noticeInvitingTenderDTO
createdTs1726657799382
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee630.00
emd50280.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose27-09-2024 16:00:00
tenderQueryClose26-09-2024 16:00:00
technicalBidOpenNone
publishedDate20-09-2024 14:02:25
publishedByPostPWD_EE_DIV_SRS
publishedByUserKPE13304 - MALLIKARJUN H
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEr RAMESH B
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9480138387
tenderSupplierListNone
tenderSchedule
createdTs1726657799413
version12
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BR/WORK_INDENT15553
titleConstruction of Foot Bridge to Darbegadde nala at Mundaganamane grama of Devanalli Grama Panchayath in Sirsi Taluka of U.K. Dist.
descriptionConstruction of Foot Bridge to Darbegadde nala at Mundaganamane grama of Devanalli Grama Panchayath in Sirsi Taluka of U.K. Dist.
categoryWORKS
categoryTextWorks
ecv2514998.67
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1683
locationNamePWD Division Office Sirsi
provisionalAmount3000000.0
groupOverheadTotal0.0
fileNumberPWD/SirsiSD/2024-25/FB/WORK002
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17266577990000NoneNoneBridges/CulvertsCONSTRUCTION OF FOOT BRIDGE ON DARBEGADDE HALLA NEAR MUNDAGANAMANE VILLAGE IN DEVANAHALLI GRAMAPANCHAYAT SIRSI TALUK, UTTARA KANNADA DISTRICT.2514998.67
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4023664155967NoneVol.1 P.No 8 Item No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum114.24114.24182.9FalseNoneNoneFalseNoneFalse20894.4960
4023665155967NoneVol.1 P.No 15 Item No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum6707.686707.6810.34FalseNoneNoneFalseNoneFalse69357.41120
4023666155967NoneVol.1 P.No 15 Item No.2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum8118.198118.1936.15FalseNoneNoneFalseNoneFalse293472.56850
4023667155967NoneVol.1 P.No 16 Item No.2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum8586.558586.5530.76FalseNoneNoneFalseNoneFalse264122.2780
4023668155967NoneVol.1 P.No 16 Item No.2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical Specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum10116.6910116.6938.63FalseNoneNoneFalseNoneFalse390807.73470
4023669155967NoneVol.1 P.No 18 Item No.2.11 bSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification b. Foundation of Bridges. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.t96550.7296550.722.35FalseNoneNoneFalseNoneFalse226894.1920
4023670155967NoneVol.1 P.No 18 Item No.2.11 cSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification c. Sub structure of Bridges. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.t96804.9696804.962.22FalseNoneNoneFalseNoneFalse214907.01120
4023671155967NoneVol.1 P.No 18 Item No.2.11 dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification d. Super structure of Bridges. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.t97056.9697056.962.8FalseNoneNoneFalseNoneFalse271759.4880
4023672155967NoneVol.3 P.No 121 Item No.13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum7628.327628.324.27FalseNoneNoneFalseNoneFalse32572.92640
4023673155967NoneVol.3 P.No 122 Item No.13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum13255.213255.29.45FalseNoneNoneFalseNoneFalse125261.640
4023674155967NoneVol.3 P.No 123 Item No.13.15(ii)Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.m153.44153.4413.5FalseNoneNoneFalseNoneFalse2071.440
4023675155967NoneVol.3 P.No 124 Item No.13.15 ivProviding and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 percent bitumen by weight. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.m53.7653.7613.5FalseNoneNoneFalseNoneFalse725.760
4023676155967NoneVol.3 P.No 117 Item No.12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum2998.242998.2424.52FalseNoneNoneFalseNoneFalse73516.84480
4023677155967NoneVol.3 P.No 117 Item No.12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.m267.68267.6819.6FalseNoneNoneFalseNoneFalse5246.5280
4023678155967NoneVol.3 P.No 117 Item No.12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A. Granular Material. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum1308.161308.1623.06FalseNoneNoneFalseNoneFalse30166.16960
4023679155967NoneVol.3 P.No 121 Item No.13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.No3663.523663.528.0FalseNoneNoneFalseNoneFalse29308.160
4023680155967NoneVol.3 P.No 121 Item No.13.5AConstruction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.m2535.682535.6844.48FalseNoneNoneFalseNoneFalse112787.04640
4023681155967NoneVol.3 P.No 79 Item No.8.55Providing and fixing RCC name board of size 1.35x0.60x0.04m fixed in reinforced cement concrete poles of siz 0.10x0.10x2.60m in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirpes as shown in drawing. The board shall be provided with 12mm thick cement plaster in cement mortar 1:4 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 m with cement concrete M 10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer in charge of the work. The cost includes excavation, cost of all materials, cost of steel, painting, centering, transportation charges &fixing charges. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Each6564.326564.321.0FalseNoneNoneFalseNoneFalse6564.320
4023682155967NoneVol.3 P.No 66 Item No.8.10Painting Two Coats on New Concrete Surfaces. Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Sqm122.08122.0886.74FalseNoneNoneFalseNoneFalse10589.21920
4023683155967NoneVol.1 P.No 7 Item No.1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum530.88530.88198.84FalseNoneNoneFalseNoneFalse105560.17920
4023684155967NoneVol.3 P.No 67 Item No.8.18Reinforced cement concrete M15 grade boundary Stone/Guard Stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.No837.76837.7616.0FalseNoneNoneFalseNoneFalse13404.160
4023685155967NoneVol.1 P.No 8 Item No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum114.24114.2427.22FalseNoneNoneFalseNoneFalse3109.61280
4023686155967NoneVol.1 P.No 15 Item No.2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum6707.686707.681.77FalseNoneNoneFalseNoneFalse11872.59360
4023687155967NoneVol.1 P.No 16 Item No.2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum8586.558586.5511.84FalseNoneNoneFalseNoneFalse101664.7520
4023688155967NoneVol.1 P.No 7 Item No.1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.Cum530.88530.8896.41FalseNoneNoneFalseNoneFalse51182.14080
4023689155967NoneVol.3 P.No 146 Item No.16.15 (a)Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. a.1200mm dia. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work.m9436.09436.05.0FalseNoneNoneFalseNoneFalse47180.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17266578040000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17266578040000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17266578040001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement (KPPP) portal due to internet connectivity issues and technical glitches at bidders end.None
17266578040000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17266578040000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17266578040001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17266578040001NoneNoneELIGIBILITYAs per Karnataka State Government order LD/300/LET/2006 Bangalore dated 01-01-2007 and Government letter No PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards construction labour welfare fund.None
17266578040001NoneNoneELIGIBILITYThe Item rates quoted shall include cost of Royalty charges on construction materials and other taxes as per the rates provided in prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and Unloading with all lifts, labour, Hire charges of machinery and equipments etc, complete and all other incidental charges.None
17266578040001NoneNoneELIGIBILITYConstitutional or Legal Status of tenderer.None
17266578040002NoneNoneELIGIBILITYIf the rate quoted by the Tenderer is less than the Amount put to tender, then the difference amount should be paid in the form of FDR / BG/ DD/Call deposit(Period 01 year) in favor of Executive Engineer, PWD Division Sirsi. And the It should be submitted to division office at the time of Agreement.None
17266578040001NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty First day of March of succeeding year (both days inclusive).None
17266578040001NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing e-Procurement (KPPP) PortalNone
17266578040001NoneNoneELIGIBILITYAll materials required for this work, shall be produced by the tenderer himself and should be got tested by the quality control authorities, at his own cost before using for the work.None
17266578040001NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17266578040001NoneNoneELIGIBILITYEligible Tenderer will be qualified only if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity as (AxNx2.5-B), where, A is Maximum value of civil engineering works executed in any one year during the last five years taking into account the completed as well as works in progress. N is Number of years prescribed for completion of the works for which Tenders are invited. B is Existing commitments and on-going works to be completedNone
17266578040001NoneNoneELIGIBILITYThe construction materials (minerals metal, sand and murrum) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore proceedings dated 25.03.2013.None
17266578040001NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all Tenders without assigning any reasons.None
17266589150000NoneNoneELIGIBILITYEach Tenderer shall furnish work execution programme bar chart for a working period of 6 months.None
17266589240001NoneNoneELIGIBILITYEMD Rs 50,280/- should be paid in favor of Executive Engineer PWD Division Sirsi through e-paymentNone
17266616650000NoneNoneELIGIBILITYWork Completion period 6 months (Including Monsoon)None
17266616730000NoneNoneELIGIBILITYThe tenderers are requested to abide instructions and conditions contained in the Standard Bid Documents -KW-2 and further orders thereon.None
17266616950000NoneNoneELIGIBILITYThe Estimate rates are exclusive of 18% GSTNone
17266617140000NoneNoneELIGIBILITYEligibility of Contractor is Class-III & AboveNone
17266617220000NoneNoneELIGIBILITYTenderers shall obtain the Work Done Certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and Scan the original certificates and attach the scanned file to the tenders. The original Certificate shall be produced before opening of Financial Bid for physical verification.None
17266617290001NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer in his/her name should have in the last five years (i.e. 2019-20 to 2023-24) achieved in at least two financial years an Average Financial Turnover of Rs. 25.14 Lakhs (in all classes of Civil engineering construction works Only)None
17266617370002NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer in his/her name should have in the last five years (i.e. 2019-20 to 2023-24) Satisfactorily completed as prime contractor, at least one similar work (at least 50% of the contract value), such as one single Foot Bridge Work of value not less than Rs. 12.57 Lakhs.None
17267318260000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of timeNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate issued by CA with UDIN & Civil work Balance Sheets 2019-20 to 2023-24TrueTechnical Bid
Company/Contactor Registration Certificate PWDTrueTechnical Bid
Workdone Certificate 2019-20 to 2023-24TrueTechnical Bid
Bidders Address & Mobile No.TrueTechnical Bid
Work Execution Programme Bar Chart of 06 MonthsTrueTechnical Bid
List of Existing commitments and ongoing worksTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Bridges/CulvertsUttara KannadaSirsiKanaraSIRSI (SC)DarbegaddeNoneNoneNoneNoneNoneNone
tenderAddressNone