tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1726994860000 | 0 | None | None | Buildings | Civil Works | 35011710.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4052366 | 157301 | None | Page No 8 Item No 1.12 Vol-1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds ofsoils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 99.75 | 99.75 | 239.63 | False | None | None | False | None | False | 23903.0925 | 0 | 4052367 | 157301 | None | Page No 8 Item No 1.14.1 Vol-1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, 1.14 including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 107.1 | 107.1 | 1128.85 | False | None | None | False | None | False | 120899.835 | 0 | 4052368 | 157301 | None | Page No 5 Item No 4.1 Vol-2 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications.
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 123.9 | 123.9 | 1742.7 | False | None | None | False | None | False | 215920.53 | 0 | 4052369 | 157301 | None | Page no 15 Item No 2.1.3 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6288.45 | 6288.45 | 129.8 | False | None | None | False | None | False | 816240.81 | 0 | 4052370 | 157301 | None | Page no 15 Item No 2.2.3 Vol-1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates" ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 7185.15 | 7185.15 | 292.64 | False | None | None | False | None | False | 2102662.296 | 0 | 4052371 | 157301 | None | Page No 16 Item No 2.3.2 Vol-1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10206.0 | 10206.0 | 21.38 | False | None | None | False | None | False | 218204.28 | 0 | 4052372 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 12215.7 | 12215.7 | 18.52 | False | None | None | False | None | False | 226234.764 | 0 | 4052373 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 12338.55 | 12338.55 | 11.28 | False | None | None | False | None | False | 139178.844 | 0 | 4052374 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 12459.3 | 12459.3 | 11.28 | False | None | None | False | None | False | 140540.904 | 0 | 4052375 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 12583.2 | 12583.2 | 11.28 | False | None | None | False | None | False | 141938.496 | 0 | 4052376 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 12703.95 | 12703.95 | 2.64 | False | None | None | False | None | False | 33538.428 | 0 | 4052377 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10088.4 | 10088.4 | 10.35 | False | None | None | False | None | False | 104414.94 | 0 | 4052378 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11496.45 | 11496.45 | 27.85 | False | None | None | False | None | False | 320176.1325 | 0 | 4052379 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11613.0 | 11613.0 | 27.29 | False | None | None | False | None | False | 316918.77 | 0 | 4052380 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cu.cm | 11726.4 | 11726.4 | 27.29 | False | None | None | False | None | False | 320013.456 | 0 | 4052381 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11842.95 | 11842.95 | 27.29 | False | None | None | False | None | False | 323194.1055 | 0 | 4052382 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11957.4 | 11957.4 | 3.45 | False | None | None | False | None | False | 41253.03 | 0 | 4052383 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10778.25 | 10778.25 | 56.58 | False | None | None | False | None | False | 609833.385 | 0 | 4052384 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10886.4 | 10886.4 | 56.18 | False | None | None | False | None | False | 611597.952 | 0 | 4052385 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10993.5 | 10993.5 | 56.18 | False | None | None | False | None | False | 617614.83 | 0 | 4052386 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11102.7 | 11102.7 | 56.18 | False | None | None | False | None | False | 623749.686 | 0 | 4052387 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 11209.8 | 11209.8 | 5.49 | False | None | None | False | None | False | 61541.802 | 0 | 4052388 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10419.15 | 10419.15 | 1.81 | False | None | None | False | None | False | 18858.6615 | 0 | 4052389 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10524.15 | 10524.15 | 1.94 | False | None | None | False | None | False | 20416.851 | 0 | 4052390 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10627.05 | 10627.05 | 1.94 | False | None | None | False | None | False | 20616.477 | 0 | 4052391 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10733.1 | 10733.1 | 1.94 | False | None | None | False | None | False | 20822.214 | 0 | 4052392 | 157301 | None | Page No 16 Item No 2.5.2 Vol-1 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 10836.0 | 10836.0 | 0.06 | False | None | None | False | None | False | 650.16 | 0 | 4052393 | 157301 | None | Page No 9 Item No 5.4 Vol-2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6708.45 | 6708.45 | 89.61 | False | None | None | False | None | False | 601144.2045 | 0 | 4052394 | 157301 | None | Page No 15 Item No 2.1.6 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in ayers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6555.15 | 6555.15 | 18.09 | False | None | None | False | None | False | 118582.6635 | 0 | 4052395 | 157301 | None | Page No 15 Item No 2.1.6 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in ayers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6620.7 | 6620.7 | 5.11 | False | None | None | False | None | False | 33831.777 | 0 | 4052396 | 157301 | None | Page No 15 Item No 2.1.6 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in ayers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6686.25 | 6686.25 | 5.11 | False | None | None | False | None | False | 34166.7375 | 0 | 4052397 | 157301 | None | Page No 15 Item No 2.1.6 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in ayers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6751.8 | 6751.8 | 5.11 | False | None | None | False | None | False | 34501.698 | 0 | 4052398 | 157301 | None | Page No 15 Item No 2.1.6 Vol-1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in ayers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6817.36 | 6817.36 | 27.59 | False | None | None | False | None | False | 188090.9624 | 0 | 4052399 | 157301 | None | Page No 14 Item No 6.8 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8367.45 | 8367.45 | 82.02 | False | None | None | False | None | False | 686298.249 | 0 | 4052400 | 157301 | None | Page No 14 Item No 6.8 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8451.12 | 8451.12 | 91.41 | False | None | None | False | None | False | 772516.8792 | 0 | 4052401 | 157301 | None | Page No 14 Item No 6.8 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8534.8 | 8534.8 | 91.41 | False | None | None | False | None | False | 780166.068 | 0 | 4052402 | 157301 | None | Page No 14 Item No 6.8 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8618.47 | 8618.47 | 91.41 | False | None | None | False | None | False | 787814.3427 | 0 | 4052403 | 157301 | None | Page No 14 Item No 6.8 Vol-2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of
work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8702.15 | 8702.15 | 35.02 | False | None | None | False | None | False | 304749.293 | 0 | 4052404 | 157301 | None | Page No 14 Item No 6.13 Vol-2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1084.65 | 1084.65 | 128.98 | False | None | None | False | None | False | 139898.157 | 0 | 4052405 | 157301 | None | Page No 14 Item No 6.13 Vol-2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1095.5 | 1095.5 | 65.19 | False | None | None | False | None | False | 71415.645 | 0 | 4052406 | 157301 | None | Page No 14 Item No 6.13 Vol-2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1106.34 | 1106.34 | 65.19 | False | None | None | False | None | False | 72122.3046 | 0 | 4052407 | 157301 | None | Page No 14 Item No 6.13 Vol-2 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1117.19 | 1117.19 | 65.19 | False | None | None | False | None | False | 72829.6161 | 0 | 4052408 | 157301 | None | Page No 7 Item No 1.9 Vol-1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 279.3 | 279.3 | 564.43 | False | None | None | False | None | False | 157645.299 | 0 | 4052409 | 157301 | None | Page No 17 Item No 6.33 Vol-2 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1292.55 | 1292.55 | 347.18 | False | None | None | False | None | False | 448747.509 | 0 | 4052410 | 157301 | None | Page No 100 Item No 12.13.2 Vol-2 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 104580.0 | 104580.0 | 0.59 | False | None | None | False | None | False | 61702.2 | 0 | 4052411 | 157301 | None | Page No 100 Item No 12.13.2 Vol-2 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 105625.8 | 105625.8 | 0.45 | False | None | None | False | None | False | 47531.61 | 0 | 4052412 | 157301 | None | Page No 100 Item No 12.13.2 Vol-2 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 106671.6 | 106671.6 | 0.45 | False | None | None | False | None | False | 48002.22 | 0 | 4052413 | 157301 | None | Page No 100 Item No 12.13.2 Vol-2 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 107717.4 | 107717.4 | 0.45 | False | None | None | False | None | False | 48472.83 | 0 | 4052414 | 157301 | None | Page No 111 Item No 12.93.2 Vol-2 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 125mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 802.2 | 802.2 | 40.6 | False | None | None | False | None | False | 32569.32 | 0 | 4052415 | 157301 | None | Page No 111 Item No 12.93.2 Vol-2 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 125mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 810.22 | 810.22 | 46.4 | False | None | None | False | None | False | 37594.208 | 0 | 4052416 | 157301 | None | Page No 111 Item No 12.93.2 Vol-2 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 125mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 818.24 | 818.24 | 46.4 | False | None | None | False | None | False | 37966.336 | 0 | 4052417 | 157301 | None | Page No 111 Item No 12.93.2 Vol-2 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately)Size 62 x 125mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 826.27 | 826.27 | 46.4 | False | None | None | False | None | False | 38338.928 | 0 | 4052418 | 157301 | None | Page No 105 Item No 12.57.1 Vol-2 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 4245.15 | 4245.15 | 25.31 | False | None | None | False | None | False | 107444.7465 | 0 | 4052419 | 157301 | None | Page No 105 Item No 12.57.1 Vol-2 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 4287.6 | 4287.6 | 14.8 | False | None | None | False | None | False | 63456.48 | 0 | 4052420 | 157301 | None | Page No 105 Item No 12.57.1 Vol-2 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 4330.05 | 4330.05 | 14.8 | False | None | None | False | None | False | 64084.74 | 0 | 4052421 | 157301 | None | Page No 105 Item No 12.57.1 Vol-2 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 4372.5 | 4372.5 | 14.8 | False | None | None | False | None | False | 64713.0 | 0 | 4052422 | 157301 | None | Page No 112 Item No 12.94.1 Vol-2 | Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately)
30 mm thickness ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3659.25 | 3659.25 | 11.76 | False | None | None | False | None | False | 43032.78 | 0 | 4052423 | 157301 | None | Page No 112 Item No 12.94.1 Vol-2 | Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately)
30 mm thickness ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3695.84 | 3695.84 | 13.44 | False | None | None | False | None | False | 49672.0896 | 0 | 4052424 | 157301 | None | Page No 112 Item No 12.94.1 Vol-2 | Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately)
30 mm thickness ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3732.44 | 3732.44 | 13.44 | False | None | None | False | None | False | 50163.9936 | 0 | 4052425 | 157301 | None | Page No 112 Item No 12.94.1 Vol-2 | Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately)
30 mm thickness ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3769.03 | 3769.03 | 13.44 | False | None | None | False | None | False | 50655.7632 | 0 | 4052426 | 157301 | None | Page No 110 Item No 12.90 Vol-2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement
of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall
be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 7070.7 | 7070.7 | 36.45 | False | None | None | False | None | False | 257727.015 | 0 | 4052427 | 157301 | None | Page No 110 Item No 12.90 Vol-2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement
of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall
be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 7141.41 | 7141.41 | 38.85 | False | None | None | False | None | False | 277443.7785 | 0 | 4052428 | 157301 | None | Page No 110 Item No 12.90 Vol-2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement
of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall
be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 7212.11 | 7212.11 | 38.85 | False | None | None | False | None | False | 280190.4735 | 0 | 4052429 | 157301 | None | Page No 110 Item No 12.90 Vol-2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement
of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall
be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 7282.82 | 7282.82 | 38.85 | False | None | None | False | None | False | 282937.557 | 0 | 4052430 | 157301 | None | Page No 110 Item No 12.90 Vol-2 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement
of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall
be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 7353.53 | 7353.53 | 3.0 | False | None | None | False | None | False | 22060.59 | 0 | 4052431 | 157301 | None | Page No 109 Item No 12.85 Vol-2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6004.95 | 6004.95 | 5.49 | False | None | None | False | None | False | 32967.1755 | 0 | 4052432 | 157301 | None | Page No 109 Item No 12.85 Vol-2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6065.0 | 6065.0 | 4.05 | False | None | None | False | None | False | 24563.25 | 0 | 4052433 | 157301 | None | Page No 109 Item No 12.85 Vol-2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6125.05 | 6125.05 | 4.05 | False | None | None | False | None | False | 24806.4525 | 0 | 4052434 | 157301 | None | Page No 109 Item No 12.85 Vol-2 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size - 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6185.1 | 6185.1 | 4.05 | False | None | None | False | None | False | 25049.655 | 0 | 4052435 | 157301 | None | Page No 77 Item No 11.5.1 Vol-2 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 4701.9 | 4701.9 | 3.78 | False | None | None | False | None | False | 17773.182 | 0 | 4052436 | 157301 | None | Page No 63 Item No 9.24 Vol-2 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 2994.6 | 2994.6 | 149.74 | False | None | None | False | None | False | 448411.404 | 0 | 4052437 | 157301 | None | Page No 63 Item No 9.24 Vol-2 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3024.55 | 3024.55 | 77.22 | False | None | None | False | None | False | 233555.751 | 0 | 4052438 | 157301 | None | Page No 63 Item No 9.24 Vol-2 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3054.49 | 3054.49 | 77.22 | False | None | None | False | None | False | 235867.7178 | 0 | 4052439 | 157301 | None | Page No 63 Item No 9.24 Vol-2 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 3084.44 | 3084.44 | 77.22 | False | None | None | False | None | False | 238180.4568 | 0 | 4052440 | 157301 | None | Page No 61 Item No 9.17.2 Vol-2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1233.75 | 1233.75 | 203.4 | False | None | None | False | None | False | 250944.75 | 0 | 4052441 | 157301 | None | Page No 61 Item No 9.17.2 Vol-2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1246.09 | 1246.09 | 200.55 | False | None | None | False | None | False | 249903.3495 | 0 | 4052442 | 157301 | None | Page No 61 Item No 9.17.2 Vol-2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1258.43 | 1258.43 | 200.55 | False | None | None | False | None | False | 252378.1365 | 0 | 4052443 | 157301 | None | Page No 61 Item No 9.17.2 Vol-2 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1270.76 | 1270.76 | 200.55 | False | None | None | False | None | False | 254850.918 | 0 | 4052444 | 157301 | None | Page No 60 Item No 9.11 Vol-2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 933.45 | 933.45 | 49.68 | False | None | None | False | None | False | 46373.796 | 0 | 4052445 | 157301 | None | Page No 60 Item No 9.11 Vol-2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 942.78 | 942.78 | 49.45 | False | None | None | False | None | False | 46620.471 | 0 | 4052446 | 157301 | None | Page No 60 Item No 9.11 Vol-2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 952.12 | 952.12 | 49.45 | False | None | None | False | None | False | 47082.334 | 0 | 4052447 | 157301 | None | Page No 60 Item No 9.11 Vol-2 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 961.45 | 961.45 | 49.45 | False | None | None | False | None | False | 47543.7025 | 0 | 4052448 | 157301 | None | Page No 65 Item No 9.39 Vol-2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1521.45 | 1521.45 | 168.02 | False | None | None | False | None | False | 255634.029 | 0 | 4052449 | 157301 | None | Page No 65 Item No 9.39 Vol-2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1536.66 | 1536.66 | 157.81 | False | None | None | False | None | False | 242500.3146 | 0 | 4052450 | 157301 | None | Page No 65 Item No 9.39 Vol-2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1551.88 | 1551.88 | 157.81 | False | None | None | False | None | False | 244902.1828 | 0 | 4052451 | 157301 | None | Page No 65 Item No 9.39 Vol-2 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1567.09 | 1567.09 | 157.81 | False | None | None | False | None | False | 247302.4729 | 0 | 4052452 | 157301 | None | Page No 43 Item No 8.10 Vol-2 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ceiling ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 221.55 | 221.55 | 294.17 | False | None | None | False | None | False | 65173.3635 | 0 | 4052453 | 157301 | None | Page No 43 Item No 8.10 Vol-2 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ceiling ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 223.77 | 223.77 | 289.87 | False | None | None | False | None | False | 64864.2099 | 0 | 4052454 | 157301 | None | Page No 43 Item No 8.10 Vol-2 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ceiling ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 225.98 | 225.98 | 289.87 | False | None | None | False | None | False | 65504.8226 | 0 | 4052455 | 157301 | None | Page No 43 Item No 8.10 Vol-2 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ceiling ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 228.2 | 228.2 | 289.87 | False | None | None | False | None | False | 66148.334 | 0 | 4052456 | 157301 | None | Page No 43 Item No 8.10 Vol-2 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Ceiling ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 230.41 | 230.41 | 25.06 | False | None | None | False | None | False | 5774.0746 | 0 | 4052457 | 157301 | None | Page No 43 Item No 8.16.2 vol-02 | Providing and fixing suitable plaster mesh manufactured out of hot dipped galvanized iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. (length of mesh only be measured for payment )Plaster mesh 150mm wide ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 39.9 | 39.9 | 567.95 | False | None | None | False | None | False | 22661.205 | 0 | 4052458 | 157301 | None | Page No 43 Item No 8.16.2 vol-02 | Providing and fixing suitable plaster mesh manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. (length of mesh only be measured for payment )Plaster mesh 150mm wide ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 40.3 | 40.3 | 567.95 | False | None | None | False | None | False | 22888.385 | 0 | 4052459 | 157301 | None | Page No 43 Item No 8.16.2 vol-02 | Providing and fixing suitable plaster mesh manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. (length of mesh only be measured for payment )Plaster mesh 150mm wide ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 40.7 | 40.7 | 567.95 | False | None | None | False | None | False | 23115.565 | 0 | 4052460 | 157301 | None | Page No 43 Item No 8.16.2 vol-02 | Providing and fixing suitable plaster mesh manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. (length of mesh only be measured for payment )Plaster mesh 150mm wide ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 41.1 | 41.1 | 567.95 | False | None | None | False | None | False | 23342.745 | 0 | 4052461 | 157301 | None | Page No 41 Item No 8.1.2 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge Internal ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 253.05 | 253.05 | 763.27 | False | None | None | False | None | False | 193145.4735 | 0 | 4052462 | 157301 | None | Page No 41 Item No 8.1.2 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge Internal ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 255.58 | 255.58 | 785.51 | False | None | None | False | None | False | 200760.6458 | 0 | 4052463 | 157301 | None | Page No 41 Item No 8.1.2 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge Internal ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 258.11 | 258.11 | 785.51 | False | None | None | False | None | False | 202747.9861 | 0 | 4052464 | 157301 | None | Page No 41 Item No 8.1.2 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge Internal ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 260.64 | 260.64 | 785.51 | False | None | None | False | None | False | 204735.3264 | 0 | 4052465 | 157301 | None | Page No 41 Item No 8.1.2 Vol-2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge Internal ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 263.17 | 263.17 | 87.19 | False | None | None | False | None | False | 22945.7923 | 0 | 4052466 | 157301 | None | Page No 23 Item No 7.18 Vol-2 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 2139.03 | 2139.03 | 12.58 | False | None | None | False | None | False | 26908.9974 | 0 | 4052467 | 157301 | None | Page No 23 Item No 7.18 Vol-2 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 2160.21 | 2160.21 | 12.58 | False | None | None | False | None | False | 27175.4418 | 0 | 4052468 | 157301 | None | Page No 23 Item No 7.18 Vol-2 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 2181.39 | 2181.39 | 12.58 | False | None | None | False | None | False | 27441.8862 | 0 | 4052469 | 157301 | None | Page No 69 Item No 10.3 Vol-2 | Extra for fixing granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 329.7 | 329.7 | 114.99 | False | None | None | False | None | False | 37912.203 | 0 | 4052470 | 157301 | None | Page No 69 Item No 10.3 Vol-2 | Extra for fixing granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 333.0 | 333.0 | 84.24 | False | None | None | False | None | False | 28051.92 | 0 | 4052471 | 157301 | None | Page No 69 Item No 10.3 Vol-2 | Extra for fixing granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 336.29 | 336.29 | 84.24 | False | None | None | False | None | False | 28329.0696 | 0 | 4052472 | 157301 | None | Page No 69 Item No 10.3 Vol-2 | Extra for fixing granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 339.59 | 339.59 | 84.24 | False | None | None | False | None | False | 28607.0616 | 0 | 4052473 | 157301 | None | Page No 184 Item No 2.11 Vol-1 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 93929.85 | 93929.85 | 47.05 | False | None | None | False | None | False | 4419399.4425 | 0 | 4052474 | 157301 | None | Page No 184 Item No 2.11 Vol-1 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 94869.15 | 94869.15 | 12.42 | False | None | None | False | None | False | 1178274.843 | 0 | 4052475 | 157301 | None | Page No 184 Item No 2.11 Vol-1 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 95808.45 | 95808.45 | 12.42 | False | None | None | False | None | False | 1189940.949 | 0 | 4052476 | 157301 | None | Page No 184 Item No 2.11 Vol-1 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 96747.75 | 96747.75 | 12.42 | False | None | None | False | None | False | 1201607.055 | 0 | 4052477 | 157301 | None | Page No 184 Item No 2.11 Vol-1 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 96747.75 | 96747.75 | 2.83 | False | None | None | False | None | False | 273796.1325 | 0 | 4052478 | 157301 | None | Page No 42 Item No 8.5.2 Vol-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 366.45 | 366.45 | 1062.02 | False | None | None | False | None | False | 389177.229 | 0 | 4052479 | 157301 | None | Page No 42 Item No 8.5.2 Vol-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 370.11 | 370.11 | 354.68 | False | None | None | False | None | False | 131270.6148 | 0 | 4052480 | 157301 | None | Page No 42 Item No 8.5.2 Vol-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 373.78 | 373.78 | 354.68 | False | None | None | False | None | False | 132572.2904 | 0 | 4052481 | 157301 | None | Page No 42 Item No 8.5.2 Vol-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 377.44 | 377.44 | 354.68 | False | None | None | False | None | False | 133870.4192 | 0 | 4052482 | 157301 | None | Page No 42 Item No 8.5.2 Vol-2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 381.11 | 381.11 | 293.72 | False | None | None | False | None | False | 111939.6292 | 0 | 4052483 | 157301 | None | Page No 50 Item No 8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 105.0 | 105.0 | 1057.44 | False | None | None | False | None | False | 111031.2 | 0 | 4052484 | 157301 | None | Page No 50 Item No 8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 106.05 | 106.05 | 1075.38 | False | None | None | False | None | False | 114044.049 | 0 | 4052485 | 157301 | None | Page No 50 Item No 8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 107.1 | 107.1 | 1075.38 | False | None | None | False | None | False | 115173.198 | 0 | 4052486 | 157301 | None | Page No 50 Item No 8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 108.15 | 108.15 | 1075.38 | False | None | None | False | None | False | 116302.347 | 0 | 4052487 | 157301 | None | Page No 50 Item No 8.51 Vol-2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 109.2 | 109.2 | 112.25 | False | None | None | False | None | False | 12257.7 | 0 | 4052488 | 157301 | None | Page No 51 Item No 8.55.2 Vol-2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer
in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 55.65 | 55.65 | 1057.44 | False | None | None | False | None | False | 58846.536 | 0 | 4052489 | 157301 | None | Page No 51 Item No 8.55.2 Vol-2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer
in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 56.21 | 56.21 | 1075.38 | False | None | None | False | None | False | 60447.1098 | 0 | 4052490 | 157301 | None | Page No 51 Item No 8.55.2 Vol-2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer
in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 56.76 | 56.76 | 1075.38 | False | None | None | False | None | False | 61038.5688 | 0 | 4052491 | 157301 | None | Page No 51 Item No 8.55.2 Vol-2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer
in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 57.32 | 57.32 | 1075.38 | False | None | None | False | None | False | 61640.7816 | 0 | 4052492 | 157301 | None | Page No 51 Item No 8.55.2 Vol-2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g/L as per specifications and as per directions of Engineer
in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 57.88 | 57.88 | 112.25 | False | None | None | False | None | False | 6497.03 | 0 | 4052493 | 157301 | None | Page No 48 Item No 8.39 Vol-2 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 133.35 | 133.35 | 1057.44 | False | None | None | False | None | False | 141009.624 | 0 | 4052494 | 157301 | None | Page No 48 Item No 8.39 Vol-2 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 134.68 | 134.68 | 1075.38 | False | None | None | False | None | False | 144832.1784 | 0 | 4052495 | 157301 | None | Page No 48 Item No 8.39 Vol-2 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 136.02 | 136.02 | 1075.38 | False | None | None | False | None | False | 146273.1876 | 0 | 4052496 | 157301 | None | Page No 48 Item No 8.39 Vol-2 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 137.35 | 137.35 | 1075.38 | False | None | None | False | None | False | 147703.443 | 0 | 4052497 | 157301 | None | Page No 48 Item No 8.39 Vol-2 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 138.68 | 138.68 | 112.25 | False | None | None | False | None | False | 15566.83 | 0 | 4052498 | 157301 | None | Page No 46 Item No 8.30 Vol-2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 182.7 | 182.7 | 1062.02 | False | None | None | False | None | False | 194031.054 | 0 | 4052499 | 157301 | None | Page No 46 Item No 8.30 Vol-2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 184.53 | 184.53 | 354.68 | False | None | None | False | None | False | 65449.1004 | 0 | 4052500 | 157301 | None | Page No 46 Item No 8.30 Vol-2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 186.35 | 186.35 | 354.68 | False | None | None | False | None | False | 66094.618 | 0 | 4052501 | 157301 | None | Page No 46 Item No 8.30 Vol-2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 188.18 | 188.18 | 354.68 | False | None | None | False | None | False | 66743.6824 | 0 | 4052502 | 157301 | None | Page No 46 Item No 8.30 Vol-2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 190.01 | 190.01 | 293.72 | False | None | None | False | None | False | 55809.7372 | 0 | 4052503 | 157301 | None | Page No 47 Item No 8.34.1 Vol-2 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 55.65 | 55.65 | 78.09 | False | None | None | False | None | False | 4345.7085 | 0 | 4052504 | 157301 | None | Page No 47 Item No 8.34.1 Vol-2 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 56.21 | 56.21 | 38.49 | False | None | None | False | None | False | 2163.5229 | 0 | 4052505 | 157301 | None | Page No 47 Item No 8.34.1 Vol-2 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 56.76 | 56.76 | 38.49 | False | None | None | False | None | False | 2184.6924 | 0 | 4052506 | 157301 | None | Page No 47 Item No 8.34.1 Vol-2 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 57.32 | 57.32 | 38.49 | False | None | None | False | None | False | 2206.2468 | 0 | 4052507 | 157301 | None | Page No 48 Item No 8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 120.75 | 120.75 | 78.09 | False | None | None | False | None | False | 9429.3675 | 0 | 4052508 | 157301 | None | Page No 48 Item No 8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 121.96 | 121.96 | 38.49 | False | None | None | False | None | False | 4694.2404 | 0 | 4052509 | 157301 | None | Page No 48 Item No 8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 123.17 | 123.17 | 38.49 | False | None | None | False | None | False | 4740.8133 | 0 | 4052510 | 157301 | None | Page No 48 Item No 8.40 Vol-2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 124.37 | 124.37 | 38.49 | False | None | None | False | None | False | 4787.0013 | 0 | 4052511 | 157301 | None | Page No 86 Item No 11.34B Vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 192.15 | 192.15 | 880.74 | False | None | None | False | None | False | 169234.191 | 0 | 4052512 | 157301 | None | Page No 86 Item No 11.34B Vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 194.07 | 194.07 | 1006.74 | False | None | None | False | None | False | 195378.0318 | 0 | 4052513 | 157301 | None | Page No 86 Item No 11.34B Vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 195.99 | 195.99 | 1006.74 | False | None | None | False | None | False | 197310.9726 | 0 | 4052514 | 157301 | None | Page No 86 Item No 11.34B Vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 197.91 | 197.91 | 1006.74 | False | None | None | False | None | False | 199243.9134 | 0 | 4052515 | 157301 | None | Page No 86 Item No 11.34B Vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 199.9 | 199.9 | 63.0 | False | None | None | False | None | False | 12593.7 | 0 | 4052516 | 157301 | None | Page No 85 Item No 11.25.2 Vol-2 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 142.8 | 142.8 | 750.0 | False | None | None | False | None | False | 107100.0 | 0 | 4052517 | 157301 | None | Page No 47 Item No 8.33.3 Vol-2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 145.95 | 145.95 | 60.69 | False | None | None | False | None | False | 8857.7055 | 0 | 4052518 | 157301 | None | Page No 47 Item No 8.33.3 Vol-2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 147.41 | 147.41 | 47.94 | False | None | None | False | None | False | 7066.8354 | 0 | 4052519 | 157301 | None | Page No 47 Item No 8.33.3 Vol-2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 148.87 | 148.87 | 47.94 | False | None | None | False | None | False | 7136.8278 | 0 | 4052520 | 157301 | None | Page No 47 Item No 8.33.3 Vol-2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 150.33 | 150.33 | 47.94 | False | None | None | False | None | False | 7206.8202 | 0 | 4052521 | 157301 | None | Page No 47 Item No 8.33.3 Vol-2 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 151.79 | 151.79 | 3.0 | False | None | None | False | None | False | 455.37 | 0 | 4052522 | 157301 | None | Page No 104 Item No 12.51 Vol-2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1066.8 | 1066.8 | 16.0 | False | None | None | False | None | False | 17068.8 | 0 | 4052523 | 157301 | None | Page No 104 Item No 12.51 Vol-2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1077.47 | 1077.47 | 15.0 | False | None | None | False | None | False | 16162.05 | 0 | 4052524 | 157301 | None | Page No 104 Item No 12.51 Vol-2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1088.14 | 1088.14 | 15.0 | False | None | None | False | None | False | 16322.1 | 0 | 4052525 | 157301 | None | Page No 104 Item No 12.51 Vol-2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1098.8 | 1098.8 | 15.0 | False | None | None | False | None | False | 16482.0 | 0 | 4052526 | 157301 | None | Page No 104 Item No 12.51 Vol-2 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1109.47 | 1109.47 | 1.0 | False | None | None | False | None | False | 1109.47 | 0 | 4052527 | 157301 | None | Page No 85 Item No 11.28 Vol-2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners,stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 593.25 | 593.25 | 408.8 | False | None | None | False | None | False | 242520.6 | 0 | 4052528 | 157301 | None | Page No 85 Item No 11.28 Vol-2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners,stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 599.18 | 599.18 | 112.0 | False | None | None | False | None | False | 67108.16 | 0 | 4052529 | 157301 | None | Page No 85 Item No 11.28 Vol-2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners,stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 605.12 | 605.12 | 112.0 | False | None | None | False | None | False | 67773.44 | 0 | 4052530 | 157301 | None | Page No 85 Item No 11.28 Vol-2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners,stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 611.05 | 611.05 | 112.0 | False | None | None | False | None | False | 68437.6 | 0 | 4052531 | 157301 | None | Page No 85 Item No 11.28 Vol-2 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners,stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 616.98 | 616.98 | 134.4 | False | None | None | False | None | False | 82922.112 | 0 | 4052532 | 157301 | None | Page No 149 Item No 15.1 Vol-2 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 866.43 | 866.43 | 54.68 | False | None | None | False | None | False | 47376.3924 | 0 | 4052533 | 157301 | None | Page No 149 Item No 15.1 Vol-2 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 875.01 | 875.01 | 39.1 | False | None | None | False | None | False | 34212.891 | 0 | 4052534 | 157301 | None | Page No 149 Item No 15.1 Vol-2 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 883.59 | 883.59 | 39.1 | False | None | None | False | None | False | 34548.369 | 0 | 4052535 | 157301 | None | Page No 149 Item No 15.1 Vol-2 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 892.16 | 892.16 | 349.07 | False | None | None | False | None | False | 311426.2912 | 0 | 4052536 | 157301 | None | Page No A-16 Item No 147 Vol-2 | Burnt stone slabs 10cms thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1524.6 | 1524.6 | 16.2 | False | None | None | False | None | False | 24698.52 | 0 | 4052537 | 157301 | None | Page No 105 Item No 12.64 Vol 2 | Providing and fixing PTMT door catcher of length 72 mm and dia. of 42 mm with suitable washers weighing not less than 33 gms ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 57.75 | 57.75 | 35.0 | False | None | None | False | None | False | 2021.25 | 0 | 4052538 | 157301 | None | Page No 107 Item No 12.76.1 Vol 2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 250x10mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 456.75 | 456.75 | 105.0 | False | None | None | False | None | False | 47958.75 | 0 | 4052539 | 157301 | None | Page No 107 Item No 12.76.3 Vol 2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 150x10mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 303.45 | 303.45 | 62.0 | False | None | None | False | None | False | 18813.9 | 0 | 4052540 | 157301 | None | Page No 107 Item No 12.75.1 Vol 2 | Providing and fixing bright finished brass butt hinges with necessary screws etc. complete : 125x85x5.5 mm (heavy type) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 288.75 | 288.75 | 112.0 | False | None | None | False | None | False | 32340.0 | 0 | 4052541 | 157301 | None | Page No 107 Item No 12.75.3 Vol 2 | Providing and fixing bright finished brass butt hinges with necessary screws etc. complete : 100x85x5.5 mm (heavy type) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 215.25 | 215.25 | 84.0 | False | None | None | False | None | False | 18081.0 | 0 | 4052542 | 157301 | None | Page No 108 Item No 12.79.1 Vol 2 | Providing and fixing bright finished brass handles with screws etc. complete: Brass handles 125 mm with plate 175x32 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 261.45 | 261.45 | 62.0 | False | None | None | False | None | False | 16209.9 | 0 | 4052543 | 157301 | None | Page No 108 Item No 12.79.2 Vol 2 | Providing and fixing bright finished brass handles with screws etc. complete: Brass handles 100 mm with plate 150x32 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 242.55 | 242.55 | 56.0 | False | None | None | False | None | False | 13582.8 | 0 | 4052544 | 157301 | None | Page No 105 Item No 12.58 Vol 2 | Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 126.0 | 126.0 | 28.0 | False | None | None | False | None | False | 3528.0 | 0 | 4052545 | 157301 | None | Page No 9 Item No 2.5iia Vol 3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.By Mechanical Means using DozerIn area of light jungle ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | 100 Sqm | 412.65 | 412.65 | 2.7 | False | None | None | False | None | False | 1114.155 | 0 | 4052546 | 157301 | None | Page No 17 Item No 3.7 Vol 3 | Compacting original ground supporting embankmentLoosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 110.25 | 110.25 | 337.5 | False | None | None | False | None | False | 37209.375 | 0 | 4052547 | 157301 | None | Page No 23 Item No 4.1(v)-vol-3 | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401-For Grading -V Material ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 2611.35 | 2611.35 | 112.5 | False | None | None | False | None | False | 293776.875 | 0 | 4052548 | 157301 | None | Page No 50 Item No 6.5 Vol 3 | Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8230.95 | 8230.95 | 150.0 | False | None | None | False | None | False | 1234642.5 | 0 | 4052549 | 157301 | None | Page No 17 Item No 3.6 Vol 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 517.65 | 517.65 | 75.0 | False | None | None | False | None | False | 38823.75 | 0 |
| 1726994860000 | 0 | None | None | Buildings | Water supply and Sanitary works | 1572748.12 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4052550 | 157302 | None | Page No 122 Item No 13.32.1 Vol-2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fi with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete. (Concealed work including cutting chases and making good walls) 15mm nominal OD Pipe ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 324.45 | 324.45 | 60.0 | False | None | None | False | None | False | 19467.0 | 0 | 4052551 | 157302 | None | Page No 122 Item No 13.32.2 Vol-2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fi with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete. (Concealed work including cutting chases and making good walls) 20mm nominal OD Pipe ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 397.95 | 397.95 | 138.65 | False | None | None | False | None | False | 55175.7675 | 0 | 4052552 | 157302 | None | Page No 122 Item No 13.32.3 Vol-2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fi with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete. (Concealed work including cutting chases and making good walls) 25mm nominal OD Pipe ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 500.85 | 500.85 | 112.0 | False | None | None | False | None | False | 56095.2 | 0 | 4052553 | 157302 | None | Page No 122 Item No 13.33.6 Vol-2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete. (internal work exposed on wall) 50mm nominal OD Pipe ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 757.05 | 757.05 | 250.0 | False | None | None | False | None | False | 189262.5 | 0 | 4052554 | 157302 | None | Page No 122 Item No 13.33.4 Vol-2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete. (internal work exposed on wall) 32mm nominal OD Pipe ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 390.6 | 390.6 | 515.0 | False | None | None | False | None | False | 201159.0 | 0 | 4052555 | 157302 | None | Page No 117 Item No 13.2.1 Vol-2 | Providing and fixing C.P. brass bib cock of approved quality15 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 300.3 | 300.3 | 60.0 | False | None | None | False | None | False | 18018.0 | 0 | 4052556 | 157302 | None | Page No 119 Item No 13.16 Vol-2 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 651.0 | 651.0 | 60.0 | False | None | None | False | None | False | 39060.0 | 0 | 4052557 | 157302 | None | Page No 118 Item No 13.9.2 Vol-2 | Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet : 150mm Diameter ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | 1 chamber | 292.95 | 292.95 | 16.0 | False | None | None | False | None | False | 4687.2 | 0 | 4052558 | 157302 | None | Page No 117 Item No 13.4.1 Vol-2 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 576.45 | 576.45 | 5.0 | False | None | None | False | None | False | 2882.25 | 0 | 4052559 | 157302 | None | Page No 117 Item No 13.4.2 Vol-2 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 32 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 627.9 | 627.9 | 5.0 | False | None | None | False | None | False | 3139.5 | 0 | 4052560 | 157302 | None | Page No 117 Item No 13.4.4 Vol-2 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 50 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 897.75 | 897.75 | 4.0 | False | None | None | False | None | False | 3591.0 | 0 | 4052561 | 157302 | None | Page No 117 Item No 13.5.3 Vol-2 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25mm nominal borewell ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 348.6 | 348.6 | 6.0 | False | None | None | False | None | False | 2091.6 | 0 | 4052562 | 157302 | None | Page No 136 Item No 14.32.2 Vol-2 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1068.9 | 1068.9 | 20.0 | False | None | None | False | None | False | 21378.0 | 0 | 4052563 | 157302 | None | Page No 137 Item No 14.40.2 Vol-2 | 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 520.8 | 520.8 | 17.0 | False | None | None | False | None | False | 8853.6 | 0 | 4052564 | 157302 | None | Item No 136 Item No 14.33 Vol-2 | Providing and fixing 600x120x5 mm glass shelf with edges round off, supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 951.3 | 951.3 | 17.0 | False | None | None | False | None | False | 16172.1 | 0 | 4052565 | 157302 | None | Page No 133 Item No 14.10.1.1 Vol-2 | Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required : 510x1040 mm bowl depth 250 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5898.9 | 5898.9 | 6.0 | False | None | None | False | None | False | 35393.4 | 0 | 4052566 | 157302 | None | Page No 102 Item No 9.10.6 Vol-5 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE Grade PE80-PN6.0,140mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 679.35 | 679.35 | 250.0 | False | None | None | False | None | False | 169837.5 | 0 | 4052567 | 157302 | None | Page No 102 Item No 9.10.4 Vol-5 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE Grade PE80-PN6.0,110mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 432.6 | 432.6 | 247.0 | False | None | None | False | None | False | 106852.2 | 0 | 4052568 | 157302 | None | Page No 102 Item No 9.10.3 Vol-5 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with lectrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE Grade PE80-PN6.0, 90mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 295.05 | 295.05 | 69.0 | False | None | None | False | None | False | 20358.45 | 0 | 4052569 | 157302 | None | Page No 131 Item No 14.1.1 Vol-2 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5128.2 | 5128.2 | 14.0 | False | None | None | False | None | False | 71794.8 | 0 | 4052570 | 157302 | None | Page No 130 Item No 14.2 Vol-2 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5079.9 | 5079.9 | 3.0 | False | None | None | False | None | False | 15239.7 | 0 | 4052571 | 157302 | None | Page No 132 Item No 14.7.5 Vol-2 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Surgeon type wash basin of size 660x480 mm with a pair of 15 mm C.P. brass pillar taps ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2689.05 | 2689.05 | 15.0 | False | None | None | False | None | False | 40335.75 | 0 | 4052572 | 157302 | None | Page No 125 Item No 13.51 Vol-2 | Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in +cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay (non modular) bricks of class designation 3.5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 1791.3 | 1791.3 | 20.0 | False | None | None | False | None | False | 35826.0 | 0 | 4052573 | 157302 | None | Page No 192 Item No 16.15.9 Vol-5 | Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm 13 T300 and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, de- watering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.H: Constructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.8M depth & SFRC cover & frame ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 47132.4 | 47132.4 | 5.0 | False | None | None | False | None | False | 235662.0 | 0 | 4052574 | 157302 | None | Page No 122 Item No 13.34 Vol-2 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Ltr | 9.45 | 9.45 | 10000.0 | False | None | None | False | None | False | 94500.0 | 0 | 4052575 | 157302 | None | Page No 127 Item No 13.59 Vol-2 | Providing and fixing CI Nahani trap of approved make conforming to ISI specifications and construction of Cistern in CC 1:2:4 as per directions (Rate is inclusive of cost of materials and fixtures and conveyance of materials to work spot). ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | 1 Nahani trap | 231.0 | 231.0 | 45.0 | False | None | None | False | None | False | 10395.0 | 0 | 4052576 | 157302 | None | Page No 120 Item No 13.22.1.2 Vol-2 | Providing and fixing PTMT grating of approved quality and colour. Circular type 125 mm nominal dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 46.2 | 46.2 | 45.0 | False | None | None | False | None | False | 2079.0 | 0 | 4052577 | 157302 | None | Page No 135 Item No 14.22B Vol-2 | Providing and fixing CP Brass 15 mm nominal dia Single lever telephonic wall mixer of quality & make as approved by Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5840.1 | 5840.1 | 16.0 | False | None | None | False | None | False | 93441.6 | 0 |
| 1726994860000 | 0 | None | None | Buildings | Rain Water Harvesting | 898614.89 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4052578 | 157303 | None | Page No 5 Item no 1.4.3 Vol-1 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 394.8 | 394.8 | 200.93 | False | None | None | False | None | False | 79327.164 | 0 | 4052579 | 157303 | None | Page No 15 Item No 2.2.1 Vol-1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6799.39 | 6799.39 | 8.8 | False | None | None | False | None | False | 59834.632 | 0 | 4052580 | 157303 | None | Page No 16 Item No 2.5.1 Vol-1 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8962.85 | 8962.85 | 32.37 | False | None | None | False | None | False | 290127.4545 | 0 | 4052581 | 157303 | None | Page No 15 Item No 2.1.3 Vol-2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6288.45 | 6288.45 | 3.02 | False | None | None | False | None | False | 18991.119 | 0 | 4052582 | 157303 | None | Page No 41 Item No 8.3.2 Vol-2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 349.65 | 349.65 | 247.65 | False | None | None | False | None | False | 86590.8225 | 0 | 4052583 | 157303 | None | Page No 7 Item No 1.9 Vol-1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 279.3 | 279.3 | 23.76 | False | None | None | False | None | False | 6636.168 | 0 | 4052584 | 157303 | None | Page No 7 Item No 1.10 Vol-1 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 168.0 | 168.0 | 14.0 | False | None | None | False | None | False | 2352.0 | 0 | 4052585 | 157303 | None | Page No 125 Item No 13.53 Vol-2 | Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 5924.1 | 5924.1 | 4.0 | False | None | None | False | None | False | 23696.4 | 0 | 4052586 | 157303 | None | Page No 18 Item No 2.11a Vol-1 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 93929.85 | 93929.85 | 2.06 | False | None | None | False | None | False | 193495.491 | 0 | 4052587 | 157303 | None | Page No 112 Item no 10.1.9 Vol-5 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For., PVC pipes 160mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 648.9 | 648.9 | 100.0 | False | None | None | False | None | False | 64890.0 | 0 | 4052588 | 157303 | None | Page No 112 Item No 10.1.7 Vol-5 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For., PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Rmtr | 431.55 | 431.55 | 100.0 | False | None | None | False | None | False | 43155.0 | 0 | 4052589 | 157303 | None | Page No 151 Item No 13.11.5 Vol-5 | Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendmen t 3HP etc complete. 3.00HP 90LPM @ 66m= 10STG outer dia 2'00" ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 29518.65 | 29518.65 | 1.0 | False | None | None | False | None | False | 29518.65 | 0 |
| 1726994860000 | 0 | None | None | Buildings | Sewage Water Treatment Plant | 1359750.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4052590 | 157304 | None | Page No 251 Item No 22.2.1 Vol-5 | Waste water Treatment by Bio Sewage Treatment Plant (Bio STP)
onsite construction [25 KLD and 50 KLD ]: Providing, installation and commissioning of anaerobic Bio Sewage Treatment Plant (Bio STP) for black water with all necessary accessories such as pre- filter, pipes for the onsite constructed ABD tank as per the prescribed specification, according to the capacity, with a baffle wall to control the flow of water and to increase the retention time in the RCC ABD Tank. It includes an internal matrix for enhanced growth of bacteria, rising and falling pipes. For grey water, pre - filter, oil skimmer is provided along with an aerator. Post filter such as sand and carbon filter are also
included as per the enclosed detailed technical specification attached as Annexure-2, including cost of material, loading and unloading and as directed by the engineer in charge etc., complete, including annual
maintenance of the system for 5 years. Note: 1. Above rates mentioned are for the preparation of estimate purpose only. All items are of ISI standards. 2. After commissioning of plant necessary testing to be done for the 3. Satisfaction of the Engineer in charge. 4. Design drawing of the. 25 KLD ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1359750.0 | 1359750.0 | 1.0 | False | None | None | False | None | False | 1359750.0 | 0 |
| 1726994860000 | 0 | None | None | Buildings | Borewell | 262284.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4052591 | 157305 | None | Vol-5, Page no-140, Item no-12.4 | Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner orSchlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5552.4 | 5552.4 | 1.0 | False | None | None | False | None | False | 5552.4 | 0 | 4052592 | 157305 | None | Vol-5, Page no-139, Item no-12.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 0 to 50 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 388.5 | 388.5 | 50.0 | False | None | None | False | None | False | 19425.0 | 0 | 4052593 | 157305 | None | Vol-5, Page no-139, Item no-12.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 50 to 100 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 487.2 | 487.2 | 50.0 | False | None | None | False | None | False | 24360.0 | 0 | 4052594 | 157305 | None | Vol-5, Page no-139, Item no-12.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 100 to 150 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 517.65 | 517.65 | 50.0 | False | None | None | False | None | False | 25882.5 | 0 | 4052595 | 157305 | None | Vol-5, Page no-139, Item no-12.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 150 to 200 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 600.6 | 600.6 | 50.0 | False | None | None | False | None | False | 30030.0 | 0 | 4052596 | 157305 | None | Vol-5, Page no-139, Item no-12.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 200 to 250 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 704.55 | 704.55 | 50.0 | False | None | None | False | None | False | 35227.5 | 0 | 4052597 | 157305 | None | Vol-5, Page no-139, Item no-12.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 250 to 300 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 777.0 | 777.0 | 50.0 | False | None | None | False | None | False | 38850.0 | 0 | 4052598 | 157305 | None | Vol-5, Page no-143, Item no-12.32 | Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 2029.65 | 2029.65 | 36.0 | False | None | None | False | None | False | 73067.4 | 0 | 4052599 | 157305 | None | Vol-5, Page no-143, Item no-12.34 | Providing and laying at site of work MS casing caps as per IS 1239 (part- II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 172.2 | 172.2 | 1.0 | False | None | None | False | None | False | 172.2 | 0 | 4052600 | 157305 | None | Vol-6, Page no-18, Item no-5.21 | Supplying,fixingandwiringearthleakagerelaywithcorebalancedcurrenttransformersuitableforsinglephase50HzACwithlatestmicrocontrollerbased,digitalreadoutofpercentageleakagecurrent,programmabledelay/auto/manualresetfacilitysuitabletomountonDIN rail/ flush mounting on panel board ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 9717.75 | 9717.75 | 1.0 | False | None | None | False | None | False | 9717.75 | 0 |
| 1726994860000 | 0 | None | None | Buildings | Electrical | 10062132.16 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
4052601 | 157306 | None | ELECTRICAL 1.2.1 | Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 69.3 | 69.3 | 2410.0 | False | None | None | False | None | False | 167013.0 | 0 | 4052602 | 157306 | None | ELECTRICAL 1.2.2 | Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 81.9 | 81.9 | 1030.0 | False | None | None | False | None | False | 84357.0 | 0 | 4052603 | 157306 | None | ELECTRICAL 1.3.1 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 71.4 | 71.4 | 990.0 | False | None | None | False | None | False | 70686.0 | 0 | 4052604 | 157306 | None | ELECTRICAL 1.3.2 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 25 mm dia 2 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 82.95 | 82.95 | 3890.0 | False | None | None | False | None | False | 322675.5 | 0 | 4052605 | 157306 | None | ELECTRICAL 1.3.3 | Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 32 mm dia 2.5 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 103.95 | 103.95 | 3900.0 | False | None | None | False | None | False | 405405.0 | 0 | 4052606 | 157306 | None | ELECTRICAL 1.4.2 | Supplying and fixing sheet Metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 100 x 75 x 65 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 123.9 | 123.9 | 100.0 | False | None | None | False | None | False | 12390.0 | 0 | 4052607 | 157306 | None | ELECTRICAL 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 58.8 | 58.8 | 900.0 | False | None | None | False | None | False | 52920.0 | 0 | 4052608 | 157306 | None | ELECTRICAL 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 122.85 | 122.85 | 150.0 | False | None | None | False | None | False | 18427.5 | 0 | 4052609 | 157306 | None | ELECTRICAL 1.9.2 | Supplying PVC flexible conduit pipe .... mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely 25 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 23.1 | 23.1 | 60.0 | False | None | None | False | None | False | 1386.0 | 0 | 4052610 | 157306 | None | ELECTRICAL 3.4.2 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 3 Way ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 166.95 | 166.95 | 98.0 | False | None | None | False | None | False | 16361.1 | 0 | 4052611 | 157306 | None | ELECTRICAL 3.4.3 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 Way ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 185.85 | 185.85 | 45.0 | False | None | None | False | None | False | 8363.25 | 0 | 4052612 | 157306 | None | ELECTRICAL 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6 Way ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 231.0 | 231.0 | 36.0 | False | None | None | False | None | False | 8316.0 | 0 | 4052613 | 157306 | None | ELECTRICAL 3.4.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 Way ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 274.05 | 274.05 | 300.0 | False | None | None | False | None | False | 82215.0 | 0 | 4052614 | 157306 | None | ELECTRICAL 3.4.6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 10-12 Way ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 334.95 | 334.95 | 150.0 | False | None | None | False | None | False | 50242.5 | 0 | 4052615 | 157306 | None | ELECTRICAL 3.5.2 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 3 Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 169.05 | 169.05 | 98.0 | False | None | None | False | None | False | 16566.9 | 0 | 4052616 | 157306 | None | ELECTRICAL 3.5.3 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 4 Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 183.75 | 183.75 | 45.0 | False | None | None | False | None | False | 8268.75 | 0 | 4052617 | 157306 | None | ELECTRICAL 3.5.4 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 6 Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 245.7 | 245.7 | 36.0 | False | None | None | False | None | False | 8845.2 | 0 | 4052618 | 157306 | None | ELECTRICAL 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 8 Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 298.2 | 298.2 | 300.0 | False | None | None | False | None | False | 89460.0 | 0 | 4052619 | 157306 | None | ELECTRICAL 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 10-12 Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 361.2 | 361.2 | 150.0 | False | None | None | False | None | False | 54180.0 | 0 | 4052620 | 157306 | None | ELECTRICAL 3.9 | Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N. F. screws. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.37 | 0.37 | 4100.0 | False | None | None | False | None | False | 1517.0 | 0 | 4052621 | 157306 | None | ELECTRICAL 3.10.2 | Supplying 4 mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws. 80/90 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 15.75 | 15.75 | 60.0 | False | None | None | False | None | False | 945.0 | 0 | 4052622 | 157306 | None | ELECTRICAL 3.10.3 | Supplying 4 mm thick white plastic plate and covering for junction boxes of size ...... mm conduit using necessary machine screws. 110 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 22.05 | 22.05 | 80.0 | False | None | None | False | None | False | 1764.0 | 0 | 4052623 | 157306 | None | ELECTRICAL 2.2.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 282.45 | 282.45 | 470.0 | False | None | None | False | None | False | 132751.5 | 0 | 4052624 | 157306 | None | ELECTRICAL 2.2.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 397.95 | 397.95 | 530.0 | False | None | None | False | None | False | 210913.5 | 0 | 4052625 | 157306 | None | ELECTRICAL 2.2.3 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 582.75 | 582.75 | 350.0 | False | None | None | False | None | False | 203962.5 | 0 | 4052626 | 157306 | None | ELECTRICAL 2.3.1 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 1 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 19.95 | 19.95 | 1100.0 | False | None | None | False | None | False | 21945.0 | 0 | 4052627 | 157306 | None | ELECTRICAL 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 1.5 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 27.3 | 27.3 | 1900.0 | False | None | None | False | None | False | 51870.0 | 0 | 4052628 | 157306 | None | ELECTRICAL 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 2.5 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 44.1 | 44.1 | 13500.0 | False | None | None | False | None | False | 595350.0 | 0 | 4052629 | 157306 | None | ELECTRICAL 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 4 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 66.15 | 66.15 | 4750.0 | False | None | None | False | None | False | 314212.5 | 0 | 4052630 | 157306 | None | ELECTRICAL 2.3.5 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 6 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 96.6 | 96.6 | 2120.0 | False | None | None | False | None | False | 204792.0 | 0 | 4052631 | 157306 | None | ELECTRICAL 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 107.1 | 107.1 | 1300.0 | False | None | None | False | None | False | 139230.0 | 0 | 4052632 | 157306 | None | ELECTRICAL 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Two Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 174.3 | 174.3 | 52.0 | False | None | None | False | None | False | 9063.6 | 0 | 4052633 | 157306 | None | ELECTRICAL 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 179.55 | 179.55 | 470.0 | False | None | None | False | None | False | 84388.5 | 0 | 4052634 | 157306 | None | ELECTRICAL 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 374.85 | 374.85 | 150.0 | False | None | None | False | None | False | 56227.5 | 0 | 4052635 | 157306 | None | ELECTRICAL 3.6.8 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Bell Push ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 185.85 | 185.85 | 4.0 | False | None | None | False | None | False | 743.4 | 0 | 4052636 | 157306 | None | ELECTRICAL 3.6.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16A One Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 189.0 | 189.0 | 16.0 | False | None | None | False | None | False | 3024.0 | 0 | 4052637 | 157306 | None | ELECTRICAL 3.6.11 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. TV/Telephone Socket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 163.8 | 163.8 | 4.0 | False | None | None | False | None | False | 655.2 | 0 | 4052638 | 157306 | None | ELECTRICAL 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 32A DP Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 342.3 | 342.3 | 16.0 | False | None | None | False | None | False | 5476.8 | 0 | 4052639 | 157306 | None | ELECTRICAL 5.19.14 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. 12 Way TP & N (Double Door) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 9171.75 | 9171.75 | 10.0 | False | None | None | False | None | False | 91717.5 | 0 | 4052640 | 157306 | None | ELECTRICAL 5.18.1 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 435.75 | 435.75 | 400.0 | False | None | None | False | None | False | 174300.0 | 0 | 4052641 | 157306 | None | ELECTRICAL 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 775.95 | 775.95 | 100.0 | False | None | None | False | None | False | 77595.0 | 0 | 4052642 | 157306 | None | ELECTRICAL 5.18.5 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 40 A DP ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1113.0 | 1113.0 | 5.0 | False | None | None | False | None | False | 5565.0 | 0 | 4052643 | 157306 | None | ELECTRICAL 12.2.1 | Supplying and fixing one of 230 V Ding dong bell and a flush type bell push with gang box fixed on necessary wooden or rawl plugs using NF screws with Remote. Ding Dong Bell ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 258.3 | 258.3 | 4.0 | False | None | None | False | None | False | 1033.2 | 0 | 4052644 | 157306 | None | ELECTRICAL 11.3.1 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI more than 80. Power Input: 220-240V@ 50/60Hz & Power factor more than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 2' - 9/10 W ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 578.55 | 578.55 | 100.0 | False | None | None | False | None | False | 57855.0 | 0 | 4052645 | 157306 | None | ELECTRICAL 11.3.2 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI more than 80. Power Input: 220-240V@ 50/60Hz & Power factor more than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 724.5 | 724.5 | 450.0 | False | None | None | False | None | False | 326025.0 | 0 | 4052646 | 157306 | None | ELECTRICAL 11.11.5 | Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI more than 70%. efficacy more than 80 lumen per W, life more than 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF more than 0.95, power loss should less than 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. 12W, 6500K ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 282.45 | 282.45 | 150.0 | False | None | None | False | None | False | 42367.5 | 0 | 4052647 | 157306 | None | ELECTRICAL 12.46 | Supplying & Fixing of 70-150 W lamp holder 2 Pin ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 66.15 | 66.15 | 150.0 | False | None | None | False | None | False | 9922.5 | 0 | 4052648 | 157306 | None | ELECTRICAL 6.2.1 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 12" Sweep (300 mm) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3117.45 | 3117.45 | 66.0 | False | None | None | False | None | False | 205751.7 | 0 | 4052649 | 157306 | None | ELECTRICAL 13.14 | Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 516.6 | 516.6 | 66.0 | False | None | None | False | None | False | 34095.6 | 0 | 4052650 | 157306 | None | ELECTRICAL 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3133.2 | 3133.2 | 150.0 | False | None | None | False | None | False | 469980.0 | 0 | 4052651 | 157306 | None | ELECTRICAL 13.1 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 179.55 | 179.55 | 150.0 | False | None | None | False | None | False | 26932.5 | 0 | 4052652 | 157306 | None | ELECTRICAL 13.12 | Extra length of GI pipe of class B 19mm dia for down rod. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 206.85 | 206.85 | 150.0 | False | None | None | False | None | False | 31027.5 | 0 | 4052653 | 157306 | None | ELECTRICAL 7.1.3 | Supplying.....litres capacity vertical/horizontal type wall mounting Electrical water heater with 22 SWG copper/SS sheet metal inner Container tinned inside and anticorrosive paint outside and 20 SWG M.S. sheet metal outer cover filled with glass wool between inner and outer container for thermal insulation complete. The inlet and outlet pipes so arranged that water flow inside results in water to flow out from the inner container without turbulence. The Inner container shall have direct immersion type copper tube nickel plate. 2kW capacity element with a neon indicator fitted with 20A capacity 25 to 85 degree Centigrade range thermostat. The water heater shall completely be wired with 40/0.0076 inch 3 core copper flexible wire of 1.5 meters length and the outer container provided with heavy gauge brackets for wall mounting. 25 L ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 10754.1 | 10754.1 | 12.0 | False | None | None | False | None | False | 129049.2 | 0 | 4052654 | 157306 | None | ELECTRICAL 13.15.1 | Erection charges for fixing a ... litres capacity wall mounting electric geysers using bolts, flat at one end nut and washers at the other end for through bolts and nuts and washers with 150x450x600mm back plate and wiring complete with 15A 3 pin top. upto 30 Litres ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 697.2 | 697.2 | 12.0 | False | None | None | False | None | False | 8366.4 | 0 | 4052655 | 157306 | None | ELECTRICAL 7.3.3 | Supplying, installation, testing and commissioning of solar hot water heater comprising of solar Flat Plate Collector (FPC) of size 2120x1040x100mm and stainless steel hot water storage tank with stainless steel heat exchanger absorber made of copper sheet and copper tube of following capacity aluminium box collector with appropriate capacity electrical back up arrangement excluding inlet and out let pipes. SS Model with 100mm thick of 48Kg/M3density Rock wool insulation with 22SWG Aluminium cladding. 300 L ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 73485.3 | 73485.3 | 4.0 | False | None | None | False | None | False | 293941.2 | 0 | 4052656 | 157306 | None | Vol-2 Building 17.6.1 | Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel screwed and socketed/plain ended casing pipes of required dia, conforming to IS: 4270,of reputed & approved make, including painted with outside surface with two coats of anticorrosive paint of approved brand and manufacture, including required hire & labour charges, fittings & accessories, all complete, for all depths, as per direction of Engineer-in-charge. 100 mm nominal size dia having minimum wall thickness 5.00 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Mtr | 1121.4 | 1121.4 | 100.0 | False | None | None | False | None | False | 112140.0 | 0 | 4052657 | 157306 | None | Vol 2 : Buildings Page No.:122 Item No.: 13.32.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. (Page : 195) 32 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 584.85 | 584.85 | 400.0 | False | None | None | False | None | False | 233940.0 | 0 | 4052658 | 157306 | None | Vol.5 : SR 2023-24 13.25.1 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1312.5 | 1312.5 | 10.0 | False | None | None | False | None | False | 13125.0 | 0 | 4052659 | 157306 | None | ELECTRICAL 9.2.5 | Providing UPS System Supplying, erecting, testing & commissioning of OFF- LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with all accessories complete and Excluding batteries and wiring complete. (Make : Microtek / Luminous / V-GUARD / Exide) 5 kVA OFF LINE UPS ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 41892.9 | 41892.9 | 4.0 | False | None | None | False | None | False | 167571.6 | 0 | 4052660 | 157306 | None | ELECTRICAL 9.5.7 | Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries. (Make : Luminous / Exide / Amaron) 100 AH capacity ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 13051.5 | 13051.5 | 24.0 | False | None | None | False | None | False | 313236.0 | 0 | 4052661 | 157306 | None | ELECTRICAL 6.22 | Extra for Fabrication supply and fixing of Stand fabricated using slotted angle /L angle of size 6mm x 50mm for mounting out door/indoor A.C. unit/ Batteries. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5047.35 | 5047.35 | 4.0 | False | None | None | False | None | False | 20189.4 | 0 | 4052662 | 157306 | None | ELECTRICAL 8.1 | Providing Local Area Network wiring Supplying and drawing UTP-CAT 6E LAN cable. (Make : D-Link / Poycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 39.9 | 39.9 | 600.0 | False | None | None | False | None | False | 23940.0 | 0 | 4052663 | 157306 | None | ELECTRICAL 8.2.2 | Supplying and drawing PVC flexible one pair telephone unarmoured tinned copper cable. (Make : D-Link / Polycab / Finolex) 2Pair ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 22.05 | 22.05 | 100.0 | False | None | None | False | None | False | 2205.0 | 0 | 4052664 | 157306 | None | ELECTRICAL 8.3 | Supplying and drawing PVC insulated gas injected physical foam jelly flooded co-axial TV cable.RG-6. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 46.2 | 46.2 | 50.0 | False | None | None | False | None | False | 2310.0 | 0 | 4052665 | 157306 | None | ELECTRICAL 8.4.2 | Supplying & Fixing of switch mounting rack with power manager & Cable manager. (Make : D-Link / TP - Link) 6U with 450mm depth ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 7325.85 | 7325.85 | 1.0 | False | None | None | False | None | False | 7325.85 | 0 | 4052666 | 157306 | None | ELECTRICAL 8.5 | 6U with 450mm depth Supplying & Fixing of Power strip ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1529.85 | 1529.85 | 1.0 | False | None | None | False | None | False | 1529.85 | 0 | 4052667 | 157306 | None | ELECTRICAL 8.9.7 | Supplying fixing of Network Switches (Make : Cisco / D-Link / TP - Link / Hewlett Packard) 8 port 10/100 Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1102.5 | 1102.5 | 1.0 | False | None | None | False | None | False | 1102.5 | 0 | 4052668 | 157306 | None | ELECTRICAL 8.10.1 | Supplying & fixing of I/O socket with back box (Make : Cisco / D-Link / TP - Link / Hewlett Packard) Single I/O ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 514.5 | 514.5 | 12.0 | False | None | None | False | None | False | 6174.0 | 0 | 4052669 | 157306 | None | ELECTRICAL 8.10.2 | Supplying & fixing of I/O socket with back box (Make : Cisco / D-Link / TP - Link / Hewlett Packard) Double I/O ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 577.5 | 577.5 | 12.0 | False | None | None | False | None | False | 6930.0 | 0 | 4052670 | 157306 | None | ELECTRICAL 8.11.1 | Supplying & Fixing of ... ms Cat 6 Patch Cable (Make : D-Link / Poycab / Finolex) 1 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 235.2 | 235.2 | 12.0 | False | None | None | False | None | False | 2822.4 | 0 | 4052671 | 157306 | None | ELECTRICAL 8.11.2 | Supplying & Fixing of ... ms Cat 6 Patch Cable (Make : D-Link / Poycab / Finolex) 2 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 269.85 | 269.85 | 12.0 | False | None | None | False | None | False | 3238.2 | 0 | 4052672 | 157306 | None | ELECTRICAL 5.7.5 | Providing Service main and Panel Board Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 200 A ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1500.45 | 1500.45 | 3.0 | False | None | None | False | None | False | 4501.35 | 0 | 4052673 | 157306 | None | ELECTRICAL 5.40.1 | Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/ DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 2588.25 | 2588.25 | 6.0 | False | None | None | False | None | False | 15529.5 | 0 | 4052674 | 157306 | None | ELECTRICAL 5.14.1 | Supply and fixing of 4pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 22/25 A ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2320.5 | 2320.5 | 1.0 | False | None | None | False | None | False | 2320.5 | 0 | 4052675 | 157306 | None | ELECTRICAL 5.20.4 | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. 32-40A 2 pole ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 4786.95 | 4786.95 | 1.0 | False | None | None | False | None | False | 4786.95 | 0 | 4052676 | 157306 | None | ELECTRICAL 5.35 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 Accuracy Energy Meter. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5990.25 | 5990.25 | 1.0 | False | None | None | False | None | False | 5990.25 | 0 | 4052677 | 157306 | None | ELECTRICAL 5.36 | Supplying, fixing and wiring 1000/5A to 1600/5A 15VA Burden class 1 Current Transformer ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 882.0 | 882.0 | 3.0 | False | None | None | False | None | False | 2646.0 | 0 | 4052678 | 157306 | None | ELECTRICAL 5.37 | Supplying, fixing and wiring heavy duty low voltage capacitors conforming to IS 2834. 3 phase, 400/440 V grade, for power factor improvement of rotating machineries like induction motor. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kvar | 504.0 | 504.0 | 1.0 | False | None | None | False | None | False | 504.0 | 0 | 4052679 | 157306 | None | ELECTRICAL 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 540.75 | 540.75 | 3.0 | False | None | None | False | None | False | 1622.25 | 0 | 4052680 | 157306 | None | ELECTRICAL 5.39 | Supplying, fixing and wiring Automatic Power Factor controller circuit unit fully, static units controlled by 14 stage microprocessor operation, relays LED display, self programming function for power stages and operating logic checking facility for healthy and efficient of each individual capacitor bank, measurement of network harmonics with indication when limit values are exceeded, Comprehensive displays with large, three phase LED display, Long term memory for settings, protection for over voltage, power factor correction fault and no voltage, to connect/ disconnect banks, with automatic recognition or with standard programs ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 22722.0 | 22722.0 | 1.0 | False | None | None | False | None | False | 22722.0 | 0 | 4052681 | 157306 | None | ELECTRICAL 5.42.1 | Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 14 SWG ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.53 | 0.53 | 220000.0 | False | None | None | False | None | False | 116600.0 | 0 | 4052682 | 157306 | None | ELECTRICAL 5.41.1 | Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40 x 40 x 6 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 320.25 | 320.25 | 10.0 | False | None | None | False | None | False | 3202.5 | 0 | 4052683 | 157306 | None | ELECTRICAL 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 3685.5 | 3685.5 | 10.0 | False | None | None | False | None | False | 36855.0 | 0 | 4052684 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:60 Item No.:8.02 | Supplying of Guy Wire & GI Wire as per BESCOM Specification. (Page-435-436) 8 SWG GI Wire(4.064 mm Dia), Std Wt: 131 Kg/KM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | MT | 78792.0 | 78792.0 | 0.075 | False | None | None | False | None | False | 5909.4 | 0 | 4052685 | 157306 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32.05 | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 148934.1 | 148934.1 | 0.05 | False | None | None | False | None | False | 7446.705 | 0 | 4052686 | 157306 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32.13 | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) 70 Sqmm, 3.5 Core, (18 GI Strips - 4 x 0.8 mm) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 333807.6 | 333807.6 | 0.1 | False | None | None | False | None | False | 33380.76 | 0 | 4052687 | 157306 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32.15 | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) 120 Sqmm, 3.5 Core, (23 GI Strips - 4 x 0.8 mm) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 479733.45 | 479733.45 | 0.15 | False | None | None | False | None | False | 71960.0175 | 0 | 4052688 | 157306 | None | ESCOM SR 2023-24 (CDS-19) | Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365) a) Earth work excavation for pipeline trenches in all kinds of soils by mechanical
means as per drawing and technical specifications, including setting out,
construction of shoring, strutting, barricading, caution lights, bracing, using
sight rails & bonding rods at every 100 mm wherever necessary as directed,
removal of stumps and other deleterious matter, dressing of sides and levelling
the bottom of trench to the extent required , utilising the available excavated
earth locally for the work etc., and all other appurtenances complete in the
following strata. All kinds of soils. Depth upto 1.50 m(Extracted from Vol-1, PWD SR Sl No. 1.17.1) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 275.1 | 275.1 | 180.0 | False | None | None | False | None | False | 49518.0 | 0 | 4052689 | 157306 | None | ESCOM SR 2023-24 (CDS-19) | Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365) c)Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications
(Extracted from Vol-1, PWD SR Sl No. 1.10) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 168.0 | 168.0 | 135.0 | False | None | None | False | None | False | 22680.0 | 0 | 4052690 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.05 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 21930.3 | 21930.3 | 0.05 | False | None | None | False | None | False | 1096.515 | 0 | 4052691 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.06 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 35 to 95 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 32695.95 | 32695.95 | 0.1 | False | None | None | False | None | False | 3269.595 | 0 | 4052692 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.07 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 120 to 240 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 33891.9 | 33891.9 | 0.15 | False | None | None | False | None | False | 5083.785 | 0 | 4052693 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:249 Item No.:35.02 | Making and fixing of Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable as per BESCOM specification (BESCOM SR Page : 445) 3.5 x 70/95/120 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 401.1 | 401.1 | 2.0 | False | None | None | False | None | False | 802.2 | 0 | 4052694 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:507 Item No.:63.04 | Supplying of Brass Cable Gland as per BESCOM specification (BESCOM SR Page:458) 45 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 206.85 | 206.85 | 12.0 | False | None | None | False | None | False | 2482.2 | 0 | 4052695 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:457 Item No.:59.03 | Supplying of Heavy Duty Copper Terminal Long Barrel (Lug) as per BESCOM specification (Page : 456) 50 Sqmm Copper Terminal, Apprx Wt: 26 Gm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 60.9 | 60.9 | 6.0 | False | None | None | False | None | False | 365.4 | 0 | 4052696 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:457 Item No.:59.05 | Supplying of Heavy Duty Copper Terminal Long Barrel (Lug) as per BESCOM specification (Page : 456) 95 Sqmm Copper Terminal, Apprx Wt: 58 Gm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 135.45 | 135.45 | 18.0 | False | None | None | False | None | False | 2438.1 | 0 | 4052697 | 157306 | None | Vol 2 : Buildings Page No.:175 Item No.: 17.1 | Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric Resistance Welded) FE 410 mild steel screwed and socketed/plain ended casing pipes of required dia, conforming to IS: 4270,of reputed & approved make, including painted with outside surface with two coats of anticorrosive paint of approved brand and manufacture, including required hire & labour charges, fittings & accessories, all complete, for all depths, as per direction of Engineer-in-charge. (Page : 248) 100 mm nominal size dia having minimum wall thickness 5.00 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 1121.4 | 1121.4 | 145.0 | False | None | None | False | None | False | 162603.0 | 0 | 4052698 | 157306 | None | ELECTRICAL 14.4.4 | Design, supplying, erecting testing and commissioning of - Passenger/ Bed-cum-passenger hospital lift with speed of 1mtr per second, variable voltage variable frequency drive, with or without machine room for the available well size, operating at 415 V 3 phase 50 cycles AC supply, powder coated / Stainless Steel car entrance doors enclosures with suitable colour vinyl flooring, LED car illumination, emergency light, intercom and fan as desired by the user, central opening / side opening door with or without attendant operation, 7 segment display buttons, call register indicator, fireman drive, SS handrails inside car, full length infrared curtain in car door, automatic rescue device with batteries, voice announcing in regional/ international languages, Braille buttons with one year warranty and maintenance with necessary scaffolding and minor civil works like fixing of guide rail, counter weight etc.,The total product and services shall adhere to IS 14665/2016 ( with latest amendments) part/section 1 to 5 with regards to general guidelines of fire safety rated doors, MRLL beams, pressure switch, manual change over for doors during emergency, ARD of 10 times with sufficient battery back up and standard dimensions of chair car and door openings for all sizes and capacities of lifts including fitness certificate and duly observing all other safety norms prescribed and adhere to CPWD specifications, PCB Norms, National Electricity Code (NEC), NBC-2016, IEC and Karnataka State Lifts, Escalators and Passengers Conveyers Act 2012 and Rules 2014. The Supplier shall be registered in Government Electrical Inspectorate in the State of Karnataka. (Make : Kone, Otis) D With Out Machine Room-SS Finish - 13 Passengers with 4 stops ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Job | 1901063.85 | 1901063.85 | 1.0 | False | None | None | False | None | False | 1901063.85 | 0 | 4052699 | 157306 | None | ELECTRICAL 1.1.1 | Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. (Make : VIP / Nandi / VI plast) 19/20 mm dia 2 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 72.45 | 72.45 | 35.0 | False | None | None | False | None | False | 2535.75 | 0 | 4052700 | 157306 | None | ELECTRICAL 2.2.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 397.95 | 397.95 | 4.0 | False | None | None | False | None | False | 1591.8 | 0 | 4052701 | 157306 | None | ELECTRICAL 2.2.3 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto 10Mtr from tapping point to out let via switch box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 582.75 | 582.75 | 4.0 | False | None | None | False | None | False | 2331.0 | 0 | 4052702 | 157306 | None | ELECTRICAL 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells / Finolex / Anchor / Polycab / V-Gaurd) 1.5 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 27.3 | 27.3 | 100.0 | False | None | None | False | None | False | 2730.0 | 0 | 4052703 | 157306 | None | ELECTRICAL 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells / Finolex / Anchor / Polycab / V-Gaurd) 2.5 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 44.1 | 44.1 | 120.0 | False | None | None | False | None | False | 5292.0 | 0 | 4052704 | 157306 | None | ELECTRICAL 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells / Finolex / Anchor / Polycab / V-Gaurd) 4 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 66.15 | 66.15 | 130.0 | False | None | None | False | None | False | 8599.5 | 0 | 4052705 | 157306 | None | ELECTRICAL 3.3.5 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. (Make : Anchor / Indo Asian / Lisha / Cona ) 8 Way ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 229.95 | 229.95 | 4.0 | False | None | None | False | None | False | 919.8 | 0 | 4052706 | 157306 | None | ELECTRICAL 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) 8 Module ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 298.2 | 298.2 | 4.0 | False | None | None | False | None | False | 1192.8 | 0 | 4052707 | 157306 | None | ELECTRICAL 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 6A One Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 107.1 | 107.1 | 10.0 | False | None | None | False | None | False | 1071.0 | 0 | 4052708 | 157306 | None | ELECTRICAL 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 6A Three Way socket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 179.55 | 179.55 | 4.0 | False | None | None | False | None | False | 718.2 | 0 | 4052709 | 157306 | None | ELECTRICAL 3.6.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 16A One Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 189.0 | 189.0 | 1.0 | False | None | None | False | None | False | 189.0 | 0 | 4052710 | 157306 | None | ELECTRICAL 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 6/16A Universal Socket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 247.8 | 247.8 | 1.0 | False | None | None | False | None | False | 247.8 | 0 | 4052711 | 157306 | None | ELECTRICAL 11.3.2 | Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI more than 80. Power Input: 220-240V@ 50/60Hz & Power factor more than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make : Philips / Bajaj / Havells / Panasonic / Syska) LED light fitting 1 x 4' - 20/22 W ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 724.5 | 724.5 | 4.0 | False | None | None | False | None | False | 2898.0 | 0 | 4052712 | 157306 | None | ELECTRICAL 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall/ ceiling / Rafter / Girders ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 128.1 | 128.1 | 4.0 | False | None | None | False | None | False | 512.4 | 0 | 4052713 | 157306 | None | ELECTRICAL 5.18.4 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 775.95 | 775.95 | 1.0 | False | None | None | False | None | False | 775.95 | 0 | 4052714 | 157306 | None | ELECTRICAL 5.18.9 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63 A TPN ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3242.4 | 3242.4 | 1.0 | False | None | None | False | None | False | 3242.4 | 0 | 4052715 | 157306 | None | ELECTRICAL 5.20.10 | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. 63 A 4 pole ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5822.25 | 5822.25 | 1.0 | False | None | None | False | None | False | 5822.25 | 0 | 4052716 | 157306 | None | ELECTRICAL 5.27 | Supplying, fixing and wiring rotary selector switch suitable for Ammeter ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 210.0 | 210.0 | 1.0 | False | None | None | False | None | False | 210.0 | 0 | 4052717 | 157306 | None | ELECTRICAL 5.28 | Supplying, fixing and wiring rotary selector switch suitable for Voltmeter ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 168.0 | 168.0 | 1.0 | False | None | None | False | None | False | 168.0 | 0 | 4052718 | 157306 | None | ELECTRICAL 5.29 | Supplying, fixing and wiring 3 Phase Digital Ammeter / Voltmeter ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1496.25 | 1496.25 | 2.0 | False | None | None | False | None | False | 2992.5 | 0 | 4052719 | 157306 | None | ELECTRICAL 5.34 | Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 590.1 | 590.1 | 3.0 | False | None | None | False | None | False | 1770.3 | 0 | 4052720 | 157306 | None | ELECTRICAL 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 540.75 | 540.75 | 3.0 | False | None | None | False | None | False | 1622.25 | 0 | 4052721 | 157306 | None | ELECTRICAL 5.40.1 | Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/ DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 2588.25 | 2588.25 | 0.75 | False | None | None | False | None | False | 1941.1875 | 0 | 4052722 | 157306 | None | ELECTRICAL 5.41.1 | Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40 x 40 x 6 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 320.25 | 320.25 | 3.0 | False | None | None | False | None | False | 960.75 | 0 | 4052723 | 157306 | None | ELECTRICAL 5.42.2 | Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 16 SWG ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.45 | 0.45 | 12500.0 | False | None | None | False | None | False | 5625.0 | 0 | 4052724 | 157306 | None | ELECTRICAL 12.58.8 | GI/Copper strips for grounding connections, using necessary fixing materials as required. 25 x 6 mm Copper strip ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 1155.0 | 1155.0 | 15.0 | False | None | None | False | None | False | 17325.0 | 0 | 4052725 | 157306 | None | Vol 1 Page No.:18 Item No.: 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and
technical specification. (Page : 91) Buildings ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 93929.85 | 93929.85 | 0.025 | False | None | None | False | None | False | 2348.24625 | 0 | 4052726 | 157306 | None | ELECTRICAL 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 3685.5 | 3685.5 | 5.0 | False | None | None | False | None | False | 18427.5 | 0 | 4052727 | 157306 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32) | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) 50 Sqmm, 3.5 Core, (16 GI Strips - 4 x 0.8 mm) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 187921.65 | 187921.65 | 0.03 | False | None | None | False | None | False | 5637.6495 | 0 | 4052728 | 157306 | None | ESCOM SR 2023-24 (CDS-19) | Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365) a) Earth work excavation for pipeline trenches in all kinds of soils by mechanical
means as per drawing and technical specifications, including setting out,
construction of shoring, strutting, barricading, caution lights, bracing, using
sight rails & bonding rods at every 100 mm wherever necessary as directed,
removal of stumps and other deleterious matter, dressing of sides and levelling
the bottom of trench to the extent required , utilising the available excavated
earth locally for the work etc., and all other appurtenances complete in the
following strata. All kinds of soils. Depth upto 1.50 m(Extracted from Vol-1, PWD SR Sl No. 1.17.1) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 275.1 | 275.1 | 18.0 | False | None | None | False | None | False | 4951.8 | 0 | 4052729 | 157306 | None | ESCOM SR 2023-24 (CDS-19) | Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365) c)Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications
(Extracted from Vol-1, PWD SR Sl No. 1.10) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 168.0 | 168.0 | 18.0 | False | None | None | False | None | False | 3024.0 | 0 | 4052730 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.06 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 35 to 95 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 32695.95 | 32695.95 | 0.03 | False | None | None | False | None | False | 980.8785 | 0 | 4052731 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:507 Item No.:63.04 | Supplying of Brass Cable Gland as per BESCOM specification (BESCOM SR Page:458) 45 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 206.85 | 206.85 | 2.0 | False | None | None | False | None | False | 413.7 | 0 | 4052732 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:457 Item No.:59.01 | Supplying of Heavy Duty Copper Terminal Long Barrel (Lug) as per BESCOM specification (Page : 456) 25 Sqmm Copper Terminal, Apprx Wt: 11 Gm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 28.35 | 28.35 | 2.0 | False | None | None | False | None | False | 56.7 | 0 | 4052733 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:457 Item No.:59.03 | Supplying of Heavy Duty Copper Terminal Long Barrel (Lug) as per BESCOM specification (Page : 456) 50 Sqmm Copper Terminal, Apprx Wt: 26 Gm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 60.9 | 60.9 | 6.0 | False | None | None | False | None | False | 365.4 | 0 | 4052734 | 157306 | None | ELECTRICAL 4.2.8 | Fabricating, supplying and erection of ... ms long hot dip Galvanized Octagonal hot dip Pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/s for .......m Pole in single section and single joint welded as per IS 9595/IS10178AWS having dimensions bottom ..... mm , top.... mm with 3 mm thick, suitable base plate and 4Nos of ..... long J bolts along with template and the Pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended. 10 m - Top 70 mm and Bottom 175 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 22575.0 | 22575.0 | 10.0 | False | None | None | False | None | False | 225750.0 | 0 | 4052735 | 157306 | None | ELECTRICAL 4.6.3 | Supplying, and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. Single Arm Bracket with 2000 mm Standard 40/50 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2730.0 | 2730.0 | 10.0 | False | None | None | False | None | False | 27300.0 | 0 | 4052736 | 157306 | None | ELECTRICAL 5.43.1 | Supply and Installation / Fixing / Provision of Pole box with HRC Fuse / MCB provision and suitable connector / terminal for 3 Ph/ 1 Ph connections with Loop-In & Loop- Out terminals for 10 mm2 /25 mm2 3.5 C AI/Ar/Cu/Ar Cable and branch out 2.5 mm2 2 core AI/Cu PVC Insulated cable, enclosed in a Thermoplastic, Polystyrene enclosure, which should be shock proof, safe, IP65(Weather Proof), rust proof, dust proof, water proof having Internally Embedded Gasket with provision for cable entry through IP65 Thermoplastic, polyamide glands and/or grommets. 200 mm x 200 mm x 98 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2415.0 | 2415.0 | 10.0 | False | None | None | False | None | False | 24150.0 | 0 | 4052737 | 157306 | None | ELECTRICAL 11.8.4 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT more than 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire more than IK08. Power Factor more than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency more than 1301m/w, nominal CRI more than 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. (Make : Philips / Bajaj / Havells / Panasonic / Syska) LED Streetlight 90 W ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 9303.0 | 9303.0 | 10.0 | False | None | None | False | None | False | 93030.0 | 0 | 4052738 | 157306 | None | ELECTRICAL 13.5 | Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 170.1 | 170.1 | 10.0 | False | None | None | False | None | False | 1701.0 | 0 | 4052739 | 157306 | None | ELECTRICAL 5.40.1 | Supplying ......... A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 2588.25 | 2588.25 | 5.0 | False | None | None | False | None | False | 12941.25 | 0 | 4052740 | 157306 | None | ELECTRICAL 1.1.4 | Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. (Make : VIP / Nandi / VI plast) 40 mm dia 2.5 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 156.45 | 156.45 | 120.0 | False | None | None | False | None | False | 18774.0 | 0 | 4052741 | 157306 | None | ELECTRICAL 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells / Finolex / Anchor / Polycab / V-Gaurd) 4 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 66.15 | 66.15 | 25.0 | False | None | None | False | None | False | 1653.75 | 0 | 4052742 | 157306 | None | ELECTRICAL 2.5.8 | Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990 (Make :V-Gaurd / Universal / Polycab / Finolex) 3C x 2.5 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 118.65 | 118.65 | 120.0 | False | None | None | False | None | False | 14238.0 | 0 | 4052743 | 157306 | None | ELECTRICAL 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make : ABB / Indo Asian / Havells / Schinder ) 6-32 A DP ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 775.95 | 775.95 | 10.0 | False | None | None | False | None | False | 7759.5 | 0 | 4052744 | 157306 | None | ELECTRICAL 5.42.1 | Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 14 SWG ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.53 | 0.53 | 25000.0 | False | None | None | False | None | False | 13250.0 | 0 | 4052745 | 157306 | None | ELECTRICAL 5.47 | Supplying and fixing Microprocessor based Electronic timer (without contactor, Din Mounting using necessary bolts, nuts and washers etc.,.) 3-120sec setting. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2430.75 | 2430.75 | 1.0 | False | None | None | False | None | False | 2430.75 | 0 | 4052746 | 157306 | None | ELECTRICAL 5.14.5 | Supply and fixing of 4pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 65 A ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 10648.05 | 10648.05 | 1.0 | False | None | None | False | None | False | 10648.05 | 0 | 4052747 | 157306 | None | ELECTRICAL 5.7.3 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 63 A ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 421.05 | 421.05 | 6.0 | False | None | None | False | None | False | 2526.3 | 0 | 4052748 | 157306 | None | ELECTRICAL 5.15.11 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. (Make : ABB / Indo Asian / Havells / Schinder ) 160 A 25 kA-FOUR Pole ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 14119.35 | 14119.35 | 1.0 | False | None | None | False | None | False | 14119.35 | 0 | 4052749 | 157306 | None | ELECTRICAL 5.15.1 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. (Make : ABB / Indo Asian / Havells / Schinder ) 100 A 25 kA - THREE Pole ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 6390.3 | 6390.3 | 4.0 | False | None | None | False | None | False | 25561.2 | 0 | 4052750 | 157306 | None | ELECTRICAL 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 540.75 | 540.75 | 6.0 | False | None | None | False | None | False | 3244.5 | 0 | 4052751 | 157306 | None | ELECTRICAL 3.9 | Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N. F. screws. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.37 | 0.37 | 16000.0 | False | None | None | False | None | False | 5920.0 | 0 | 4052752 | 157306 | None | Vol 1 Page No.:5 Item No.: 1.4 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (Page:78) In all kinds of soils Depth upto 1.5 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 254.1 | 254.1 | 66.0 | False | None | None | False | None | False | 16770.6 | 0 | 4052753 | 157306 | None | Vol 1 Page No.:18 Item No.: 2.11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Page : 91) Buildings ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 93929.85 | 93929.85 | 0.27 | False | None | None | False | None | False | 25361.0595 | 0 | 4052754 | 157306 | None | Vol 1 Page No.:15 Item No.: 2.1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Page. : 88) Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6288.45 | 6288.45 | 0.36 | False | None | None | False | None | False | 2263.842 | 0 | 4052755 | 157306 | None | Vol 1 Page No.:15 Item No.: 2.2.1.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (Page. : 88) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6601.35 | 6601.35 | 10.0 | False | None | None | False | None | False | 66013.5 | 0 | 4052756 | 157306 | None | BWSSB SR 2023-24 Page - 113 Sl.No.:10.1 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: (Page:164) PVC pipes 63mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 169.05 | 169.05 | 150.0 | False | None | None | False | None | False | 25357.5 | 0 | 4052757 | 157306 | None | BWSSB SR 2023-24 Page - 127 Sl.No.:11.1 | Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete. (Page : 178) Light Duty GI pipe of 40mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 432.6 | 432.6 | 10.0 | False | None | None | False | None | False | 4326.0 | 0 | 4052758 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:469 Item No.:60.01) | Supplying of Aluminium End Terminal (Lug) as per BESCOM specification (Page : 457) 16 sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2.1 | 2.1 | 16.0 | False | None | None | False | None | False | 33.6 | 0 | 4052759 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:249 Item No.:35.01) | Making and fixing of Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable as per BESCOM specification (BESCOM SR Page : 445) Up to 4C x 50 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Set | 340.2 | 340.2 | 6.0 | False | None | None | False | None | False | 2041.2 | 0 | 4052760 | 157306 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32.05 | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 148934.1 | 148934.1 | 0.02 | False | None | None | False | None | False | 2978.682 | 0 | 4052761 | 157306 | None | ESCOM SR 2023-24 (CDS-19) | Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365) a) Earth work excavation for pipeline trenches in all kinds of soils by mechanical
means as per drawing and technical specifications, including setting out,
construction of shoring, strutting, barricading, caution lights, bracing, using
sight rails & bonding rods at every 100 mm wherever necessary as directed,
removal of stumps and other deleterious matter, dressing of sides and levelling
the bottom of trench to the extent required , utilising the available excavated
earth locally for the work etc., and all other appurtenances complete in the
following strata. All kinds of soils. Depth upto 1.50 m(Extracted from Vol-1, PWD SR Sl No. 1.17.1) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 275.1 | 275.1 | 12.0 | False | None | None | False | None | False | 3301.2 | 0 | 4052762 | 157306 | None | ESCOM SR 2023-24 (CDS-19) | Labour charges for Laying of XLPE UG Cable Using Conventional Laying with Excavation of Soil (Page : 365) c)Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications
(Extracted from Vol-1, PWD SR Sl No. 1.10) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 168.0 | 168.0 | 12.0 | False | None | None | False | None | False | 2016.0 | 0 | 4052763 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.05) | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 21930.3 | 21930.3 | 0.02 | False | None | None | False | None | False | 438.606 | 0 | 4052764 | 157306 | None | ESCOM SR 2023-24 (CDS-1) | Supplying & Fixing of Spiral Earth Electrode as per BESCOM Specification. (Page : 347) (239+93) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 348.6 | 348.6 | 10.0 | False | None | None | False | None | False | 3486.0 | 0 | 4052765 | 157306 | None | ELECTRICAL 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 3685.5 | 3685.5 | 2.0 | False | None | None | False | None | False | 7371.0 | 0 | 4052766 | 157306 | None | ESCOM SR 2023-24 (Sl.No.:60 Item No.:8.02 | Supplying of Guy Wire & GI Wire as per BESCOM Specification. (Page-435-436) 8 SWG GI Wire(4.064 mm Dia), Std Wt: 131 Kg/KM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | MT | 78792.0 | 78792.0 | 0.01 | False | None | None | False | None | False | 787.92 | 0 | 4052767 | 157306 | None | ELECTRICAL 8.11.1 | Supplying & Fixing of ... ms Cat 6 Patch Cable (Make : D-Link / Poycab / Finolex) 1 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 235.2 | 235.2 | 8.0 | False | None | None | False | None | False | 1881.6 | 0 | 4052768 | 157306 | None | ELECTRICAL 8.1 | Supplying and drawing UTP-CAT 6E LAN cable. (Make : D-Link / Poycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 39.9 | 39.9 | 500.0 | False | None | None | False | None | False | 19950.0 | 0 | 4052769 | 157306 | None | ELECTRICAL 8.10.1 | Supplying & fixing of I/O socket with back box (Make : Cisco / D-Link / TP - Link / Hewlett Packard) Single I/O ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 514.5 | 514.5 | 10.0 | False | None | None | False | None | False | 5145.0 | 0 | 4052770 | 157306 | None | ELECTRICAL 8.4.3 | Supplying & Fixing of switch mounting rack with power manager & Cable manager. (Make : D-Link / TP - Link) 9U with 450mm depth ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 8899.8 | 8899.8 | 1.0 | False | None | None | False | None | False | 8899.8 | 0 | 4052771 | 157306 | None | ELECTRICAL 8.5 | Supplying & Fixing of Power strip ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1529.85 | 1529.85 | 1.0 | False | None | None | False | None | False | 1529.85 | 0 | 4052772 | 157306 | None | ELECTRICAL 1.2.2 | Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Make : VIP / Nandi / VI plast) 25 mm dia 2 mm thick ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 81.9 | 81.9 | 550.0 | False | None | None | False | None | False | 45045.0 | 0 | 4052773 | 157306 | None | ELECTRICAL 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 6A One Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 107.1 | 107.1 | 3.0 | False | None | None | False | None | False | 321.3 | 0 | 4052774 | 157306 | None | ELECTRICAL 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 6A Three Way socket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 179.55 | 179.55 | 3.0 | False | None | None | False | None | False | 538.65 | 0 | 4052775 | 157306 | None | ELECTRICAL 3.6.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 16A One Way Switch ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 189.0 | 189.0 | 2.0 | False | None | None | False | None | False | 378.0 | 0 | 4052776 | 157306 | None | ELECTRICAL 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona ) 6/16A Universal Socket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 247.8 | 247.8 | 2.0 | False | None | None | False | None | False | 495.6 | 0 | 4052777 | 157306 | None | ELECTRICAL 2.3.1 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells / Finolex / Anchor / Polycab / V-Gaurd) 1 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 19.95 | 19.95 | 30.0 | False | None | None | False | None | False | 598.5 | 0 | 4052778 | 157306 | None | ELECTRICAL 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells / Finolex / Anchor / Polycab / V-Gaurd) 4 mm2 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 66.15 | 66.15 | 50.0 | False | None | None | False | None | False | 3307.5 | 0 | 4052779 | 157306 | None | ELECTRICAL 9.3.1 | Supplying, erecting, testing & commissioning of ON-LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with isolation transformer all accessories complete and Excluding batteries and wiring complete. (Make : Microtek / Luminous / V-GUARD / Exide) 1 kVA ON LINE UPS ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 24830.4 | 24830.4 | 1.0 | False | None | None | False | None | False | 24830.4 | 0 | 4052780 | 157306 | None | ELECTRICAL 6.22 | Extra for Fabrication supply and fixing of Stand fabricated using slotted angle /L angle of size 6mm x 50mm for mounting out door/indoor A.C. unit/ Batteries. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5047.35 | 5047.35 | 1.0 | False | None | None | False | None | False | 5047.35 | 0 | 4052781 | 157306 | None | ELECTRICAL 9.5.6 | Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries. (Make : Luminous / Exide / Amaron) 75/80 AH capacity ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 10680.6 | 10680.6 | 6.0 | False | None | None | False | None | False | 64083.6 | 0 | 4052782 | 157306 | None | AQRate | Supplying, installing, wiring and commissioning of Network Video Recorder (NVR) with the following features: NVR should support IP fixed/PTZ Camera, Alluminium Housing construction, Number of Video Input Channels-8, Number of Non-IP based Video input Channels for HVR-8, Number of IP based Video input Channels for HVR-8, Number of Video Output Channels-2, Recording Resolution- (1280 x 720)HD.Time for Replacement of Defective Product During Warranty Period-96 hour. with Warranty-2. (HIKVISION/ Equivalent) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 25250.0 | 25250.0 | 1.0 | False | None | None | False | None | False | 25250.0 | 0 | 4052783 | 157306 | None | AQRate | Supplying, installing, wiring and commissioning of IP 2 Megapixel Indoor fixed IP DOME CAMERA housed in platic body, 0.34" CMOS image sensor, 1920x1080 full HD resolution, capable to operated on Day/Night with minimum 0.1Lux illimination with 30M range, 3.6-9mm focal length, 25-30fps dual compressed stream. 72Hr replamcent within 1 year Waranty 1 year with 72Hr complete.(HIKVISION/ Equivalent) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 10000.0 | 10000.0 | 4.0 | False | None | None | False | None | False | 40000.0 | 0 | 4052784 | 157306 | None | AQRate | Supplying, installing, wiring and commissioning of IP 2 Megapixel IP BULLET CAMERA housed in alluminium body, 1inch size CCD Image Sensor, 1inch, D1 (704 x 480 Pixel) ,HD (1280 x 720 Pixel) ,Full HD (1920 x 1080 Pixel) ,4K HD (3840 X 2160 Pixel) day/night resolution, 50 Mtr IR illumination range at 0.01lux level, 25-60 fps frame rate with dual compressed stream video, replacement within 24hrs in 2yers warranty period complete. (HIKVISION/Equivalent) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 11500.0 | 11500.0 | 4.0 | False | None | None | False | None | False | 46000.0 | 0 | 4052785 | 157306 | None | AQRate | Supplying, installing, wiring and commissioning of HARD DISC Type of Drive-SAS. Capacity of Drive-1TB, Rotational Speed (7200rpm) Interface Type Synchronous Transfer Rate (Maximum-1011mbps) Warranty-1Year, (TOSHIBA/ Equivalent) Unit 1 TB ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 4500.0 | 4500.0 | 4.0 | False | None | None | False | None | False | 18000.0 | 0 | 4052786 | 157306 | None | AQRate | Supplying connecting HDMI CABLE as per TEC Specification G/WIR06/02 (3mtr) complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Per Mtr | 3800.0 | 3800.0 | 4.0 | False | None | None | False | None | False | 15200.0 | 0 | 4052787 | 157306 | None | AQRate | Supplying, installing, testing and commissioning of 32'' MONITOR.81-82cm Screen Size (Diagonal), LED Backlit Technology, 1920 x 1080 Full HD Resolution (Pixels), 300nits Brightness. (DELL/SAMSUNG/ equivalent) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 36000.0 | 36000.0 | 1.0 | False | None | None | False | None | False | 36000.0 | 0 | 4052788 | 157306 | None | AQRate | Supplying fixing of Power on Ethernet (PoE) un Managed Switch, 1No. of 1 G SFP Port (Uplink), Multi-Gigabit Support with Redundant Power supply, 1.8Gbps switching capacity-non blocking, 1.34 Throughput MPPS, Duly certified by IPv6 Ready from day one, 63W power consumption ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 15000.0 | 15000.0 | 1.0 | False | None | None | False | None | False | 15000.0 | 0 |
|
|
---|