createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726649889500
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee960.00
emd100000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-09-2024 16:30:00
tenderQueryClose19-09-2024 15:00:00
technicalBidOpen30-09-2024 11:00:00
publishedDate18-09-2024 15:37:40
publishedByPostTAPCMSGB_SEC_GBNR
publishedByUserKPE22301 - KARTHIKARADYA K N
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonHanumantha Reddy
splitEmdRequiredYnNone
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber6362011127
tenderSupplierListNone
tenderSchedule
createdTs1726649889527
version9
createdDateNone
modifiedDateNone
tenderNumberTAPCMSGB/2024-25/BD/WORK_INDENT2
titleRepairs and New construction of Agricultural Producer Co-Operative Marketing Society Ltd Gowdown and Office Building at Gowribidnur Town, Chikkaballapur District.
descriptionProducer Co-Operative Marketing Society Ltd Gowdown and Office Building at Gowribidnur Town, Chikkaballapur District
categoryWORKS
categoryTextWorks
ecv3815513.30
deptNameGauribidanur Taluk Agricultural Producers Co-Operative Marketing Society Ltd
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location11140
locationNameGauribidanur Taluk Agricultural Producers Co-Operative Marketing Society Ltd Chikkaballapur
provisionalAmount4550000.0
groupOverheadTotal0.0
fileNumberTAPCMS/GBD/BD/280/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17266498900000NoneNoneBuildingsRepairs and New construction of Agricultural Producer Co-Operative Marketing Society Ltd Gowdown and Office Building at Gowribidnur Town Taluk, Chikkaballapur District.3815513.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4021773155903NoneItme No1Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.Common SR Volume (2) (P-187,It No 19.3) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum2426.02426.040.62FalseNoneNoneFalseNoneFalse98544.120
4021774155903NoneItem No.2Demolishing stone rubble masonry manually/ by mechanical meansincluding stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerin- charge.In lime mortar Common SR Volume(2) ( P.No 187 item 19.9.1)2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum792.0792.044.11FalseNoneNoneFalseNoneFalse34935.120
4021775155903NoneItem No.3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. M3 In lime mortar Common SR Volume (2) (P-163,It No 19.7.2 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum583.0583.021.29FalseNoneNoneFalseNoneFalse12412.070
4021776155903NoneItem No.4Removing of Old Door ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm100.0100.07.56FalseNoneNoneFalseNoneFalse756.00
4021777155903NoneItem No.5Refixing of Old Door ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm100.0100.03.78FalseNoneNoneFalseNoneFalse378.00
4021778155903NoneItem No.6Removing and refixing stone slabs of drains and pointing in CM (1:3)(P.No.25, I.No. 5.33 of PWD SR 2018-19) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm105.0105.026.28FalseNoneNoneFalseNoneFalse2759.40
4021779155903NoneItem No.7Earth work excavation for Foundation by manual means for all Buildings, Bridges, Retaining walls, Abutment Piers and such similar works as per drawing and technical Specifications, including setting out, providing shoring & strutting,barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils Depth upto 1.5 mCommon SR Volume (1) (P-6,It No 1.15.1 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum363.0363.012.35FalseNoneNoneFalseNoneFalse4483.050
4021780155903NoneItem No.8Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:4:8( M5) Using 40 mm and down size graded crushed coarse aggregates Common SR Volume (1) (P-15,It No 2.1.2 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum5664.05664.02.47FalseNoneNoneFalseNoneFalse13990.080
4021781155903NoneItem No.9Providing and Constructing Laterite size stone Masonry including Cost and Conveince of all metirials curing etc Complete as specification IS 3620/1979 having compressive strenght not less than 3.5 N/MM Sqm for Satulated Dry Samples - For Foundation In CM 1:6 Common SR Volume (2) (P-3,It No 6.35 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum6374.06374.07.9FalseNoneNoneFalseNoneFalse50354.60
4021782155903NoneItem No.10Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Common SR Volume (1) (P-16,It No 2.5.1 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum6630.06630.01.98FalseNoneNoneFalseNoneFalse13127.40
4021783155903NoneItem No.11Add Centring Charges for Plinth Add for 50% Common SR Volume (1) (P-115,Slno8 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum3315.03315.01.98FalseNoneNoneFalseNoneFalse6563.70
4021784155903NoneItem No.12Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Common SR Volume (2) (P-13,It No 6.4 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum8661.08661.016.8FalseNoneNoneFalseNoneFalse145504.80
4021785155903NoneItem No.13Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates Common SR Volume (1) (P-16,It No 2.5.2 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum6843.06843.022.93FalseNoneNoneFalseNoneFalse156909.990
4021786155903NoneItem No.14Add Centring Charges for Roof Add for 60% Common SR Volume (1) (P-115,Slno8 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum4105.84105.822.93FalseNoneNoneFalseNoneFalse94145.9940
4021787155903NoneItem No.15Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates Common SR Volume (1) (P-16,It No 2.5.2 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum6843.06843.059.8FalseNoneNoneFalseNoneFalse409211.40
4021788155903NoneItem No.16Add Centring Charges for Roof Add for 50% Common SR Volume (1) (P-115,Slno8 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum3421.53421.559.8FalseNoneNoneFalseNoneFalse204605.70
4021789155903NoneItem No.17Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Common SR Volume (2) (P-13,It No 6.4 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum8661.08661.034.78FalseNoneNoneFalseNoneFalse301229.580
4021790155903NoneItem No.18Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (Thelaps and wastages shall not be measured separately)Common SR Volume (2) (P-84,Slno11.32 ) 2022-23 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.MT89457.089457.09.36FalseNoneNoneFalseNoneFalse837317.520
4021791155903NoneItem No.19Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.2.1) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum295.0295.0483.81FalseNoneNoneFalseNoneFalse142723.950
4021792155903NoneItem No.20Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Common SR Volume (2) (P-41,It No 8.4.2) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm213.0213.0449.36FalseNoneNoneFalseNoneFalse95713.680
4021793155903NoneItem No.21Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.3.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm354.0354.0327.57FalseNoneNoneFalseNoneFalse115959.780
4021794155903NoneItem No.22Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.(P-60, Item No : 9.12) Vol - 2 PWD SR of 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm1449.01449.05.0FalseNoneNoneFalseNoneFalse7245.00
4021795155903NoneItem No.23Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Common SR Volume (2) (P-60, It No 9.11) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm889.0889.027.3FalseNoneNoneFalseNoneFalse24269.70
4021796155903NoneItem No.24SOLID PANEL PVC DOOR SHUTTER Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm fro styles and 15x15mm for top & bottom rails, covered with heat moulded PVC channel of 5mm thick sheet & 30 x 50mm wide to form styles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the styles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 m.m Aluminium hinges.Common SR Volume (2) (P-106,It No 12.55.2 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm2040.02040.03.15FalseNoneNoneFalseNoneFalse6426.00
4021797155903NoneItem No.25Providing and fixing of 2 track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows and shall be provided with 5mm plain float glass, standard hardware single point locking system with touch lock. Wall thickness of frame and sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T and P s shall not be made) Common SR Volume (2) (P-123, It No 12.55) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm5390.05390.018.0FalseNoneNoneFalseNoneFalse97020.00
4021798155903NoneItem No.26Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm .Common SR Volume (2) (P-60, It No 9.12.2) ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm1145.01145.0132.5FalseNoneNoneFalseNoneFalse151712.50
4021799155903NoneItem No.27Providing Mathi / Nandi wood wrought and putup for purlins, common rafters and similar work including cost of materials, labour, usage charges complete as per specifications.Common SR Volume (2) (P-99,It No 12.3 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Cum122399.0122399.00.3FalseNoneNoneFalseNoneFalse36719.70
4021800155903NoneItem No.28Providing and fixing in position fully panelled Teak wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures)Common SR Volume (2) (P-100,It No 12.16 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm9479.09479.02.52FalseNoneNoneFalseNoneFalse23887.080
4021801155903NoneItem No.29Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface isfurther allowed to dry for 12 hrs.Common SR Volume (2) (P-54,It No 8.82 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm677.0677.05.04FalseNoneNoneFalseNoneFalse3412.080
4021802155903NoneItem No.30Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.Common SR Volume (2) (P-50,It No 8.51 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm100.0100.0933.17FalseNoneNoneFalseNoneFalse93317.00
4021803155903NoneItem No.31Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as perdirections of Engineer-in-charge Common SR Volume (2) (P-48,It No 8.39 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm127.0127.0933.17FalseNoneNoneFalseNoneFalse118512.590
4021804155903NoneItem No.32Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-45,Itno8.30 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm174.0174.0481.17FalseNoneNoneFalseNoneFalse83723.580
4021805155903NoneItem No.33Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge.Common SR Volume(2) ( P.No 44 item 8.19.1)2022-23 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm255.0255.036.4FalseNoneNoneFalseNoneFalse9282.00
4021806155903NoneItem No.34Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding Common SR Volume (2) (P-85, It No 11.34(A) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Kg / Sqm168.0168.0378.0FalseNoneNoneFalseNoneFalse63504.00
4021807155903NoneItem No.35Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. G.I. pipes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge. Common SR Volume (2) (P-84,It No 11.26.3 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Kgs183.0183.0250.0FalseNoneNoneFalseNoneFalse45750.00
4021808155903NoneItem No.36KSRB 7.3 : Providing and fixing 1mm thick M.S. sheet garage door with frame and diagonal braces of size 40x40x6 mm angle Iron, 3.15mm thick M.S. Gusset plates at the junctions and corners, with handles, stoppers and locking arrangements etc., including applying a priming coat of red lead paint cost of materials, labour, HOM of machinery complete as per specifications. Double leaf door of size 2.4x2.4m. Specification No. KBS 7.9 / 7.12. (P.No. 31, I.No. 7.3 of CSR 2018-19) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm2729.02729.05.04FalseNoneNoneFalseNoneFalse13754.160
4021809155903NoneItem No.37Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-48,Itno8.41 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm167.0167.038.0FalseNoneNoneFalseNoneFalse6346.00
4021810155903NoneItem No.38Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. Common SR Volume (2) (P 63,Itno9.30 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm2852.02852.011.27FalseNoneNoneFalseNoneFalse32142.040
4021811155903NoneItem No.39Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.3.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm354.0354.0156.0FalseNoneNoneFalseNoneFalse55224.00
4021812155903NoneItem No.40Providing and fixing flush door shutter made out of solid core black board type, well seasoned chemically treated hard wood battens and internal frame with minimum 45 mm wide wooden frame all-round door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door using liquid phenol formaldehyde resin as per IS specification 2202 (Part-I) 1991. From manufacturer (Factory) complete as per specification. - 35mm thick both side teak ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm3800.03800.06.3FalseNoneNoneFalseNoneFalse23940.00
4021813155903NoneItem No.41Providing and fixing white vitercous china type pedestal type water closet(Europian type WC Pan Common SR Volume (2) (P-123, It No 14.2.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Nos4026.04026.01.0FalseNoneNoneFalseNoneFalse4026.00
4021814155903NoneItem No.42Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer Common SR Volume (2) (P-125, It No 14.7(A)) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.No3599.03599.01.0FalseNoneNoneFalseNoneFalse3599.00
4021815155903NoneItem No.43Providing and fixing unplasticised PVC connection pipe with brass unions : 15 mm nominal bore Common SR Volume (2) (P-116, It No 13.8.1.1) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.No83.083.01.0FalseNoneNoneFalseNoneFalse83.00
4021816155903NoneItem No.44Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia Common SR Volume (2) (P-136, It No 4.28.2.2) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.No92.092.01.0FalseNoneNoneFalseNoneFalse92.00
4021817155903NoneItem No.45Providing and fixing white vitreous china flat back or wall corner type lipped fronturinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively.Common SR Volume (2) (P-135, It No 14.23) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.No1154.01154.01.0FalseNoneNoneFalseNoneFalse1154.00
4021818155903NoneItem No.46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-41, It No 8.3.1 ) 2023-24 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm174.0174.0195.91FalseNoneNoneFalseNoneFalse34088.340
4021819155903NoneItem No.47Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Common SR Volume (2) (P-48,Itno8.41 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm167.0167.073.04FalseNoneNoneFalseNoneFalse12197.680
4021820155903NoneItem No.48Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface isfurther allowed to dry for 12 hrs.Common SR Volume (2) (P-54,It No 8.82 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm677.0677.036.96FalseNoneNoneFalseNoneFalse25021.920
4021821155903NoneItem No.49Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge Common SR Volume (2) (P-48, It No 8.39 ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm95.095.0771.7FalseNoneNoneFalseNoneFalse73311.50
4021822155903NoneItem No.50Extra for removing white wash or colour wash by steel brushing and / or scraping, sand papering the ceiling and / or sloping roof surface smooth including repairs to scraches, cost of material, labour, complete as per specifications.Common SR Volume (2) (P-85, It No 11.34(A) ) 2021-22 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Sqm10.010.01006.85FalseNoneNoneFalseNoneFalse10068.50
4021823155903NoneItem No.51KSRB 8.6-8 : Providing and fixing on wall surface. 40 kg / sq.cm H.D.P.E. rain down water pipes 110mm outer dia. approved make and brand with necessary specials like shoes, bends and offsets fixed with iron clamps, wall plugs, screws, including cost of materials, labour, complete as per specifications. (P.No. 47/ I.No. 8.19 of CSR 2015-16) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.Mtr426.0426.033.0FalseNoneNoneFalseNoneFalse14058.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17266498910000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17266498910000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17266498910000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17266498910000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17266498910000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17266499300000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17266499490000NoneNoneELIGIBILITYTotal value of civil engineering works executed and payments received in the last five years (year-wise), List of existing commitments and ongoing work, List of works for which tenders already submitted, Banker Details, Conditional tenders will not be accepted., The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17266499570000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable. The employer is not responsible for any delay in accessing kpp Portal. All the formats prescribed in the bid document shall be filled by the tenderer in complete. All scanned documents to be uploaded shall be in original and the President & Building construction committee TAPCMS, Gowribidnur the right to verify the documents before approval. The employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons. The intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents Contractors Should be registered with KPWD as Class-I Contractor and further orders thereon. In the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work. The tenderer should maintain the Building works during the defective liability period for 1 years.None
17266499650000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in any of the forms given in clause 24.1 of ITT for an amount equivalent to 5% of the Contract price plus additional security deposit for unbalanced tenders in accordance with clause 24.3 of ITT and clause 44 of the conditions of contract for all works. Contractor should take all precautions to ensure that no damage is caused to any adjacent structures/utilities above or below the ground and also to the existing other similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost. Damage to physical property and personal injury and death will be the personal risk of the contractor. All safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent. Formation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost. However, in case of 1st & Final bill the entire security deposit will be deducted from the final bill. (If applicable) Further particulars, if any, required by the Contractor can be had from the office of the TAPCMS Ltd,, Gowribidnur during office hours on all working days.None
17266499740000NoneNoneELIGIBILITYMaterials like bitumen or steel,cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost. All the items in the tender include all lead, lifts,loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and convenience of all materials and all other such incidental charges necessary for successful completion of works as per the detalied technical specification and direction of Engineer - in charge of this work. Contractor should follow strictly the prevailing rules of labour act & the contractor should employ only registered labours as per Govt. Circular No. PWD/198/BMS/2009/ Dated: 24-06-2009, negative tenders for labour portion will be rejected. (If applicable) Royalty on construction materials and other taxes will be deducted as per prevailing Govt. orders. As per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund. The returns submitted to the I.T. along with the Profit and Loss account statement, Balance sheet should be uploaded for the financial turnover criteria attested by registered Chartered Accountant, along with UDIN else will be treated as invalid. Participating agencies should compulsorily possess GST and PAN numbers. GST number should be valid and in force at the time of participation.None
17266499800000NoneNoneELIGIBILITYThe contractor must ensure that the deployed labourNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneSatisfactoriy completed as prime contractor at-least one such similar work of value not less than Rs.22.75Lakhs (50% of estimated cost of tender)(similar work)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedCapabilities of VendorOther
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Should upload relevant documents
NoneNoneNoneNoneAssessed available tender capacity - (AxNx2.5-B) where A -Maximum value of civil engineering works executed in any one year during the last five years (updated to current financial year price level)(FY in which tenders are invited) taking into account the completed as well as works in progress. N - Number of years prescribed for completion of the works for which tenders are invited. B Value, at Current Financial year (FY in which tenders are invited) price level, of existing commitments and on-going works to be completed during the next 8Months. (Period of completion of the works for which tenders are invitedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneKPWD CLASS III And Above RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneAnnual turnover certificate issued by Chartered accountant with UDIN Number for past 5 years i.e., 2019-20 to 2023-24Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years (i.e. 2019- 20 to 2023-24) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs45.50 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- tenders already submitted
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneValid GST CertificateOthersOther
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- GST Certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD CLASS III And Above RegistrationTrueTechnical Bid
Annual turnover certificate issued by Chartered accountant with UDIN Number for past 5 years i.e., 2019-20 to 2023-24TrueTechnical Bid
Work done certificate issued by not below the rank of Executive EngineerTrueTechnical Bid
Assessed available tender capacityTrueTechnical Bid
Existing & Ongoing Commitment StatementTrueTechnical Bid
IT & Balance sheet 2019-20 to 2023-24TrueTechnical Bid
GST Returns Last 3 MonthsTrueTechnical Bid
Aadhar Card, Pan Card & GST CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone