1726636848000 | 0 | None | None | Other Works | Construction of Compound wall and Fencing at SWM Site of TP Boragaon | 6224996.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4018716 | 155759 | None | code01 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach hannels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to omplete the work. .In all kinds of soils Depth upto 1.5 m PWD Common SR 2023-24 VOl.1(Page No.5, I.No.1.4.1) | Cum | 254.1 | 254.1 | 304.5 | False | None | None | False | None | False | 77373.45 | 0 | 4018717 | 155759 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates PWD Common SR 2023-24 VOl.1(Page No.15, I.No.2.1.2) | Cum | 5947.2 | 5947.2 | 38.25 | False | None | None | False | None | False | 227480.4 | 0 | 4018718 | 155759 | None | code03 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)PWD Common SR 2023-24 VOl.2(Page No.9, I.No.5.2) | Cum | 6948.9 | 6948.9 | 151.998 | False | None | None | False | None | False | 1056218.9022 | 0 | 4018719 | 155759 | None | code04 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates PWD Common SR 2023-24 VOl.1(Page No.15, I.No.2.1.4) | Cum | 6527.85 | 6527.85 | 33.803 | False | None | None | False | None | False | 220660.91355 | 0 | 4018720 | 155759 | None | code05 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and
sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work PWD Common SR 2023-24 Volume 2 (P No: 13 I.No:6.7) | Cum | 8621.55 | 8621.55 | 193.997 | False | None | None | False | None | False | 1672554.83535 | 0 | 4018721 | 155759 | None | code06 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge. PWD Common DSR 2023-24 Volume 2 (P No: 84 I.No: 11.25.2) | Kg | 142.8 | 142.8 | 689.91 | False | None | None | False | None | False | 98519.148 | 0 | 4018722 | 155759 | None | code07 | Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples,
turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used (PWDSR 2023-24 Vol-2 P.No.95 I.No.11.57.1) | Kg | 18.9 | 18.9 | 2840.0 | False | None | None | False | None | False | 53676.0 | 0 | 4018723 | 155759 | None | code08 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including. preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in-charge PWD Common DSR 2023-24 VOl.2(Page No.48, I.No.8.39) | Sqm | 133.35 | 133.35 | 3045.0 | False | None | None | False | None | False | 406050.75 | 0 | 4018724 | 155759 | None | code09 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, sage charges of machinery, curing and all other ppurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD Common SR 2023-24 Volume 1 (P No: 16 I.No:2.3.1 ) | Cum | 6639.15 | 6639.15 | 89.7956 | False | None | None | False | None | False | 596166.45774 | 0 | 4018725 | 155759 | None | code10 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Foundation upto Plinth All other types Form Works Consider 3% PWD Common SR 2023-24 Volume 1 (P No: 111 I.No:1) | Cum | 199.17 | 199.17 | 9.2046 | False | None | None | False | None | False | 1833.280182 | 0 | 4018726 | 155759 | None | code11 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Columns / Shaft (Slip Centering) Form Works Consider 70% PWD Common SR 2023-24 Volume 1 (P No: 111 I.No:9) | Cum | 4647.4 | 4647.4 | 16.108 | False | None | None | False | None | False | 74860.3192 | 0 | 4018727 | 155759 | None | code12 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Beams, Lintels & Troughs of Aqueducts Form Works Consider 60% PWD Common SR 2023-24 Volume 1 (P No: 111 I.No:14) | Cum | 4647.4 | 4647.4 | 30.015 | False | None | None | False | None | False | 139491.711 | 0 | 4018728 | 155759 | None | code13 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. PWD Common SR 2023-24 Volume 1 (P No: 18 I.No:2.11h ) | t | 82961.55 | 82961.55 | 6.8393 | False | None | None | False | None | False | 567398.928915 | 0 | 4018729 | 155759 | None | code14 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.PWD Common SR 2023-24 Volume 2 (P No:41 I.No: 8.4.1) | Sqm | 339.15 | 339.15 | 3045.0 | False | None | None | False | None | False | 1032711.75 | 0 |
|