createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726816696748
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd440000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-10-2024 16:00:00
tenderQueryClose30-09-2024 12:00:00
technicalBidOpen04-10-2024 16:30:00
publishedDate24-09-2024 10:37:44
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate25-09-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonTechnical Assistant
splitEmdRequiredYnTrue
emdBankGuarantee340000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1726816696783
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT12471
titleWidening and Improvements to Road from Sirigeri-Nadavi road (MDR) from km 6.00 to 8.00 in Siruguppa taluk of Ballari district under 5054 MDR Improvements.
descriptionWidening and Improvements to Road from Sirigeri-Nadavi road (MDR) from km 6.00 to 8.00 in Siruguppa taluk of Ballari district under 5054 MDR Improvements.
categoryWORKS
categoryTextWorks
ecv29309179.27
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount35000000.0
groupOverheadTotal0.0
fileNumberAEE/KPWD/SDN/SGP/5054/RD/MDR/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17268166970000NoneNoneRoadsConstruction of Flexible pavement From Ch.6.00km to 8.105km27933027.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4036953156604NoneCSR 2023-24, Vol-3 SL No 2.5 (ii) A, P No -9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material tobe used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical Means using Dozer (A) In area of light jungle (COMMON SR 2023-24, Vol-3 Sl.No. 2.5 (ii).A, P.No - 9) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.100 Sqm412.7412.744.2FalseNoneNoneFalseNoneFalse18241.340
4036954156604NoneCSR 2023-24, Vol-3 Sl.No. 2.1 (iii).A, P.No9Cutting of Trees, excluding removal of stumps and roots of trees. Girth from 900 mm to 1800 mm (COMMON SR 2023-24, Vol-3 Sl.No. 2.1 (iii).A, P.No - 9 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Each1859.61859.65.0FalseNoneNoneFalseNoneFalse9298.00
4036955156604NoneCOMMON SR 2023-24, Vol-3, P.NO -17, SL. No -3.5Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (COMMON SR 2023-24, Vol-3, P.NO -17, SL. No -3.5) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm6.36.36315.0FalseNoneNoneFalseNoneFalse39784.50
4036956156604NoneCOMMON SR 2023-24, Vol-3, P.NO -10, SL. No -2.8 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means a. Cement Concrete Grade M-15 & M-20 (COMMON SR 2023-24, Vol-3, P.NO -10, SL. No -2.8 iia ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum755.0755.036.75FalseNoneNoneFalseNoneFalse27746.250
4036957156604NoneCOMMON SR 2023-24, Vol-3, Sl.No.3.7 ,P.No - 17pacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction (COMMON SR 2023-24, Vol-3, Sl.No.3.7 ,P.No - 17) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum110.25110.253315.38FalseNoneNoneFalseNoneFalse365520.6450
4036958156604NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum107.1107.13975.98FalseNoneNoneFalseNoneFalse425827.4580
4036959156604NoneCOMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum497.7497.72252.02FalseNoneNoneFalseNoneFalse1120830.3540
4036960156604NoneCOMMON SR 2023-24, Vol-1, SI.No. 1.7, P.No - 7)Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.COMMON SR 2023-24 Vol-1, SI.No. 1.7, P.No - 7) (Royalty shall be recovered @ Rs. 60.00/m3 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum124.95124.952089.58FalseNoneNoneFalseNoneFalse261093.0210
4036961156604NoneCOMMON SR 2023-24,Vol-3, Sl.No. 3.6 ,P.No -17Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 305 (COMMON SR 2023-24,Vol-3, Sl.No. 3.6 ,P.No -17) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum517.65517.653940.98FalseNoneNoneFalseNoneFalse2040048.2970
4036962156604NoneCOMMON SR 2023-24, Vol-3 Sl.No.4.1.A.(v) ,P.No - 2Granular Sub-Base A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (COMMON SR 2023-24, Vol-3 Sl.No.4.1.A.(v) ,P.No - 23) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum2611.352611.352368.12FalseNoneNoneFalseNoneFalse6183990.1620
4036963156604NoneCOMMON SR 2023-24, Vol-3 Sl.No.4.17 ,P.No - 26Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in (COMMON SR 2023-24, Vol-3 Sl.No.4.17 ,P.No - 26.) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum2686.952686.952960.94FalseNoneNoneFalseNoneFalse7955897.7330
4036964156604NoneCOMMON SR 2023-24, Vol-3 Sl.No.5.1.A.(i), P.No - 3Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on Prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg per m2 using mechanical means. 502 (COMMON SR 2023-24, Vol-3 Sl.No.5.1.A.(i), P.No - 31) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm43.0543.0511983.75FalseNoneNoneFalseNoneFalse515900.43750
4036965156604NoneCOMMON SR 2023-24, Vol-3, Sl.No.5.3.(i), P.No - 31Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (COMMON SR 2023-24, Vol-3, Sl.No.5.3.(i), P.No - 31) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm12.612.611983.75FalseNoneNoneFalseNoneFalse150995.250
4036966156604NoneCSR 2023-24, Vol-3 Sl.No.5.8 -ii (C) ,P.No -30Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction COMMON SR 2023-24, Vol-3 Sl.No.5.8 -ii (C) ,P.No - 30 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum8044.058044.05599.19FalseNoneNoneFalseNoneFalse4819914.31950
4036967156604NoneCOMMON SR 2023-24, Vol-3 Sl.No. 5.31, P.No - 43Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with40/60 TPH capacity hot mix plant batch type using crushedaggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. IRC-37: 2018 COMMON SR 2023-24, Vol-3 Sl.No. 5.31, P.No - 43 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum10659.610659.6299.59FalseNoneNoneFalseNoneFalse3193509.5640
4036968156604NoneCOMMON SR 2023-24, Vol-3 Sl.No. 8.15 ,P.No - 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.803 (COMMON SR 2023-24, Vol-3 Sl.No. 8.15 ,P.No - 67) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum556.5556.5421.0FalseNoneNoneFalseNoneFalse234286.50
4036969156604NoneCOMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section of IRC:67:2012.801.120 cm equilateral triangle. COMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos6546.756546.753.0FalseNoneNoneFalseNoneFalse19640.250
4036970156604NoneCOMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.801 COMMON SR 2023-24, Vol-3 Sl.No. 8.5 (A), P.No - 64 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos4918.24918.22.0FalseNoneNoneFalseNoneFalse9836.40
4036971156604NoneCOMMON SR 2023-24, Vol-3, SL.NO. 8.54, P.NO.78Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 (COMMON SR 2023-24, Vol-3, SL.NO. 8.54, P.NO.78) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
4036972156604NoneCOMMON SR 2023-24, Vol-3, SL.NO. 8.18, P.NO.67Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (COMMON SR 2023-24, Vol-3, SL.NO. 8.18, P.NO.67) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Each785.4785.414.0FalseNoneNoneFalseNoneFalse10995.60
4036973156604NoneCOMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone (precast) (COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 (ii)) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Each3073.353073.353.0FalseNoneNoneFalseNoneFalse9220.050
4036974156604NoneCOMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (i) 200m stone (precast) (COMMON SR 2023-24, Vol-3 Page No.67 Item No.8.16 (ii)) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Each884.1884.111.0FalseNoneNoneFalseNoneFalse9725.10
4036975156604NoneCOMMON SR 2023-24, Vol-3 Page No.80 Item No.8.60.1Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Bituminous Macadam (BM) Gr II and Semi Dense Bituminous Macadam (SDBC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 (COMMON SR 2023-24, Vol-3 Page No.80 Item No.8.60.1 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.No43564.543564.52.0FalseNoneNoneFalseNoneFalse87129.00
4036976156604NoneCOMMON SR 2023-24, Vol-1, SL.NO. 41, P.NO.129Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW, taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line, encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto evel and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. (Plain Terrain New Alignment)incharge.(COMMON SR 2023-24, Vol-1, SL.NO. 41, P.NO.129) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Km47250.047250.02.105FalseNoneNoneFalseNoneFalse99461.250
4036977156604NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum107.1107.118.0FalseNoneNoneFalseNoneFalse1927.80
4036978156604NoneCOMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. for 110 mm (Weight of pipe 1.894kg)(COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.m375.9375.925.0FalseNoneNoneFalseNoneFalse9397.50
4036979156604NoneCOMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. For 160mm (Weight of pipe-3.923kg)(COMMON SR 2023-24, Vol-5, P.NO -120, SL. No -10.14) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.m678.3678.325.0FalseNoneNoneFalseNoneFalse16957.50
4036980156604NoneSR 2023-24 , Item No : 1.9 , Page No : 7 , Vol 1 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( SR 2023-24 , Item No : 1.9 , Page No : 7 , Vol 1 ) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm279.3279.318.0FalseNoneNoneFalseNoneFalse5027.40
4036981156604NoneData rate SE office Ballari 2023-24 Dt 20-01-2024Road Maintenance for 3rd year for road with BM+SDBC as wearing coat Maintenance of road for 3rd year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by clearing, cleaning,reshaping, deepening of side drains, stripping excess soil from the shoulder surface and Making up loss of material/irregularties on shoulder whereever necessary, Maintenance and painting of 200 meter and km stones, white washing of parapet walls of CD work and tree trunks, patching os shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Km28360.028360.02.105FalseNoneNoneFalseNoneFalse59697.80
4036982156604NoneData rate SE office Ballari 2023-24 Dt 20-01-2024Road Maintenance for 4th year for road with BM+SDBC as wearing coat Maintenance of road for 4th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by clearing, cleaning,reshaping, deepening of side drains, stripping excess soil from the shoulder surface and Making up loss of material/irregularties on shoulder whereever necessary, Maintenance and painting of 200 meter and km stones, white washing of parapet walls of CD work and tree trunks, patching os shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Km47010.047010.02.105FalseNoneNoneFalseNoneFalse98956.050
4036983156604NoneData rate SE office Ballari 2023-24 Dt 20-01-2024Road Maintenance for 5th year for road with BM+SDBC as wearing coat Maintenance of road for 5th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by clearing, cleaning,reshaping, deepening of side drains, stripping excess soil from the shoulder surface and Making up loss of material/irregularties on shoulder whereever necessary, Maintenance and painting of 200 meter and km stones, white washing of parapet walls of CD work and tree trunks, patching os shallow and deep potholes using premixed bitumen mixes corresponding to the layers of the road and repairs to CDs including vent clearance. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Km58300.058300.02.105FalseNoneNoneFalseNoneFalse122721.50
17268166970000NoneNoneRoadsConstruction of 1-Vent Pipe Culvert at Ch-6.278km339541.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4036984156605NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum107.1107.128.08FalseNoneNoneFalseNoneFalse3007.3680
4036985156605NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum6288.456288.452.34FalseNoneNoneFalseNoneFalse14714.9730
4036986156605NoneCOMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -16, SI.No -2.4.2) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum6639.156639.1520.35FalseNoneNoneFalseNoneFalse135106.70250
4036987156605NoneAddendum I Percentage Additionalities for FormworkAppendix I Additionalities for Formwork, Centering & Scaffolding S.N.7 Culverts (head walls) 8 percent P.N. 115 ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum531.13531.1320.35FalseNoneNoneFalseNoneFalse10808.49550
4036988156605NoneCOMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures (COMMON SR 2023-24 Vol-1, P.NO -18, SI.No -2.11) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.t82961.5582961.551.08FalseNoneNoneFalseNoneFalse89598.4740
4036989156605NoneCOMMON SR 2023-24, Vol-3 Sl.No. 16.15.B, P.No - 14Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 (COMMON SR 2023-24, Vol-3 Sl.No. 16.15.B, P.No - 146) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.m8355.98355.910.0FalseNoneNoneFalseNoneFalse83559.00
4036990156605NoneCOMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm114.45114.4524.0FalseNoneNoneFalseNoneFalse2746.80
17268166970000NoneNoneRoadsRising of Existing CDs Headwalls73527.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4036991156606NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum6288.456288.451.44FalseNoneNoneFalseNoneFalse9055.3680
4036992156606NoneSR 2023-24, Vol-2 SL.No. 5.4, P. No. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (SR 2023-24, Vol-2 SL.No. 5.4, P. No. 9) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum6708.456708.456.48FalseNoneNoneFalseNoneFalse43470.7560
4036993156606NoneSR 2023-24, Vol-2 SL.No. 8.3.1, P. No. 41Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24, Vol-2 SL.No. 8.3.1, P. No. 41) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm371.7371.743.2FalseNoneNoneFalseNoneFalse16057.440
4036994156606NoneCOMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Sqm114.45114.4543.2FalseNoneNoneFalseNoneFalse4944.240
17268166970000NoneNoneRoadsField Culverts202850.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4036995156607NoneCOMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (COMMON SR 2023-24, Vol-1, P.NO -8, SL. No -1.14.1) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum107.1107.114.7FalseNoneNoneFalseNoneFalse1574.370
4036996156607NoneCOMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (COMMON SR 2023-24 Vol-1, P.NO -15, SI.No -2.1.3) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum6288.456288.454.2FalseNoneNoneFalseNoneFalse26411.490
4036997156607NoneCOMMON SR 2023-24, Vol-3 Sl.No. 16.15.C, P.No - 14Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 (COMMON SR 2023-24, Vol-3 Sl.No. 16.15.C, P.No - 146) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum3501.753501.7537.5FalseNoneNoneFalseNoneFalse131315.6250
4036998156607NoneCOMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No - 7) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Cum497.7497.787.5FalseNoneNoneFalseNoneFalse43548.750
17268166970000NoneNoneRoadsShifting of Electrical Poles and Transformer760232.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4036999156608NoneCSR 2023-24 Vol 6 ESCOM Item no 1.01 Pg no 3Material cost 200105-RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 Labour charges for 2.02 - Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth Labour charges for 1.1.1 Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos8818.08818.017.0FalseNoneNoneFalseNoneFalse149906.00
4037000156608NoneCSR 2023-24 Vol 6 ESCOM SR MC 27901205Material cost for 27901205-11 kV Horizontal cross arm wit Labour charges for 5.03 Fixing of V-Shape/Horizontal cross arm including Single To Support Brace and Insulator fixing ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos.903.0903.019.0FalseNoneNoneFalseNoneFalse17157.00
4037001156608NoneCSR 2023-24 Vol 6 Material code 27901206Material cost for 27901206-11 kV Horizontal cross arm wit Labour charges for 5.03 Fixing of V-Shape/Horizontal cross arm including Single To Support Brace and Insulator fixing ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos900.0900.018.0FalseNoneNoneFalseNoneFalse16200.00
4037002156608NoneCSR 2023-24 Vol 6 MC 2811101Material cost for 2811101-Guy with Complete set Labour charges for 5.10 Fixing of GUY Set with break insulator making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) Labour charges for 1.7 Digging of Pit for GUY SET Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Set1763.01763.010.0FalseNoneNoneFalseNoneFalse17630.00
4037003156608NoneCSR 2023-24 Vol 6 Item code 6.06 pg 5283008-11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos205.0205.036.0FalseNoneNoneFalseNoneFalse7380.00
4037004156608NoneCSR 2023-24 Vol 6 Item no 6.10 Pg 5283320-Silcon rubber composite insulator 11 kV, 45 kN Polymeric Insulator ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos186.0186.021.0FalseNoneNoneFalseNoneFalse3906.00
4037005156608NoneCSR 2023-24 Vol 6 ESCOM SR 284108Material cost for 284108-Rabbit ACSR Conductor labour charges for Labour For Rabbit ACSR ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.m62.962.92550.0FalseNoneNoneFalseNoneFalse160395.00
4037006156608NoneCSR 2023-24 Vol 6 MC 2791110227911102-9 Mtr RCC DP Transformer Strct Labour charges for Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing For 25/63/100 kVA.Labour charges for Digging of Pit Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos37908.037908.04.0FalseNoneNoneFalseNoneFalse151632.00
4037007156608NoneCSR 2023-24 Vol 6 MC 2791110427911104-9 Mtr RCC DP Transformer Strct Labour charges for Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing for For 100 to 250 kVA Labour charges for Digging of Pit Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Set44186.044186.02.0FalseNoneNoneFalseNoneFalse88372.00
4037008156608NoneCSR 2023-24 Vol 6 ESCOM SR item no 1.06 Material cost 200006-PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg N BESCOM /GM/ QS&S/50 Dtd 24.11.2018) . asper REC Standards Labour charges for 2.02 - Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth Labour charges for 1.1.1 Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos5941.05941.08.0FalseNoneNoneFalseNoneFalse47528.00
4037009156608NoneCSR 2023-24 Vol 6 item no 1.01 pg no 3Material cost 200105-RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 Labour charges for 2.02 - Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth Labour charges for 1.1.1 Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos8818.08818.02.0FalseNoneNoneFalseNoneFalse17636.00
4037010156608NoneCSR 2023-24 Vol 6 Material code 27901203Material cost for 27901203-4 pin cross arm with pole clam Labour charges for Fixing of 4 Pin cross arm with insulator and Braces fixing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos583.0583.02.0FalseNoneNoneFalseNoneFalse1166.00
4037011156608NoneCSR 2023-24 Vol 6 Material code 27901204Material cost for 27901204-4 pin cross arm with pole clam Labour charges for Fixing of 4 Pin cross arm with insulator and Braces fixing. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos580.0580.010.0FalseNoneNoneFalseNoneFalse5800.00
4037012156608NoneCSR 2023-24 Vol 6 Item no MC 2811101Material cost for 2811101-Guy with Complete set Labour charges for 5.10 Fixing of GUY Set with break insulator making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) Labour charges for 1.7 Digging of Pit for GUY SET Ordinary Soil ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Set1763.01763.06.0FalseNoneNoneFalseNoneFalse10578.00
4037013156608NoneCSR 2023-24 Vol 6 ESCOM SR Item no 6.03 pg 5 283003- 1.1 kV Ceramic Pin Insulator (Shell only) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos31.031.032.0FalseNoneNoneFalseNoneFalse992.00
4037014156608NoneCSR 2023-24 Vol 6 ESCOM SR Item no 6.04 Pg 5283053- 1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos35.035.032.0FalseNoneNoneFalseNoneFalse1120.00
4037015156608NoneCSR 2023-24 Vol 6 ESCOM SR Item no 6.07 pg 5283158-NO.8 Strain Insulator ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.Nos27.027.016.0FalseNoneNoneFalseNoneFalse432.00
4037016156608NoneCSR 2023-24 Vol 6 Item no 7.01 pg 5284105-Weasel ACSR Conductor Labour charges for Stringing of conductor wren, squirrel, weasel, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps. ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of labour, HOM charges of all machineries, incidental and equipment charges, and implementation of Environmental and Social Safeguards etc., complete and as per the directions of engineer-in-charge of work.m38.5238.521620.0FalseNoneNoneFalseNoneFalse62402.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17268166980000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17268166980000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17268166980000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17268166980000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17268166980000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17268191450000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17268191610000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17268191710000NoneNoneELIGIBILITYAs per Karnataka State Government order No LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.07.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17268191790000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17268192000000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders, except GST, which will be paid separately.None
17268192080000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17268192170000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17268192240000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17268192330000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17268192730000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or whatsoever.None
17268192840000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period at his own cost.None
17268192920000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing e-procurement portal.None
17268193000000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17268193090000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per Government Circular No.PWD/159/CRM/2009 Dated 30-09-2010 (If applicable for this work).None
17268193170000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17268193270000NoneNoneELIGIBILITYAgency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17268193360000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand for works costing more than 10.00 crores, as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17268193430000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests as per approved Quality Assurance Plan (QAP) for satisfactory completion.None
17268193520000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17268193610000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17268193690000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of Labour Act and applicable any other law as concerned to work.None
17268193770000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17268193860000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17268193960000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhs.None
17268194050000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17268194150000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17268194240000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17268194330000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of or in connection with or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the arbitration Centre-Karnataka (Domestic and International) Rules 2012 by one or more arbitrators appointed in accordance with its rules.None
17268194420000NoneNoneELIGIBILITYIt is mandatory to furnish the information regarding works which are yet to be completed, as on date of submission of his tender, in format-5. The tenderer shall note that, deliberately not furnishing the correct information is liable for rejection of such tenders.None
17268194500000NoneNoneELIGIBILITYThe time stipulated for completion of work is 9 (Nine) calendar months including rainy season.None
17268194600001NoneNoneELIGIBILITYThe defect liability period for the work is 5 yearsNone
17268194710000NoneNoneELIGIBILITYIMP NOTE : As Per the Government order, the defect liability period for this project is 5 Years (Five) Years (For Initial 2 years after completion of work, road shall be maintained by the contractor at his own cast and risk. subsequently, for 3rd, 4th and 5th years, maintenance shall be carried out as per BOQ.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, satisfactorily completed as prime contractor, at least one Similar Nature of Work such as Improvements to Bituminous Road work of value not less than Rs.146.55 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 had executed in any one Financial year, the following minimum quantities items of work (a)Earthwork Excavation/Formation of Road Embankment/Sub-grade/sub-base-8254.00 Cum. (b) Granular sub-base-1894.00 Cum (c) Wet Mix Macadam/Water bound macadam - 2369 Cum (d) DBM/BM/BC/SDBC-719 cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Quantity wise work done certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his/her name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 and 2023-24, achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.586.18 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own/Hire/Lease -Hydraulic Excavator - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own - Vehicle mounted Mechanical Bitumen Sprayer - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own - Mechanical Paver Finisher - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability Tippers, by Own - 2 No. and by Own / Hire / Lease - 2 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability Vehicle mounted water tanker (a) By own- 1 No and (b) By own/Hire/Lease -1 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own - 60/70 TPH capacity Pug Mill - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own - Vibratory Road Roller - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own - 40/60 TPH capacity of HMP - 1 No (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs.97.70 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc. from an nationalized or scheduled bank.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneCopy of Registration for having registered in KPWD under Class-II and above categoryOthersLegal Status of Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneDetailed information of the works for which Tenderer has submitted his tender in different departments either Central or State.OthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Tendered works
NoneNoneNoneNoneDetailed information on committed offers of works on hand and ongoing works which are yet to be completedOthersCommitted works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Committed works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate from Chartered Accountant, compulsorily indicating UDINTrueTechnical Bid
Contractor Registration certificate for having registered in KPWD under requisite categoryTrueTechnical Bid
Similar work done certificate issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
Quantity wise work done certificate issued by an officer not below the rank of Executive EngineerTrueTechnical Bid
Unconditional Bank line of credit from any Nationalized or scheduled bankTrueTechnical Bid
Current contract commitments including works on hand, works awarded and works for which tenders submittedTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsBallariSiruguppaBellarySIRUGUPPASirigeri NadaviNoneNoneNoneNoneNoneNone
RoadsBallariSiruguppaBellarySIRUGUPPASirigeri NadaviNoneNoneNoneNoneNoneNone
RoadsBallariSiruguppaBellarySIRUGUPPASirigeri NadaviNoneNoneNoneNoneNoneNone
RoadsBallariSiruguppaBellarySIRUGUPPASirigeri-NadaviNoneNoneNoneNoneNoneNone
RoadsBallariSiruguppaBellarySIRUGUPPASirigeri Nadavi roadNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1726904419000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, PWD Division, Fort Main Road
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone