1726926272000 | 0 | None | None | Bridges/Culverts | Construction of Foot Bridge on the left side of Channagihally connecting village at Ch.9.00 Km from Yarane Junction to Holenarasipura joining Road SH-102 in Hassan Taluk. | 1691891.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4051790 | 157251 | None | PWD SR 2023-24 of Pg.9, I.No. 2.5(ii)(A) V-III | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical Means using Dozer (A)In area of light jungle ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | 100 Sqm | 393.0 | 393.0 | 40.0 | False | None | None | False | None | False | 15720.0 | 0 | 4051791 | 157251 | None | P.W.D SR 2023-24 V-1,P-8,Item No.1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 102.0 | 102.0 | 247.5 | False | None | None | False | None | False | 25245.0 | 0 | 4051792 | 157251 | None | PWD SR 2023-24, V-1, P-15, Item no.2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 5989.0 | 5989.0 | 6.63 | False | None | None | False | None | False | 39707.07 | 0 | 4051793 | 157251 | None | PWD S.R 2023-24, V-1,P-15, Item no.2.2.1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour,Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately),M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6915.7 | 6915.7 | 31.89 | False | None | None | False | None | False | 220541.673 | 0 | 4051794 | 157251 | None | PWD S.R 2023-24, V-1,P-17, Item no.2.4.3 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other 17 Item No. Description of Item Unit Rate Rs. appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately. i)M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6969.6 | 6969.6 | 26.6 | False | None | None | False | None | False | 185391.36 | 0 | 4051795 | 157251 | None | PWD S.R 2023-24, V-1 P18 2.11C | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcementincluding cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying withbinding wire / softannealed steel wire and other ancilary operations complete as per drawing and
technical specification-sub structure of bridges ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Tonne | 86433.0 | 86433.0 | 3.19 | False | None | None | False | None | False | 275721.27 | 0 | 4051796 | 157251 | None | PWD S.R 2023-24, V1 P18 2.11(d) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcementincluding cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawingandtechnical specification - super structure of bridges ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Tonne | 86658.0 | 86658.0 | 2.53 | False | None | None | False | None | False | 219244.74 | 0 | 4051797 | 157251 | None | PWD S.R 2023-24, V-1,P-17,Item no.2.5.3 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (5 to 10m) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8408.4 | 8408.4 | 14.74 | False | None | None | False | None | False | 123939.816 | 0 | 4051798 | 157251 | None | PWD S.R 2023-24, V-1, P-18, Item no.2.11(d) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcementincluding cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawingandtechnical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | MT | 86658.0 | 86658.0 | 1.47 | False | None | None | False | None | False | 127387.26 | 0 | 4051799 | 157251 | None | PWD S.R 2023-24, V-3, P-117, Item no.12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification (A) Granular material, ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1168.0 | 1168.0 | 137.17 | False | None | None | False | None | False | 160214.56 | 0 | 4051800 | 157251 | None | PWD S.R 2023-24, V-3,P- 117, Item no. 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the equirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2677.0 | 2677.0 | 29.04 | False | None | None | False | None | False | 77740.08 | 0 | 4051801 | 157251 | None | PWD S.R 2023-24, V-3, P-121, item no.13.5 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 2264.0 | 2264.0 | 16.0 | False | None | None | False | None | False | 36224.0 | 0 | 4051802 | 157251 | None | PWD S.R 2023-24, V-3, P-121, Item no.13.7 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 3271.0 | 3271.0 | 2.0 | False | None | None | False | None | False | 6542.0 | 0 | 4051803 | 157251 | None | PWD S.R 2023-24, V-3, P-121, Itemno.13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6811.0 | 6811.0 | 2.7 | False | None | None | False | None | False | 18389.7 | 0 | 4051804 | 157251 | None | PWD S.R 2023-24, V-3, P-122, Item no.13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 11835.0 | 11835.0 | 3.6 | False | None | None | False | None | False | 42606.0 | 0 | 4051805 | 157251 | None | PWD S.R 2023-24, V-3, P-121, Item no.13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 13971.0 | 13971.0 | 1.35 | False | None | None | False | None | False | 18860.85 | 0 | 4051806 | 157251 | None | PWD S.R 2023-24, V-3,P-123,Item no.13.14 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 84.0 | 84.0 | 93.6 | False | None | None | False | None | False | 7862.4 | 0 | 4051807 | 157251 | None | PWD S.R 2023-24, V-3,P-123,Itemno.13.15(iii) | Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 231.0 | 231.0 | 16.4 | False | None | None | False | None | False | 3788.4 | 0 | 4051808 | 157251 | None | PWD S.R 2023-24, V-1, P-7 Item no. 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 474.0 | 474.0 | 62.5 | False | None | None | False | None | False | 29625.0 | 0 | 4051809 | 157251 | None | PWD S.R 2023-24, V-3,P-117,Item no.12.15 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 138.0 | 138.0 | 30.0 | False | None | None | False | None | False | 4140.0 | 0 | 4051810 | 157251 | None | PWD S.R 2023-24, V-2,P-77,Item no.11.1 | Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Kg | 106.0 | 106.0 | 500.0 | False | None | None | False | None | False | 53000.0 | 0 |
|