1726924988000 | 0 | None | None | Bridges | Construction of connecting bridge to Hoskatte lake of Chikkole village, Belur taluk | 668724.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4051683 | 157247 | None | Vol-1 P.No.8 I.No.1.14.1 PWD SR 2023-24 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 102.0 | 102.0 | 59.18 | False | None | None | False | None | False | 6036.36 | 0 | 4051684 | 157247 | None | Vol-1 P.No.15 I.No. 2.1.3 PWD SR 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 5989.0 | 5989.0 | 4.38 | False | None | None | False | None | False | 26231.82 | 0 | 4051685 | 157247 | None | Vol-1 P.No. 111 & 112 PWD SR 2023-24 | The cost of formwork and Centring for Open Foundation 4 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 239.56 | 239.56 | 4.38 | False | None | None | False | None | False | 1049.2728 | 0 | 4051686 | 157247 | None | PWD SR 2023-24 Vol-1 P.No.15 I.No. 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6287.0 | 6287.0 | 14.42 | False | None | None | False | None | False | 90658.54 | 0 | 4051687 | 157247 | None | Vol-1 P.No. 111 & 112 PWD SR 2023-24 | The cost of formwork and Centring for Foundation 4 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 251.48 | 251.48 | 14.42 | False | None | None | False | None | False | 3626.3416 | 0 | 4051688 | 157247 | None | Vol-1 P.No.18 I.No. 2.11 B PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundation of Bridges. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Tonne | 86206.0 | 86206.0 | 1.08 | False | None | None | False | None | False | 93102.48 | 0 | 4051689 | 157247 | None | PWD SR 2023-24 Vol-1 P.No.16 I.No. 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6323.0 | 6323.0 | 8.3 | False | None | None | False | None | False | 52480.9 | 0 | 4051690 | 157247 | None | PWD SR 2023-24 Vol-1 P.No. 111 & 112 | The cost of formwork and Centring for Abutments 10 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 632.3 | 632.3 | 8.3 | False | None | None | False | None | False | 5248.09 | 0 | 4051691 | 157247 | None | PWD SR 2023-24 Vol-1 P.No.18 I.No. 2.11 C | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | t | 86433.0 | 86433.0 | 0.62 | False | None | None | False | None | False | 53588.46 | 0 | 4051692 | 157247 | None | PWD SR 2023-24 Vol-3 P.No.117 I.No. 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 239.0 | 239.0 | 28.0 | False | None | None | False | None | False | 6692.0 | 0 | 4051693 | 157247 | None | Vol-3 P.No.117 I.No. 12.3 A PWD SR 2023-24 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1168.0 | 1168.0 | 28.8 | False | None | None | False | None | False | 33638.4 | 0 | 4051694 | 157247 | None | Vol-3 P.No.117 I.No. 12.4 PWD SR 2023-24 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2677.0 | 2677.0 | 15.84 | False | None | None | False | None | False | 42403.68 | 0 | 4051695 | 157247 | None | Vol-1 P.No.16 I.No. 2.5.3 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7007.0 | 7007.0 | 2.29 | False | None | None | False | None | False | 16046.03 | 0 | 4051696 | 157247 | None | Vol-1 P.No. 111 & 112 PWD SR 2023-24 | The cost of formwork and Centring for Solid Slab Super Structure 20 Percent ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1401.4 | 1401.4 | 2.29 | False | None | None | False | None | False | 3209.206 | 0 | 4051697 | 157247 | None | Vol-1 P.No.18 I.No. 2.11 D PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Tonne | 86658.0 | 86658.0 | 0.27 | False | None | None | False | None | False | 23397.66 | 0 | 4051698 | 157247 | None | Vol-3 P.No.129 I.No. 14.4 A PWD SR 2023-24 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1912.0 | 1912.0 | 10.8 | False | None | None | False | None | False | 20649.6 | 0 | 4051699 | 157247 | None | Vol-3 P.No.121 I.No. 13.6 PWD SR 2023-24 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 4428.0 | 4428.0 | 17.2 | False | None | None | False | None | False | 76161.6 | 0 | 4051700 | 157247 | None | Vol-3 P.No.121 I.No. 13.7PWD SR 2023-24 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 3271.0 | 3271.0 | 6.0 | False | None | None | False | None | False | 19626.0 | 0 | 4051701 | 157247 | None | Vol-3 P.No.121 I.No. 13.8 PWD SR 2023-24 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 6811.0 | 6811.0 | 0.45 | False | None | None | False | None | False | 3064.95 | 0 | 4051702 | 157247 | None | Vol-3 P.No.122 I.No. 13.9 PWD SR 2023-24 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 11835.0 | 11835.0 | 0.9 | False | None | None | False | None | False | 10651.5 | 0 | 4051703 | 157247 | None | Vol-3 P.No.121 I.No. 13.2 PWD SR 2023-24 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 13971.0 | 13971.0 | 0.99 | False | None | None | False | None | False | 13831.29 | 0 | 4051704 | 157247 | None | Vol-2 P.No.83 I.No. 11.16.3 PWD SR 2023-24 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Kg | 122.0 | 122.0 | 224.11 | False | None | None | False | None | False | 27341.42 | 0 | 4051705 | 157247 | None | Vol-3 P.No.123 I.No. 13.14 PWD SR 2023-24 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 84.0 | 84.0 | 15.6 | False | None | None | False | None | False | 1310.4 | 0 | 4051706 | 157247 | None | Vol-1 P.No.7 I.No.1.8 PWD SR 2023-24 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 474.0 | 474.0 | 81.6 | False | None | None | False | None | False | 38678.4 | 0 |
|