noticeInvitingTenderDTO
createdTs1726056525140
version15
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd925100.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose10-10-2024 16:00:00
tenderQueryClose08-10-2024 16:00:00
technicalBidOpen14-10-2024 11:00:00
publishedDate20-09-2024 17:10:35
publishedByPostPWD_EE_DIV_CMJ
publishedByUserKPE13484 - S P MAHESH
bidValidityPeriod90
noOfCalls1
preBidMeetingDate26-09-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonTechnical Assistant
splitEmdRequiredYnTrue
emdBankGuarantee825100.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08226222027
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1726056525183
version12
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/OW/WORK_INDENT15111
titleCONSTRUCTION OF RETAINING WALL AROUND SRI MALAI MAHADESHWARA SWAMY STATUE AT DEEPADAGIRI ODDU IN MM HILLS HANUR TALUK, CHAMARAJANAGAR DISTRICT
descriptionConstruction of Gabion Facia Geo-Synthetic Reinforced Earth wall with Gabion Facia at Sri.Maleya Mahadeshwaraswamy Statue at MM Hills, in Chamarajanagara District
categoryWORKS
categoryTextWorks
ecv61671306.79
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1678
locationNamePWD Division Office Chamarajanagara
provisionalAmount78000000.0
groupOverheadTotal0.0
fileNumberPWD/AEE/MMH/AE2/GBRW/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17260565250001NoneNoneOther WorksCONSTRUCTION OF RETAINING WALL AROUND SRI MALAI MAHADESHWARA SWAMY STATUE AT DEEPADAGIRI ODDU IN MM HILLS HANUR TALUK, CHAMARAJANAGAR DISTRICT61671306.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3960011153452None1.14.1,VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m, V.1, P.8, Item no.1.14.1. ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum114.24114.243523.5FalseNoneNoneFalseNoneFalse402524.640
3960012153452None1.14.2.VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m to 6m V.1, P.8, Item no.1.14.2. ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum131.04131.044009.5FalseNoneNoneFalseNoneFalse525404.880
3960013153452None1.14.3,VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth above 6m m, V.1, P.8, Item no.1.14.3. ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum161.28161.2812218.85FalseNoneNoneFalseNoneFalse1970656.1280
3960014153452None1.15.1,VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In ordinary/soft rock without blasting upto 1.5 m depth, V.1, P.8, Item no.1.15.1 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum406.56406.562192.31FalseNoneNoneFalseNoneFalse891305.55360
3960015153452None2.1.3,VOL-1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, formwork and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates, V-1, 15, 2.1.3 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum6707.686707.68116.09FalseNoneNoneFalseNoneFalse778694.57120
3960016153452None2.2.3,VOL-1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour,Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately),M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, V-1,P-15,2.2.3 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum7096.327096.32288.0FalseNoneNoneFalseNoneFalse2043740.160
3960017153452None2.11h,VOL-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, All other type of structures V-1, 18, 2.11 h ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workt88492.3288492.3217.28FalseNoneNoneFalseNoneFalse1529147.28960
3960018153452None14.12,VOL-3Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of + 2%) Zinic+PVC coated, Mesh wire diameter 2.7/3.7 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mmID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge. CPWD DSR VOLII, Pg 262, code 16.95 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum3872.253872.253528.0FalseNoneNoneFalseNoneFalse13661298.00
3960019153452None7.5,VOL-3With reinforcing elements of synthetic geogrid (including cost of loopings for joining with Facia pannel) as per drawing. all complete as per directions of Engineer in charge of work V-3 Reinforced earth , 58, 7.5. ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workSqm430.08430.0836045.0FalseNoneNoneFalseNoneFalse15502233.60
3960020153452NoneDR1Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of + 2%) Zinic+PVC coated, Mesh wire diameter 2.7/3.7 mm, mechanically edged/selvedged shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mmID/OD), as per drawing, all complete as per directions of Engineer-in-charge. Data Rate-SEOFFICE-MYS-CIR-2024-25-4218-19 DATE-21-8-24 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workSqm378.5378.514580.0FalseNoneNoneFalseNoneFalse5518530.00
3960021153452None14.6,VOL-3Laying of a Geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/ cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.V-3, 129, 14.6 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workSqm125.44125.446777.5FalseNoneNoneFalseNoneFalse850169.60
3960022153452None1.8,VOL-1Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (A) , V-1, pg 7, 1.8 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum530.88530.8817193.38FalseNoneNoneFalseNoneFalse9127621.57440
3960023153452None1.9,VOL-1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m V-1,p-7,1.9 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum297.92297.9216459.87FalseNoneNoneFalseNoneFalse4903724.47040
3960024153452None12.4,VOL-3Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 60 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.V-3, 117, 12.4 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum2998.242998.24642.0FalseNoneNoneFalseNoneFalse1924870.080
3960025153452None11.26.1,VOL-2Providing and fixing Steel work welded in built up sections/ framedwork, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.V-2, 84, 11.26.1 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workKg154.56154.5610000.0FalseNoneNoneFalseNoneFalse1545600.00
3960026153452None10.14.21,VOL-5Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. V-5, 120, 10.14.21 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workm1387.681387.68210.0FalseNoneNoneFalseNoneFalse291412.80
3960027153452NonePG111,VOL-1Additionalities for Formwork, centring, & Scaffolding for sub structure. Including cost of all materials, cost of labour, cost of equipment and machinery, cost of hire charges of machinery, lead & lift, loading and unloading, transportation and all other incidental harges etc., complete. The work shall be carried out as per the directions of the Engineer-in- Charge of the work. ITEM SPEC NO: PWD SR, 2023-24, VOL-1, PG NO-111 ---- Including cost of all materials cost of labour cost of equipment and machinery cost of hire charges of machinery lead AND lift loading and unloading transportation and all other incidental charges etc complete. The work shall be carried out as per the directions of the Engineer in Charge of the workCum709.63709.63288.0FalseNoneNoneFalseNoneFalse204373.440
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17260569570000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17260569570000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17260569570000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17260569570000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17260569570000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17260570010000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17260570060000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17260570130000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17260570190000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17260570250000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17260570300000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17260570360000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17260570420000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17260570470000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17260570530000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the prescribed form in the favour of the Executive Engineer, PWD Division, Chamarajanagara, given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17260570580000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials.None
17260570630000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured according to ENVIRONMENTAL MANAGEMENT SYSTEM (EMS ISO 14001:2015) & QUALITY MANAGEMENT SYSTEM (QMS ISO 9001:2015) Policies, so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extentNone
17260570700000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17260570750000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should get tested by the quality control authority before use on the work at their own cost.None
17260570800000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.6 of STD tender document Attached.None
17260570850000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer -in charge of this work.None
17260570900000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17260570960000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17260571010000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17260571070000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Chamarajanagar Division, during office hours on all working days.None
17260571130000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17260571180000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17260571230000NoneNoneELIGIBILITYRs 1,00,000 of the EMD should be paid through e-payment as specified in e-procurement portal and the remaining balance amount of EMD must be produced in the form of Bank Guarantee by uploading the scan copy of the Bank Guarantee. The original copy should be produced at the time of Technical Bid Opening.None
17260571280000NoneNoneELIGIBILITYThe successful contractor should setup material testing laboratory at the work site before commencement of work.None
17260571340000NoneNoneELIGIBILITYThe difference in cost deposited by the lowest successful tenderer (for unbalanced) along with the performance security will be released to the contractor 30 days after the completion of defects liability period.None
17260571410000NoneNoneELIGIBILITYAll the uploaded documents in e-portal should be got verified at the Division office within 3 working days from the stipulated date of opening of Technical Bid by producing the original documents at the Division office, failing which the tender is liable for rejection. No separate communication will be made in this regard.None
17260571460000NoneNoneELIGIBILITYBankers Certificate for the stipulated amount as per clause 3.3 (b) should be submitted in the format as prescribed in the bid document only. Otherwise tender is liable for rejection.None
17260571510000NoneNoneELIGIBILITYThe contractor who participates in tenders for more than one work for which tenders are invited in this IFT, the tenderer must fulfill all the conditions and criteria cumulatively for the participated works.None
17260571560000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4None
17260571600000NoneNoneELIGIBILITYPrice escalation shall not be considered in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17260571650000NoneNoneELIGIBILITYRegarding Appealing aggrieved contractor may appeal to the prescribed (Appellant) Authority within 30 days as per KTTP and appeal should be trough eproc only as per Govt: Order No.pwd/572/CRN-2020 Bangalore Dt:09.10.2020. same will not be considered if appeal through Letters.None
17260571700000NoneNoneELIGIBILITYThe returns submitted to the Income Tax Department, PROFIT & lOSS STATEMENT or 26AS COPY Shall be uploaded and shall be produced at the time of verification of Original documents at Division officeNone
17260571810000NoneNoneELIGIBILITYContractors should be registered as KPWD/CPWD Class I Civil Contractor.None
17260571860002NoneNoneELIGIBILITYThe time for completion of whole work is 11 Months (including rainy days)None
17262065100000NoneNoneELIGIBILITYRates are exclusive of GST and 18% GST will be paid separatelyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2019-20 to 2023-24 (b) Satisfactorily completed (at least 90% of the contract value) as prime contractor, at least one similar work such as Reinforced Earth Gabion Wall work etc., of value not less than Rs.308.36 Lakhs. (usually not less than 50% estimated value of contract)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2019-20 to 2023-24 (c) Executed in any one year, ( for a continuous period of 12 months) the minimum quantities of work.1)Earth work excavation/Embankment 31310.00 Cum 2)RCC/PCC 323.00 Cum 3)TMT STEEL 14.00 MT 4)Gabion structure 2823.00 Cum 5)Geogrid/Geotextile 34258.00 Sqm 6) Hexagonal Shaped Wire mesh 11664.00 Sqm (usually 80% of the peak annual rate of construction)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneEach Tenderer should further demonstrate a. Availability by owning required following key and critical equipment for this work b. the remaining can be deployed on lease, hire for all works provided, the relevant documents commitment agreements etc. for availability for this work are furnished a) Machineries to be owned 1. Excavator 1. Nos 2. Tipper/HGV 2 Nos 3. Concrete Mixer With weigh batching 1 No 4. Centering Sheets 250 SQM 5. Pin Vibrator 1 No 6. Soil Vibratory compactor 1 No 7. Water Tanker 1 No Machineries could be on LeaseHireOwnership: 1. Excavator 1 Nos 2. TipperHGV 2 Nos 3. Concrete Mixer With weigh batching 1 No 4. Soil Vibratory compactor 1 No 5. Pin Vibrator 1 No 6. Water Tanker 1 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machinary capacity
NoneNoneNoneNoneList of existing commitments and ongoing worksCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2019-20 to 2023-24 (a) achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only) of Rs. 1233.43 Lakhs (usually not less than two times the estimated annual payments under this contract)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 168.19 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc.,NOTE:-LOC K form for the stipulated amount should be submitted in the prescribed format as in the bid document only. Otherwise tender is liable for rejectionFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearOthersNot Applicable
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Not Applicable
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN for last 5 yearsTrueTechnical Bid
KPWD/CPWD Class I Registration CertificateTrueTechnical Bid
GST Registration CertificateTrueTechnical Bid
Work done certificate in support of similar nature of work done, Quqntities executed in any 12 months during last 5 years, 2019-20 to 2023-24TrueTechnical Bid
Line of Credit/ Bankers certificate in prescribed formatTrueTechnical Bid
Details of on going works and work on handTrueTechnical Bid
Additional documents like EMD payments etc.TrueTechnical Bid
List of existing commitments and ongoing works to be completed during the next 3 monthsTrueTechnical Bid
Any documents which supports technical Qualification, MachinariesTrueTechnical Bid
ITR, Profit & Loss statement OR 26AS for last 5 yearsTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Other WorksChamarajanagaraHanuruChamarajanagarHANURMAHADESHWARA SWAMY 108 FT STATUE, MM HILLS.NoneNoneNoneNoneNoneNone
tenderAddress
createdTs1726730366000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of The Executive Engineer PWD Division Court Road Chamarajanagara
streetNone
cityChamarajanagara
stateKarnataka
pin571313