createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1727162351210
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd28000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-10-2024 16:00:00
tenderQueryClose26-09-2024 17:30:00
technicalBidOpenNone
publishedDate24-09-2024 13:17:58
publishedByPostKNNL_EE_DIV_GLBC3_BLG
publishedByUserKPE10509 - HANAMAPPA RAMAPPA MAHARADDI
bidValidityPeriod180
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypePERCENTAGE
denominationTypeTextPercentage
retenderedYnNone
percentageRateTypeTextSingle Rate
contactPersonH R MAHARADDI
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnNone
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08425275228
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1727162351239
version4
createdDateNone
modifiedDateNone
tenderNumberKNNL/2024-25/BD/WORK_INDENT1550
titleConstruction of entance steps and filling of murrum infront of Basement wall for Block-3 of Complex Building and other annual maintenance works of Mudhol GLBC Colony and IB for the Year 2024-25
descriptionConstruction of entance steps and filling of murrum infront of Basement wall for Block-3 of Complex Building and other annual maintenance works of Mudhol GLBC Colony and IB for the Year 2024-25
categoryWORKS
categoryTextWorks
ecv1114864.48
deptNameKarnataka Neeravari Nigam Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location3932
locationNameKNNL Division GLBC Div No 3 Bilagi
provisionalAmount1117000.0
groupOverheadTotal0.0
fileNumber2701/MUDHOL/2024-25/IM
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17271623510000NoneNoneBuildingsConstruction of entance steps and filling of murrum infront of Basement wall for Block-3 of Complex Building and other annual maintenance works of Mudhol GLBC Colony and IB for the Year 2024-251114864.48
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4063293158005NoneA01Clearing Grass and Removal of Rubbish & dumping to outside periphery by manual means.Sqm4.584.584080.6FalseNoneNoneFalseNoneFalse18689.1480
4063294158005NoneA02Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.Cum3005.813005.810.66FalseNoneNoneFalseNoneFalse1983.83460
4063295158005NoneA03Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum126.38126.3851.18FalseNoneNoneFalseNoneFalse6468.12840
4063296158005NoneA04Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates.Cum7702.867702.861.8FalseNoneNoneFalseNoneFalse13865.1480
4063297158005NoneA05Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6952.036952.036.84FalseNoneNoneFalseNoneFalse47551.88520
4063298158005NoneA06Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum8412.768412.762.4FalseNoneNoneFalseNoneFalse20190.6240
4063299158005NoneA07Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery,scaffolding, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum13318.1313318.131.19FalseNoneNoneFalseNoneFalse15848.57470
4063300158005NoneA08Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum12321.8512321.8520.85FalseNoneNoneFalseNoneFalse256910.57250
4063301158005NoneA09Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.For Buildingst110837.22110837.221.46FalseNoneNoneFalseNoneFalse161822.34120
4063302158005NoneA10Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg700.03700.03292.75FalseNoneNoneFalseNoneFalse204933.78250
4063303158005NoneA11Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum587.29587.29385.0FalseNoneNoneFalseNoneFalse226106.650
4063304158005NoneA12Bed sheet -Bleached white bed sheet confirming to IS 175-1989 (latest) with variety No-5; 48%-polyster & 52% Cotton 155 gms as per sqm of size of 275 cm x 175 cmEach2276.02276.04.0FalseNoneNoneFalseNoneFalse9104.00
4063305158005NoneA13Providing and supplying Pillow (Memory foam) with deep sleeping comfort of size upto 70cm x 40cm as per direction of engineer in chargeNo1115.11115.14.0FalseNoneNoneFalseNoneFalse4460.40
4063306158005NoneA14Providing & supplying 100% Polyester machine wash capable Blanket 66x90inches with calm and light colors as per direction of Engineer in charge of workNo1982.41982.44.0FalseNoneNoneFalseNoneFalse7929.60
4063307158005NoneA15Providing & supplying 100% Cotton machine wash capable & high absorbent Towel 70x140cm with minimum 600 gsm thickness as per direction of Engineer in charge of workNo185.85185.854.0FalseNoneNoneFalseNoneFalse743.40
4063308158005NoneA16Supplying of Civic Worker ( Scavenger) .Per Day708.66708.6652.0FalseNoneNoneFalseNoneFalse36850.320
4063309158005NoneA17Supplying of DhobiPer Day708.66708.6624.0FalseNoneNoneFalseNoneFalse17007.840
4063310158005NoneA18Supplying of PlumberPer Day771.72771.7224.0FalseNoneNoneFalseNoneFalse18521.280
4063311158005NoneA19Supplying of Electrician ( Licensed )Per Day827.62827.6224.0FalseNoneNoneFalseNoneFalse19862.880
4063312158005NoneA20Supplying of Carpenter Class-IIPer Day750.52750.5212.0FalseNoneNoneFalseNoneFalse9006.240
4063313158005NoneA21Supplying of SweeperPer Day708.66708.6624.0FalseNoneNoneFalseNoneFalse17007.840
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17271623570000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17271623570000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17271623570000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17271623570000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17271623570000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17271623570000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17271623570000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17271623570000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17271623570000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17271623570001NoneNoneELIGIBILITYIf any of the dates mentioned above happen to be a general holiday, the next working day holds goodNone
17271623800000NoneNoneELIGIBILITYAmount put to the tender is inclusive of GST. GST will be paid at applicable rates at the time of payment of RA Bills.The increase in GST shall not be paid in the extended period of contract for which the contractor is responsible. Hence, the contractor should quote the rates including GSTNone
17271623980000NoneNoneELIGIBILITYAs per Royalty charges is concerned, contractor should submit MDPs for each material issued from Mines and Geology Department, GOK. Otherwise penalty charges will be recovered as per Nigam Circular No.8708 Dt:26.12.2023None
17271624130000NoneNoneELIGIBILITYThe contractor is bound by prevailing labour act and other statutory requirements during the course of contract/ services.None
17271624220000NoneNoneELIGIBILITYPhoto copies of the work under taken in the stages of before execution work under progress, and completion of the work should be produced at the time of submitting the bill by the contractor on his own cost.None
17271624290000NoneNoneELIGIBILITYIf the amount quoted by the contractor for the work is below ninety percent of estimated amount put to tender or recast amount put to tender of the department, then the contractor shall furnish an additional performance security in the form of Bank Guarantee for any amount equivalent to the difference between the cost as per quoted percentage and 90% of the estimated amount put to tender or recast amount put to tender. In case of contractor quotation rates above 125% of the estimated rates then the amount over and above 125% will be withheld during the progress of work. The additional performance security will be released proportionately to the bill amount till the contractor achieves progress of the entire cost of the work as per agreement.None
17271624370000NoneNoneELIGIBILITYThe conditional tender will be rejected.None
17271624450000NoneNoneELIGIBILITYA Cess of 1% of the agreement amount will be deducted as per Karnataka Building and other Labour Welfare Fund Act 1996 and Rules 2006None
17271624580000NoneNoneELIGIBILITYThe Amount put to tender is Inclusive of GST, Hence the Contractor should quote the rates including GST. The increase in GST shall not be paid in the extended period of contract for which the contractor is responsible.None
17271624780000NoneNoneELIGIBILITYFinancial turnover previous years, and existing commitments / on going works shall be given a weightage of 10 % per year to bring them to the price level of the 2024-25.None
17271624860000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17271624940000NoneNoneELIGIBILITYTypographical errors, if any, will not be the ground for any claims by the Bidder/ Firm/ Company.None
17271625020000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the kpp portal. The Original Formats/Documents shall be produced at the time of opening of l Bid for physical verificationNone
17271625100000NoneNoneELIGIBILITYThe defect liability period for the work is 12 (Twelve) calendar months.None
17271625220000NoneNoneELIGIBILITYThe officer competent to accept the tender shall have the right reject any or all the tenders without assigning any reason whatsoever.None
17271625360000NoneNoneELIGIBILITYAny change / extensions, etc in the tender schedule (calendar of events) will not be published / advertised through news papers changes will be updated on/in kpp portal onlyNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Valid Contractors enrolment certificate under KPWD Class-IV and aboveTrueTechnical Bid
Valid GST Registration CertificateTrueTechnical Bid
Valid Employees Provident Fund Registration CertificateTrueTechnical Bid
Annual Turnover Certificate with UDIN NO for Calculation of Bid CapacityTrueTechnical Bid
Tenderers who meet the above specified minimum qualifying criteria will only be qualified if their available tender capacity is more than the total tender value The available tender capacity will be calculated as under Assessed available tender capacity is AxNx2.5-BTrueTechnical Bid
List of existing commitments and ongoing workTrueTechnical Bid
Postal Address & Scanned Signature of the Bidder.TrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsBagalkoteMudholBagalkotMUDHOL (SC)MUdholNoneNoneNoneNoneNoneNone