1726645653000 | 0 | None | None | Bridges/Culverts | Construction of Foot Bridge across Naala at Hebre Village of Bandal Panchayat in Sirsi Taluk of Uttara Kannada District | 754995.6 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4021399 | 155873 | None | Vol.1 P.No 8 Item No.1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 125.66 | 125.66 | 102.99 | False | None | None | False | None | False | 12941.7234 | 0 | 4021400 | 155873 | None | Vol.1 P.No15 Item No.2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 7378.45 | 7378.45 | 4.29 | False | None | None | False | None | False | 31653.5505 | 0 | 4021401 | 155873 | None | Vol.1 P.No. 15 Item No.2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (Add Formwork for Open foundation of Bridge @ 4% of Cost of concrete as per Vol 1/P No 111/Item 05-Addendum-1) ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 8118.19 | 8118.19 | 10.06 | False | None | None | False | None | False | 81668.9914 | 0 | 4021402 | 155873 | None | Vol.1 P.No. 16 Item No.2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Add Formwork for Pier & Abutment @ 10% of Cost of concrete as per Vol 1/P No 111/Item 10-Addendum-1) ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 8586.55 | 8586.55 | 12.1 | False | None | None | False | None | False | 103897.255 | 0 | 4021403 | 155873 | None | Vol.1 P.No 16 Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical Specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (Add Formwork for Solid Slab Super Structure@ 20% of Cost of concrete as per Vol 1/P No 112/Item 1-Addendum-1) ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 10116.69 | 10116.69 | 8.08 | False | None | None | False | None | False | 81742.8552 | 0 | 4021404 | 155873 | None | Vol.1 P.No18 Item No. 2.11 b | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. b. Foundation of Bridges ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | t | 96550.72 | 96550.72 | 0.62 | False | None | None | False | None | False | 59861.4464 | 0 | 4021405 | 155873 | None | Vol.1 P.No 18 Item No.2.11 c | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification c. Sub structure of Bridges ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | t | 96804.96 | 96804.96 | 1.27 | False | None | None | False | None | False | 122942.2992 | 0 | 4021406 | 155873 | None | Vol.1 P.No 18 Item No. 2.11 d | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification d. Super structure of Bridges ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | t | 97056.96 | 97056.96 | 0.76 | False | None | None | False | None | False | 73763.2896 | 0 | 4021407 | 155873 | None | Vol.3 P.No 121 Item No.13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 7628.32 | 7628.32 | 1.2 | False | None | None | False | None | False | 9153.984 | 0 | 4021408 | 155873 | None | Vol.1 P.No 16 Item No. 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical Specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 7664.16 | 7664.16 | 1.6 | False | None | None | False | None | False | 12262.656 | 0 | 4021409 | 155873 | None | Vol.3 P.No 123 Item No. 13.15(ii) | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 153.44 | 153.44 | 6.0 | False | None | None | False | None | False | 920.64 | 0 | 4021410 | 155873 | None | Vol.3 P.No 124 Item No.13.15 (iv) | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 percent bitumen by weight. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 53.76 | 53.76 | 6.0 | False | None | None | False | None | False | 322.56 | 0 | 4021411 | 155873 | None | Vol.3 P.No 117 Item No. 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 2998.24 | 2998.24 | 16.91 | False | None | None | False | None | False | 50700.2384 | 0 | 4021412 | 155873 | None | Vol.3 P.No 117 Item No. 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 267.68 | 267.68 | 10.8 | False | None | None | False | None | False | 2890.944 | 0 | 4021413 | 155873 | None | Vol.3 P.No 117 Item No. 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A. Granular Material. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 1308.16 | 1308.16 | 4.97 | False | None | None | False | None | False | 6501.5552 | 0 | 4021414 | 155873 | None | Vol.3 P.No 121 Item No. 13.7 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | No | 3663.52 | 3663.52 | 6.0 | False | None | None | False | None | False | 21981.12 | 0 | 4021415 | 155873 | None | Vol.3 P.No 121 Item No. 13.5A | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 2535.68 | 2535.68 | 29.8 | False | None | None | False | None | False | 75563.264 | 0 | 4021416 | 155873 | None | Vol.1 P.No 7 Item No. 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 530.88 | 530.88 | 11.73 | False | None | None | False | None | False | 6227.2224 | 0 |
|