1723985136000 | 0 | None | None | Bridge cum Barrages | Construction of Bridge cum Barrage across Tungabhadra River near Chikkamanhale Village Raichur taluk and District and improvement & widening of approach roads for both side. | 1174170422.43 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3803463 | 144405 | None | 001 PART A1 ROAD | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. . (ii). By Mechanical Means A. In area of light jungle | 100 Sqm | 412.65 | 412.65 | 368.72 | False | None | None | False | None | False | 152152.308 | 0 | 3803464 | 144405 | None | 002 PART A1 ROAD | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead | Sqm | 6.3 | 6.3 | 3495.92 | False | None | None | False | None | False | 22024.296 | 0 | 3803465 | 144405 | None | 003 PART A1 ROAD | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
(ii) By Mechanical Means
Cement Concrete M15 & M20 | Cum | 979.65 | 979.65 | 3.17 | False | None | None | False | None | False | 3105.4905 | 0 | 3803466 | 144405 | None | 004 PART A1 ROAD | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Removal of all types of Hume pipes and stacking including earthwork and dismantling of masonry works B. Above 600 mm to 900 mm dia. | m | 1150.8 | 1150.8 | 6.6 | False | None | None | False | None | False | 7595.28 | 0 | 3803467 | 144405 | None | 005 PART A1 ROAD | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | Cum | 110.25 | 110.25 | 4233.02 | False | None | None | False | None | False | 466690.455 | 0 | 3803468 | 144405 | None | 006 PART A1 ROAD | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. | Cum | 99.75 | 99.75 | 5531.17 | False | None | None | False | None | False | 551734.2075 | 0 | 3803469 | 144405 | None | 007 PART A1 ROAD | Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work In Ordinary/Soft rock upto 300 mm depth | Cum | 380.1 | 380.1 | 515.86 | False | None | None | False | None | False | 196078.386 | 0 | 3803470 | 144405 | None | 008 PART A1 ROAD | Earth work excavation for FOUNDATION by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth upto 1.50m | Cum | 581.71 | 581.71 | 171.95 | False | None | None | False | None | False | 100025.0345 | 0 | 3803471 | 144405 | None | 009 PART A1 ROAD | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. | Cum | 497.7 | 497.7 | 36684.48 | False | None | None | False | None | False | 18257865.696 | 0 | 3803472 | 144405 | None | 010 PART A1 ROAD | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. | Cum | 124.95 | 124.95 | 1238.06 | False | None | None | False | None | False | 154695.597 | 0 | 3803473 | 144405 | None | 011 PART A1 ROAD | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | Cum | 517.65 | 517.65 | 11069.97 | False | None | None | False | None | False | 5730369.9705 | 0 | 3803474 | 144405 | None | 012 PART A1 ROAD | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
A Plant Mix Method
(v) For Grading -V Material | Cum | 2611.35 | 2611.35 | 4228.44 | False | None | None | False | None | False | 11041936.794 | 0 | 3803475 | 144405 | None | 013 PART A1 ROAD | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | Cum | 2686.95 | 2686.95 | 5625.32 | False | None | None | False | None | False | 15114953.574 | 0 | 3803476 | 144405 | None | 014 PART A1 ROAD | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
B. Mechanical means
(i) Grading-I (63 mm to 45 mm)
a) Using Screening Crushable type such as Moorum or Gravel | Cum | 2272.2 | 2272.2 | 1100.0 | False | None | None | False | None | False | 2499420.0 | 0 | 3803477 | 144405 | None | 015 PART A1 ROAD | Prime Coat over WMM/WBM
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg per m2 using mechanical means. (As per issue rates) | Sqm | 43.05 | 43.05 | 17627.42 | False | None | None | False | None | False | 758860.431 | 0 | 3803478 | 144405 | None | 016 PART A1 ROAD | Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom | Sqm | 12.6 | 12.6 | 17627.42 | False | None | None | False | None | False | 222105.492 | 0 | 3803479 | 144405 | None | 017 PART A1 ROAD | Tack coat on Bituminous surface
Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom | Sqm | 12.6 | 12.6 | 17627.42 | False | None | None | False | None | False | 222105.492 | 0 | 3803480 | 144405 | None | 018 PART A1 ROAD | Providing and laying Dense Graded Bituminous Macadam with120 TPH capacity HMP batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
(As per issue rates) | Cum | 10002.3 | 10002.3 | 997.41 | False | None | None | False | None | False | 9976394.043 | 0 | 3803481 | 144405 | None | 019 PART A1 ROAD | Providing and laying Bituminous Concrete with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
(As per issue rates) | Cum | 11240.25 | 11240.25 | 528.82 | False | None | None | False | None | False | 5944069.005 | 0 | 3803482 | 144405 | None | 020 PART A1 ROAD | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | Sqm | 1121.4 | 1121.4 | 3738.43 | False | None | None | False | None | False | 4192275.402 | 0 | 3803483 | 144405 | None | 021 PART A1 ROAD | Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | Sqm | 101.85 | 101.85 | 3963.0 | False | None | None | False | None | False | 403631.55 | 0 | 3803484 | 144405 | None | 022 PART A1 ROAD | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
PCC M15 grade for kerb base | m | 250.95 | 250.95 | 1292.0 | False | None | None | False | None | False | 324227.4 | 0 | 3803485 | 144405 | None | 023 PART A1 ROAD | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
PCC M20 grade for kerb Cast in Situ | m | 278.25 | 278.25 | 1292.0 | False | None | None | False | None | False | 359499.0 | 0 | 3803486 | 144405 | None | 024 PART A1 ROAD | Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per PCC M15 grade for kerb base | m | 254.1 | 254.1 | 6216.8 | False | None | None | False | None | False | 1579688.88 | 0 | 3803487 | 144405 | None | 025 PART A1 ROAD | Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
PCC M20 grade for kerb Cast in Situ | m | 389.55 | 389.55 | 6216.8 | False | None | None | False | None | False | 2421754.44 | 0 | 3803488 | 144405 | None | 026 PART A1 ROAD | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces | Sqm | 114.45 | 114.45 | 825.55 | False | None | None | False | None | False | 94484.1975 | 0 | 3803489 | 144405 | None | 027 PART A1 ROAD | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. | Sqm | 556.5 | 556.5 | 668.55 | False | None | None | False | None | False | 372048.075 | 0 | 3803490 | 144405 | None | 028 (A) PART A1 ROAD | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. (600 MM Equilateral triangle type XI) | Nos | 3784.2 | 3784.2 | 12.0 | False | None | None | False | None | False | 45410.4 | 0 | 3803491 | 144405 | None | 028 (B) PART A1 ROAD | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. (600 MM Circle type XI) | Nos | 4566.45 | 4566.45 | 12.0 | False | None | None | False | None | False | 54797.4 | 0 | 3803492 | 144405 | None | 029 PART A1 ROAD | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing | Sqm | 9460.5 | 9460.5 | 1.8 | False | None | None | False | None | False | 17028.9 | 0 | 3803493 | 144405 | None | 030 PART A1 ROAD | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. | Each | 383.25 | 383.25 | 895.0 | False | None | None | False | None | False | 343008.75 | 0 | 3803494 | 144405 | None | 031 PART A1 ROAD | Supply and erection of 14 Feet Height Street Light Pole 14 Feet Height Street Light Pole on suitable cement concrete foundation with 2.5 Feet height dia 95 mm cast iron decorative round pedestal as per design weighing not less than 37Kgs, the pedestal shall be fitted with Class 'C' G.I.Pipe 7 Feet height 75 mm outer dia and 7 feet height top piece outer dia of 65 mm fixed by measure of threading/welding/coupling complete. (excluding foundation). | Each | 21630.0 | 21630.0 | 73.0 | False | None | None | False | None | False | 1578990.0 | 0 | 3803495 | 144405 | None | 032 PART A1 ROAD | Construction of unlined surface drains of average crosssectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.
(B) Mechanical Means | m | 26.25 | 26.25 | 1500.0 | False | None | None | False | None | False | 39375.0 | 0 | 3803496 | 144405 | None | 033 PART A1 ROAD | PCC for Open Foundation
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)
Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates
(As per issue rates) | Cum | 6288.45 | 6288.45 | 982.2 | False | None | None | False | None | False | 6176515.59 | 0 | 3803497 | 144405 | None | 034 PART A1 ROAD | PCC for Open Foundation
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates
(As per issue rates) | Cum | 6527.85 | 6527.85 | 18.26 | False | None | None | False | None | False | 119198.541 | 0 | 3803498 | 144405 | None | 035 PART A1 ROAD | PCC - M20
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(As per issue rates) | Cum | 6601.35 | 6601.35 | 200.92 | False | None | None | False | None | False | 1326343.242 | 0 | 3803499 | 144405 | None | 036 PART A1 ROAD | Sub Structure Concrete
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(As per issue rates) | Cum | 6652.8 | 6652.8 | 1344.29 | False | None | None | False | None | False | 8943292.512 | 0 | 3803500 | 144405 | None | 037 PART A1 ROAD | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification | Tonne | 86433.0 | 86433.0 | 918.02 | False | None | None | False | None | False | 79347222.66 | 0 | 3803501 | 144405 | None | 038 PART A1 ROAD | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m | Cum | 107.1 | 107.1 | 11946.89 | False | None | None | False | None | False | 1279511.919 | 0 | 3803502 | 144405 | None | 039 PART A1 ROAD | Sub Structure Concrete
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(As per issue rates) | Cum | 7318.08 | 7318.08 | 8068.18 | False | None | None | False | None | False | 59043586.6944 | 0 | 3803503 | 144405 | None | 040 PART A1 ROAD | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. MORTH Specification No.2706 & 2200 | Nos / Rmtr | 144.9 | 144.9 | 129.87 | False | None | None | False | None | False | 18818.163 | 0 | 3803504 | 144405 | None | 041 PART A1 ROAD | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. As per MoRT & H Technical Specification Clause 2504 | Cum | 3187.8 | 3187.8 | 3493.2 | False | None | None | False | None | False | 11135622.96 | 0 | 3803505 | 144405 | None | 042 PART A1 ROAD | PVC Pipe 110mm outer dia at 2kg per cm2. | Rmtr | 162.75 | 162.75 | 647.71 | False | None | None | False | None | False | 105414.8025 | 0 | 3803506 | 144405 | None | 043 PART A1 ROAD | Turfing with Sods
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of sods and watering including all lead, lifts, all labour, hire charges of all machineries etc., complete.in accordance with MoRT&H Technical Specification Clause 307.
(As per item 3.23 of NHSR 2022-2023, NH Zone, Schedule page 24) | Sqm | 46.2 | 46.2 | 8810.46 | False | None | None | False | None | False | 407043.252 | 0 | 3803507 | 144405 | None | 044 PART A1 ROAD | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification | Tonne | 90754.65 | 90754.65 | 30.01 | False | None | None | False | None | False | 2723547.0465 | 0 | 3803508 | 144405 | None | 045 PART A1 ROAD | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification | Nos | 3434.55 | 3434.55 | 12.0 | False | None | None | False | None | False | 41214.6 | 0 | 3803509 | 144405 | None | 046 PART A1 ROAD | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical
specifications. A) Stone/Boluder | Cum | 2007.6 | 2007.6 | 63.38 | False | None | None | False | None | False | 127241.688 | 0 | 3803510 | 144405 | None | 047 PART A1 ROAD | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Boulder Laid Dry Without Wire Crates | Cum | 2007.6 | 2007.6 | 35.82 | False | None | None | False | None | False | 71912.232 | 0 | 3803511 | 144405 | None | 048 PART A1 ROAD | Reinforced Cement Concrete Crash Barrier
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-25 grade concrete with TMT reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at ocations directed by the Engineer, all as specified. (Area = 0.243 m2/m, single face) (ii) M 30 grade concrete | Rmtr | 2639.7 | 2639.7 | 74.0 | False | None | None | False | None | False | 195337.8 | 0 | 3803512 | 144405 | None | 049 PART A2 BRIDGE | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
(iii) By Mechanical Means using Dozer
a. In area of light jungle | 100 Sqm | 412.65 | 412.65 | 291.0 | False | None | None | False | None | False | 120081.15 | 0 | 3803513 | 144405 | None | 050 PART A2 BRIDGE | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.
1.14.1: In all kinds of soils Depth upto 3 m | Cum | 129.59 | 129.59 | 4937.11 | False | None | None | False | None | False | 639800.0849 | 0 | 3803514 | 144405 | None | 051 PART A2 BRIDGE | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth | Cum | 461.19 | 461.19 | 989.88 | False | None | None | False | None | False | 456522.7572 | 0 | 3803515 | 144405 | None | 052 PART A2 BRIDGE | Earth work excavation for FOUNDATION by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth upto 1.50m | Cum | 703.86 | 703.86 | 1584.38 | False | None | None | False | None | False | 1115181.7068 | 0 | 3803516 | 144405 | None | 053 PART A2 BRIDGE | Providing and Constructing Temporary Island 24 m diameter for Construction of Well Foundation for 8m dia. Well.
(A) Assuming depth of water 1.0 m and height of island to be 1.25m. | Nos | 321035.4 | 321035.4 | 24.0 | False | None | None | False | None | False | 7704849.6 | 0 | 3803517 | 144405 | None | 054 PART A2 BRIDGE | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. | Cum | 497.7 | 497.7 | 60121.44 | False | None | None | False | None | False | 29922440.688 | 0 | 3803518 | 144405 | None | 055 PART A2 BRIDGE | Providing and fixing 25mm diameter steel anchor dowel in hard rock including drilling hole of 32 mm diameter up to 0.75 mtrs depth, placing the dowel in position and effectively grouting the hole with CM 1:1 proportion etc. complete. | Nos | 1312.5 | 1312.5 | 384.0 | False | None | None | False | None | False | 504000.0 | 0 | 3803519 | 144405 | None | 056 PART A2 BRIDGE | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates | Cum | 6917.3 | 6917.3 | 436.85 | False | None | None | False | None | False | 3021822.505 | 0 | 3803520 | 144405 | None | 057 PART A2 BRIDGE | Open Foundation concrete
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 7318.08 | 7318.08 | 3676.26 | False | None | None | False | None | False | 26903164.7808 | 0 | 3803521 | 144405 | None | 058 PART A2 BRIDGE | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.
Pile diameter-1000 mm | m | 12743.85 | 12743.85 | 1650.6 | False | None | None | False | None | False | 21034998.81 | 0 | 3803522 | 144405 | None | 059 PART A2 BRIDGE | Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | Tonne | 131695.2 | 131695.2 | 224.09 | False | None | None | False | None | False | 29511577.368 | 0 | 3803523 | 144405 | None | 060 PART A2 BRIDGE | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 8778.08 | 8778.08 | 4819.84 | False | None | None | False | None | False | 42308941.1072 | 0 | 3803524 | 144405 | None | 061 PART A2 BRIDGE | Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. | Tonne | 345.45 | 345.45 | 34320.0 | False | None | None | False | None | False | 11855844.0 | 0 | 3803525 | 144405 | None | 062 PART A2 BRIDGE | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification
For Foundation | Tonne | 90516.3 | 90516.3 | 692.49 | False | None | None | False | None | False | 62681632.587 | 0 | 3803526 | 144405 | None | 063 PART A2 BRIDGE | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification
For Sub Structure | Tonne | 90754.65 | 90754.65 | 625.96 | False | None | None | False | None | False | 56808780.714 | 0 | 3803527 | 144405 | None | 064 PART A2 BRIDGE | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)
M 40 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Height upto 15 m to 20m | Cum | 11373.26 | 11373.26 | 8336.12 | False | None | None | False | None | False | 94808860.1512 | 0 | 3803528 | 144405 | None | 065 PART A2 BRIDGE | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification
For Super Structure | Tonne | 90990.9 | 90990.9 | 1217.32 | False | None | None | False | None | False | 110765042.388 | 0 | 3803529 | 144405 | None | 066 PART A2 BRIDGE | Providing and laying 3mm thick asphalt seal pad made of actatic polypropylene polymer (app) modified bituminous pad reinforced with non woven polyester mat of high bear strength as a carrier (confirming to ASTM - D6222 (S) Specification) on concrete bridge deck slab including cost of materials, labour, HOM complete as per specifications. | Sqm | 426.3 | 426.3 | 7236.84 | False | None | None | False | None | False | 3085064.892 | 0 | 3803530 | 144405 | None | 067 PART A2 BRIDGE | Providing and laying Bituminous Concrete with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects | Cum | 11240.25 | 11240.25 | 289.47 | False | None | None | False | None | False | 3253715.1675 | 0 | 3803531 | 144405 | None | 068 PART A2 BRIDGE | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
Boulder Laid Dry Without Wire Crates | Cum | 2007.6 | 2007.6 | 3340.08 | False | None | None | False | None | False | 6705544.608 | 0 | 3803532 | 144405 | None | 069 PART A2 BRIDGE | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, c/c spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. | Rmtr | 2445.45 | 2445.45 | 1953.82 | False | None | None | False | None | False | 4777969.119 | 0 | 3803533 | 144405 | None | 070 PART A2 BRIDGE | Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works | Rmtr | 15969.45 | 15969.45 | 303.21 | False | None | None | False | None | False | 4842096.9345 | 0 | 3803534 | 144405 | None | 071 PART A2 BRIDGE | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification | Nos | 3434.55 | 3434.55 | 624.0 | False | None | None | False | None | False | 2143159.2 | 0 | 3803535 | 144405 | None | 072 PART A2 BRIDGE | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. MORTH specification No. 710.1.4.of IRC:78 and 2200 | Cum | 2810.85 | 2810.85 | 91.41 | False | None | None | False | None | False | 256939.7985 | 0 | 3803536 | 144405 | None | 073 PART A2 BRIDGE | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification as per MORTH Specification No. 2700 | Cum | 7151.55 | 7151.55 | 19.65 | False | None | None | False | None | False | 140527.9575 | 0 | 3803537 | 144405 | None | 074 PART A2 BRIDGE | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). MORTH specification No.1500,1600, 1700 & 2704 | Cum | 12426.75 | 12426.75 | 23.58 | False | None | None | False | None | False | 293022.765 | 0 | 3803538 | 144405 | None | 075 PART A2 BRIDGE | High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications | Tonne | 245927.85 | 245927.85 | 218.66 | False | None | None | False | None | False | 53774583.681 | 0 | 3803539 | 144405 | None | 076 PART A2 BRIDGE | KSRRB M800-28. Lighting on Bridges : Providing and fixing lighting on bridges, mounted on steel hollow circular poles of standard specifications, 5 m high fixed on parapets with cement concrete, 20 m apart and fitted with sodium vapour lamp complete as per specifications | Nos | 7339.5 | 7339.5 | 49.6 | False | None | None | False | None | False | 364039.2 | 0 | 3803540 | 144405 | None | 077 PART A2 BRIDGE | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications | Nos / Rmtr | 144.9 | 144.9 | 32.84 | False | None | None | False | None | False | 4758.516 | 0 | 3803541 | 144405 | None | 078 PART A2 BRIDGE | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification. MORTH Specification No.710.1.4.of IRC:78 & 2200
A. Granular material | Cum | 1226.4 | 1226.4 | 860.49 | False | None | None | False | None | False | 1055304.936 | 0 | 3803542 | 144405 | None | 079 PART A2 BRIDGE | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. As per MoRT &H Technical Specification Clause 2504 . | Cum | 3187.8 | 3187.8 | 168.69 | False | None | None | False | None | False | 537749.982 | 0 | 3803543 | 144405 | None | 080 PART A2 BRIDGE | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A) Stone/Boluder | Cum | 2007.6 | 2007.6 | 168.69 | False | None | None | False | None | False | 338662.044 | 0 | 3803544 | 144405 | None | 081 PART A2 BRIDGE | Concealed Conduit System
Supplying heavy gauge PVC conduit pipe . mmdia.mm thick confirming to IS 2509 with suitable sizebends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary
40 mm dia 2.5 mm thick | Rmtr | 154.35 | 154.35 | 4094.0 | False | None | None | False | None | False | 631908.9 | 0 | 3803545 | 144405 | None | 082 PART A3 BARRAGE | Clearing Grass and Removal of Rubbish & dumping to outside periphery by manual means | 100 Sqm | 388.5 | 388.5 | 203.0 | False | None | None | False | None | False | 78865.5 | 0 | 3803546 | 144405 | None | 083 PART A3 BARRAGE | Cutting of Trees, excluding removal of stumps and roots of trees | Each | 993.3 | 993.3 | 100.0 | False | None | None | False | None | False | 99330.0 | 0 | 3803547 | 144405 | None | 084 PART A3 BARRAGE | Removal of stumps and roots including backfilling with suitable material to required compaction | Each | 511.35 | 511.35 | 100.0 | False | None | None | False | None | False | 51135.0 | 0 | 3803548 | 144405 | None | 085 (A) PART A3 BARRAGE | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (0.00 to 3.00) m depth | Cum | 111.44 | 111.44 | 38800.0 | False | None | None | False | None | False | 4323872.0 | 0 | 3803549 | 144405 | None | 085 (B) PART A3 BARRAGE | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (3.00 to 6.00) m depth | Cum | 130.28 | 130.28 | 4244.0 | False | None | None | False | None | False | 552908.32 | 0 | 3803550 | 144405 | None | 086 PART A3 BARRAGE | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work | Cum | 549.86 | 549.86 | 556.0 | False | None | None | False | None | False | 305722.16 | 0 | 3803551 | 144405 | None | 087 PART A3 BARRAGE | Preparing foundation bed for masonry or concrete by removing all loose material by wedging / chiselling and disposing off the same as directed and cleaning the surface with air and water jet including cost of all materials, machinery, labour and all other ancillary operations complete. (Organisation specific) | Sqm | 57.75 | 57.75 | 13581.0 | False | None | None | False | None | False | 784302.75 | 0 | 3803552 | 144405 | None | 088 PART A3 BARRAGE | Drilling 50 mm dia. holes vertical or inclined upto 10 degrees to vertical in rock / masonry / concrete by percussion drilling method using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete | Rmtr | 374.85 | 374.85 | 7875.0 | False | None | None | False | None | False | 2951943.75 | 0 | 3803553 | 144405 | None | 089 PART A3 BARRAGE | Flushing grout holes of all sizes with water and air jets alternatively for an average period of 30 minutes and observing water intake after flushing including cost of all materials, machinery, labour and all other ancillary operations complete. | Rmtr | 69.3 | 69.3 | 7875.0 | False | None | None | False | None | False | 545737.5 | 0 | 3803554 | 144405 | None | 090 PART A3 BARRAGE | Grouting with neat cement grout mix of suitable consistency under specified grout pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary and all other ancillary operations complete. | t | 14065.8 | 14065.8 | 198.13 | False | None | None | False | None | False | 2786856.954 | 0 | 3803555 | 144405 | None | 091 PART A3 BARRAGE | Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 38 mm dia hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenatnt works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete. | Each | 1337.7 | 1337.7 | 5426.0 | False | None | None | False | None | False | 7258360.2 | 0 | 3803556 | 144405 | None | 092 PART A3 BARRAGE | Providing and laying in-situ vibrated M-15 grade cement concrete using 40mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all lead and lifts. | Cum | 6370.35 | 6370.35 | 2754.5 | False | None | None | False | None | False | 17547129.075 | 0 | 3803557 | 144405 | None | 093 PART A3 BARRAGE | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. | Cum | 7282.96 | 7282.96 | 1843.8 | False | None | None | False | None | False | 13428321.648 | 0 | 3803558 | 144405 | None | 094 PART A3 BARRAGE | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite / trap / basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. | Cum | 7531.1 | 7531.1 | 1132.9 | False | None | None | False | None | False | 8531983.19 | 0 | 3803559 | 144405 | None | 095 (A) PART A3 BARRAGE | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) (0 to 5.0) m lift | Cum | 7928.59 | 7928.59 | 18432.4 | False | None | None | False | None | False | 146142942.316 | 0 | 3803560 | 144405 | None | 095 (B) PART A3 BARRAGE | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) (5.0 to 10.0) m lift | Cum | 8030.53 | 8030.53 | 3606.9 | False | None | None | False | None | False | 28965318.657 | 0 | 3803561 | 144405 | None | 095 (C) PART A3 BARRAGE | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) (10.00 - 15.00)m | Cum | 8047.52 | 8047.52 | 328.2 | False | None | None | False | None | False | 2641196.064 | 0 | 3803562 | 144405 | None | 095 (D) PART A3 BARRAGE | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) (15.00 - 20.00)m | Cum | 8064.51 | 8064.51 | 324.9 | False | None | None | False | None | False | 2620159.299 | 0 | 3803563 | 144405 | None | 095 (E) PART A3 BARRAGE | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) (20.00 - 25.00)m | Cum | 8081.5 | 8081.5 | 273.0 | False | None | None | False | None | False | 2206249.5 | 0 | 3803564 | 144405 | None | 096 PART A3 BARRAGE | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and
technical specification. | t | 93284.1 | 93284.1 | 848.0 | False | None | None | False | None | False | 79104916.8 | 0 | 3803565 | 144405 | None | 097 PART A3 BARRAGE | Providing and constructing contraction joints by fixing 230 mm wide central bulb type PVC water stop in single line supported by 10 mm dia. steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, vulcanizing water seal joints and all other ancillary operations complete. | Rmtr | 603.75 | 603.75 | 891.0 | False | None | None | False | None | False | 537941.25 | 0 | 3803566 | 144405 | None | 098 PART A3 BARRAGE | Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, labour, watering, ramming and all other ancillary operations complete. | Cum | 2317.35 | 2317.35 | 2475.0 | False | None | None | False | None | False | 5735441.25 | 0 | 3803567 | 144405 | None | 099 PART A3 BARRAGE | Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete. | Sqm | 477.75 | 477.75 | 926.0 | False | None | None | False | None | False | 442396.5 | 0 | 3803568 | 144405 | None | 100 PART A3 BARRAGE | Providing hearting embankment using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete. | Sqm | 531.3 | 531.3 | 2138.0 | False | None | None | False | None | False | 1135919.4 | 0 | 3803569 | 144405 | None | 101 PART A3 BARRAGE | Providing and fixing GI pressure relief pipe with one end closed by perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes and all other ancillary operations complete. | Each | 550.2 | 550.2 | 822.0 | False | None | None | False | None | False | 452264.4 | 0 | 3803570 | 144405 | None | 102 PART A3 BARRAGE | Providing and forming 350x 350 x 400 mm deep filter drain consisting of 75 mm thick 10 mm down coarse aggregate layer around pressure relief pipe and 75 mm thick sand layer around coarse aggregate layer including cost of all materials, labour, excavation of pit and all other ancillary operations complete. | Each | 107.1 | 107.1 | 822.0 | False | None | None | False | None | False | 88036.2 | 0 | 3803571 | 144405 | None | 103 PART A3 BARRAGE | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories for river sluice /canal sluice vent including cost of all materials,machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats cold applied coal tar epoxy paint, seal fixing etc., complete as per specifications and approved drawings with all lead and all lifts including packing / forwarding charges for other materials. | t | 154875.0 | 154875.0 | 12.0 | False | None | None | False | None | False | 1858500.0 | 0 | 3803572 | 144405 | None | 104 PART A3 BARRAGE | Design, fabrication, supply, erection and commissioning of embedded parts ( without groove liner ) consisting of sill beam, wheel tracks, seal seats, guide rails, breast wall liner ( upto one vent height plus 1 m above the roof of vent ) etc., with all accessories for river / canal sluice service gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete as per specifications and approved drawings with all lead and all lifts including packing / forwarding charges for other materials | t | 229110.0 | 229110.0 | 21.0 | False | None | None | False | None | False | 4811310.0 | 0 | 3803573 | 144405 | None | 105 PART A3 BARRAGE | Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint etc., complete as per specifications and approved drawings with all lead and all lifts including packing / forwarding charges for other materials. | Tonne Capacity | 50085.0 | 50085.0 | 30.0 | False | None | None | False | None | False | 1502550.0 | 0 |
|