1726655437000 | 0 | None | None | Bridges | Construction Of Foot Bridge Kalgar Nala In Itaguli GP In Sirsi Taluk | 1675345.9 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4022665 | 155944 | None | Vol-1 I.No-1.14.1 P.No-8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 125.66 | 125.66 | 114.07 | False | None | None | False | None | False | 14334.0362 | 0 | 4022666 | 155944 | None | Vol-1 I.No-2.1.3 P.No-15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 7378.45 | 7378.45 | 7.41 | False | None | None | False | None | False | 54674.3145 | 0 | 4022667 | 155944 | None | Vol-1 I.No-2.2.3 A P.No-15 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 8118.19 | 8118.19 | 33.68 | False | None | None | False | None | False | 273420.6392 | 0 | 4022668 | 155944 | None | Vol-1 I.No-2.4.3 P.No-16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 8586.55 | 8586.55 | 26.89 | False | None | None | False | None | False | 230892.3295 | 0 | 4022669 | 155944 | None | Vol-1 I.No-2.5.2 P.No-16 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical Specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 10538.22 | 10538.22 | 19.08 | False | None | None | False | None | False | 201069.2376 | 0 | 4022670 | 155944 | None | Vol-1 I.No-2.11b P.No-18 | pplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification b. Foundation of Bridges ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Tonne | 96550.72 | 96550.72 | 2.57 | False | None | None | False | None | False | 248135.3504 | 0 | 4022671 | 155944 | None | Vol-1 I.No-2.11c A P.No-18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification c. Sub structure of Bridges ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Tonne | 96804.96 | 96804.96 | 2.29 | False | None | None | False | None | False | 221683.3584 | 0 | 4022672 | 155944 | None | Vol-1 I.No-2.11d A P.No-18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification d. Super structure of Bridges ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Tonne | 97056.96 | 97056.96 | 2.51 | False | None | None | False | None | False | 243612.9696 | 0 | 4022673 | 155944 | None | Vol-3 I.No-13.15(ii) P.No-123 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 153.44 | 153.44 | 6.0 | False | None | None | False | None | False | 920.64 | 0 | 4022674 | 155944 | None | Vol-3 I.No-13.15(iv) P.No-124 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 percent bitumen by weigh ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 53.76 | 53.76 | 6.0 | False | None | None | False | None | False | 322.56 | 0 | 4022675 | 155944 | None | Vol-3 I.No-12.2 P.No-117 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 267.68 | 267.68 | 22.1 | False | None | None | False | None | False | 5915.728 | 0 | 4022676 | 155944 | None | Vol-3 I.No-13.7 P.No-121 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | No | 3663.52 | 3663.52 | 8.0 | False | None | None | False | None | False | 29308.16 | 0 | 4022677 | 155944 | None | Vol-3 I.No-13.5 A P.No-121 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | m | 2535.68 | 2535.68 | 32.0 | False | None | None | False | None | False | 81141.76 | 0 | 4022678 | 155944 | None | Vol I it no1.8 p no 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 530.88 | 530.88 | 22.31 | False | None | None | False | None | False | 11843.9328 | 0 | 4022679 | 155944 | None | Vol I it no1.12 p no 8 | Earth work in surface excavation by mechanical means for lowering & levelingthe ground for all works other than foundation in all kinds of soils & upto depthnot exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumpsand other deleterious matter including dressing of excavated surfaces, disposingoff or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 106.4 | 106.4 | 126.0 | False | None | None | False | None | False | 13406.4 | 0 | 4022680 | 155944 | None | Vol I it no p no 7 | Construction of Embankment with approved materials deposited at site fromroadway cutting and excavation from drain and foundation of other structuresgraded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 133.28 | 133.28 | 126.0 | False | None | None | False | None | False | 16793.28 | 0 | 4022681 | 155944 | None | Vol I it no1.8 p no 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- including cost of all materials, with all lead and lift, transporting to site, loading and unloading, labour charges, HOM, etc complete as per specifications and as per directions of Engineer-in-charge of Work. | Cum | 530.88 | 530.88 | 52.5 | False | None | None | False | None | False | 27871.2 | 0 |
|