createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726910872448
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee2110.00
emd85000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-09-2024 17:30:00
tenderQueryClose27-09-2024 17:30:00
technicalBidOpen02-10-2024 17:30:00
publishedDate21-09-2024 16:26:16
publishedByPostMI_EE_DIV_DWD
publishedByUserKPE16244 - DEVARAJ K SHIGGANVI
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonMr. Devaraj K Shigganvi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8362448310
mobileNumber8362448310
tenderSupplierListNone
tenderSchedule
createdTs1726910872476
version6
createdDateNone
modifiedDateNone
tenderNumberMI/2024-25/IW/WORK_INDENT2578
titleConstruction of Check dam across nala near Shirmapura (Site No.2) village in Haveri taluk Haveri District. (SC Reserved)
descriptionConstruction of Check dam across nala near Shirmapura (Site No.2) village in Haveri taluk Haveri District. (SC Reserved)
categoryWORKS
categoryTextWorks
ecv8434774.71
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location122
locationNameMinor Irrigation Division Dharwad
provisionalAmount10000000.0
groupOverheadTotal0.0
fileNumberMIAEE2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17269108720000NoneNoneIrrigation and Other WorksConstruction of Check dam across Halla near Shirmapura (Site No.2) village in Haveri taluk Haveri Distric-(SC Reservation)8434774.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4047067157088NoneSS21Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete.Including all lead and lifts complete as per direction of Engineer in charge of work Sqm9.49.48700.0FalseNoneNoneFalseNoneFalse81780.00
4047068157088NoneSS22Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights,including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m including all lead and lifts complete as per the direction of Engineer in charge of work.Cum102.0102.0444.0FalseNoneNoneFalseNoneFalse45288.00
4047069157088NoneSS23Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights,including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m In ordinary/soft rock without blasting upto 1.5 m depth including all lead and lifts complete as per the direction of Engineer in charge of workCum363.0363.0119.0FalseNoneNoneFalseNoneFalse43197.00
4047070157088NoneSS4 Providing and laying insitu vibrated cement concrete M-20 using approved,clean, hard graded aggregates including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing etc., complete with all leads and lifts. (For Dam and Allied works) f) Using 40mm and down coarse aggregates and 28 days cube compressivestrength, Cement content=320 kg/m3.i)i) Levelling course, foundation filling, backfilling and similar works including all lead and lifts complete as per the direction of Engineer in charge of workCum5705.05705.0274.6FalseNoneNoneFalseNoneFalse1566593.00
4047071157088NoneSS25Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (including all lead and lifts complete as per the direction of Engineer in charge of workCum6323.06323.0744.1FalseNoneNoneFalseNoneFalse4704944.30
4047072157088NoneSS26 Providing, fabricating and placing in position steel reinforcement bars for RCC structures including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapping / welding joints wherever required, tying with 1.25 mm diameter soft annealed steel wire and all other ancillary operations complete.including all lead and lifts complete as per the direction of Engineer in charge of workTonne88842.088842.08.567FalseNoneNoneFalseNoneFalse761109.4140
4047073157088NoneSS7Providing and Constructing 75 mmm dia PVC weep holes for concrete / masonary walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm Down corse aggregate in 1:4 propotion including 100mm thick sand backing at the junction of wall and soil backfill, cost of all materials ,Machinery ,labour etc ,complete with lead upto 1 km and all liftsincluding all lead and lifts complete as per the direction of Engineer in charge of work. Rmtr337.0337.0165.0FalseNoneNoneFalseNoneFalse55605.00
4047074157088NoneSS8Earth work in surface excavation by mechanical means for lowering &leveling the ground for all works other than foundation in all kinds ofsoils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (In all kinds of soil upto 300 mm depth)including all lead and lifts complete as per the direction of Engineer in charge of work Cum95.095.09600.0FalseNoneNoneFalseNoneFalse912000.00
4047075157088NoneSS29Providing rubble stone / boulder filling behind abutment / below apron including cost of all materials, labour, hand packing, finishing top surface etc., complete with all lead and liftsincluding all lead and lifts complete as per the direction of Engineer in charge of work. Cum1278.01278.051.0FalseNoneNoneFalseNoneFalse65178.00
4047076157088NoneSS210Construction of Embankment by excavating the available approvedGravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirementcomplete as per specifications, including cost of labour,rolling,water,allmaterials,usage& all other appurtenaces required to complete the work.including all lead and lifts complete as per the direction of Engineer in charge of work Cum474.0474.0420.0FalseNoneNoneFalseNoneFalse199080.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17269108730000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17269108730000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17269108730000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17269108730000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17269108730000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17269113130000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17269113220000NoneNoneELIGIBILITYThe Tender are invited as per Standard Tender bid document KW-3None
17269113310000NoneNoneELIGIBILITYConditional Tenders will not be consideredNone
17269113420000NoneNoneELIGIBILITYAll relevant documents as per the KW-3 need to be uploaded while submitting bid in general documents provision in KPPP portal.None
17269113500000NoneNoneELIGIBILITYThe Employer reserves the right to accept or reject any of the tender without assigning any reason.None
17269113570000NoneNoneELIGIBILITYThe contractor has make his own arrangements for procurement of all the required materials and the materials so procured shall confirm to the relevant IS Specifications or Equivalent and obtain necessary quality certificate from authorized quality control.None
17269113660000NoneNoneELIGIBILITYThe Contractor is fully responsible for the Equipment / Material until the same is handed over to the EXECUTIVE ENGINEER in an operating condition after commissioning. The Contractor is responsible for the proper maintenance of equipment / material as well as protection of the same against theft, elements of nature, damages etc., while in his custody as well as after erection until the same is taken over by the EXECUTIVE ENGINEER under due acknowledgment in writingNone
17269113830000NoneNoneELIGIBILITYAll the documents required as per technical qualification criteria needed to be uploaded in Original or Attested by any official not below the rank of Executive Engineer or NotaryNone
17269113880000NoneNoneELIGIBILITYThe Contractors should submit all the Documents as uploaded in Original or duly attested by a Notary/an officer not below the rank of an Executive Engineer on or before opening of Technical Bid as Notified.None
17269113970000NoneNoneELIGIBILITYName, address, and Mobile number, telex, Email and fax numbers of the contractor is to be providedNone
17269114050000NoneNoneELIGIBILITYUnique Document Identification Number (UDIN) from Practicing Chartered Accountant is preferred in Annual Turn overNone
17269114130000NoneNoneELIGIBILITYThe intending bidders are advised to visit the site of work and make themselves familiar with the local situation regarding the availability of the construction materials, workmen, land required for construction activities etc.None
17269114210000NoneNoneELIGIBILITYThe tenderer shall also disclose if there are any bankruptcy proceedings against himNone
17269116440000NoneNoneELIGIBILITYThe Contractor shall provide work program as per Clause 25 under the chapter Time control of conditions of contract. The contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work.None
17269116610000NoneNoneELIGIBILITYDuring the execution of the works, if any minor minerals are required, contractors have to abide by the Karnataka Minor Mineral Concession Rules 1994 (as amended up to date). As per the prevailing rules for any use of minor minerals the contractor has to submit the Mineral Dispatch Permit obtained from Mines and Geology Department. If Mineral Dispatch Permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty and DMF contribution as per Karnataka Minor Mineral Concession Rules 1994 ( as amended from time to time) will be deducted from the contractors bill at the time of paymentNone
17269116700000NoneNoneELIGIBILITYThe Work Done Certificates shall be issued by the Executive Engineer (if work done in Karnataka State), otherwise it shall be issued/ counter signed by Superintending Engineer (if work is done in other states)None
17269116770000NoneNoneELIGIBILITYThe Work Done Certificates shall be issued by the Executive Engineer (if work done in Karnataka State), otherwise it shall be issued/ counter signed by Superintending Engineer (if work is done in other states)None
17269116850000NoneNoneELIGIBILITYThe contractor shall quote the rates without adding GST for either materials or works contract (service). GST payable by the contractor under this works contract will be paid to the contractor separately over and above the contractors bid amount. tender has been inviting through an Option with INCLUSIVE. But the item wise rates do not include GST. If the GST rates are revised during the contract period, Payment will be made/withdrawn accordingly. The increase if any in the GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the Authority.None
17269117100000NoneNoneELIGIBILITYEstimate rates are excluding GST as per Common SR 2023-24 and prevailing GST (18 Percent of Amount put to Tender) amount is kept in form of Overhead sum in sanctioned estimate. According to guidelines in Common SR Amount put to tender and ECV amount are excluding GST. KPPP Portal format has No Options to add GST separately. The item wise rates do not include GST. Hence, GST will be paid separately for the quoted amount accordingly.None
17269117190000NoneNoneELIGIBILITYThe period of completion is 06 (Six months) including monsoonNone
17269117260000NoneNoneELIGIBILITYIf any of the dates mentioned in this tender happens to be a general holiday, the next working day holds good.None
17269117340000NoneNoneELIGIBILITYOther details can be seen in the tender documents.None
17269117420000NoneNoneELIGIBILITYOmission and Typographical errors if any will not be the ground for any claims by the Contractor.None
17269117520000NoneNoneELIGIBILITYALL relevant documents as per the KW-3 need to be uploaded while submitting bid in general documents provision in e-Procurement portal.None
17269117690000NoneNoneELIGIBILITYThe Tenders are invited as per Standard tender Document KW-3. The Tenderer should adhere to all terms & conditions in the tender documents , Standard Specifications, and prevailing Government orders/ circulars.None
17269117760000NoneNoneELIGIBILITYThe tenderer shall be eligible KPWD Registered contractorNone
17269117840000NoneNoneELIGIBILITYLetter of Credit should be in prescribed format, if not, then the Bid is liable to be rejectedNone
17269117910000NoneNoneELIGIBILITYThe tenderer should furnish the Domicile (Residential certificate) of the state of Karnataka for more than 10 years.None
17269117990000NoneNoneELIGIBILITYThis Tender is Reserved for SC categoryNone
17269118050000NoneNoneELIGIBILITYhe Tenderer must furnish Scheduled Caste certificate as per tender notification. (S.C.)None
17269118130000NoneNoneELIGIBILITYThe Contractor shall provide work program as per Clause 25 under the chapter Time control of conditions of contract. The contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work.Bidders should submit bar chart.Quality assurance and 3rd party inspection report should be submitted at different stages of workNone
17269118210000NoneNoneELIGIBILITYThe intending bidders are advised to visit the site of work and make themselves familiar with the local situation regarding the availability of the construction materials, workmen, land required for construction activities etc.And should upload the site inspection letter issued from division /Sub division/Self declerationNone
17269128310000NoneNoneELIGIBILITYIf the GST rates are revised during the contract period, payment will be made/withdrawn accordinglyNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the Contract value), in last five years (I,e 2019-20 to 2023-24) as prime contractor, at least one similar work such as Any Construction of work to an extent of 25% of the cost of the work Rs. 21.09 Lakhs. Work Done Certificates shall be issued by the Executive Engineer (if work done in Karnataka State), otherwise it shall be issued / counter signed by Superintending Engineer( if the work is done in other states)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonexecuted in any one year the following minimum quantities of work (Cement Concrete - 814.96 cum, Earthwork - 8466.40 cum, steel work -6.85 tonnes)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneQualification Information. As per K/W-3Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Qualification Information
NoneNoneNoneNoneAssessed available tender capacity (AxNx5 - B) Where A- Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. Tender Inviting Authority N - Number of years prescribed for completion of the works for which Tenders are invited. B - Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 6/12 years (period of completion of the works for which Tenders are invited) Note- The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bid Capacity Calculation
NoneNoneNoneNoneAchieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 84.35 Lakhs. Financial turnover of previous years will be given a weightage of 10% per year to bring them to price level of FY 2024-25Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. 30.00 Lakhs (Credit lines/ letter of credit/ certificates from banks) for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneThe tenderer shall be eligible KPWD Registered contractorOthersPWD registration
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- PWD registration certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from Civil Engineering construction Work receipts only. for last 05 years i.e from 2019-20 to 2023-24TrueTechnical Bid
Company/contract Registration Certificate KPWD LicenseTrueTechnical Bid
Similar Nature work done certificates for the last five year period issued by the officer not below the rank of Executive Engineer and counter signed by Superintending Engineer. for last 05 years i.e from 2019-20 to 2023-24TrueTechnical Bid
Audited Profit & Loss statements,Balance sheets,ITR copies Considering Yearly construction Work Receipts only issued by Chartered Accountant with UDIN is preferred. for last 05 years i.e from 2019-20 to 2023-24TrueTechnical Bid
Details of Existing commitments and on-going works and which Tenders already submitted as per section 3 of Standard bid document K/W-3TrueTechnical Bid
Assessed Available Tender Capacity as per K/W-3TrueTechnical Bid
EPF Registration Certificate and recent months paid challenTrueTechnical Bid
G.S.T. Registration certificate. & latest G.S.T. Returns filed document.TrueTechnical Bid
Line of Credit of not less than Rs.30.00 Lakhs Bankers certificate / LOC certificate should be in prescribed format, if not, then the Bid is liable to be rejectedTrueTechnical Bid
Executed in any one year the following minimum quantities of work Cement Concrete - 814.96 cum, Earthwork - 8466.40 cum, steel work -6.85 tonnesTrueTechnical Bid
The tenderer should furnish the Domicile Residential certificate of the state of Karnataka for more than 10 yearsTrueTechnical Bid
The Tenderer must furnish Scheduled Caste certificate as per tender notification.S.C.TrueTechnical Bid
The Contractor shall provide work program as per Clause 25 under the chapter Time control of conditions of contract. The contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work.Bidders should submit bar chart.Quality assurance and 3rd party inspection report should be submitted at different stages of workTrueTechnical Bid
The intending bidders are advised to visit the site of work and make themselves familiar with the local situation regarding the availability of the construction materials, workmen, land required for construction activities etc.And should upload the site inspection letter issued from division /Sub division/Self declerationTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone