createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726913114132
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee2030.00
emd68700.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose08-10-2024 17:30:00
tenderQueryClose07-10-2024 11:00:00
technicalBidOpen10-10-2024 11:00:00
publishedDate21-09-2024 16:51:20
publishedByPostRDPR_EE_DIV_VJP
publishedByUserKPE13083 - NABILAL M GABASAVALGI
bidValidityPeriod90
noOfCalls1
preBidMeetingDate07-10-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonB B Palayi JE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9008301832
tenderSupplierListNone
tenderSchedule
createdTs1726913114173
version4
createdDateNone
modifiedDateNone
tenderNumberRDPR/2024-25/BD/WORK_INDENT7674
titleConstruction of New Rooms Near KPS School at Baradol village in Chadachan Taluka of Vijayapur District (H A/c 8443 DC ED KPS/2022-23) For ST Bidders
descriptionConstruction of New Rooms Near KPS School at Baradol village in Chadachan Taluka of Vijayapur District (H A/c 8443 DC ED KPS/2022-23) For ST Bidders
categoryWORKS
categoryTextWorks
ecv8105464.20
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location803
locationNameRDPR Division Office Vijayapura
provisionalAmount8398000.0
groupOverheadTotal1236947.0
fileNumberRDPR/INDI/DEPOSIT/BARADOL/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17269131140000NoneNoneBuildingsESTIMATE FOR LPS GROUND FLOOR2363407.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047320157111Nonecode01Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm91.091.0117.7FalseNoneNoneFalseNoneFalse10710.70
4047321157111Nonecode02Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm118.0118.0117.7FalseNoneNoneFalseNoneFalse13888.60
4047322157111Nonecode03Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum242.0242.085.82FalseNoneNoneFalseNoneFalse20768.440
4047323157111Nonecode04Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads &lifts, all complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum1186.01186.012.85FalseNoneNoneFalseNoneFalse15240.10
4047324157111Nonecode05Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregatesCum5338.05338.011.24FalseNoneNoneFalseNoneFalse59999.120
4047325157111Nonecode06Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum6618.06618.08.58FalseNoneNoneFalseNoneFalse56782.440
4047326157111Nonecode07Providing Coursed rubble masonry (second sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum6205.06205.08.58FalseNoneNoneFalseNoneFalse53238.90
4047327157111Nonecode08Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum6389.06389.018.12FalseNoneNoneFalseNoneFalse115768.680
4047328157111Nonecode09Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6287.06287.09.59FalseNoneNoneFalseNoneFalse60292.330
4047329157111Nonecode10Additionalities For formwork, Centring and scffodling for Formwark for Sub structures @ 3% - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For FootingCum188.61188.619.59FalseNoneNoneFalseNoneFalse1808.76990
4047330157111Nonecode11Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Ground Floor.Cum6843.06843.01.21FalseNoneNoneFalseNoneFalse8280.030
4047331157111Nonecode12Additionalities For formwork, Centring and scffodling for Formwark Formwark for column @ 70% With - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For RCC Column upto Plinth Level.Cum4790.14790.11.21FalseNoneNoneFalseNoneFalse5796.0210
4047332157111Nonecode13Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum266.0266.032.09FalseNoneNoneFalseNoneFalse8535.940
4047333157111Nonecode14Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Fround Floor Plinth Beams.Cum6843.06843.04.45FalseNoneNoneFalseNoneFalse30451.350
4047334157111Nonecode15Additionalities For formwork, Centring and scffodling for Formwark Formwark for plinth beams@ 50% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For RCC Column upto Plinth LevelCum3421.53421.54.45FalseNoneNoneFalseNoneFalse15225.6750
4047335157111Nonecode16Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Ground Floor.Cum6843.06843.06.44FalseNoneNoneFalseNoneFalse44068.920
4047336157111Nonecode17Additionalities For formwork, Centring and scffodling for Formwark Formwark for column @ 70% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For RCC Column above Plinth Level to Ground Floor. For RCC Column above Plinth Level to Ground Floor.Cum4790.14790.16.44FalseNoneNoneFalseNoneFalse30848.2440
4047337157111Nonecode18Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Ground Floor.Cum6843.06843.08.51FalseNoneNoneFalseNoneFalse58233.930
4047338157111Nonecode19Additionalities For formwork, Centring and scffodling for Formwark Formwark for Lintels, Roof Beams @ 60% With All lead & lifts asdirected by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Lintels, Roof Beams.Cum4105.84105.88.51FalseNoneNoneFalseNoneFalse34940.3580
4047339157111Nonecode20Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Ground Floor for Slab.Cum6843.06843.015.12FalseNoneNoneFalseNoneFalse103466.160
4047340157111Nonecode21Additionalities For formwork, Centring and scffodling for Formwark Formwark for Roof Slab @ 50% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For SlabCum3421.53421.515.12FalseNoneNoneFalseNoneFalse51733.080
4047341157111Nonecode22Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Ground Floor.Cum6843.06843.00.48FalseNoneNoneFalseNoneFalse3284.640
4047342157111Nonecode23Additionalities For formwork, Centring and scffodling for Formwark Formwark for chajja@ 45% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Chajja.Cum3079.353079.350.48FalseNoneNoneFalseNoneFalse1478.0880
4047343157111Nonecode24Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor,Cum474.0474.033.82FalseNoneNoneFalseNoneFalse16030.680
4047344157111Nonecode25Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum1186.01186.023.02FalseNoneNoneFalseNoneFalse27301.720
4047345157111Nonecode26Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregatesCum5338.05338.011.36FalseNoneNoneFalseNoneFalse60639.680
4047346157111Nonecode27Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground FloorCum7969.07969.035.06FalseNoneNoneFalseNoneFalse279393.140
4047347157111Nonecode28Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor.Tonne89457.089457.03.5497FalseNoneNoneFalseNoneFalse317545.51290
4047348157111Nonecode29Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor for Slab.Sqm817.0817.0120.92FalseNoneNoneFalseNoneFalse98791.640
4047349157111Nonecode30Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor Inside Plaster.Sqm255.0255.0153.11FalseNoneNoneFalseNoneFalse39043.050
4047350157111Nonecode31Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor for Ceiling Plaster.Sqm255.0255.0106.24FalseNoneNoneFalseNoneFalse27091.20
4047351157111Nonecode32Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor.Sqm371.0371.0296.53FalseNoneNoneFalseNoneFalse110012.630
4047352157111Nonecode33Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground FloorSqm2852.02852.06.45FalseNoneNoneFalseNoneFalse18395.40
4047353157111Nonecode34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground FloorSqm1545.01545.0110.11FalseNoneNoneFalseNoneFalse170119.950
4047354157111Nonecode35Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor.Sqm100.0100.0259.35FalseNoneNoneFalseNoneFalse25935.00
4047355157111Nonecode36Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor.Sqm4478.04478.014.4FalseNoneNoneFalseNoneFalse64483.20
4047356157111Nonecode37Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor.Kg168.0168.0302.4FalseNoneNoneFalseNoneFalse50803.20
4047357157111Nonecode38Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt,dust,mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm137.0137.0153.11FalseNoneNoneFalseNoneFalse20976.070
4047358157111Nonecode39Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt,dust,mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm137.0137.0106.24FalseNoneNoneFalseNoneFalse14554.880
4047359157111Nonecode40Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm53.053.0296.53FalseNoneNoneFalseNoneFalse15716.090
4047360157111Nonecode41Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm89.089.0296.53FalseNoneNoneFalseNoneFalse26391.170
4047361157111Nonecode42Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Cum124202.0124202.00.552FalseNoneNoneFalseNoneFalse68559.5040
4047362157111Nonecode43Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm6897.06897.011.52FalseNoneNoneFalseNoneFalse79453.440
4047363157111Nonecode44Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc.125x65x2.12mm ) Providing and fixing fixtures for Door & Windows - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Doors.Each55.055.024.0FalseNoneNoneFalseNoneFalse1320.00
4047364157111Nonecode45Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. Providing and fixing fixtures for Door & Windows - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Doors.Each49.049.024.0FalseNoneNoneFalseNoneFalse1176.00
4047365157111Nonecode46Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For DoorsEach1016.01016.04.0FalseNoneNoneFalseNoneFalse4064.00
4047366157111Nonecode47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm139.0139.014.4FalseNoneNoneFalseNoneFalse2001.60
4047367157111Nonecode48Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm138.0138.011.52FalseNoneNoneFalseNoneFalse1589.760
4047368157111Nonecode49Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm138.0138.042.0FalseNoneNoneFalseNoneFalse5796.00
4047369157111Nonecode50Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Black Boards,Sqm475.0475.011.52FalseNoneNoneFalseNoneFalse5472.00
4047370157111Nonecode51Providing & fixing on wall face unplasticised Rigid PVC rain water pipes conferming to IS :13592 type A Including Jointing with seal ring conferming to IS 5382 leaving to 10 mm gap for thermal expansion (i)Single socketed pipes 75 mm daimeter - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For PVC Rain Water Pipes.Mtr197.0197.030.0FalseNoneNoneFalseNoneFalse5910.00
17269131140000NoneNoneBuildingsELECTRICAL ESTIMATE FOR LPS303897.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047371157112Nonecode01Concealed Conduit System Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(25mm dia 2mm thick)Mtr78.078.0450.0FalseNoneNoneFalseNoneFalse35100.00
4047372157112Nonecode02Supplying heavy gauge PVC Conduit Pipe ….dia .mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (25mm dia 2mm thick)(Groove)Mtr79.079.0120.0FalseNoneNoneFalseNoneFalse9480.00
4047373157112Nonecode03Supplying and fixing PVC/metal conduit Deep junction box - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (25 mm deep Junction box)Mtr56.056.085.0FalseNoneNoneFalseNoneFalse4760.00
4047374157112Nonecode04Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (10"x7"x3")Each112.0112.015.0FalseNoneNoneFalseNoneFalse1680.00
4047375157112Nonecode05Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (8" x 6" x 3" (203 x 152 x 76 mm))Each86.086.035.0FalseNoneNoneFalseNoneFalse3010.00
4047376157112Nonecode06Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (4" x 4" x 3" ( 101 x 101 x 76 mm))Each74.074.045.0FalseNoneNoneFalseNoneFalse3330.00
4047377157112Nonecode07Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work6A One Way SwitchEach102.0102.045.0FalseNoneNoneFalseNoneFalse4590.00
4047378157112Nonecode08Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work6A Two Way SwitchEach166.0166.075.0FalseNoneNoneFalseNoneFalse12450.00
4047379157112Nonecode09Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. GROUP A - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Short point upto 3Mtr from tapping point to out let via switch)Point285.0285.0100.0FalseNoneNoneFalseNoneFalse28500.00
4047380157112Nonecode10Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. GROUP A - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch)Point394.0394.0100.0FalseNoneNoneFalseNoneFalse39400.00
4047381157112Nonecode11Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. GROUP A - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Long point above 6Mtr upto 10Mtr from tapping point to out let via switch)Point570.0570.050.0FalseNoneNoneFalseNoneFalse28500.00
4047382157112Nonecode12Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (1.5 Sq.mm)Mtr26.026.0950.0FalseNoneNoneFalseNoneFalse24700.00
4047383157112Nonecode13Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (2.5 Sq.mm)Mtr42.042.0500.0FalseNoneNoneFalseNoneFalse21000.00
4047384157112Nonecode14Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (6 Sq.mm)Mtr92.092.095.0FalseNoneNoneFalseNoneFalse8740.00
4047385157112Nonecode15Supplying and mounting 2 Nos. of 2 way 6 amps flush type switches either surface/flush mounted on existing gang box or in 4mm thick plastic sheet and mounted on a flush mounted wooden box and wiring as per IS 1293 - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Fan Regulator)Each170.0170.06.0FalseNoneNoneFalseNoneFalse1020.00
4047386157112Nonecode16Supplying and fixing PBBC/Bakelite straight or slant batten holder and wiring with 60w/230 volts lamps. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (6Amps Bakelite ceiling rose)Each78.078.050.0FalseNoneNoneFalseNoneFalse3900.00
4047387157112Nonecode17Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc., and fixing on existing wooden or metal box using N.F. screws. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (4mm Plastic sheet)Sqm0.410.41650.0FalseNoneNoneFalseNoneFalse266.50
4047388157112Nonecode18Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Ceiling Fan)Each2984.02984.06.0FalseNoneNoneFalseNoneFalse17904.00
4047389157112Nonecode19Extra length of GI pipe of class B 19mm dia for down rod - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (GI Pipe for Fan Down Rod)Mtr197.0197.06.0FalseNoneNoneFalseNoneFalse1182.00
4047390157112Nonecode20Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(On wall / ceiling / Rafter / Girders)Each122.0122.032.0FalseNoneNoneFalseNoneFalse3904.00
4047391157112Nonecode21Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Fixing of Ceiling Fan)Each171.0171.06.0FalseNoneNoneFalseNoneFalse1026.00
4047392157112Nonecode22Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.III - Double Door - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (16 Way SP & N)Each2908.02908.03.0FalseNoneNoneFalseNoneFalse8724.00
4047393157112Nonecode23Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (50-63Amps TPN)Each3088.03088.06.0FalseNoneNoneFalseNoneFalse18528.00
4047394157112Nonecode24Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (6-32Amps SP)Each415.0415.06.0FalseNoneNoneFalseNoneFalse2490.00
4047395157112Nonecode25Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (6-32 Amps DP)Each739.0739.06.0FalseNoneNoneFalseNoneFalse4434.00
4047396157112Nonecode26Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 122 mm dia - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (Earthing)Each3510.03510.03.0FalseNoneNoneFalseNoneFalse10530.00
4047397157112Nonecode27Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. GI Wire - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (8 SWG GI Wire)Mtr19.019.060.0FalseNoneNoneFalseNoneFalse1140.00
4047398157112Nonecode28Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (63Amps Fuse Cutouts)Each401.0401.09.0FalseNoneNoneFalseNoneFalse3609.00
17269131140000NoneNoneBuildingsESTIMATE FOR HPS GROUND FLOOR1569131.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047399157113Nonecode01Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum91.091.076.1FalseNoneNoneFalseNoneFalse6925.10
4047400157113Nonecode02Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm118.0118.076.1FalseNoneNoneFalseNoneFalse8979.80
4047401157113Nonecode03Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum242.0242.064.41FalseNoneNoneFalseNoneFalse15587.220
4047402157113Nonecode04Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads &lifts, all complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum1186.01186.010.77FalseNoneNoneFalseNoneFalse12773.220
4047403157113Nonecode05Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregatesCum5338.05338.09.08FalseNoneNoneFalseNoneFalse48469.040
4047404157113Nonecode06Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum6618.06618.07.62FalseNoneNoneFalseNoneFalse50429.160
4047405157113Nonecode07Providing Coursed rubble masonry (second sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum6205.06205.07.62FalseNoneNoneFalseNoneFalse47282.10
4047406157113Nonecode08Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum6389.06389.011.23FalseNoneNoneFalseNoneFalse71748.470
4047407157113Nonecode09Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6287.06287.06.47FalseNoneNoneFalseNoneFalse40676.890
4047408157113Nonecode10Additionalities For formwork, Centring and scffodling for Formwark for Sub structures @ 3% With All lead & lifts as directed by the engineer in charge of the work --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum188.61188.616.47FalseNoneNoneFalseNoneFalse1220.30670
4047409157113Nonecode11Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Ground Floor.Cum6843.06843.00.83FalseNoneNoneFalseNoneFalse5679.690
4047410157113Nonecode12Additionalities For formwork, Centring and scffodling for Formwark Formwark for column @ 70% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For RCC Column upto Plinth level.Cum4790.14790.10.83FalseNoneNoneFalseNoneFalse3975.7830
4047411157113Nonecode13Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum266.0266.022.9FalseNoneNoneFalseNoneFalse6091.40
4047412157113Nonecode14Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Ground Floor for Plinth Beams.Cum6843.06843.03.34FalseNoneNoneFalseNoneFalse22855.620
4047413157113Nonecode15Additionalities For formwork, Centring and scffodling for Formwark Formwark for plinth beams@ 50% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For RCC Column Plinth Level.Cum3421.53421.53.34FalseNoneNoneFalseNoneFalse11427.810
4047414157113Nonecode16Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. For Ground Floor.Cum6843.06843.03.37FalseNoneNoneFalseNoneFalse23060.910
4047415157113Nonecode17Additionalities For formwork, Centring and scffodling for Formwark Formwark for column @ 70% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For RCC Column above Plinth.Cum4790.14790.13.37FalseNoneNoneFalseNoneFalse16142.6370
4047416157113Nonecode18Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Ground Floor.Cum6843.06843.07.41FalseNoneNoneFalseNoneFalse50706.630
4047417157113Nonecode19Additionalities For formwork, Centring and scffodling for Formwark Formwark for Lintels, Roof Beams @ 60% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Lintels Roof Beams @ 60%.Cum4105.84105.87.41FalseNoneNoneFalseNoneFalse30423.9780
4047418157113Nonecode20Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Ground Floor.Cum6843.06843.011.36FalseNoneNoneFalseNoneFalse77736.480
4047419157113Nonecode21Additionalities For formwork, Centring and scffodling for Formwark Formwark for Roof Slab @ 50% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Roof Slab @ 50%.Cum3421.53421.511.36FalseNoneNoneFalseNoneFalse38868.240
4047420157113Nonecode22Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For Ground Floor & First Floor.Cum6843.06843.00.12FalseNoneNoneFalseNoneFalse821.160
4047421157113Nonecode23Additionalities For formwork, Centring and scffodling for Formwark for chajja@ 45% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Chajja.Cum3079.353079.350.12FalseNoneNoneFalseNoneFalse369.5220
4047422157113Nonecode24Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Cum474.0474.019.27FalseNoneNoneFalseNoneFalse9133.980
4047423157113Nonecode25Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregatesCum5338.05338.04.89FalseNoneNoneFalseNoneFalse26102.820
4047424157113Nonecode26Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Cum7969.07969.033.88FalseNoneNoneFalseNoneFalse269989.720
4047425157113Nonecode27Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specifications a.Buildings --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkTonne89457.089457.02.1333FalseNoneNoneFalseNoneFalse190838.61810
4047426157113Nonecode28Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor. Inside Plaster.Sqm255.0255.0150.48FalseNoneNoneFalseNoneFalse38372.40
4047427157113Nonecode29Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor Ceiling Plaster.Sqm255.0255.063.54FalseNoneNoneFalseNoneFalse16202.70
4047428157113Nonecode30Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm371.0371.0105.26FalseNoneNoneFalseNoneFalse39051.460
4047429157113Nonecode31Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm2852.02852.019.99FalseNoneNoneFalseNoneFalse57011.480
4047430157113Nonecode32Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm1545.01545.091.68FalseNoneNoneFalseNoneFalse141645.60
4047431157113Nonecode33Providing and applying white cement based putty of average thickness 1 mm, For Ground Floor.of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm100.0100.0214.02FalseNoneNoneFalseNoneFalse21402.00
4047432157113Nonecode34Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm4478.04478.07.2FalseNoneNoneFalseNoneFalse32241.60
4047433157113Nonecode35Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkKg168.0168.0151.2FalseNoneNoneFalseNoneFalse25401.60
4047434157113Nonecode36Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt,dust,mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm137.0137.0150.48FalseNoneNoneFalseNoneFalse20615.760
4047435157113Nonecode37Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt,dust,mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor. Qty as per Ceiling Plaster.Sqm137.0137.063.54FalseNoneNoneFalseNoneFalse8704.980
4047436157113Nonecode38Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Ground Floor as per External Wall.Sqm53.053.0105.26FalseNoneNoneFalseNoneFalse5578.780
4047437157113Nonecode39Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Qtty as per External Walls.Sqm89.089.0105.26FalseNoneNoneFalseNoneFalse9368.140
4047438157113Nonecode40Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Cum124202.0124202.00.108FalseNoneNoneFalseNoneFalse13413.8160
4047439157113Nonecode41Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Sqm6897.06897.05.76FalseNoneNoneFalseNoneFalse39726.720
4047440157113Nonecode42Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc.125x65x2.12mm ) Providing and fixing fixtures for Door & Windows - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For DoorsEach55.055.012.0FalseNoneNoneFalseNoneFalse660.00
4047441157113Nonecode43Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. Providing and fixing fixtures for Door & Windows - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Doors. For Ground Floor. for GrillEach49.049.012.0FalseNoneNoneFalseNoneFalse588.00
4047442157113Nonecode44Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Doors.Each1016.01016.02.0FalseNoneNoneFalseNoneFalse2032.00
4047443157113Nonecode45Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm139.0139.07.2FalseNoneNoneFalseNoneFalse1000.80
4047444157113Nonecode46Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor. for Door/Sqm138.0138.05.76FalseNoneNoneFalseNoneFalse794.880
4047445157113Nonecode47Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work For Ground Floor.Kg138.0138.021.0FalseNoneNoneFalseNoneFalse2898.00
4047446157113Nonecode48Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Black Boards (GF)Sqm475.0475.08.64FalseNoneNoneFalseNoneFalse4104.00
17269131140000NoneNoneBuildingsESTIMATE FOR HPS FIRST FLOOR1271604.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047447157114Nonecode01Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For First FlowerCum6911.436911.434.21FalseNoneNoneFalseNoneFalse29097.12030
4047448157114Nonecode02Additionalities For formwork, Centring and scffodling for Formwark Formwarkfor column @ 70% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. RCC Column above Plinth.Cum4838.04838.04.21FalseNoneNoneFalseNoneFalse20367.980
4047449157114Nonecode03Providing and laying in position cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, For First Floor.Cum6911.436911.437.21FalseNoneNoneFalseNoneFalse49831.41030
4047450157114Nonecode04Additionalities For formwork, Centring and scffodling for Formwark Formwark for Lintels, Roof Beams @ 60% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Lintels Roof Beams @ 60%Cum4146.864146.867.21FalseNoneNoneFalseNoneFalse29898.86060
4047451157114Nonecode05Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6911.436911.4315.31FalseNoneNoneFalseNoneFalse105813.99330
4047452157114Nonecode06Additionalities For formwork, Centring and scffodling for Formwark Formwarkfor Roof Slab @ 50% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Roof Slab.Cum3455.723455.7215.31FalseNoneNoneFalseNoneFalse52907.07320
4047453157114Nonecode07Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. First Floor Window Chajja.Cum6911.436911.430.12FalseNoneNoneFalseNoneFalse829.37160
4047454157114Nonecode08Additionalities For formwork, Centring and scffodling for Formwark Formwarkfor chajja@ 45% With All lead & lifts as directed by the engineer in charge of the work - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Chajja @ 45%.Cum3110.143110.140.12FalseNoneNoneFalseNoneFalse373.21680
4047455157114Nonecode09Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:5:10 (M5)Using 40 mm nominal size graded crushed coarse aggregatesCum5391.385391.386.91FalseNoneNoneFalseNoneFalse37254.43580
4047456157114Nonecode10Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Cum8048.698048.6927.47FalseNoneNoneFalseNoneFalse221097.51430
4047457157114Nonecode11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Tonne90351.5790351.572.79FalseNoneNoneFalseNoneFalse252080.88030
4047458157114Nonecode12Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm825.17825.1768.93FalseNoneNoneFalseNoneFalse56878.96810
4047459157114Nonecode13Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor Inside Plaster.Sqm257.55257.5590.0FalseNoneNoneFalseNoneFalse23179.50
4047460157114Nonecode14Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor Ceiling Plaster.Sqm257.55257.5567.32FalseNoneNoneFalseNoneFalse17338.2660
4047461157114Nonecode15Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Sqm374.71374.71187.77FalseNoneNoneFalseNoneFalse70359.29670
4047462157114Nonecode16Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Sqm1560.451560.4574.18FalseNoneNoneFalseNoneFalse115754.1810
4047463157114Nonecode17Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Sqm101.0101.0157.32FalseNoneNoneFalseNoneFalse15889.320
4047464157114Nonecode18Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Sqm4522.784522.787.2FalseNoneNoneFalseNoneFalse32564.0160
4047465157114Nonecode19Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Kg169.68169.68151.2FalseNoneNoneFalseNoneFalse25655.6160
4047466157114Nonecode20Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt,dust,mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Sqm138.37138.3790.0FalseNoneNoneFalseNoneFalse12453.30
4047467157114Nonecode21Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt,dust,mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor for ceiling plaster.Sqm138.37138.3767.32FalseNoneNoneFalseNoneFalse9315.06840
4047468157114Nonecode22Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor. as per External Walls.Sqm53.5353.53187.77FalseNoneNoneFalseNoneFalse10051.32810
4047469157114Nonecode23Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor. as per External Walls.Sqm89.8989.89187.77FalseNoneNoneFalseNoneFalse16878.64530
4047470157114Nonecode24Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Cum125444.02125444.020.108FalseNoneNoneFalseNoneFalse13547.954160
4047471157114Nonecode25Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor.Sqm6965.976965.975.76FalseNoneNoneFalseNoneFalse40123.98720
4047472157114Nonecode26Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc.125x65x2.12mm ) Providing and fixing fixtures for Door & Windows --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkEach55.5555.5512.0FalseNoneNoneFalseNoneFalse666.60
4047473157114Nonecode27Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. Providing and fixing fixtures for Door & Windows - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkEach36.3636.3612.0FalseNoneNoneFalseNoneFalse436.320
4047474157114Nonecode28Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Doors.Each1026.161026.162.0FalseNoneNoneFalseNoneFalse2052.320
4047475157114Nonecode29Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor For Grill.Sqm140.39140.397.2FalseNoneNoneFalseNoneFalse1010.8080
4047476157114Nonecode30Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For First Floor. For Door.Sqm140.39140.395.76FalseNoneNoneFalseNoneFalse808.64640
4047477157114Nonecode31Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Black boards (GF+FF)Sqm475.0475.08.64FalseNoneNoneFalseNoneFalse4104.00
4047478157114Nonecode32Providing & fixing on wall face unplasticised Rigid PVC rain water pipes conferming to IS :13592 type A Including Jointing with seal ring conferming to IS 5382 leaving to 10 mm gap for thermal expansion (i)Single socketed pipes 75 mm daimeter - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. PVC Rain Water Pipes.Mtr198.97198.9715.0FalseNoneNoneFalseNoneFalse2984.550
17269131140000NoneNoneBuildingsELECTRICAL ESTIMATE FOR HPS264979.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047479157115Nonecode01Concealed Conduit System Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (25mm dia 2mm thick)Mtr78.078.0400.0FalseNoneNoneFalseNoneFalse31200.00
4047480157115Nonecode02Supplying heavy gauge PVC Conduit Pipe ….dia .mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (25mm dia 2mm thick)(Groove)Mtr79.079.0100.0FalseNoneNoneFalseNoneFalse7900.00
4047481157115Nonecode03Supplying and fixing PVC/metal conduit Deep junction box - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (25 mm deep Junction box)Mtr56.056.080.0FalseNoneNoneFalseNoneFalse4480.00
4047482157115Nonecode04Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (10"x7"x3")Each112.0112.030.0FalseNoneNoneFalseNoneFalse3360.00
4047483157115Nonecode05Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (8" x 6" x 3" (203 x 152 x 76 mm))Each86.086.030.0FalseNoneNoneFalseNoneFalse2580.00
4047484157115Nonecode06Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (4" x 4" x 3" ( 101 x 101 x 76 mm))Each74.074.040.0FalseNoneNoneFalseNoneFalse2960.00
4047485157115Nonecode07Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work 6A One Way SwitchEach102.0102.040.0FalseNoneNoneFalseNoneFalse4080.00
4047486157115Nonecode08Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work.6A Two Way SwitchEach166.0166.070.0FalseNoneNoneFalseNoneFalse11620.00
4047487157115Nonecode09Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. GROUP A- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(Short point upto 3Mtr from tapping point to out let via switch)Point285.0285.080.0FalseNoneNoneFalseNoneFalse22800.00
4047488157115Nonecode10Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. GROUP A- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work.(Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch)Point394.0394.080.0FalseNoneNoneFalseNoneFalse31520.00
4047489157115Nonecode11Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2 X1.5Sq.mm Cable confirming to the GTP, with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet / gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. GROUP A- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work.(Long point above 6Mtr upto 10Mtr from tapping point to out let via switch)Point570.0570.045.0FalseNoneNoneFalseNoneFalse25650.00
4047490157115Nonecode12Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (1.5 Sq.mm)Mtr26.026.0850.0FalseNoneNoneFalseNoneFalse22100.00
4047491157115Nonecode13Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A- Charges with all lead and lift including .other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work (2.5 Sq.mm)Mtr42.042.0400.0FalseNoneNoneFalseNoneFalse16800.00
4047492157115Nonecode14Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A.- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (6 Sq.mm)Mtr92.092.080.0FalseNoneNoneFalseNoneFalse7360.00
4047493157115Nonecode15Supplying and mounting 2 Nos. of 2 way 6 amps flush type switches either surface/flush mounted on existing gang box or in 4mm thick plastic sheet and mounted on a flush mounted wooden box and wiring as per IS 1293 - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (Fan Regulator)Each170.0170.04.0FalseNoneNoneFalseNoneFalse680.00
4047494157115Nonecode16Supplying and fixing PBBC/Bakelite straight or slant batten holder and wiring with 60w/230 volts lamps.- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (6Amps Bakelite ceiling rose)Each78.078.040.0FalseNoneNoneFalseNoneFalse3120.00
4047495157115Nonecode17Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc., and fixing on existing wooden or metal box using N.F. screws.- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (4mm Plastic sheet)Sqm0.410.41600.0FalseNoneNoneFalseNoneFalse246.00
4047496157115Nonecode18Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (Ceiling Fan)Each2984.02984.04.0FalseNoneNoneFalseNoneFalse11936.00
4047497157115Nonecode19Extra length of GI pipe of class B 19mm dia for down rod- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (GI Pipe for Fan Down Rod)Mtr197.0197.04.0FalseNoneNoneFalseNoneFalse788.00
4047498157115Nonecode20Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (On wall / ceiling / Rafter / Girders)Each122.0122.030.0FalseNoneNoneFalseNoneFalse3660.00
4047499157115Nonecode21Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work.(Fixing of Ceiling Fan)Each171.0171.04.0FalseNoneNoneFalseNoneFalse684.00
4047500157115Nonecode22Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.III - Double Door- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work(16 Way SP & N)Each2908.02908.03.0FalseNoneNoneFalseNoneFalse8724.00
4047501157115Nonecode23Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (50-63Amps TPN)Each3088.03088.06.0FalseNoneNoneFalseNoneFalse18528.00
4047502157115Nonecode24Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (6-32Amps SP)Each415.0415.06.0FalseNoneNoneFalseNoneFalse2490.00
4047503157115Nonecode25Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (6-32 Amps DP)Each739.0739.06.0FalseNoneNoneFalseNoneFalse4434.00
4047504157115Nonecode26Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 122 mm dia - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For EarthingEach3510.03510.03.0FalseNoneNoneFalseNoneFalse10530.00
4047505157115Nonecode27Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. GI Wire - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (8 SWG GI Wire)Mtr19.019.060.0FalseNoneNoneFalseNoneFalse1140.00
4047506157115Nonecode28Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. (63Amps Fuse Cutouts)Each401.0401.09.0FalseNoneNoneFalseNoneFalse3609.00
17269131140000NoneNoneBuildingsESTIMATE FOR REPAIR FOR LPS547047.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047507157116Nonecode01Chipping unsound weak concrete material from slabs. Beams, columns & roofs upto 50mm by manual means or by standard power driven percussion type including cleaning reinforcement with wire brush complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm144.0144.098.04FalseNoneNoneFalseNoneFalse14117.760
4047508157116Nonecode02Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm737.0737.0224.84FalseNoneNoneFalseNoneFalse165707.080
4047509157116Nonecode03Providing Jungle wood such as Nerale, Neem wrought and putup for purlins, common rafters and similar work including cost of materials, labour, usage charges complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkCum44929.044929.00.37FalseNoneNoneFalseNoneFalse16623.730
4047510157116Nonecode04Providing and fixing in position fully panelled shutters for windows with Honne wood stiles and rails of 35mm. thick, 75mm wide in two halves with panels provided with MDF of 25mm thick including cost of materials, labour charges, usage charges complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm6201.06201.035.16FalseNoneNoneFalseNoneFalse218027.160
4047511157116Nonecode05Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Inside PointSqm13.013.0683.24FalseNoneNoneFalseNoneFalse8882.120
4047512157116Nonecode06Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Inside Point.Sqm137.0137.0683.24FalseNoneNoneFalseNoneFalse93603.880
4047513157116Nonecode07Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Outside PointSqm13.013.0272.76FalseNoneNoneFalseNoneFalse3545.880
4047514157116Nonecode08Finishing walls with water proofing cement paint of required shade :Old work (one coats applied @ 2.20 kg/10 m²) over priming\ coat of primer applied @ 0.80 litrs/10 m² complete including cost of Priming coat including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Outside PointSqm87.087.0272.76FalseNoneNoneFalseNoneFalse23730.120
4047515157116Nonecode09Painting with oil type wood preservative of approved brand and manufacture: Old work (one coats) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm31.031.045.48FalseNoneNoneFalseNoneFalse1409.880
4047516157116Nonecode10Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Name Board and Others.cm4.04.0350.0FalseNoneNoneFalseNoneFalse1400.00
17269131140000NoneNoneBuildingsESTIMATE FOR REPAIR FOR HPS548450.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047517157117Nonecode01Chipping unsound weak concrete material from slabs. Beams, columns & roofs upto 50mm by manual means or by standard power driven percussion type including cleaning reinforcement with wire brush complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm144.0144.096.0FalseNoneNoneFalseNoneFalse13824.00
4047518157117Nonecode02Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm737.0737.0247.86FalseNoneNoneFalseNoneFalse182672.820
4047519157117Nonecode03Repairs to plaster in patches of 2.5 m2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1:4 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm379.0379.010.8FalseNoneNoneFalseNoneFalse4093.20
4047520157117Nonecode04Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Inside Point.Sqm13.013.0601.54FalseNoneNoneFalseNoneFalse7820.020
4047521157117Nonecode05Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Inside Point.Sqm137.0137.0601.54FalseNoneNoneFalseNoneFalse82410.980
4047522157117Nonecode06Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. For Outside Point.Sqm13.013.0213.16FalseNoneNoneFalseNoneFalse2771.080
4047523157117Nonecode07Finishing walls with water proofing cement paint of required shade :Old work (one coats applied @ 2.20 kg/10 m²) over priming\ coat of primer applied @ 0.80 litrs/10 m² complete including cost of Priming coat including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm87.087.0213.16FalseNoneNoneFalseNoneFalse18544.920
4047524157117Nonecode08Painting with oil type wood preservative of approved brand and manufacture: Old work (one coats) --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm31.031.052.74FalseNoneNoneFalseNoneFalse1634.940
4047525157117Nonecode09Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkKg113.0113.0724.5FalseNoneNoneFalseNoneFalse81868.50
4047526157117Nonecode10Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete - Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of Work. Name Board and Others.cm4.04.0350.0FalseNoneNoneFalseNoneFalse1400.00
4047527157117Nonecode11Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete --- Charges with all lead and lift including other incedental charges wherever necessary for successful completion of work and as directed by the Engineer in Charge of WorkSqm1545.01545.098.0FalseNoneNoneFalseNoneFalse151410.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17269131150000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17269131150000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17269131150000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17269131150000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17269131150000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17269132230000NoneNoneELIGIBILITYTo qualify for award of this contract each tenderer in his name should have in the last five years period (i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24) Turnover Certificate obtained from Charted Accountant and achieved in at least two financial years an average Annual Financial Turnover (in all classes of civil Engineering construction works only) of Rs. 68.69 lakhs (usually not less than the estimated cost under this contractNone
17269132320000NoneNoneELIGIBILITYIn last five years (i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24) Satisfactorily completed as a prime contractor for at least one similar nature of work done 25% of the cost of the work i.e., not less than the amount Rs 17.17 lakhs, certificate issued from the rank of Executive Engineer and above for the same should be furnished by the contractor. (With Work Indent Number).None
17269132360000NoneNoneELIGIBILITYLiquid assets and /or availability of credit facilities of not less than Rs 20.61 lakhs (30% of amount put to tender) (Credit lines/ letter of credit/ certificates from Nationalized banks for meeting the fund requirement etc.) for particularly this work only. (Unconditional) in given formatNone
17269132410000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years Executed in any one year, the following minimum 80 % quantities of work in last five years. 1 Earth Work Excavation 162.66 Cum 2 RCC/PCC 119.22 Cum 3 UCR 40.41 Cum 4 BBM 77.13 Cum 5 Steel 6.779 Tonne 6 Plaster 976.20 Sqm 7 Flooring 176.54 SqmNone
17269132490000NoneNoneELIGIBILITYEMD may be paid fully by E-payment Rs. 68,700/-None
17269132580000NoneNoneELIGIBILITYContractor should obey with the above conditions in addition to the KW-3None
17269132680000NoneNoneELIGIBILITYContractor should upload KPWD renewal registration copy.None
17269132710000NoneNoneELIGIBILITYThe contractor should scan the GST Certificate, PAN card & Contact Phone No, Postal Address DetailsNone
17269132810000NoneNoneELIGIBILITYPeriod of completion 3 Months including MonsoonNone
17269132840000NoneNoneELIGIBILITYCalculation sheet of Bidder Capacity AxNX2.5-BNone
17269132890000NoneNoneELIGIBILITYIn case the contractor participating in the tender submits a lower rate, the difference amount shall be paid in advance as security deposit in any nationalized bank and the relevant document shall be uploaded, in case not uploaded, which such tender proposal shall be rejected.None
17269132920000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately.None
17269132950000NoneNoneELIGIBILITYPWD Registration Certificate Class I and AboveNone
17269133690000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe reserved category as prescribed in the tender document.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract each tenderer in his name should have in the last five years period (i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24) Turnover Certificate obtained from Charted Accountant and achieved in at least two financial years an average Annual Financial Turnover (in all classes of civil Engineering construction works only) of Rs. 68.69 lakhs (usually not less than the estimated cost under this contractCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneIn last five years (i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24) Satisfactorily completed as a prime contractor for at least one similar nature of work done 25% of the cost of the work i.e., not less than the amount Rs 17.17 lakhs, certificate issued from the rank of Executive Engineer and above for the same should be furnished by the contractor. (With Work Indent Number).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of not less than Rs 20.61 lakhs (30% of amount put to tender) (Credit lines/ letter of credit/ certificates from Nationalized banks for meeting the fund requirement etc.) for particularly this work only. (Unconditional) in given formatCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years Executed in any one year, the following minimum 80 % quantities of work in last five years. 1 Earth Work Excavation 162.66 Cum 2 RCC/PCC 119.22 Cum 3 UCR 40.41 Cum 4 BBM 77.13 Cum 5 Steel 6.779 Tonne 6 Plaster 976.20 Sqm 7 Flooring 176.54 SqmCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneEMD may be paid fully by E-payment Rs. 68,700/-Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- EMD
NoneNoneNoneNoneIn case the contractor participating in the tender submits a lower rate, the difference amount shall be paid in advance as security deposit in any nationalized bank and the relevant document shall be uploaded, in case not uploaded, which such tender proposal shall be rejected.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Difference Amt FDR or DD
NoneNoneNoneNonePWD Registration Certificate Class I and AboveCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe reserved category as prescribed in the tender document.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Cast Certificate
NoneNoneNoneNoneAccurate postal address and Phone / cell NumberCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Accurate postal address and Phone / cell Number
NoneNoneNoneNoneTender who meet the above specified minimum qualifying will only be qualified if there available tender capacity is more than the total tinder value the web available tender capacity will be calculated as under associated available tender capacity A X N X 2.50 - BCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- tender capacity A X N X 2.50 - B
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD CLASS-1 and Above Registration CertificationTrueTechnical Bid
Tendere Must Submnit PAN & GST CertificateTrueTechnical Bid
Tenderer must have of value 2019-20, 2020-21, 2021-22, 2022-23 to 2023-24 satisfactory completed as a prime contractor at least one any Work of 25PERCENT of the Amount Put to Tender Percent of not less than Rs 17.17 lakhs issued by the officer not below tha rank of Executive Engineer for any Works Work Done certificate with works should be produced Work Done with Indent No.TrueTechnical Bid
Work Order / Commitments of ongoing works issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
To quality for award of this contant each tenderer in his name should have in the 2019-20 to 2023-24 years period achieved in at least two financial years an average finance turnover of Rs 68.69 lakhs usually not less than amount put to tender from CA on letter Head with UDIN No otherwise bid will be directly disqualifiedTrueTechnical Bid
Accurate postal address and Phone / cell NumberTrueTechnical Bid
Tender who meet the above specified minimum qualifying will only be qualified if there available tender capacity is more than the total tinder value the web available tender capacity will be calculated as under associated available tender capacity A X N X 2.50 - BTrueTechnical Bid
Contractor should submit the difference amount as per the CSR 2023 24 and it is to be handed over to the EE PRE Division Office Vijayapur after issuing the LOITrueTechnical Bid
LIQUID ASSETS AND OR AVAILABILITY OF CREDIT FACILITIES OF NOT LESS THAN 30 PERCENT OF THE AMOUNT OF CONTRACT THE VALUE SHOULD NOT LESS THAN RS 20.61 LAKHSTrueTechnical Bid
Reserved Category CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1726914722000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PRE Division ZP Campus VIJAYAPUR
streetNone
cityVIJAYAPUR
stateKarnataka
pin586101
tenderRecallDTONone