1726838794000 | 0 | None | None | Bridges | Construction of Minor Bridge on Karadigala - Chinnalli - Yesluru Village Road Valalahalli GP in Sakleshpur Taluk. | 1693521.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4041862 | 156863 | None | 1.14.1 Vol-1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 125.66 | 125.66 | 96.24 | False | None | None | False | None | False | 12093.5184 | 0 | 4041863 | 156863 | None | 2.1.3 Vol-1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7378.45 | 7378.45 | 12.6 | False | None | None | False | None | False | 92968.47 | 0 | 4041864 | 156863 | None | 2.4.3 Vol-1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, costof all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8118.19 | 8118.19 | 24.9 | False | None | None | False | None | False | 202142.931 | 0 | 4041865 | 156863 | None | 2.4.3 Vol-1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, costof all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8586.55 | 8586.55 | 28.52 | False | None | None | False | None | False | 244888.406 | 0 | 4041866 | 156863 | None | 2.5.2 Vol-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 10116.69 | 10116.69 | 8.03 | False | None | None | False | None | False | 81237.0207 | 0 | 4041867 | 156863 | None | 2.11 C Vol-1 | Supplying, Fitting and Placing un-coated TMT bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications for Sub Structure ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | MT | 96804.96 | 96804.96 | 3.5 | False | None | None | False | None | False | 338817.36 | 0 | 4041868 | 156863 | None | 12.3 A Vol-3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 1308.16 | 1308.16 | 52.56 | False | None | None | False | None | False | 68756.8896 | 0 | 4041869 | 156863 | None | 12.4 Vol-3 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2998.24 | 2998.24 | 36.04 | False | None | None | False | None | False | 108056.5696 | 0 | 4041870 | 156863 | None | 13.2 Vol-3 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 15647.52 | 15647.52 | 1.37 | False | None | None | False | None | False | 21437.1024 | 0 | 4041871 | 156863 | None | 13.7 VOl-3 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Nos | 3663.52 | 3663.52 | 4.0 | False | None | None | False | None | False | 14654.08 | 0 | 4041872 | 156863 | None | 14.4 A Vol-3 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2141.44 | 2141.44 | 18.0 | False | None | None | False | None | False | 38545.92 | 0 | 4041873 | 156863 | None | 1.8 Vol-1 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling, water, all materials,usage& all other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 530.88 | 530.88 | 477.3 | False | None | None | False | None | False | 253389.024 | 0 | 4041874 | 156863 | None | 13.5 Vol-3 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 2535.68 | 2535.68 | 14.0 | False | None | None | False | None | False | 35499.52 | 0 | 4041875 | 156863 | None | 13.8 Vol-3 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7628.32 | 7628.32 | 3.6 | False | None | None | False | None | False | 27461.952 | 0 | 4041876 | 156863 | None | 13.9 Vol-3 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 13255.2 | 13255.2 | 5.4 | False | None | None | False | None | False | 71578.08 | 0 | 4041877 | 156863 | None | 14.1 Vol-3 | Providing and laying boulders apron on river bed for protectionagainst scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A Boulder Laid Dry Without Wire Crates. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 2141.44 | 2141.44 | 22.2 | False | None | None | False | None | False | 47539.968 | 0 | 4041878 | 156863 | None | 13.14 Vol-3 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 94.08 | 94.08 | 25.9 | False | None | None | False | None | False | 2436.672 | 0 | 4041879 | 156863 | None | 11.16.1 Vol-2 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Kgs | 152.32 | 152.32 | 210.2 | False | None | None | False | None | False | 32017.664 | 0 |
|