224.0 | 0 | 4020341 | 155828 | None | 008 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 97.0 | 97.0 | 105.0 | False | None | None | False | None | False | 10185.0 | 0 | 4020308 | 155828 | None | 009 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means ( Uni SR-2023-24, Volume 3, Page No 31, Item No 5.1 A(i)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 41.0 | 41.0 | 11522.5 | False | None | None | False | None | False | 472422.5 | 0 | 4020324 | 155828 | None | 009 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)( 2023-24 SR Vol-1 page No 16. I.No 2.5.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1368.6 | 1368.6 | 45.08 | False | None | None | False | None | False | 61696.488 | 0 | 4020342 | 155828 | None | 009 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 97.0 | 97.0 | 105.0 | False | None | None | False | None | False | 10185.0 | 0 | 4020309 | 155828 | None | 0010 | Tack coat on Granular surface treated with primer : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on the Granular surface cleaned with echanical broom Common SR Vol-3 , P.No : 31, I.No : 5.3(ii) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 14.0 | 14.0 | 11522.5 | False | None | None | False | None | False | 161315.0 | 0 | 4020325 | 155828 | None | 010 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridges( 2023-24 SR Vol-1 page No 18, I.No 2.11 b) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 86206.0 | 86206.0 | 1.81 | False | None | None | False | None | False | 156032.86 | 0 | 4020343 | 155828 | None | 010 | Maintenance of Earthen Shoulder (filling with fresh soil) : Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate quipment .(Common SR Vol-3 , P.No : 91, I.No : 10.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 97.0 | 97.0 | 105.0 | False | None | None | False | None | False | 10185.0 | 0 | 4020344 | 155828 | None | 011 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Mtr | 6.0 | 6.0 | 4050.0 | False | None | None | False | None | False | 24300.0 | 0 | 4020310 | 155828 | None | 0011 | Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to Common SR Vol-3 , P.No : 32, I.No : 5.8 (c) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7661.0 | 7661.0 | 576.12 | False | None | None | False | None | False | 4413655.32 | 0 | 4020326 | 155828 | None | 011 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges ( 2023-24 SR Vol-1 page No 18, I.No 2.11 c) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 86433.0 | 86433.0 | 1.83 | False | None | None | False | None | False | 158172.39 | 0 | 4020345 | 155828 | None | 012 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Mtr | 6.0 | 6.0 | 4060.0 | False | None | None | False | None | False | 24360.0 | 0 | 4020327 | 155828 | None | 012 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges ( 2023-24 SR Vol-1 page No 18, I.No 2.11 d) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 86658.0 | 86658.0 | 1.7 | False | None | None | False | None | False | 147318.6 | 0 | 4020311 | 155828 | None | 0012 | Mix Seal Surfacing Providing, laying and rolling of Close-Graded Premix Carpet (OGPC) surfacing material by Manual Means of 20 mm thickness composed 13.2 mm to 0.9 mm (Type-B) aggregates using VG30 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification.Common SR Vol-3 , P.No : 134, I.No : 20.13 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 227.0 | 227.0 | 11522.5 | False | None | None | False | None | False | 2615607.5 | 0 | 4020328 | 155828 | None | 013 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ( 2023-24 SR Vol-3 page No. 117. I.No 12.4) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2677.0 | 2677.0 | 30.0 | False | None | None | False | None | False | 80310.0 | 0 | 4020312 | 155828 | None | 0013 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m 2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.( Uni SR-2023-24, Volume 3, Page No 67, Sl No 8.15) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 530.0 | 530.0 | 419.0 | False | None | None | False | None | False | 222070.0 | 0 | 4020346 | 155828 | None | 013 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.(Common SR Vol-3 , P.No : 147, I.No : 16.19) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Mtr | 6.0 | 6.0 | 4060.0 | False | None | None | False | None | False | 24360.0 | 0 | 4020329 | 155828 | None | 014 | PCC M15 Grade leveling course below approach slab complete as
per drawing and Technical specification ( P No-121, I No-13.8 VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6811.0 | 6811.0 | 3.38 | False | None | None | False | None | False | 23021.18 | 0 | 4020347 | 155828 | None | 014 | Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909 (Common SR Vol-3 , P.No : 147, I.No : 16.20 i) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | No | 2047.0 | 2047.0 | 3.0 | False | None | None | False | None | False | 6141.0 | 0 | 4020313 | 155828 | None | 0014 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a inimum value of 500 Kg. Fixing will be by drilling holes on the road for the hanks to go inside, without nails and using epoxy resin based dhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.Common SR Vol-3 , P.No : 74, I.No : 8.43 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | No | 365.0 | 365.0 | 170.0 | False | None | None | False | None | False | 62050.0 | 0 | 4020348 | 155828 | None | 015 | Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911 (Common SR Vol-3 , P.No : 147, I.No : 16.22) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Km | 2047.0 | 2047.0 | 4.0 | False | None | None | False | None | False | 8188.0 | 0 | 4020314 | 155828 | None | 0014 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012 60 cm equilateral triangleCommon SR Vol-3 , P.No :54, I.No : 8.6. A(iv) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 3604.0 | 3604.0 | 10.0 | False | None | None | False | None | False | 36040.0 | 0 | 4020330 | 155828 | None | 015 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ( P No-122, I No-13.9 VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 11835.0 | 11835.0 | 4.5 | False | None | None | False | None | False | 53257.5 | 0 | 4020315 | 155828 | None | 0015 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m 2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Common SR Vol-3 , P.No :65, I.No : 8.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 9010.0 | 9010.0 | 4.5 | False | None | None | False | None | False | 40545.0 | 0 | 4020331 | 155828 | None | 016 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ( P No-121, I No-13.2 VOL-III CSR 2023-24 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 13971.0 | 13971.0 | 2.81 | False | None | None | False | None | False | 39258.51 | 0 | 4020349 | 155828 | None | 016 | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (i) Painting two coats with synthetic enamel paint (Common SR Vol-3 , P.No : 148, I.No : 16.24 (i)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Km | 206.0 | 206.0 | 1.0 | False | None | None | False | None | False | 206.0 | 0 | 4020332 | 155828 | None | 017 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.( 2023-24 SR Vol-3 page No 123. I.No 13.14) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 84.0 | 84.0 | 18.0 | False | None | None | False | None | False | 1512.0 | 0 | 4020350 | 155828 | None | 017 | Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1913 (ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade (Common SR Vol-3 , P.No : 148, I.No : 20.25 (ii)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Km | 1135.0 | 1135.0 | 2.0 | False | None | None | False | None | False | 2270.0 | 0 | 4020333 | 155828 | None | 018 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.( 2023-24 SR Vol-3 page No 7. I.No 1.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 474.0 | 474.0 | 270.0 | False | None | None | False | None | False | 127980.0 | 0 |
|
|
---|