createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1726641783765
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd450000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-10-2024 16:00:00
tenderQueryClose01-10-2024 16:00:00
technicalBidOpen04-10-2024 16:00:01
publishedDate25-09-2024 17:57:39
publishedByPostPWD_EE_SPLDIV_MYS
publishedByUserKPE16693 - HARISH G
bidValidityPeriod90
noOfCalls1
preBidMeetingDate25-09-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonTEJAVATHI
splitEmdRequiredYnTrue
emdBankGuarantee350000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212492297
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1726641783808
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT10751
titleConstruction of ITI College Building in CA No. 01-T, 3rd Stage, C-Zone, Nachanahalli-Kuppalur Layout at Mysuru City
descriptionConstruction of ITI College Building in CA No. 01-T, 3rd Stage, C-Zone, Nachanahalli-Kuppalur Layout at Mysuru City
categoryWORKS
categoryTextWorks
ecv29972681.64
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1675
locationNamePWD Speical Division Office Mysuru
provisionalAmount37223000.0
groupOverheadTotal0.0
fileNumberaeepwdno1splsubdiv/mysuru/ITICollegeBuilding/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17266417840000NoneNoneBuildingsCivil Work24062660.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4019821155808None2.5 (ii) b. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of thorny jungle Item No. 2.5 (ii) b. page No. 7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work100 Sqm508.2508.260.0FalseNoneNoneFalseNoneFalse30492.00
4019822155808None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Item No. 1.14.1 Page No. 8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum112.46112.461213.7FalseNoneNoneFalseNoneFalse136492.7020
4019823155808None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Item No. 1.14.1 Page No. 8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum107.1107.1203.87FalseNoneNoneFalseNoneFalse21834.4770
4019824155808None4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. Item No. 4.1 Pgage No. 5 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum123.9123.91596.0FalseNoneNoneFalseNoneFalse197744.40
4019825155808None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Item No.1.10 Page No. 7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum168.0168.01035.3FalseNoneNoneFalseNoneFalse173930.40
4019826155808None2.1.2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates Item No. 2.1.2 Page No. 15 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum5947.25947.2206.93FalseNoneNoneFalseNoneFalse1230654.0960
4019827155808None5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Item no. 5.4 Page No. 9 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum6708.456708.45133.53FalseNoneNoneFalseNoneFalse895779.32850
4019828155808None2.2.3Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.2.3 Page No. 15 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum7185.027185.02154.48FalseNoneNoneFalseNoneFalse1109941.88960
4019829155808None2.2.3Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.2.3 Page No. 15 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum9979.29979.228.93FalseNoneNoneFalseNoneFalse288698.2560
4019830155808None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.5.2 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum12214.7612214.7665.66FalseNoneNoneFalseNoneFalse802021.14160
4019831155808None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.5.2 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum10777.7310777.7318.7FalseNoneNoneFalseNoneFalse201543.5510
4019832155808None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.5.2 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum11496.2411496.2461.27FalseNoneNoneFalseNoneFalse704374.62480
4019833155808None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.5.2 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum10777.7310777.73176.34FalseNoneNoneFalseNoneFalse1900544.90820
4019834155808None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.5.2 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum7185.157185.1552.95FalseNoneNoneFalseNoneFalse380453.69250
4019835155808None2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Item no. 2.5.2 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum10418.4710418.477.69FalseNoneNoneFalseNoneFalse80118.03430
4019836155808None2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Item No. 2.1.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum11097.3511097.3510.51FalseNoneNoneFalseNoneFalse116633.14850
4019837155808None2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Item No. 2.11a ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workTonne93929.8593929.8547.51FalseNoneNoneFalseNoneFalse4462607.17350
4019838155808None8.16.1Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment.Plaster mesh Item No.8.16.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm35.735.71293.6FalseNoneNoneFalseNoneFalse46181.520
4019839155808None6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specification Item NO. 6.32 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm1375.51375.51325.44FalseNoneNoneFalseNoneFalse1823142.720
4019840155808None6.34 Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. Item No. 6.34 Page No. 17 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm1159.21159.2144.93FalseNoneNoneFalseNoneFalse168002.8560
4019841155808None12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Item no. 12.13.1 Page no. 100 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum103755.75103755.752.62FalseNoneNoneFalseNoneFalse271840.0650
4019842155808None12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. Item no. 12.51 Page no. 105 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo1066.81066.829.0FalseNoneNoneFalseNoneFalse30937.20
4019843155808None12.57.5Providing and fixing flush door shutter made out of solid core block board type, well seasoned, chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. do- 35 mm thick one side teak and one side commercial Item no. 12.57.5 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm4091.854091.8560.6FalseNoneNoneFalseNoneFalse247966.110
4019844155808None12.97.1Providing and fixing to exiting door frames 30mm thick Glass Fiber Reinforced Plastic (FRP) Paneled door shutter of required colour and approved brand and manufacture, made with fire-retardants grade unsaturated polyester resin, modular to 3mm thick FRP laminate for forming hollow rails and styles, with wooden frame and suitable blocks of seasoned wood insides at required places for fixing of fitting, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS 14856 including fixing to frames Item no. 12.97.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm3364.23364.217.01FalseNoneNoneFalseNoneFalse57225.0420
4019845155808None11.6.1Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Item no. 11.6.1 Page No. 76 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm2764.652764.6525.65FalseNoneNoneFalseNoneFalse70913.27250
4019846155808None11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. Page No. 11.34B Page No. 85 (Vol-2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKgs192.15192.153620.99FalseNoneNoneFalseNoneFalse695773.22850
4019847155808None12.90Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Item No. 12.90 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm7070.77070.7153.66FalseNoneNoneFalseNoneFalse1086483.7620
4019848155808None12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Item no. 12.85 Page no. 110 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm6004.956004.9518.77FalseNoneNoneFalseNoneFalse112712.91150
4019849155808None8.4.2Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Item No. 8.4.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm327.6327.62279.86FalseNoneNoneFalseNoneFalse746882.1360
4019850155808None8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Item No. 8.2.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm309.75309.751240.18FalseNoneNoneFalseNoneFalse384145.7550
4019851155808None8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smoothrendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications and as per directions of Engineer-in-charge. Item No. 8.1.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm253.05253.05186.71FalseNoneNoneFalseNoneFalse47246.96550
4019852155808None11.28Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Item No. 11.28 Page no. 83 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKgs593.25593.25815.0FalseNoneNoneFalseNoneFalse483498.750
4019853155808None9.30Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications Item no. 9.30 Page no. 64 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm5594.45594.487.91FalseNoneNoneFalseNoneFalse491803.7040
4019854155808None9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. Item No. 9.24 Page no. 63 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm2994.62994.6405.38FalseNoneNoneFalseNoneFalse1213950.9480
4019855155808None10.2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. Item No. 10.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm344.4344.4210.0FalseNoneNoneFalseNoneFalse72324.00
4019856155808None9.12.2Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm Item no. 9.12.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm1202.251202.25332.65FalseNoneNoneFalseNoneFalse399928.46250
4019857155808None9.2Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge. Item no. 9.2 Page no.59 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm840.0840.0365.15FalseNoneNoneFalseNoneFalse306726.00
4019858155808None9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. Item no. 9.11 Page no.60 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm933.45933.4551.91FalseNoneNoneFalseNoneFalse48455.38950
4019859155808None9.39Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Item no. 9.39 Page No. 65 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm1521.451521.45186.71FalseNoneNoneFalseNoneFalse284069.92950
4019860155808None8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Item No. 8.33.3 Page No. 47 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm145.95145.95172.43FalseNoneNoneFalseNoneFalse25166.15850
4019861155808None8.34.2Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Item no. 8.34.2 Page No. 47 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm60.960.9188.37FalseNoneNoneFalseNoneFalse11471.7330
4019862155808None8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Item no. 8.33.2 Page No. 46 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm144.9144.9188.37FalseNoneNoneFalseNoneFalse27294.8130
4019863155808None8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. Item No. 8.51 Page No. 50 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm105.0105.03306.6FalseNoneNoneFalseNoneFalse347193.00
4019864155808None8.55.2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre as per specifications and as per directions of Engineer in charge. Item no. 8.55.2 pg. 51 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm55.6555.654546.78FalseNoneNoneFalseNoneFalse253028.3070
4019865155808None8.53.2Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Item no. 8.53.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm103.95103.953306.6FalseNoneNoneFalseNoneFalse343721.070
4019866155808None8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Item no.8.30 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm182.7182.71240.18FalseNoneNoneFalseNoneFalse226580.8860
4019867155808None7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal,complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. Item No. 7.38 Page No. 26 (Vol-2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm596.4596.434.88FalseNoneNoneFalseNoneFalse20802.4320
4019868155808None11.16.1Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications andas per directions of the Engineer-in-Charge. Item no. 11.16.1 Page no. 81 (Vol-2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKgs142.8142.8523.12FalseNoneNoneFalseNoneFalse74701.5360
4019869155808None15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m 2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. . Item No. 15.1 Page No. 133 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm857.85857.851059.19FalseNoneNoneFalseNoneFalse908626.14150
17266417840000NoneNoneBuildingsWater Supply & Sanitary work1242682.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4019870155809None14.3.1Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : Item no. 14.3.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo6275.856275.858.0FalseNoneNoneFalseNoneFalse50206.80
4019871155809None14.7.5Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Angle back wash basin size 600 x 480 mm with single 15mm C.P. brass pillar tapItem no. 14.7.5 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo2689.052689.058.0FalseNoneNoneFalseNoneFalse21512.40
4019872155809None14.8Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings 14.8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo1494.151494.158.0FalseNoneNoneFalseNoneFalse11953.20
4019873155809None14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests Item no. 14.1.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo5128.25128.22.0FalseNoneNoneFalseNoneFalse10256.40
4019874155809None14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing Rectangular shape 453x357 mm Item no. 14.32.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo1068.91068.97.0FalseNoneNoneFalseNoneFalse7482.30
4019875155809None14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. Item No. 14.40.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo520.8520.87.0FalseNoneNoneFalseNoneFalse3645.60
4019876155809None13.23.1Providing and fixing brass bib cock of approved quality : 15 mm nominal bore, 105 mm long, weighing not less than 138 g Item no. 13.23.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo215.25215.2525.0FalseNoneNoneFalseNoneFalse5381.250
4019877155809None14.29Providing and fixing 100 mm sand cast Iron grating for gully trap. Item No. 14.29 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo49.3549.3515.0FalseNoneNoneFalseNoneFalse740.250
4019878155809None13.31.2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & coldwater supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 20 mm nominal dia Pipes Item No. 13.31.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm254.1254.1600.0FalseNoneNoneFalseNoneFalse152460.00
4019879155809None13.31.3Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & coldwater supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall 25 mm nominal dia Pipes Item No. 13.31.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm333.9333.9570.0FalseNoneNoneFalseNoneFalse190323.00
4019880155809None13.33.4Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching. refilling & testing of joints com plete as per direction of Engineer in Charge. External work 32 mm nominal dia Pipes Item No. 13.33.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm390.6390.6150.0FalseNoneNoneFalseNoneFalse58590.00
4019881155809None13.3.2Providing and fixing brass stop cock of approved quality :20 mm nominal bore Item no. 13.3.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo320.25320.2515.0FalseNoneNoneFalseNoneFalse4803.750
4019882155809None13.4.1Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) Item No. 13.4.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo576.45576.4515.0FalseNoneNoneFalseNoneFalse8646.750
4019883155809None13.4.2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) 32 mm nominal bore Item No. 13.4.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo627.9627.910.0FalseNoneNoneFalseNoneFalse6279.00
4019884155809None1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m Item No. 1.4.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum254.1254.1270.0FalseNoneNoneFalseNoneFalse68607.00
4019885155809None10.1.7Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 Item No. 10.1.7 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm431.55431.55240.0FalseNoneNoneFalseNoneFalse103572.00
4019886155809None13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, Single socketed pipes 100 mm diameter Item No.13.48 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm305.55305.5554.75FalseNoneNoneFalseNoneFalse16728.86250
4019887155809None10.1.8Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 Item No. 10.1.8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm613.2613.2100.0FalseNoneNoneFalseNoneFalse61320.00
4019888155809None603OPVC pipes of Class 500- PN-16 200mm dia. Sl No. 603 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm2211.32211.380.0FalseNoneNoneFalseNoneFalse176904.00
4019889155809None2.6.8Labour charges for laying and jointing GI pipes with earth work including fixing collars, elbows, tees, bends, gland cocks and other fittings with cuts and threads, white lead paints wherever necessary, conveying the materials from office to workspot and retuning the surplus materials from workspot to stores for: 100mm dia. GI pipes & specials. Item No. 2.6.8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm55.6555.65100.0FalseNoneNoneFalseNoneFalse5565.00
4019890155809None16.15.6Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.H: Constructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.5M depth & SFRC cover & frame 13.6 Item No. 16.15.6 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo40300.0540300.054.0FalseNoneNoneFalseNoneFalse161200.20
4019891155809None14.4.1Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :One urinal basin with 5 litre white P.V.C. automatic flushing cister Item No. 14.4.1 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo4676.74676.78.0FalseNoneNoneFalseNoneFalse37413.60
4019892155809None13.34 Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. Item No. 13.34 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workl9.459.458000.0FalseNoneNoneFalseNoneFalse75600.00
4019893155809None13.35Making chases up to 7.5x7.5 cm in walls including making good and fini shing with matching surface after housing G.1. pipe etc Item No. 13.35 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo139.65139.6525.0FalseNoneNoneFalseNoneFalse3491.250
17266417840000NoneNoneBuildingsBorewell403940.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4019894155810None12.4Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo5552.45552.42.0FalseNoneNoneFalseNoneFalse11104.80
4019895155810None12.1.1Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Item No. 12.1.1 0.00 to 50.00M ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm388.5388.550.0FalseNoneNoneFalseNoneFalse19425.00
4019896155810None12.1.2Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) above 50m to 100.00M Item No. 12.1.2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm487.2487.250.0FalseNoneNoneFalseNoneFalse24360.00
4019897155810None12.1.3Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) above 100m to 150.00M Item No. 12.1.3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm517.65517.6550.0FalseNoneNoneFalseNoneFalse25882.50
4019898155810None12.1.4Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) above 150m to 200.00M Item No. 12.1.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm600.6600.650.0FalseNoneNoneFalseNoneFalse30030.00
4019899155810None12.1.5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth)above 200m to 250.00M Item No. 12.1.5 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm704.55704.5550.0FalseNoneNoneFalseNoneFalse35227.50
4019900155810None12.1.6Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) above 250m to 300.00M Item No. 12.1.6 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm777.0777.050.0FalseNoneNoneFalseNoneFalse38850.00
4019901155810None12.32Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. Item no. 12.32 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm2029.652029.6540.0FalseNoneNoneFalseNoneFalse81186.00
4019902155810None12.34Providing and laying at site of work MS casing caps as per IS 1239 (part- II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge Item No. 12.34 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo172.2172.21.0FalseNoneNoneFalseNoneFalse172.20
4019903155810None13.4.4Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) 50 mm nominal bore Item No. 13.4.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo897.75897.751.0FalseNoneNoneFalseNoneFalse897.750
4019904155810None13.33.4Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching. refilling & testing of joints com plete as per direction of Engineer in Charge. External work 32 mm nominal dia Pipes Item No. 13.33.4 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm390.6390.6150.0FalseNoneNoneFalseNoneFalse58590.00
4019905155810None13.40.8Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 7.5 HP, size 65x50 Head 46M, Discharge 360 LPM Item No. 13.40.8 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo36907.536907.51.0FalseNoneNoneFalseNoneFalse36907.50
4019906155810None13.46Providing and fixing LT cable of size 4 x 25 Sqm suitable for centrifugal pump sets with ISI mark and its latest amendments. Item No. 13.46 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workm590.1590.170.0FalseNoneNoneFalseNoneFalse41307.00
17266417840000NoneNoneBuildingsSump work302938.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4019907155811None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth Note: Cost of De-watering upto 5 % of (A+B) may be added, where required as sessment for dewatering shall be made as per site cond ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum400.21400.2153.62FalseNoneNoneFalseNoneFalse21459.26020
4019908155811None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (Item No.1.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum168.0168.053.62FalseNoneNoneFalseNoneFalse9008.160
4019909155811None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(Item No.2.1.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum6288.456288.452.36FalseNoneNoneFalseNoneFalse14840.7420
4019910155811None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No.2.4.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum6852.386852.384.72FalseNoneNoneFalseNoneFalse32343.23360
4019911155811None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No.2.4.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum7318.087318.085.76FalseNoneNoneFalseNoneFalse42152.14080
4019912155811None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No.2.4.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum9979.29979.22.25FalseNoneNoneFalseNoneFalse22453.20
4019913155811None2.11.aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Item No.2.11.a) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workTonne93929.8593929.851.27FalseNoneNoneFalseNoneFalse119290.90950
4019914155811None8.6.2Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Item No. 8.6.2 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm450.45450.4584.54FalseNoneNoneFalseNoneFalse38081.0430
4019915155811None8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineer in-Charge. (Item No. 8.12) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKgs67.267.218.59FalseNoneNoneFalseNoneFalse1249.2480
4019916155811None18.3Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge.(Item No- 18.3 vol 5) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach2060.12060.11.0FalseNoneNoneFalseNoneFalse2060.10
17266417840000NoneNoneBuildingsPart A Electrification, Controlling Switches and Fixtures2825853.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4019917155812None1.2.1Part A:- Electrification, Controlling Switches and Fixtures Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia .mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary.(Vol-6 P.No 2 SL No 1.2.1) 19/20 mm dia 2mm thick ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr69.369.3100.0FalseNoneNoneFalseNoneFalse6930.00
4019918155812None1.2.225mm dia 2mm thick (Vol-6 P.No 2 SL No 1.2.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr81.981.91000.0FalseNoneNoneFalseNoneFalse81900.00
4019919155812None1.2.232mm dia 2mm thick(Vol-6 P.No 2 SL No 1.2.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr108.15108.15200.0FalseNoneNoneFalseNoneFalse21630.00
4019920155812None1.3.1Supplying heavy gauge PVC Conduit Pipe ….dia ….mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. (Vol-6 P.No 2 /1.3.1) 19/20 mm dia 2mm thick ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr71.471.450.0FalseNoneNoneFalseNoneFalse3570.00
4019921155812None1.3.225mm dia 2mm thick (Vol-6 P.No 2 /1.3.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr82.9582.95500.0FalseNoneNoneFalseNoneFalse41475.00
4019922155812None1.3.332mm dia 2.5mm thick (Vol-6 P.No 2 /1.3.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr103.95103.95100.0FalseNoneNoneFalseNoneFalse10395.00
4019923155812None1.5.2Supplying and fixing PVC/metal conduit accessories.(Vol-6 P.No 3 SL No 1.5.2)deep junction box 25mm junction box ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach58.858.8350.0FalseNoneNoneFalseNoneFalse20580.00
4019924155812None1.9.3Supplying PVC/GI flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely (Vol-6 P.No 3/1.9.3) 32 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr30.4530.4530.0FalseNoneNoneFalseNoneFalse913.50
4019925155812None3.8Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws (Vol-6 P. No 9/3.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSq CM0.430.435000.0FalseNoneNoneFalseNoneFalse2150.00
4019926155812None3.4.1Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Vol-6 P.No 8 SL No 3.4.1 ) 1-3Way ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach144.9144.960.0FalseNoneNoneFalseNoneFalse8694.00
4019927155812None3.4.6Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Vol-6 P.No 8 SL No 3.4.6)10-12Way ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach334.95334.95120.0FalseNoneNoneFalseNoneFalse40194.00
4019928155812None3.5.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(Vol-6 P.No 8 SL No 3.5.1) 1 to 2 Module ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach143.85143.8560.0FalseNoneNoneFalseNoneFalse8631.00
4019929155812None3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(Vol-6 P.No 8 SL No 3.5.6)10-12Moudule ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach361.2361.2120.0FalseNoneNoneFalseNoneFalse43344.00
4019930155812None3.6.1Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293. (Vol-6 P.No 9 SL No 3.6.1) 6Amps one way. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach107.1107.1540.0FalseNoneNoneFalseNoneFalse57834.00
4019931155812None3.6.2Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293. (Vol-6 P.No 9 SL No 3.6.2) 6A Two Way Switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach174.3174.34.0FalseNoneNoneFalseNoneFalse697.20
4019932155812None3.6.3Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 (Vol-6 P.No 9 SL No 3.6.3)6A Three Way socket ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach179.55179.55180.0FalseNoneNoneFalseNoneFalse32319.00
4019933155812None3.6.4Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 (Vol-6 Vol-6 P.No 9 SL No 3.6.4) Stepped Fan Regulator Two Module ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach374.85374.85110.0FalseNoneNoneFalseNoneFalse41233.50
4019934155812None3.6.9Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 (Vol-6 P.No 9 SL No 3.6.9) 32A DP Switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach342.3342.320.0FalseNoneNoneFalseNoneFalse6846.00
4019935155812None3.6.10Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 (Vol-6 P.No 9 SL No3.6.10) 6/16A Universal Socket ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach247.8247.820.0FalseNoneNoneFalseNoneFalse4956.00
4019936155812None3.6.12Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 (Vol-6 P.No 9/3.6.12) TV/Telephone socket ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach163.8163.810.0FalseNoneNoneFalseNoneFalse1638.00
4019937155812None3.6.13Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 (Vol-6 P.No 9/3.6.13) RJ45/I.O Outlet Cat-6 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach353.85353.8510.0FalseNoneNoneFalseNoneFalse3538.50
4019938155812None8.1Supplying and drawing UTP-CAT 6E LAN cable.(Vol-6 P.No 36/8.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr39.939.91000.0FalseNoneNoneFalseNoneFalse39900.00
4019939155812None8.5Supplying & Fixing of Power strip(Vol-6 P.No 36/8.5) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach1529.851529.852.0FalseNoneNoneFalseNoneFalse3059.70
4019940155812None8.6Supplying of shelf(Vol-6 P.No 36/8.6) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach868.35868.352.0FalseNoneNoneFalseNoneFalse1736.70
4019941155812None8.8Supplying & Fixing of Fan(Vol-6 P.No36/8.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach1269.451269.452.0FalseNoneNoneFalseNoneFalse2538.90
4019942155812None8.9.6Supplying fixing of Network Switches.(Vol-6 P.No 36/8.9.6)16 port 10/100 Switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach2572.52572.52.0FalseNoneNoneFalseNoneFalse5145.00
4019943155812None8.10.1Supplying & fixing of I/O socket eith back box(Vol-6 P.No 36/8.10.1) Single I/o ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach514.5514.510.0FalseNoneNoneFalseNoneFalse5145.00
4019944155812None8.11.2Supplying & Fixing of …mtrs Cat6 Patch Cable (Vol-6 P.No 37/8.11.2) 2mtr ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach269.85269.8510.0FalseNoneNoneFalseNoneFalse2698.50
4019945155812None8.4.2Supplying & Fixing of switch mounting rack with power manager & Cable manager.(Vol-6 P.No 37/8.4.2)6U with 450mm depth ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach7325.857325.852.0FalseNoneNoneFalseNoneFalse14651.70
4019946155812None8.9.2Supplying fixing of Network Switches. 24 Port Gigabyte (manageable) (Vol-6 P.No 36/8.9.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach43522.543522.52.0FalseNoneNoneFalseNoneFalse87045.00
4019947155812None1.12Supplyin and Fixing Metal Fan Box with Round Hook.(Vol-6 P.No 4 SL No 1.12) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo168.0168.0110.0FalseNoneNoneFalseNoneFalse18480.00
4019948155812None3.10.2Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws.(Vol-6 P.No 9/3.10.2) 80/90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo15.7515.75350.0FalseNoneNoneFalseNoneFalse5512.50
4019949155812None3.13.4Supplying and fixing of metal clad industrial plugs and sockets. (Vol-6 P.No 9/3.13.4)3pole+earth 440V PLUG 32 Amps ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach640.35640.3510.0FalseNoneNoneFalseNoneFalse6403.50
4019950155812None3.13.83pole+earth 440V SOCKET 30 Amps (Vol-6 P.No 10/3.13.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach869.21869.2110.0FalseNoneNoneFalseNoneFalse8692.10
4019951155812None2.2.1Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(Vol-6 P.No 5 SL No 2.2.1) Short point up to 3Mtr from tapping point to out let via switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workPoint282.45282.45120.0FalseNoneNoneFalseNoneFalse33894.00
4019952155812None2.2.2Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(Vol-6 P.No 5 SL No 2.2.2) Medium point above 3mtr up to 6Mtr from tapping point to out let via switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workPoint397.95397.95120.0FalseNoneNoneFalseNoneFalse47754.00
4019953155812None2.2.3Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(Vol-6 P.No 5 SL No 2.2.3) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch box ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workPoint582.75582.75120.0FalseNoneNoneFalseNoneFalse69930.00
4019954155812None2.3.1Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (Vol-6 P.No5 SL No 2.3.1) 1 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr19.9519.952000.0FalseNoneNoneFalseNoneFalse39900.00
4019955155812None2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (Vol-6 P.No5 SL No 2.3.2) 1.5 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr27.327.32000.0FalseNoneNoneFalseNoneFalse54600.00
4019956155812None2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (Vol-6 P.No5 SL No 2.3.3) 2.5 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr44.144.14000.0FalseNoneNoneFalseNoneFalse176400.00
4019957155812None2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments . (Vol-6 P.No5 SL No2.3.4)4 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr66.1566.152000.0FalseNoneNoneFalseNoneFalse132300.00
4019958155812None2.3.5Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments . (Vol-6 P.No5 SL No 2.3.5)6 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr96.696.61000.0FalseNoneNoneFalseNoneFalse96600.00
4019959155812None5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. (Vol-6 P.No 17 SL No 5.18.4)6-32 Amps DP ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach775.95775.9530.0FalseNoneNoneFalseNoneFalse23278.50
4019960155812None5.18.9Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. (Vol-6 P.No 18 SL No 5.18.9)50-63 Amps TPN ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach3242.43242.420.0FalseNoneNoneFalseNoneFalse64848.00
4019961155812None5.20.8Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. 63 Amps 4 pole (Vol-6 P.No 18 SL No5.20.8) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach5404.355404.3510.0FalseNoneNoneFalseNoneFalse54043.50
4019962155812None5.19.9Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.(Vol-6 P.No 18 SL No 5.19.9 )II- Double Door 12Way SP &N ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach2445.452445.4510.0FalseNoneNoneFalseNoneFalse24454.50
4019963155812None5.19.11Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.( Vol-6 P.No 18 SL No 5.19.11 )III- Double Door 4Way TP &N ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach4239.94239.910.0FalseNoneNoneFalseNoneFalse42399.00
4019964155812None5.35Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter.(Vol-6 P.No 19 SL No 5.35) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach5990.255990.251.0FalseNoneNoneFalseNoneFalse5990.250
4019965155812None5.42.3Fabricating supplying and mounting MS box made out …SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.18SWG(Vol-6 P.No 19 SL No 5.42.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSq CM0.40.4120000.0FalseNoneNoneFalseNoneFalse48000.00
4019966155812None5.41.2Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 50x50x6mm(Vol-6 P.No 19 SL No 5.41.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr414.75414.7520.0FalseNoneNoneFalseNoneFalse8295.00
4019967155812None5.40.1Supplying . amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete.100Amps 4x30x6mm Aluminium Strips (Vol-6 P.No18 SL No 5.40.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr2588.252588.255.0FalseNoneNoneFalseNoneFalse12941.250
4019968155812None5.7.4Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 100Amps(Vol-6 P.No 14 SL No 5.7.4) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach725.55725.554.0FalseNoneNoneFalseNoneFalse2902.20
4019969155812None5.34Supplying, fixing and wiring 50/5 to 400/5Amps 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound. (Vol-6 P.No 19SL No 5.34) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach590.1590.18.0FalseNoneNoneFalseNoneFalse4720.80
4019970155812None12.57Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.(Vol-6 P.No 54 SL No 12.57) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workJob4468.84468.820.0FalseNoneNoneFalseNoneFalse89376.00
4019971155812None12.58.2GI/Copper strips for grounding connections, using necessary fixing materials as required. (Vol-6 P.No 54 SL No 12.58.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr134.4134.4100.0FalseNoneNoneFalseNoneFalse13440.00
4019972155812None11.3.2Supplying of . feet - LED PVC Square Batten .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50Hz & Power factor 0.9 along with CE approved. 5 years Warranty against any manufacturing defect working under standard electrical condition ( Vol-6 P.No 43 SL No11.3.2)LED light fitting 1 x 4' - 20/22 W ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach724.5724.5220.0FalseNoneNoneFalseNoneFalse159390.00
4019973155812None11.3.1Supplying of . feet - LED PVC Square Batten .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50Hz & Power factor 0.9 along with CE approved. 5 years Warranty against any manufacturing defect working under standard electrical condition (Vol-6 P.No 43 SL No 11.3.1)LED light fighting 1x 2' - 9/10 w ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach578.55578.558.0FalseNoneNoneFalseNoneFalse4628.40
4019974155812None11.6.2Supplying of recess mounting non integral type .'LED W luminaire comprising of pressure decast/extruded aluminum housing, with spring loaded fase ceiling clamps, Power LEDs with CCT 6500 degree K, CRI 70%. efficasy 100 lumen per watt, 120degree beam spread, life 25000 burning hours and Complaince to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level. LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF 0.95, power loss should 5% of lamp wattage., short circuit & open circuit protection to be integrated in the circuit, , THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 volts. BIS Approved and Tested by NABL/CPRI acredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.LED modular down light 2x2' 34-36w RC380B-LED36S(Vol-6 P.No 45 SL No 11.6.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo4780.654780.658.0FalseNoneNoneFalseNoneFalse38245.20
4019975155812None6.2.1Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete.12" Sweep (300mm)(Vol-6 P.No 30 SL No 6.2.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach3117.453117.458.0FalseNoneNoneFalseNoneFalse24939.60
4019976155812None6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system 48" Sweep (1200 mm) Regular model (Vol-6 P.No 30/6.3.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach3133.23133.2110.0FalseNoneNoneFalseNoneFalse344652.00
4019977155812None13.7.1Fixing all types and all capacities of fluorescent /False ceiling/spot light /CFL/LED fittings indoor on the wall/ ceiling/rafters/girders using 23/0.0076' twin twisted PVC insulated wires, required Nos of round blocks and clamps. (Vol-6 P.No 56 SL No 13.7.1)On wall / ceiling /Rafter / Girders ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach128.1128.1236.0FalseNoneNoneFalseNoneFalse30231.60
4019978155812None13.10Fixing a Ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook wisth fan regulator to the existing board together wisth wupplying and fixing 5amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (Vol-6 P.No 57 SL No 13.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach179.55179.55110.0FalseNoneNoneFalseNoneFalse19750.50
4019979155812None13.12Extra length of GI pipe of class B 19mm dia for down rod. (Vol-6 P.No 57 SL No 13.12) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr206.85206.85110.0FalseNoneNoneFalseNoneFalse22753.50
4019980155812None13.14Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps. ceiling rose with ufficient length of 23 / 0.0076 inch PVC insulated twin core wire.(Vol-6 P.No 57 SL No 13.14) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach516.6516.68.0FalseNoneNoneFalseNoneFalse4132.80
4019981155812None11.7.3Supply of LED pole mounting type post top lantern with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/ clear glass material, delivering superior light output. Rated life Burning Hrs 50000 hr@ Lumen Maintenance of 70%, CCT 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/ IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB LED Efficiency 130 lm/w, nominal CRI 75. Luminaire manufacturer should have in- house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. (Vol-6 P.No 45 SL No 11.7.3)LED Post Top Lantern with 25/30 watts ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach8108.18108.110.0FalseNoneNoneFalseNoneFalse81081.00
4019982155812None13.6Fixing charges of post top/ Gate/ Garden fitting /LED on the existing CI/ GI or any other pipe using required size of reducer, wiring using suitable wires.(Vol-6 P.No 56 SL No 13.6) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach207.9207.910.0FalseNoneNoneFalseNoneFalse2079.00
4019983155812None4.2.2Fabricating, supplying and erection of .Mtrs long hot dip Galvanized Octagonal pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/sec for .Mtrs pole in single section and single joint welded as per IS 9595/IS10178AWS having dimensions bottom .mm, top.mm with 3mm thick, suitable base plate and 4Nos of . long J bolts along with template and the pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended. 4 meters -Top 70mm and bottom 130mm dia (Vol-6 P.No 7 SL No 4.2.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach8610.08610.010.0FalseNoneNoneFalseNoneFalse86100.00
4019984155812None11.8.4Supply of LED Streetlight with pressure die cast aluminium housing body with optimal heat sink for better thermal dissipation. Diffuser with Injection moulded & is made of polycarbonate material with high transmission index, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%. CCT 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains Current should not be greater than 0.1A to 0.7A & Surge Protection- Min KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operates wide voltage range from 100V to 270V 50/60Hz application. Over load & Short circuit protection ensures reliable operation in spite of problem in output side. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 130lm/w at 1W & Fixture Efficiency 80lm/w with nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 5 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/Lumileds/Osram make LED Source. Suitable for B1/B2 Roads as per IS 1944 Part I & Part II. ( Vol-6 P.No 46 SL No 11.8.4) LED Streetlight 90watts ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo9303.09303.04.0FalseNoneNoneFalseNoneFalse37212.00
4019985155812None13.2.2Supplying and Fixing.mm dia class A GI pipe bracket up to 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clamps, bolts ,nuts and wiring using suitable capacity wires. (Vol-6 P.No 56 SL No 13.2.2)Using 32mm dia G.I.pipe ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach1359.751359.754.0FalseNoneNoneFalseNoneFalse5439.00
4019986155812None32.141.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 (ESCOM P.No.13/ SL No 210/ 32.14) 95 Sqmm, 3.5 Core, (21 GI Strips - 4 x 0.8 mm) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm391875.75391875.750.2FalseNoneNoneFalseNoneFalse78375.150
4019987155812None32.051.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 (ESCOM P.No 13/ SL No 201/32.05) 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm148934.1148934.10.1FalseNoneNoneFalseNoneFalse14893.410
4019988155812None21.05Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 Sqmm(ESCOM P.No 52/21.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm21930.321930.30.1FalseNoneNoneFalseNoneFalse2193.030
4019989155812None21.06Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 35 to 95 Sqmm (ESCOM P.No 52/SL No 175/21.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm32695.9532695.950.2FalseNoneNoneFalseNoneFalse6539.190
4019990155812None1.5.1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work (Vol I P.No 6 SL No 1.5.1) In ordinary/soft rock without blasting upto 1.5 m depth (0.5*0.75*300) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workcm313.95313.95112.5FalseNoneNoneFalseNoneFalse35319.3750
4019991155812None11.3.6Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete.(Vol -5 Water Supply P.No 128 SL No 11.3.6) Heavy Duty GI pipe of 50mm dia ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr712.95712.9520.0FalseNoneNoneFalseNoneFalse14259.00
4019992155812None60.03Aluminium End Terminal Lug (ESCOM P.No 27 SL No 471/60.03) 16 Sqmm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach2.12.116.0FalseNoneNoneFalseNoneFalse33.60
4019993155812None60.03Aluminium End Terminal Lug (ESCOM P.No 27 SL No 471/60.03) 95 Sqmm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach15.7515.7516.0FalseNoneNoneFalseNoneFalse252.00
4019994155812None13.40.5Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments ( Vol -5 Water Supply SR P.No 157/13.40.5 )5 HP, size 50x40 Head 46M, Discharge 174 LPM ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach27737.8527737.851.0FalseNoneNoneFalseNoneFalse27737.850
4019995155812None13.11.5Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per pecifications,as per necessary ammendments and instructions of engineer incharge of work. 3.00 HP - 90 LPM @ 66 m = 6 STG Outlet Dia - 2.00 ( Vol -5 Water Supply SR 151/13.11.5 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach29518.6529518.651.0FalseNoneNoneFalseNoneFalse29518.650
4019996155812None5.2.1Supplying fully automatic star-delta starter unit push button type with suitable wires, 3 contractors, one adjustable thermal timer mounted on a common base plate held in steel enclosure for use on 400/440 volts 3 phase and wired after fixing to the existing wooden board for motor. .( Vol-6 P.No14/5.2.1 ) Upto 12.5 HP ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach7827.757827.752.0FalseNoneNoneFalseNoneFalse15655.50
4019997155812None2.6.1Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper conductor confirming to table 3 class 5 of IS:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100Volts with specified IS-694:1990 & confirming to the attached GTP of GROUP-A( Vol-6 P.No7/2.6.1) 3C X 2.5Sq.mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr122.85122.85100.0FalseNoneNoneFalseNoneFalse12285.00
4019998155812None13.6.2.2Providing and fixing gun metal non- return valve of approved quality (screwed end) 32 mm nominal bore ( Civil SR V-2/ 191/13.6.2.2 ) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach971.25971.252.0FalseNoneNoneFalseNoneFalse1942.50
4019999155812None13.34Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work ( Water Supply SR 207/13.34)) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workJob1522.51522.52.0FalseNoneNoneFalseNoneFalse3045.00
4020000155812None2.62.4Providing and fixing 3 layer PP-R (Poly Propylene Random Copolymer)pipes confirming to IS.15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply, including all PP-R plain and brass threaded polypropylene random fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer-In- Charge. PN - 16 Pipe,SDR 7.4- 32 mm OD(Water Supply 86/2.62.4) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach362.25362.2560.0FalseNoneNoneFalseNoneFalse21735.00
4020001155812None1.2Earth work in surface excavation for stripping, seating of bund, Road way by manual means for lowering & levelling the ground for all works other than foundation & depth in Ordinary rock and soft rock upto 300mm depth as per drawing and technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work(Common SR Vol-I P.No 5 SL No 1.2) (1.4*2.2*0.9*1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum603.75603.752.5FalseNoneNoneFalseNoneFalse1509.3750
4020002155812None2.1.2Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Common SR Vol-I P.15 SL No 2.1.2) (1.4*2.2*1*1 )Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum5947.25947.22.25FalseNoneNoneFalseNoneFalse13381.20
17266417840000NoneNoneBuildingsPart B- LT/HT Power Supply with Accessories1134606.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
4020003155813None2.02RCC Pole - 9 Mtr Long, 145 Kg WL (V-6 ESCOM P.No 3/ 1/1.01) Labour (V-6 ESCOM P.No 44/ 30/2.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo8598.458598.4510.0FalseNoneNoneFalseNoneFalse85984.50
4020004155813None2.05Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500 Kg WL (V-6 ESCOM P.No 3/7/1.07) Labour(V-6 ESCOM P.No 44/ 33/2.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo21258.321258.34.0FalseNoneNoneFalseNoneFalse85033.20
4020005155813None5.0411 kV, Horizontal Cross Arm (V-6 ESCOM P.No 3/12.2.02) Labour (V-6 ESCOM P.No 45/52/5.04) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo679.35679.3510.0FalseNoneNoneFalseNoneFalse6793.50
4020006155813None6.1011 kV, 45 KN Polymeric Insulator (V-6 ESCOM P.No 5/56/6.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSet195.3195.312.0FalseNoneNoneFalseNoneFalse2343.60
4020007155813None52.6.0611 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V-6 ESCOM P.No 5/52.6.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo215.25215.2572.0FalseNoneNoneFalseNoneFalse15498.00
4020008155813None6.1011 kV, 45 KN Polymeric Insulator (V-6 ESCOM P.No 5/56/6.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSet195.3195.336.0FalseNoneNoneFalseNoneFalse7030.80
4020009155813NoneCDS-1Guy Set Complete with No. 15 Strain Insulator ((CDS-1) Labour (CDS-1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSet1851.151851.154.0FalseNoneNoneFalseNoneFalse7404.60
4020010155813None6.02ACSR conductor as per IS : 398 (Part - 2/1996)are the latest revision Rabbit ACSR (6/3.35 mm Al+1/3.35 mm St), Std Wt: 214 Kg/KM (V-6 ESCOM P.No 3/ XX b) Labour (V-6 ESCOM P.No 46/65/6.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm53124.7553124.753.0FalseNoneNoneFalseNoneFalse159374.250
4020011155813None3.02Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 (V-6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - MS Labour(V-6 ESCOM P.No 44/39/3.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo29914.529914.51.0FalseNoneNoneFalseNoneFalse29914.50
4020012155813None13.01DOLO Cut Out (V-6 ESCOM P.No 12/25.02) Labour (V-6 ESCOM P.No 48/96/13.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo4701.94701.91.0FalseNoneNoneFalseNoneFalse4701.90
4020013155813None13.02GOS Set 200 Amps Single break (V-6 ESCOM P.No 11/166/24.01) Labour (V-6 ESCOM P.No 48/97/13.02) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSet11081.711081.71.0FalseNoneNoneFalseNoneFalse11081.70
4020014155813None52.01Transparent Alkathine tube 19 mm dia, 2 mm thick in coils of 30 Mtr (V-6 ESCOM P.No 23/394/52.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workMtr542.85542.8530.0FalseNoneNoneFalseNoneFalse16285.50
4020015155813None13.08Distribution Transformer - 3 Phase, 11kV/433V - Amorphous Core with Oil as per IS-1180 (Part-1): 2014 B. CABLE ENTRY TYPE. (V-6 ESCOM P.No 8/112/ 13.08)100 kVA, Aluminium Wdg, Star 2 (5 Star) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workEach235001.55235001.551.0FalseNoneNoneFalseNoneFalse235001.550
4020016155813None3.01Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Poleincluding fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing (V-6 ESCOM P.No 44/338/3.01) For 100 to 250 kVA ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workPer Structure6011.256011.251.0FalseNoneNoneFalseNoneFalse6011.250
4020017155813None36.0511 kV, 3 Core, XPLE HTUG Cable with pressure extruded inner sheeth, ROUND WIRE ARMOURED as per IS-7098 (Part-2) Armouring wires dia and Resistivity as per IS-3975. 95 Sqmm, (54 GI Wires - 2.5 mm Dia) (V-6 ESCOM P.No 15/258/36.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm934149.3934149.30.06FalseNoneNoneFalseNoneFalse56048.9580
4020018155813None21-01Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 3x95 to 150 Sqmm (V-6 ESCOM P.No 52/21-01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKm64388.164388.10.06FalseNoneNoneFalseNoneFalse3863.2860
4020019155813None1.5.1Earth work excavation by manual means for drains,canals, waste weir draft,approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work (Vol I P.No 6/1.5.1) In ordinary/soft rock without blasting upto 1.5 m depth (0.5*0.75*60) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum313.95313.9522.5FalseNoneNoneFalseNoneFalse7063.8750
4020020155813None45.04Heat Shrinkable Outdoor Type Cable Termination Kit for XLPE Cable 3x240 Sqmm (V-6 ESCOM P.No 20/346/45.04) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSet3931.23931.22.0FalseNoneNoneFalseNoneFalse7862.40
4020021155813None45.13Heat Shrinkable Indoor Type Cable Termination Kit for XLPE Cable 3x240 Sqmm (V-6 ESCOM P.No 21/355/45.13) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSet4174.84174.86.0FalseNoneNoneFalseNoneFalse25048.80
4020022155813None25.05Fixing of Termination Kit (V-6 ESCOM P.No 55/246/25.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo399.0399.08.0FalseNoneNoneFalseNoneFalse3192.00
4020023155813None45.0111 kV, Jointing & Cable Termination Kit as per IS-13573 Heat Shrinkable Type Transition Jointing Kit for XLPE Cable 3x95 Sqmm (V-6 ESCOM P.No20/343/45.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKit10758.310758.36.0FalseNoneNoneFalseNoneFalse64549.80
4020024155813None45.0111 kV, Jointing & Cable Termination Kit as per IS-13573 Heat Shrinkable Type Transition Jointing Kit for XLPE Cable 3x95 Sqmm (V-6 ESCOM P.No20/343/45.01) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKit10758.310758.36.0FalseNoneNoneFalseNoneFalse64549.80
4020025155813None4.06Construction of platform with size stone, cement concert for erection of 500 kVA Transformer/Metering cubicle/Heavy Equipment.Construction of platform (1.5x1.5x1.2) Mtr in size stone, for erection of transformers/Heavy equipment including all materials, labour. Excavation of (1.5x1.5x1) Mtr pit for foundation providing and laying cement concrete 1:4:8 for foundation laid in 10 cm thick layers, well compacted curing etc., complete providing and construction of stone masonary 0.9 Mtr below ground level and 1.2 Mtr above ground level neatly hammer dressed in cement morter 1:6. Providing and Laying cement concrete slab 1.5x1.5x0.10 Mtr with cement concrete of 1:2:4 mix forming & cutting complete, providing pointing to stone masonary in cement morter 1:3 after racking joint & nisely lining curing etc., plastering the concrete surfaces in cement morter 1:4 including smooth randering curing etc., curing at every stages completely.(CESC SR 2021-22 P.N.2/ 61/ 4.06) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workNo31879.0531879.052.0FalseNoneNoneFalseNoneFalse63758.10
4020026155813None38.740mm down size Jelly (V-1 P. A-38/7) (7.5*11.5*0.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum1249.51249.510.0FalseNoneNoneFalseNoneFalse12495.00
4020027155813None11.58Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia 4 mm)(Civil SR V-II 95/11.58) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workSqm843.15843.1580.0FalseNoneNoneFalseNoneFalse67452.00
4020028155813None11.15.1Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with rectangular/ L-Type sections, made of 1.60 mm thick M.S. Sheet, joints mitr ed, welded and grinded finish, with profiles of required size, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer: Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost of materials, labour, usage charges of machinery complete as per specifications /and as per directions of the Engineer-in-Charge. (Civil Sr V-I 82/11.15.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workKgs134.4134.4150.0FalseNoneNoneFalseNoneFalse20160.00
4020029155813None2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-I P.No 15 SL No 2.2.1.) )(1.4*2.2*0.2*1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the workCum6610.356610.3510.0FalseNoneNoneFalseNoneFalse66103.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17266417880000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17266417880000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17266417880000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17266417880000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17266417880000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17266437680000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of Karnataka Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17266437770001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value Min Rs.500 and Max Rs.7500 soon after contract has been issued to bidder.None
17266437980000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17266438060000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17266438160000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17266438260000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17266438340000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17266438430000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17266438580000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17266438680000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materials.None
17266438780000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17266438870000NoneNoneELIGIBILITYMaterials like ASPHALT, AGGREGATES, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17266439120001NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.6 of STD tender document Attached.None
17266439210000NoneNoneELIGIBILITYAll the items in the tender include all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer- in-charge of this work.None
17266439330000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17266439500000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17266439600000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17266439670000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17266439760000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and costNone
17266439860000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4None
17266440110000NoneNoneELIGIBILITYContractors should be registered as KPWD Class II and above Civil Contractor.None
17266440240000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public works Department Special Division Mysore during office hours on all working days.None
17266440310000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the form of NSC/DD/FDR in the name of the Executive Engineer, PWD, Special Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17266440460001NoneNoneELIGIBILITYAll the rates in the amount put to tender are inclusive of all taxes expect GST. GST will be paid separatelyNone
17266441590001NoneNoneELIGIBILITY3.2.a.To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 achieved in at least two financial years a Minimum financial turn over (in all classes of civil engineering construction works only) of Rs. Rs. 599.46 lakhsNone
17266442150000NoneNoneELIGIBILITY3.2.b.Mandating satisfactory completion as a prime contractor for at least one similar work to an extent of 50% of the cost of the work, such as of value not less than Rs 149.87 lakhsNone
17266443780000NoneNoneELIGIBILITY3.2.c.Executed in any one year, the following minimum quantities of work (usually 80% of the peak annual rate of construction) Earthwork Excavation 1741.22Cum, PCC/RCC 798.23Cum, CONCRETEBLOCKS/BBM/SSM 1603.85Sqm, FLOORING- Granite/Vitrified/Ceramic/Mosaic/ CC 1064.57 Sqm, PLASTERING 3791.27Sqm, REINFORCEMENT STEEL 48.77 Tonnes, PAINTING 4907.56 SqmNone
17266444020000NoneNoneELIGIBILITY3.2.d.The Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed one similar work electrical works Rs. 19.81 Lakhs in any one year.None
17266444230000NoneNoneELIGIBILITY3.2.e.The Tenderer or his identified sub-contractor should possess valid license for executing water supply/sanitary engineering works and should have executed one similar work water supply/sanitary engineering works totaling Rs. 9.75 Lakhs in any one year.None
17266445220000NoneNoneELIGIBILITY3.3.b.liquid assets and /or availability of credit facilities of no less than Rs. 81.75 Lakhs Credit lines/ letter of credit/ certificates from nationalized banksNone
17266445710000NoneNoneELIGIBILITYCONDITION for annual financial turnover (documents required)- Audited CAcertificate with UDINNone
17266446570000NoneNoneELIGIBILITYBankers E-mail ID & Contact Number must be Up loaded.None
17266446880000NoneNoneELIGIBILITYRegarding Appealing aggrieved contractors may appeal to the prescribed (Appellant) authority within 30 days as per KTTP and appeal should be through e-proc only as per Govt. order No: pwd/572/CRM-2020(E) Bangalore DT.09-10-2020. The same will not be considered if appeal through LettersNone
17268160880000NoneNoneELIGIBILITYMachineries: For Own: Purchase invoice/Purchase Bill/Sale Deed with copy of purchase invoice from the seller. For Vechicles Registration certificate with fitness certificate & T.C., issued by R.T.O.None
17268161080000NoneNoneELIGIBILITYMachineries: For Lease/Hire : Leese/Hire Agreement with Purchase invoice/Purchase Bill/Sale Deed obtain from the Leesee. For Vechicles Leese/Hire Agreement with Registration certificate with fitness certificate & T.C., issued by R.T.O to the LeeseeNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneExecuted in any one year, the following minimum quantities of work (usually 80% of the peak annual rate of construction) Earthwork Excavation 1392.98 Cum, PCC/RCC 638.61 Cum, CONCRETEBLOCKS/BBM/SSM 1176.28Sqm, FLOORING- Granite/Vitrified/Ceramic/Mosaic/ CC 851.66 Sqm, PLASTERING 3033.02Sqm, REINFORCEMENT STEEL 39.02 Tonnes, PAINTING 3926.05 SqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneb.Mandating satisfactory completion as a prime contractor for at least one similar work to an extent of 50% of the cost of the work, such as of value not less than Rs 149.87 lakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoned.The Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed one similar work electrical works Rs. 19.81 Lakhs in any one year.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonee.The Tenderer or his identified sub-contractor should possess valid license for executing water supply/sanitary engineering works and should have executed one similar work water supply/sanitary engineering works totaling Rs. 9.75 Lakhs in any one year.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneKPWD Class II and above Civil Contractor.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneliquid assets and /or availability of credit facilities of no less than Rs. 81.75Lakhs Credit lines/ letter of credit/ certificates from nationalized banksCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNone3.1To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 achieved in at least two financial years a Minimum financial turn over (in all classes of civil engineering construction works only) of Rs. Rs. 599.46 lakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneMachineries: Mechanical Concrete Mixer with Hopper Owned 01 Hired/ Leased 01, Tipper Owned 01 Hired/ Leased 02, Water Tanker Owned 01 Hired/ Leased 02, Pin/Plate vibrators Owned 01 Hired/ Leased 02OthersMACHINERIES
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase invoice, Bills & Hire or Lease agreement RC issued by RTO.
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Class II and above Civil ContractorTrueTechnical Bid
Annual Turnover Certificate with UDIN from CATrueTechnical Bid
Balance Sheets,Profit & Loss Statements certified from a Registered Chartered accountant.TrueTechnical Bid
IT returns,TrueTechnical Bid
Work Done Certificate for Similar nature of civil work, duly attested by the Officer Not below the rank of E.E.TrueTechnical Bid
Workdone certificatec executed in any one year, the following minimum quantities of workTrueTechnical Bid
Work Done Certificate for Similar nature work for electrical, duly attested by the Officer Not below the rank of E.E.TrueTechnical Bid
Work Done Certificate for Similar nature work for Water supply and sanitary engineering works duly attested by the Officer Not below the rank of E.E. in any one yearTrueTechnical Bid
Banker Certificate - Line of Credit in the prescribed formTrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
Machineries own Purchase invoice/Purchase Bill/Sale Deed with copy of purchase invoice from the seller. For Vechicles Registration certificate with fitness certificate & T.C., issued by R.T.O.TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1726831571000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer Public Works Department Special Division Mysore
streetNone
cityMyuru
stateKarnataka
pin570010
tenderRecallDTONone