createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726924988323
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd8370.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-09-2024 16:00:00
tenderQueryClose29-09-2024 17:30:00
technicalBidOpenNone
publishedDate22-09-2024 12:45:29
publishedByPostPWD_EE_DIV_HSN
publishedByUserKPE10475 - GIRISH B
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSHWETHA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08172268437
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1726924988362
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BG/WORK_INDENT15809
titleConstruction of connecting bridge to Hoskatte lake of Chikkole village, Belur taluk
descriptionConstruction of Bridge
categoryWORKS
categoryTextWorks
ecv668724.40
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1771
locationNamePWD Division Office Hassan
provisionalAmount800000.0
groupOverheadTotal0.0
fileNumberAEE/PWD/SB-DN/BLR/FOOT-BRIDGE/3/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17269249880000NoneNoneBridgesConstruction of connecting bridge to Hoskatte lake of Chikkole village, Belur taluk668724.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4051683157247NoneVol-1 P.No.8 I.No.1.14.1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum102.0102.059.18FalseNoneNoneFalseNoneFalse6036.360
4051684157247NoneVol-1 P.No.15 I.No. 2.1.3 PWD SR 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5989.05989.04.38FalseNoneNoneFalseNoneFalse26231.820
4051685157247NoneVol-1 P.No. 111 & 112 PWD SR 2023-24The cost of formwork and Centring for Open Foundation 4 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum239.56239.564.38FalseNoneNoneFalseNoneFalse1049.27280
4051686157247NonePWD SR 2023-24 Vol-1 P.No.15 I.No. 2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6287.06287.014.42FalseNoneNoneFalseNoneFalse90658.540
4051687157247NoneVol-1 P.No. 111 & 112 PWD SR 2023-24The cost of formwork and Centring for Foundation 4 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum251.48251.4814.42FalseNoneNoneFalseNoneFalse3626.34160
4051688157247NoneVol-1 P.No.18 I.No. 2.11 B PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundation of Bridges. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne86206.086206.01.08FalseNoneNoneFalseNoneFalse93102.480
4051689157247NonePWD SR 2023-24 Vol-1 P.No.16 I.No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6323.06323.08.3FalseNoneNoneFalseNoneFalse52480.90
4051690157247NonePWD SR 2023-24 Vol-1 P.No. 111 & 112The cost of formwork and Centring for Abutments 10 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum632.3632.38.3FalseNoneNoneFalseNoneFalse5248.090
4051691157247NonePWD SR 2023-24 Vol-1 P.No.18 I.No. 2.11 CSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.t86433.086433.00.62FalseNoneNoneFalseNoneFalse53588.460
4051692157247NonePWD SR 2023-24 Vol-3 P.No.117 I.No. 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m239.0239.028.0FalseNoneNoneFalseNoneFalse6692.00
4051693157247NoneVol-3 P.No.117 I.No. 12.3 A PWD SR 2023-24Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum1168.01168.028.8FalseNoneNoneFalseNoneFalse33638.40
4051694157247NoneVol-3 P.No.117 I.No. 12.4 PWD SR 2023-24Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2677.02677.015.84FalseNoneNoneFalseNoneFalse42403.680
4051695157247NoneVol-1 P.No.16 I.No. 2.5.3 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7007.07007.02.29FalseNoneNoneFalseNoneFalse16046.030
4051696157247NoneVol-1 P.No. 111 & 112 PWD SR 2023-24The cost of formwork and Centring for Solid Slab Super Structure 20 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum1401.41401.42.29FalseNoneNoneFalseNoneFalse3209.2060
4051697157247NoneVol-1 P.No.18 I.No. 2.11 D PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne86658.086658.00.27FalseNoneNoneFalseNoneFalse23397.660
4051698157247NoneVol-3 P.No.129 I.No. 14.4 A PWD SR 2023-24Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum1912.01912.010.8FalseNoneNoneFalseNoneFalse20649.60
4051699157247NoneVol-3 P.No.121 I.No. 13.6 PWD SR 2023-24Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m4428.04428.017.2FalseNoneNoneFalseNoneFalse76161.60
4051700157247NoneVol-3 P.No.121 I.No. 13.7PWD SR 2023-24Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No3271.03271.06.0FalseNoneNoneFalseNoneFalse19626.00
4051701157247NoneVol-3 P.No.121 I.No. 13.8 PWD SR 2023-24PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6811.06811.00.45FalseNoneNoneFalseNoneFalse3064.950
4051702157247NoneVol-3 P.No.122 I.No. 13.9 PWD SR 2023-24Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum11835.011835.00.9FalseNoneNoneFalseNoneFalse10651.50
4051703157247NoneVol-3 P.No.121 I.No. 13.2 PWD SR 2023-24Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum13971.013971.00.99FalseNoneNoneFalseNoneFalse13831.290
4051704157247NoneVol-2 P.No.83 I.No. 11.16.3 PWD SR 2023-24Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kg122.0122.0224.11FalseNoneNoneFalseNoneFalse27341.420
4051705157247NoneVol-3 P.No.123 I.No. 13.14 PWD SR 2023-24Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm84.084.015.6FalseNoneNoneFalseNoneFalse1310.40
4051706157247NoneVol-1 P.No.7 I.No.1.8 PWD SR 2023-24Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum474.0474.081.6FalseNoneNoneFalseNoneFalse38678.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17269249890000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17269249890000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17269249890001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidder s end.None
17269249890000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17269249890000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17269250730000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17269250820000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17269250910000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender and the employer will in no case be responsible and liable for these costsNone
17269251010000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all Tender without assigning any reasonsNone
17269251080000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E-Procurement PortalNone
17269251160000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17269251260000NoneNoneELIGIBILITYAs per Government order LD/300/LET/2006 Bangalore dated 1.01.2007 nad Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17269251360000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17269251450000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approvalNone
17269251550000NoneNoneELIGIBILITYMaterials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the workNone
17269251640000NoneNoneELIGIBILITYContractors should be registered with KPWD Class IV and above RegistrationNone
17269251730000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should give all details and documents as per K.W-1None
17269251820000NoneNoneELIGIBILITYWork should be carried out as per K/W-1 STD attached with tenderNone
17269251900000NoneNoneELIGIBILITYThe period of completion of this work is 4 MonthsNone
17269251980000NoneNoneELIGIBILITYDefect Liability Period : 1 YearNone
17269252120000NoneNoneELIGIBILITYContractor shall bound to comply the prevailing rules and regulations with regard to the EPF Contribution rules and any modifications thereof before and after execution of agreementNone
17269252230001NoneNoneELIGIBILITYThe FSD deducted in RA Bills will be refunded only after the successful completion of Defect Liability Period.None
17269252320000NoneNoneELIGIBILITYContractors has to submit their labour EPF details with every Running BilNone
17269252410000NoneNoneELIGIBILITYGST shall be paid to the executed amount separately. (18% GST considered in Estimate)None
17269252510000NoneNoneELIGIBILITYThe GST shall not be paid in the extended period of contract for which the Contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17269252590000NoneNoneELIGIBILITYContractors has to upload the E P F Registration CertificateNone
17269252690000NoneNoneELIGIBILITYContractor Shall comply with the Environment Protection Act 1986 and the Rules made there underNone
17269252770000NoneNoneELIGIBILITYContractors are responsible for ensuring Safety and also whole & Sole responsibility for any injury or risk factors of workersNone
17269252840000NoneNoneELIGIBILITYThe contractor belonging to Scheduled Caste should upload Caste Certificate issued by Competent AuthorityNone
17269253130000NoneNoneELIGIBILITYIf the contractor is a firm then all the partners or members of the firm shall belong to the Scheduled Caste as the case may be.None
17269253230000NoneNoneELIGIBILITYThe contractor belonging to Scheduled Caste shall be domicile of the State of Karnataka for more than 10 years(Should upload Certificate issued by Competent Authority).None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Class-IV and above Registration CertificateTrueTechnical Bid
The contractor belonging to Scheduled Caste should upload Caste Certificate issued by Competent AuthorityTrueTechnical Bid
The contractor belonging to Scheduled Caste shall be domicile of the State of Karnataka for more than 10 years,Should upload Certificate issued by Competent AuthorityTrueTechnical Bid
Tenderers will only be qualified, if their available tender capacity is more than the total tender value. i.e. A x N x 5.00 - B as per KW-1 Document. The Bidder must submit the Annual Turnover Certificate issued by Approved Chartered Accountant with UDIN or Workdone Certificate issued by not below the rank of Executive Engineer for computing the value of A and B for the last five years i.e. 2019-20,2020-21,2021-22, 2022-23 and 2023-24 Updated to 2024-25 price levelTrueTechnical Bid
Work done certificate of any workdone of value not less than Rs.1.67 lakhs, certificate should be enclosed, issued by Competant Authority not below the rank of Executive Engineer Updated to 2024-25 price levelTrueTechnical Bid
Contractors has to upload the EPF Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BridgesHassanBeluruHassanBELUR (SC)Hoskatte lake of Chikkole village Belur talukNoneNoneNoneNoneNoneNone
tenderAddressNone
tenderRecallDTONone