tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1726816697000 | 0 | None | None | Roads | Construction of Flexible pavement From Ch.6.00km to 8.105km | 27933027.02 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4036953 | 156604 | None | CSR 2023-24, Vol-3 SL No 2.5 (ii) A, P No -9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material tobe used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical Means using Dozer (A) In area of light jungle (COMMON SR 2023-24, Vol-3 Sl.No. 2.5 (ii).A, P.No - 9) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | 100 Sqm | 412.7 | 412.7 | 44.2 | False | None | None | False | None | False | 18241.34 | 0 | 4036954 | 156604 | None | CSR 2023-24, Vol-3 Sl.No. 2.1 (iii).A, P.No9 | Cutting of Trees, excluding removal of stumps and roots of trees. Girth from 900 mm to 1800 mm (COMMON SR 2023-24, Vol-3 Sl.No. 2.1 (iii).A, P.No - 9 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Each | 1859.6 | 1859.6 | 5.0 | False | None | None | False | None | False | 9298.0 | 0 | 4036955 | 156604 | None | COMMON SR 2023-24, Vol-3, P.NO -17, SL. No -3.5 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (COMMON SR 2023-24, Vol-3, P.NO -17, SL. No -3.5) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 6.3 | 6.3 | 6315.0 | False | None | None | False | None | False | 39784.5 | 0 | 4036956 | 156604 | None | COMMON SR 2023-24, Vol-3, P.NO -10, SL. No -2.8 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means a. Cement Concrete Grade M-15 & M-20 (COMMON SR 2023-24, Vol-3, P.NO -10, SL. No -2.8 iia ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 755.0 | 755.0 | 36.75 | False | None | None | False | None | False | 27746.25 | 0 | 4036957 | 156604 | None | COMMON SR 2023-24, Vol-3, Sl.No.3.7 ,P.No - 17 | pacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction (COMMON SR 2023-24, Vol-3, Sl.No.3.7 ,P.No - 17) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 110.25 | 110.25 | 3315.38 | False | None | None | False | None | False | 365520.645 | 0 | 4036958 | 156604 | None | COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 107.1 | 107.1 | 3975.98 | False | None | None | False | None | False | 425827.458 | 0 | 4036959 | 156604 | None | COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 497.7 | 497.7 | 2252.02 | False | None | None | False | None | False | 1120830.354 | 0 | 4036960 | 156604 | None | COMMON SR 2023-24, Vol-1, SI.No. 1.7, P.No - 7) | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.COMMON SR 2023-24 Vol-1, SI.No. 1.7, P.No - 7) (Royalty shall be recovered @ Rs. 60.00/m3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 124.95 | 124.95 | 2089.58 | False | None | None | False | None | False | 261093.021 | 0 | 4036961 | 156604 | None | COMMON SR 2023-24,Vol-3, Sl.No. 3.6 ,P.No -17 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 305 (COMMON SR 2023-24,Vol-3, Sl.No. 3.6 ,P.No -17) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 517.65 | 517.65 | 3940.98 | False | None | None | False | None | False | 2040048.297 | 0 | 4036962 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No.4.1.A.(v) ,P.No - 2 | Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (COMMON SR 2023-24, Vol-3 Sl.No.4.1.A.(v) ,P.No - 23) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 2611.35 | 2611.35 | 2368.12 | False | None | None | False | None | False | 6183990.162 | 0 | 4036963 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No.4.17 ,P.No - 26 | Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in (COMMON SR 2023-24, Vol-3 Sl.No.4.17 ,P.No - 26.) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 2686.95 | 2686.95 | 2960.94 | False | None | None | False | None | False | 7955897.733 | 0 | 4036964 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No.5.1.A.(i), P.No - 3 | Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on Prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg per m2 using mechanical means. 502 (COMMON SR 2023-24, Vol-3 Sl.No.5.1.A.(i), P.No - 31) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 43.05 | 43.05 | 11983.75 | False | None | None | False | None | False | 515900.4375 | 0 | 4036965 | 156604 | None | COMMON SR 2023-24, Vol-3, Sl.No.5.3.(i), P.No - 31 | Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (COMMON SR 2023-24, Vol-3, Sl.No.5.3.(i), P.No - 31) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 12.6 | 12.6 | 11983.75 | False | None | None | False | None | False | 150995.25 | 0 | 4036966 | 156604 | None | CSR 2023-24, Vol-3 Sl.No.5.8 -ii (C) ,P.No -30 | Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction COMMON SR 2023-24, Vol-3 Sl.No.5.8 -ii (C) ,P.No - 30 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 8044.05 | 8044.05 | 599.19 | False | None | None | False | None | False | 4819914.3195 | 0 | 4036967 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No. 5.31, P.No - 43 | Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with40/60 TPH capacity hot mix plant batch type using crushedaggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. IRC-37: 2018 COMMON SR 2023-24, Vol-3 Sl.No. 5.31, P.No - 43 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 10659.6 | 10659.6 | 299.59 | False | None | None | False | None | False | 3193509.564 | 0 | 4036968 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No. 8.15 ,P.No - 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.803 (COMMON SR 2023-24, Vol-3 Sl.No. 8.15 ,P.No - 67) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 556.5 | 556.5 | 421.0 | False | None | None | False | None | False | 234286.5 | 0 | 4036969 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section of IRC:67:2012.801.120 cm equilateral triangle. COMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 6546.75 | 6546.75 | 3.0 | False | None | None | False | None | False | 19640.25 | 0 | 4036970 | 156604 | None | COMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.801 COMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 4918.2 | 4918.2 | 2.0 | False | None | None | False | None | False | 9836.4 | 0 | 4036971 | 156604 | None | COMMON SR 2023-24, Vol-3, SL.NO. 8.54, P.NO.78 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 (COMMON SR 2023-24, Vol-3, SL.NO. 8.54, P.NO.78) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 4036972 | 156604 | None | COMMON SR 2023-24, Vol-3, SL.NO. 8.18, P.NO.67 | Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (COMMON SR 2023-24, Vol-3, SL.NO. 8.18, P.NO.67) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Each | 785.4 | 785.4 | 14.0 | False | None | None | False | None | False | 10995.6 | 0 | 4036973 | 156604 | None | COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone (precast) (COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 (ii)) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Each | 3073.35 | 3073.35 | 3.0 | False | None | None | False | None | False | 9220.05 | 0 | 4036974 | 156604 | None | COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (i) 200m stone (precast) (COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 (ii)) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Each | 884.1 | 884.1 | 11.0 | False | None | None | False | None | False | 9725.1 | 0 | 4036975 | 156604 | None | COMMON SR 2023-24, Vol-3 Page No.80 Item No.8.60.1 | Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Bituminous Macadam (BM) Gr II and Semi Dense Bituminous
Macadam (SDBC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 (COMMON SR 2023-24, Vol-3 Page No.80 Item No.8.60.1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | No | 43564.5 | 43564.5 | 2.0 | False | None | None | False | None | False | 87129.0 | 0 | 4036976 | 156604 | None | COMMON SR 2023-24, Vol-1, SL.NO. 41, P.NO.129 | Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW, taking at least 10 spot levels per cross section, picking up all
existing details inside the Row like electric telephone line, encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto evel and preparing Auto CAD plan by using above data taking out 1
set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. (Plain Terrain New Alignment)incharge.(COMMON SR 2023-24, Vol-1, SL.NO. 41, P.NO.129) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Km | 47250.0 | 47250.0 | 2.105 | False | None | None | False | None | False | 99461.25 | 0 | 4036977 | 156604 | None | COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 107.1 | 107.1 | 18.0 | False | None | None | False | None | False | 1927.8 | 0 | 4036978 | 156604 | None | COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. for 110 mm (Weight of pipe 1.894kg)(COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | m | 375.9 | 375.9 | 25.0 | False | None | None | False | None | False | 9397.5 | 0 | 4036979 | 156604 | None | COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. For 160mm (Weight of pipe-3.923kg)(COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | m | 678.3 | 678.3 | 25.0 | False | None | None | False | None | False | 16957.5 | 0 | 4036980 | 156604 | None | SR 2023-24 , Item No : 1.9 , Page No : 7 , Vol 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( SR 2023-24 , Item No : 1.9 , Page No : 7 , Vol 1 ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 279.3 | 279.3 | 18.0 | False | None | None | False | None | False | 5027.4 | 0 | 4036981 | 156604 | None | Data rate SE office Ballari 2023-24 Dt 20-01-2024 | Road Maintenance for 3rd year for road with BM+SDBC as wearing coat Maintenance of road for 3rd year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by clearing, cleaning,reshaping, deepening of side drains, stripping excess soil from the shoulder surface and Making up loss of material/irregularties on shoulder whereever necessary, Maintenance and painting of 200 meter and km stones, white washing of parapet walls of CD work and tree trunks, patching os shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Km | 28360.0 | 28360.0 | 2.105 | False | None | None | False | None | False | 59697.8 | 0 | 4036982 | 156604 | None | Data rate SE office Ballari 2023-24 Dt 20-01-2024 | Road Maintenance for 4th year for road with BM+SDBC as wearing coat Maintenance of road for 4th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by clearing, cleaning,reshaping, deepening of side drains, stripping excess soil from the shoulder surface and Making up loss of material/irregularties on shoulder whereever necessary, Maintenance and painting of 200 meter and km stones, white washing of parapet walls of CD work and tree trunks, patching os shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Km | 47010.0 | 47010.0 | 2.105 | False | None | None | False | None | False | 98956.05 | 0 | 4036983 | 156604 | None | Data rate SE office Ballari 2023-24 Dt 20-01-2024 | Road Maintenance for 5th year for road with BM+SDBC as wearing coat Maintenance of road for 5th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by clearing, cleaning,reshaping, deepening of side drains, stripping excess soil from the shoulder surface and Making up loss of material/irregularties on shoulder whereever necessary, Maintenance and painting of 200 meter and km stones, white washing of parapet walls of CD work and tree trunks, patching os shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Km | 58300.0 | 58300.0 | 2.105 | False | None | None | False | None | False | 122721.5 | 0 |
| 1726816697000 | 0 | None | None | Roads | Construction of 1-Vent Pipe Culvert at Ch-6.278km | 339541.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4036984 | 156605 | None | COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 107.1 | 107.1 | 28.08 | False | None | None | False | None | False | 3007.368 | 0 | 4036985 | 156605 | None | COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3)
---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 6288.45 | 6288.45 | 2.34 | False | None | None | False | None | False | 14714.973 | 0 | 4036986 | 156605 | None | COMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 6639.15 | 6639.15 | 20.35 | False | None | None | False | None | False | 135106.7025 | 0 | 4036987 | 156605 | None | Addendum I Percentage Additionalities for Formwork | Appendix I Additionalities for Formwork, Centering & Scaffolding S.N.7 Culverts (head walls) 8 percent P.N. 115 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 531.13 | 531.13 | 20.35 | False | None | None | False | None | False | 10808.4955 | 0 | 4036988 | 156605 | None | COMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures (COMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | t | 82961.55 | 82961.55 | 1.08 | False | None | None | False | None | False | 89598.474 | 0 | 4036989 | 156605 | None | COMMON SR 2023-24, Vol-3 Sl.No. 16.15.B, P.No - 14 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 (COMMON SR 2023-24, Vol-3 Sl.No. 16.15.B, P.No - 146) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | m | 8355.9 | 8355.9 | 10.0 | False | None | None | False | None | False | 83559.0 | 0 | 4036990 | 156605 | None | COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 114.45 | 114.45 | 24.0 | False | None | None | False | None | False | 2746.8 | 0 |
| 1726816697000 | 0 | None | None | Roads | Rising of Existing CDs Headwalls | 73527.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4036991 | 156606 | None | COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 6288.45 | 6288.45 | 1.44 | False | None | None | False | None | False | 9055.368 | 0 | 4036992 | 156606 | None | SR 2023-24, Vol-2 SL.No. 5.4, P. No. 9 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) (SR 2023-24, Vol-2 SL.No. 5.4, P. No. 9) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 6708.45 | 6708.45 | 6.48 | False | None | None | False | None | False | 43470.756 | 0 | 4036993 | 156606 | None | SR 2023-24, Vol-2 SL.No. 8.3.1, P. No. 41 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to
brick/stone masonry including rounding off corners wherever required
smooth rendering, providing and removing scaffolding, including cost of
materials, labour, curing complete as per specifications and as per directions
of Engineer-in-charge. (SR 2023-24, Vol-2 SL.No. 8.3.1, P. No. 41) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 371.7 | 371.7 | 43.2 | False | None | None | False | None | False | 16057.44 | 0 | 4036994 | 156606 | None | COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Sqm | 114.45 | 114.45 | 43.2 | False | None | None | False | None | False | 4944.24 | 0 |
| 1726816697000 | 0 | None | None | Roads | Field Culverts | 202850.23 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4036995 | 156607 | None | COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 107.1 | 107.1 | 14.7 | False | None | None | False | None | False | 1574.37 | 0 | 4036996 | 156607 | None | COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 6288.45 | 6288.45 | 4.2 | False | None | None | False | None | False | 26411.49 | 0 | 4036997 | 156607 | None | COMMON SR 2023-24, Vol-3 Sl.No. 16.15.C, P.No - 14 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 (COMMON SR 2023-24, Vol-3 Sl.No. 16.15.C, P.No - 146) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 3501.75 | 3501.75 | 37.5 | False | None | None | False | None | False | 131315.625 | 0 | 4036998 | 156607 | None | COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7 | Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Cum | 497.7 | 497.7 | 87.5 | False | None | None | False | None | False | 43548.75 | 0 |
| 1726816697000 | 0 | None | None | Roads | Shifting of Electrical Poles and Transformer | 760232.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4036999 | 156608 | None | CSR 2023-24 Vol 6 ESCOM Item no 1.01 Pg no 3 | Material cost 200105-RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 Labour charges for 2.02 - Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth Labour charges for 1.1.1 Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 8818.0 | 8818.0 | 17.0 | False | None | None | False | None | False | 149906.0 | 0 | 4037000 | 156608 | None | CSR 2023-24 Vol 6 ESCOM SR MC 27901205 | Material cost for 27901205-11 kV Horizontal cross arm wit Labour charges for 5.03 Fixing of V-Shape/Horizontal cross arm including Single To Support Brace and Insulator fixing ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos. | 903.0 | 903.0 | 19.0 | False | None | None | False | None | False | 17157.0 | 0 | 4037001 | 156608 | None | CSR 2023-24 Vol 6 Material code 27901206 | Material cost for 27901206-11 kV Horizontal cross arm wit Labour charges for 5.03 Fixing of V-Shape/Horizontal cross arm including Single To Support Brace and Insulator fixing ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 900.0 | 900.0 | 18.0 | False | None | None | False | None | False | 16200.0 | 0 | 4037002 | 156608 | None | CSR 2023-24 Vol 6 MC 2811101 | Material cost for 2811101-Guy with Complete set Labour charges for 5.10 Fixing of GUY Set with break insulator making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) Labour charges for 1.7 Digging of Pit for GUY SET Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Set | 1763.0 | 1763.0 | 10.0 | False | None | None | False | None | False | 17630.0 | 0 | 4037003 | 156608 | None | CSR 2023-24 Vol 6 Item code 6.06 pg 5 | 283008-11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 205.0 | 205.0 | 36.0 | False | None | None | False | None | False | 7380.0 | 0 | 4037004 | 156608 | None | CSR 2023-24 Vol 6 Item no 6.10 Pg 5 | 283320-Silcon rubber composite insulator 11 kV, 45 kN Polymeric Insulator ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 186.0 | 186.0 | 21.0 | False | None | None | False | None | False | 3906.0 | 0 | 4037005 | 156608 | None | CSR 2023-24 Vol 6 ESCOM SR 284108 | Material cost for 284108-Rabbit ACSR Conductor labour charges for Labour For Rabbit ACSR ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | m | 62.9 | 62.9 | 2550.0 | False | None | None | False | None | False | 160395.0 | 0 | 4037006 | 156608 | None | CSR 2023-24 Vol 6 MC 27911102 | 27911102-9 Mtr RCC DP Transformer Strct Labour charges for Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing For 25/63/100 kVA.Labour charges for Digging of Pit Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 37908.0 | 37908.0 | 4.0 | False | None | None | False | None | False | 151632.0 | 0 | 4037007 | 156608 | None | CSR 2023-24 Vol 6 MC 27911104 | 27911104-9 Mtr RCC DP Transformer Strct Labour charges for Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing for For 100 to 250 kVA Labour charges for Digging of Pit Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Set | 44186.0 | 44186.0 | 2.0 | False | None | None | False | None | False | 88372.0 | 0 | 4037008 | 156608 | None | CSR 2023-24 Vol 6 ESCOM SR item no 1.06 | Material cost 200006-PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg N BESCOM /GM/ QS&S/50 Dtd 24.11.2018) . asper REC Standards Labour charges for 2.02 - Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth Labour charges for 1.1.1 Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 5941.0 | 5941.0 | 8.0 | False | None | None | False | None | False | 47528.0 | 0 | 4037009 | 156608 | None | CSR 2023-24 Vol 6 item no 1.01 pg no 3 | Material cost 200105-RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 Labour charges for 2.02 - Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth Labour charges for 1.1.1 Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 8818.0 | 8818.0 | 2.0 | False | None | None | False | None | False | 17636.0 | 0 | 4037010 | 156608 | None | CSR 2023-24 Vol 6 Material code 27901203 | Material cost for 27901203-4 pin cross arm with pole clam Labour charges for Fixing of 4 Pin cross arm with insulator and Braces fixing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 583.0 | 583.0 | 2.0 | False | None | None | False | None | False | 1166.0 | 0 | 4037011 | 156608 | None | CSR 2023-24 Vol 6 Material code 27901204 | Material cost for 27901204-4 pin cross arm with pole clam Labour charges for Fixing of 4 Pin cross arm with insulator and Braces fixing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 580.0 | 580.0 | 10.0 | False | None | None | False | None | False | 5800.0 | 0 | 4037012 | 156608 | None | CSR 2023-24 Vol 6 Item no MC 2811101 | Material cost for 2811101-Guy with Complete set Labour charges for 5.10 Fixing of GUY Set with break insulator making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) Labour charges for 1.7 Digging of Pit for GUY SET Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Set | 1763.0 | 1763.0 | 6.0 | False | None | None | False | None | False | 10578.0 | 0 | 4037013 | 156608 | None | CSR 2023-24 Vol 6 ESCOM SR Item no 6.03 pg 5 | 283003- 1.1 kV Ceramic Pin Insulator (Shell only) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 31.0 | 31.0 | 32.0 | False | None | None | False | None | False | 992.0 | 0 | 4037014 | 156608 | None | CSR 2023-24 Vol 6 ESCOM SR Item no 6.04 Pg 5 | 283053- 1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 35.0 | 35.0 | 32.0 | False | None | None | False | None | False | 1120.0 | 0 | 4037015 | 156608 | None | CSR 2023-24 Vol 6 ESCOM SR Item no 6.07 pg 5 | 283158-NO.8 Strain Insulator ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | Nos | 27.0 | 27.0 | 16.0 | False | None | None | False | None | False | 432.0 | 0 | 4037016 | 156608 | None | CSR 2023-24 Vol 6 Item no 7.01 pg 5 | 284105-Weasel ACSR Conductor Labour charges for Stringing of conductor wren, squirrel, weasel, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work. | m | 38.52 | 38.52 | 1620.0 | False | None | None | False | None | False | 62402.4 | 0 |
|
|
---|